List of Projects1 undertaken by Agneya Carbon Ventures

S.No. Project Area

Client Name Project Details Project Impact

1 Renewable Energy Regulations

Maharashtra

Electricity Regulatory Commission (MERC)

Name: Assisting the honourable Commission in amendment of MERC RE Tariff Regulation 2010. Details: Agneya has been given a mandate to assess the impact of MNRE circular removing minimum WPD criterion for wind power projects development. This change is a result of technological advancement in Wind Energy making less windy sites commercially exploitable. Duration:2.5 months

The project outcome is expected to have impact on - Eligibility criteria applied to wind power

projects for tariff - Wind zone definitions n Maharashtra - Tariff determination for relevant wind

zones - Operationalization of regulations

including Hub height criteria

2 Techno-Commercial-Financial Feasibility Analysis for Wind Energy Projects

Surana Corporation

Limited

Name: Assessment and due diligence of wind energy project sites in Tamil Nadu and Maharashtra Details: Agneya team carried out the detailed techno-commercial and financial feasibility of the wind energy project, technical suitability of the site, analysis of options for commercialization of energy – including third party sale and RECs and recommend most appropriate option to the client. Duration:0.5 months

Our analysis helped client make a decision on choosing the most feasible wind energy project sites that will maximize financial returns and minimize the risk to the project from various factors.

1This list is a snapshot of various projects and assignments Agneya Carbon Ventures has undertaken since its inception. Significant and prominent projects are featured here.

Page 2: Agneya Clientele

Agneya Carbon Ventures agneya

Page 2 of 7

S.No. Project Area

Client Name Project Details Project Impact

3 Preparation of Detailed Project Report for proposed investment in Renewable Energy

Surana Corporation

Limited

Name: Preparation of DPR for setting up wind energy project of capacity 25 MW Details: Agneya prepared DPR considering the mapping of available wind project sites across five states, comparison of all the sites on parameters like financial returns, commercial benefits, technical risk, developer, regulatory outlook etc Duration: 0.5 months

DPR helped client to narrow down on available choices for wind energy project development. Eventually the analysis and recommendation helped Client in choosing the best site for setting up their wind energy project.

4 Preparation of Detailed Project Report for proposed investment in Renewable Energy

Siddhivinayak Developers

Name: Preparation of DPR for setting up wind energy project Details: Agneya team assessed the wind energy potential of available site with effective liaisoning with C-WET and other competent bodies. Further we prepared DPR considering the wind energy potential available and assessed the site on parameters like – financial returns, commercial benefits, technical risk, developer, regulatory outlook etc. Duration:5 months

The outcome of the project was - Wind potential assessment of available

site and micro-siting - Recommendation on the suitable

techno-commercial and financial model to maximize returns from investment.

Page 3: Agneya Clientele

Agneya Carbon Ventures agneya

Page 3 of 7

S.No. Project Area

Client Name Project Details Project Impact

5 Renewable Energy Certificates

Surana Corporation

Limited

Name: Comprehensive REC services for 10 MW of wind energy project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC, issuance of RECs and REC trading. Agneya also managed the Generation Based Incentives – procedures and modalities for the Client. Duration:5 months

The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs and preparation of

REC issuance management framework - Trading of RECs

6 Renewable Energy Certificates

Nava Bharat

Ventures Limited

Name: Comprehensive REC services for 3 MW of co-generation project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC and issuance of RECs Duration:6 months

The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs

7 Renewable Energy Certificates

SRS Ispat

Name: Comprehensive REC services for 1 MW of wind energy project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC and issuance of RECs Duration:6 months

The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs

Page 4: Agneya Clientele

Agneya Carbon Ventures agneya

Page 4 of 7

S.No. Project Area

Client Name Project Details Project Impact

8 Renewable Energy Certificates

Mirra & Mirra

Industries

Name: Comprehensive REC services for 1.75 MW of wind energy project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC and issuance of RECs Duration:6 months

The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs

9 Renewable Energy Certificates

MM Forgings

Name: Comprehensive REC services for 4.5 MW of wind energy project Details: The project involved feasibility of project REC registration and issuance, project REC accreditation state nodal agency, project REC registration with NLDC, issuance of RECs and REC trading Duration:6 months

The project outcome was - Project accreditation - Project registration with NLDC - Issuance of RECs - Trading of RECs

10 Assessment of Renewable Purchase Obligation

BMM Inspat Limited

Name: Addressing Renewable Energy Purchase Obligation for BMM Ispat Ltd. Details: The project involved comprehensive analysis of current and future energy profile of BMM Ispat, given their conventional generation capacity and future growth plan. Analysis was carried to assess the total RPO liability for BMM and RE/REC based options to address it. Duration:5 months

Our analysis helped BMM to understand their current and future energy profile and find opportunities for energy efficiency gains. RPO analysis on technical and financial parameters provided them with multiple options to meet RPO – through captive consumption of RE, third party sourcing of RE and RECs procurement.

Page 5: Agneya Clientele

Agneya Carbon Ventures agneya

Page 5 of 7

S.No. Project Area

Client Name Project Details Project Impact

11 Assessment of Renewable Purchase Obligation

Nava Bharat

Ventures Limited

Name: Addressing Renewable Energy Purchase Obligation for NBV Steel division Details: The project involved comprehensive analysis to assess the total RPO for NBV’s steel division and various options to address it. Duration: 0.5 months

Our analysis helped NBV to understand the RPO liability arising out of their captive power plants supplying to Ferro Alloys Division. Separate sugestions were made to top management to address the RPO in short term and medium term.

12 Carbon Disclosure and Reporting (CDP)

GVK Power & Infrastructure Ltd

(GVKPIL)

Name: Preparation of response for CDP on behalf of GVK Power & Infrastructure Ltd Details: Agneya worked with core team to develop GHG Inventory of all group companies of GVKPIL, assessment of climate change related business risks and opportunities and preparation and filing of response to CDP Duration: 1.5 months

The project outcome was - GVKPIL was ranked 8th among top 200

Indian companies in Carbon Disclosure Leadership Index (CDLI) by CDP

- GVKPIL filed the response to CDP for the first time

- GHG inventory of whole GVKPIL was accounted for 1st time

- CDP report was prepared and distributed to all stakeholders

Page 6: Agneya Clientele

Agneya Carbon Ventures agneya

Page 6 of 7

S.No. Project Area

Client Name Project Details Project Impact

13 Carbon Management System

Mumbai International

Airport Pvt. Ltd.

Name: Design, develop and implementation of Carbon Accounting and Management System conforming to ISO 14064-1 at Chhatrapati Shivaji International Airport Details: Agneya developed comprehensive management system to account, report, monitor and manage carbon footprint of Chhatrapati Shivaji International Airport (CSIA). The management system was developed in conformance with international standard ISO 14064-1 Duration: 6.5 months

The project outcome was - Chhatrapati Shivaji International Airport

became the 1st airport in India and 2nd in Asia to account its Carbon Footprint according to ISO 14064-1

- It carried out successful verification audit of its carbon footprint by 3rd party

- It helped CSIA meet regulatory norms set by DGCA

- Agneya developed and implemented web based software tool to measure and monitor carbon footprint

14 Sustainability Management Systems

Mumbai International

Airport Pvt. Ltd.

Name: Design, develop and implement Sustainability Management Framework conforming to GRI protocol and Sustainability Reporting Details: Agneya developed comprehensive management framework to manage sustainability issues pertaining to operations of Chhatrapati Shivaji International Airport (CSIA). Agneya is also developing CSIA’s first Sustainability Development Report (SDR) which is being published along with Annual Report Duration: 7 months

The project outcome was - All the employees of CSIA got

sensitized with sustainability issues and their impact on business

- All department of CSIA now have sustainability agenda and framework to manage the business growth sustainability

- Key sustainability parameters are identified and tracked

Page 7: Agneya Clientele

Agneya Carbon Ventures agneya

Page 7 of 7

S.No. Project Area

Client Name Project Details Project Impact

15 Carbon Management System

GMR Hyderabad

International Airport Limited

Name: Design, develop and implement Carbon Accounting and Management System conforming to ISO 14064-1 at Rajiv Gandhi Airport Details: Agneya developed comprehensive management system to account, report, monitor and manage carbon footprint of Rajiv Gandhi International Airport (RGIA). The management system was developed in conformance with international standard ISO 14064-1 Duration: 2 months

The project outcome was - Rajiv Gandhi International Airport

became the 2nd airport in India and 3rd in Asia to account its Carbon Footprint according to ISO 14064-1

- It carried out successful verification audit of its carbon footprint by 3rd party

- It helped RGIA meet regulatory norms set by DGCA

16 Carbon Management System

Farm Equipment

Sector (FES) Division Mahindra & Mahindra

Name: Design, develop and implementation of Carbon Accounting and Management framework at Kandivali Plant of FES division Details: Agneya developed comprehensive management framework, tool and documents to manage carbon footprint of plant. Duration: 2 months

- Core team members of the plant are capable of managing carbon footprint by themselves

- Various tools and procedures implemented at plant have successfully demonstrated carbon management in practice

17 Carbon Management System

Surana Industries

Limited

Name: Assessment of Carbon Footprint of Steel division of SIL Details: Agneya accounted the carbon footprint of steel division, analysis of risks and opportunities due to climate change and assessment of carbon footprint reduction options Duration: 1.5 months

The project led to - Carbon footprint of steel division - Carbon intensity analysis showed need