Agneya Carbon Ventures agneya
Page 1 of 7
List of Projects1 undertaken by Agneya Carbon Ventures
S.No. Project Area
Client Name Project Details Project Impact
1 Renewable Energy Regulations
Maharashtra
Electricity Regulatory Commission (MERC)
Name: Assisting the honourable Commission in amendment of MERC RE Tariff Regulation 2010. Details: Agneya has been given a mandate to assess the impact of MNRE circular removing minimum WPD criterion for wind power projects development. This change is a result of technological advancement in Wind Energy making less windy sites commercially exploitable. Duration:2.5 months
The project outcome is expected to have impact on - Eligibility criteria applied to wind power
projects for tariff - Wind zone definitions n Maharashtra - Tariff determination for relevant wind
zones - Operationalization of regulations
including Hub height criteria
2 Techno-Commercial-Financial Feasibility Analysis for Wind Energy Projects
Surana Corporation
Limited
Name: Assessment and due diligence of wind energy project sites in Tamil Nadu and Maharashtra Details: Agneya team carried out the detailed techno-commercial and financial feasibility of the wind energy project, technical suitability of the site, analysis of options for commercialization of energy – including third party sale and RECs and recommend most appropriate option to the client. Duration:0.5 months
Our analysis helped client make a decision on choosing the most feasible wind energy project sites that will maximize financial returns and minimize the risk to the project from various factors.
1This list is a snapshot of various projects and assignments Agneya Carbon Ventures has undertaken since its inception. Significant and prominent projects are featured here.
Agneya Carbon Ventures agneya
Page 2 of 7
S.No. Project Area
Client Name Project Details Project Impact
3 Preparation of Detailed Project Report for proposed investment in Renewable Energy
Surana Corporation
Limited
Name: Preparation of DPR for setting up wind energy project of capacity 25 MW Details: Agneya prepared DPR considering the mapping of available wind project sites across five states, comparison of all the sites on parameters like financial returns, commercial benefits, technical risk, developer, regulatory outlook etc Duration: 0.5 months
DPR helped client to narrow down on available choices for wind energy project development. Eventually the analysis and recommendation helped Client in choosing the best site for setting up their wind energy project.
4 Preparation of Detailed Project Report for proposed investment in Renewable Energy
Siddhivinayak Developers
Name: Preparation of DPR for setting up wind energy project Details: Agneya team assessed the wind energy potential of available site with effective liaisoning with C-WET and other competent bodies. Further we prepared DPR considering the wind energy potential available and assessed the site on parameters like – financial returns, commercial benefits, technical risk, developer, regulatory outlook etc. Duration:5 months
The outcome of the project was - Wind potential assessment of available
site and micro-siting - Recommendation on the suitable
techno-commercial and financial model to maximize returns from investment.
Agneya Carbon Ventures agneya
Page 3 of 7
S.No. Project Area
Client Name Project Details Project Impact
5 Renewable Energy Certificates
Surana Corporation
Limited
Name: Comprehensive REC services for 10 MW of wind energy project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC, issuance of RECs and REC trading. Agneya also managed the Generation Based Incentives – procedures and modalities for the Client. Duration:5 months
The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs and preparation of
REC issuance management framework - Trading of RECs
6 Renewable Energy Certificates
Nava Bharat
Ventures Limited
Name: Comprehensive REC services for 3 MW of co-generation project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC and issuance of RECs Duration:6 months
The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs
7 Renewable Energy Certificates
SRS Ispat
Name: Comprehensive REC services for 1 MW of wind energy project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC and issuance of RECs Duration:6 months
The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs
Agneya Carbon Ventures agneya
Page 4 of 7
S.No. Project Area
Client Name Project Details Project Impact
8 Renewable Energy Certificates
Mirra & Mirra
Industries
Name: Comprehensive REC services for 1.75 MW of wind energy project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC and issuance of RECs Duration:6 months
The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs
9 Renewable Energy Certificates
MM Forgings
Name: Comprehensive REC services for 4.5 MW of wind energy project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC, issuance of RECs and REC trading Duration:6 months
The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs - Trading of RECs
10 Assessment of Renewable Purchase Obligation
BMM Inspat Limited
Name: Addressing Renewable Energy Purchase Obligation for BMM Ispat Ltd. Details: The project involved comprehensive analysis of current and future energy profile of BMM Ispat, given their conventional generation capacity and future growth plan. Analysis was carried to assess the total RPO liability for BMM and RE/REC based options to address it. Duration:5 months
Our analysis helped BMM to understand their current and future energy profile and find opportunities for energy efficiency gains. RPO analysis on technical and financial parameters provided them with multiple options to meet RPO – through captive consumption of RE, third party sourcing of RE and RECs procurement.
Agneya Carbon Ventures agneya
Page 5 of 7
S.No. Project Area
Client Name Project Details Project Impact
11 Assessment of Renewable Purchase Obligation
Nava Bharat
Ventures Limited
Name: Addressing Renewable Energy Purchase Obligation for NBV Steel division Details: The project involved comprehensive analysis to assess the total RPO for NBV’s steel division and various options to address it. Duration: 0.5 months
Our analysis helped NBV to understand the RPO liability arising out of their captive power plants supplying to Ferro Alloys Division. Separate sugestions were made to top management to address the RPO in short term and medium term.
12 Carbon Disclosure and Reporting (CDP)
GVK Power & Infrastructure Ltd
(GVKPIL)
Name: Preparation of response for CDP on behalf of GVK Power & Infrastructure Ltd Details: Agneya worked with core team to develop GHG Inventory of all group companies of GVKPIL, assessment of climate change related business risks and opportunities and preparation and filing of response to CDP Duration: 1.5 months
The project outcome was - GVKPIL was ranked 8th among top 200
Indian companies in Carbon Disclosure Leadership Index (CDLI) by CDP
- GVKPIL filed the response to CDP for the first time
- GHG inventory of whole GVKPIL was accounted for 1st time
- CDP report was prepared and distributed to all stakeholders
Agneya Carbon Ventures agneya
Page 6 of 7
S.No. Project Area
Client Name Project Details Project Impact
13 Carbon Management System
Mumbai International
Airport Pvt. Ltd.
Name: Design, develop and implementation of Carbon Accounting and Management System conforming to ISO 14064-1 at Chhatrapati Shivaji International Airport Details: Agneya developed comprehensive management system to account, report, monitor and manage carbon footprint of Chhatrapati Shivaji International Airport (CSIA). The management system was developed in conformance with international standard ISO 14064-1 Duration: 6.5 months
The project outcome was - Chhatrapati Shivaji International Airport
became the 1st airport in India and 2nd in Asia to account its Carbon Footprint according to ISO 14064-1
- It carried out successful verification audit of its carbon footprint by 3rd party
- It helped CSIA meet regulatory norms set by DGCA
- Agneya developed and implemented web based software tool to measure and monitor carbon footprint
14 Sustainability Management Systems
Mumbai International
Airport Pvt. Ltd.
Name: Design, develop and implement Sustainability Management Framework conforming to GRI protocol and Sustainability Reporting Details: Agneya developed comprehensive management framework to manage sustainability issues pertaining to operations of Chhatrapati Shivaji International Airport (CSIA). Agneya is also developing CSIA’s first Sustainability Development Report (SDR) which is being published along with Annual Report Duration: 7 months
The project outcome was - All the employees of CSIA got
sensitized with sustainability issues and their impact on business
- All department of CSIA now have sustainability agenda and framework to manage the business growth sustainability
- Key sustainability parameters are identified and tracked
Agneya Carbon Ventures agneya
Page 7 of 7
S.No. Project Area
Client Name Project Details Project Impact
15 Carbon Management System
GMR Hyderabad
International Airport Limited
Name: Design, develop and implement Carbon Accounting and Management System conforming to ISO 14064-1 at Rajiv Gandhi Airport Details: Agneya developed comprehensive management system to account, report, monitor and manage carbon footprint of Rajiv Gandhi International Airport (RGIA). The management system was developed in conformance with international standard ISO 14064-1 Duration: 2 months
The project outcome was - Rajiv Gandhi International Airport
became the 2nd airport in India and 3rd in Asia to account its Carbon Footprint according to ISO 14064-1
- It carried out successful verification audit of its carbon footprint by 3rd party
- It helped RGIA meet regulatory norms set by DGCA
16 Carbon Management System
Farm Equipment
Sector (FES) Division Mahindra & Mahindra
Name: Design, develop and implementation of Carbon Accounting and Management framework at Kandivali Plant of FES division Details: Agneya developed comprehensive management framework, tool and documents to manage carbon footprint of plant. Duration: 2 months
- Core team members of the plant are capable of managing carbon footprint by themselves
- Various tools and procedures implemented at plant have successfully demonstrated carbon management in practice
17 Carbon Management System
Surana Industries
Limited
Name: Assessment of Carbon Footprint of Steel division of SIL Details: Agneya accounted the carbon footprint of steel division, analysis of risks and opportunities due to climate change and assessment of carbon footprint reduction options Duration: 1.5 months
The project led to - Carbon footprint of steel division - Carbon intensity analysis showed need
for energy efficiency initiatives at plant - Risks and opportunities, RPO