air barrier construction design details

14
Drawing Number(s) a) roof/wall 2-14 AB b) wall/foundation 1-04A-AB, 2-04 AB, 2-07 AB c) window/wall 2-09 AB, 2-11 AB d) expansion joint 1-02-AB e) change in plane 2-10 AB, 2-12 AB f) change in substrate 1-03-AB g) penetrations 2-01 AB, 2-13 AB h) inter-story connections and deflection joints 2-15 AB i) substrate joints and defects 2-15 AB

Upload: haquynh

Post on 08-Dec-2016

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Air Barrier Construction Design Details

Drawing Number(s)

a) roof/wall 2-14 AB

b) wall/foundation 1-04A-AB, 2-04 AB, 2-07 AB

c) window/wall 2-09 AB, 2-11 AB

d) expansion joint 1-02-AB

e) change in plane 2-10 AB, 2-12 AB

f) change in substrate 1-03-AB

g) penetrations 2-01 AB, 2-13 AB

h) inter-story connections and deflection joints 2-15 AB

i) substrate joints and defects 2-15 AB

Page 2: Air Barrier Construction Design Details

Masonry CavityWall Insulation

Masonry Cavity Wall Control Joint

These details are intended for use by design professionals and users of NCFI productsand systems to assist in developing project specific details. They should be modifiedwhere necessary to accommodate specific project conditions. Final details andspecifiations must be approved by a licensed professional.

Dwg. # 1-02-AB

10-5-10N.T.S.

LIMIT OF HORIZONTALMASONRY REINFORCEMENT

BRICK

CMU

CONTROL JOINT CONFIGUREDAS SPECIFIED BY OTHERS

LIMIT OF HORIZONTALMASONRY REINFORCEMENT

BRICK

CMU

SPRAY-APPLIED

FOAM INSULATIONPOLYURETHANE

TRANSITION MEMBRANEADHERED 3" MIN. ON

BOTH SIDES OFCONTROL JOINT

Page 3: Air Barrier Construction Design Details

Masonry CavityWall Insulation

Masonry Cavity Wall Column Joint

These details are intended for use by design professionals and users of NCFI productsand systems to assist in developing project specific details. They should be modifiedwhere necessary to accommodate specific project conditions. Final details andspecifiations must be approved by a licensed professional.

Dwg. # 1-03-AB

10-5-10N.T.S.

STEEL COLUMN

SPRAY-APPLIEDPOLYURETHANE FOAMINSULATION

MASONRY ANCHORS (TYPICAL)

CMU CMU

TRANSITION MEMBRANEADHERED 3" MIN. ONBOTH SIDES OF CMU FACE

Page 4: Air Barrier Construction Design Details

Masonry CavityWall Insulation

Masonry Cavity Wall Section at Footer

These details are intended for use by design professionals and users of NCFI productsand systems to assist in developing project specific details. They should be modifiedwhere necessary to accommodate specific project conditions. Final details andspecifiations must be approved by a licensed professional.

Dwg. # 1-04A-AB

10-5-10N.T.S.

MASONRY ANCHORS

BRICK FACINGCMU

MORTAR FILL

SPRAY-APPLIEDPOLYURETHANE FOAMINSULATION

CONTINUOUS THRU-WALL, PEEL and STICKFLASHING w/ WEEPVENTS

TRANSITION MEMBRANE

Page 5: Air Barrier Construction Design Details
Page 6: Air Barrier Construction Design Details
Page 7: Air Barrier Construction Design Details
Page 8: Air Barrier Construction Design Details
Page 9: Air Barrier Construction Design Details
Page 10: Air Barrier Construction Design Details
Page 11: Air Barrier Construction Design Details
Page 12: Air Barrier Construction Design Details
Page 13: Air Barrier Construction Design Details
Page 14: Air Barrier Construction Design Details