agenda green mountain transit board of commissioners april ... · green mountain transit board of...

40
15 Industrial Parkway, Burlington, VT 05401 RideGMT.com 802-864-2282 Green Mountain Transit AGENDA Green Mountain Transit Board of Commissioners April 17 th 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401 The mission of GMT is to promote and operate safe, convenient, accessible, innovative, and sustainable public transportation services in northwest and central Vermont that reduce congestion and pollution, encourage transit oriented development, and enhance the quality of life for all. 7:30 a.m. 1. Open Meeting 7:31 a.m. 2. Adjustment of the Agenda 7:36 a.m. 3. Public Comment 7:40 a.m. 4. Consent Agenda* March 20 th , 2018 Board Meeting Minutes (pages 3-6) Check Register (pages 7-19) Finance/Grants/Capital Projects Report (pages 20-29) ADA and Broker Services Report (pages 30-31) Maintenance Report (page 32) Operations Report (page 33) Planning Report (page 34) Marketing and Public Affairs Report (page 35) IT Support, Administrative Support, Training and HR Report (page 36) 7:45 a.m. 5. Board Business Strategic Plan Board Elections 7:50 a.m. 6. NextGen Update 7:55 a.m. 7. Customer Service Survey Update (pages 37-40) 8:15 a.m. 8. Medicaid Discussion 8:25 a.m. 9. RouteMatch/RouteShout Update 8:45 a.m. 10. Audit RFP Update 1

Upload: others

Post on 25-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

15 Industrial Parkway, Burlington, VT 05401 RideGMT.com RideGMT.com802-864-2282

Green Mountain Transit

AGENDA Green Mountain Transit Board of Commissioners

April 17th 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

The mission of GMT is to promote and operate safe, convenient, accessible, innovative, and sustainable public transportation services in northwest and central Vermont that reduce congestion

and pollution, encourage transit oriented development, and enhance the quality of life for all.

7:30 a.m. 1. Open Meeting

7:31 a.m. 2. Adjustment of the Agenda

7:36 a.m. 3. Public Comment

7:40 a.m. 4. Consent Agenda* • March 20th, 2018 Board Meeting Minutes (pages 3-6)• Check Register (pages 7-19) • Finance/Grants/Capital Projects Report (pages 20-29)• ADA and Broker Services Report (pages 30-31)• Maintenance Report (page 32)• Operations Report (page 33)• Planning Report (page 34)• Marketing and Public Affairs Report (page 35)• IT Support, Administrative Support, Training

and HR Report (page 36)

7:45 a.m. 5. Board Business • Strategic Plan• Board Elections

7:50 a.m. 6. NextGen Update

7:55 a.m. 7. Customer Service Survey Update (pages 37-40)

8:15 a.m. 8. Medicaid Discussion

8:25 a.m. 9. RouteMatch/RouteShout Update

8:45 a.m. 10. Audit RFP Update

1

Page 2: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

15 Industrial Parkway, Burlington, VT 05401 RideGMT.com RideGMT.com802-864-2282

Green Mountain Transit

8:50 a.m. 11. GM & Committee reports • General Manager Update• Finance Committee: Next scheduled meeting is May 8th @ 8 am.• Leadership Committee: Next scheduled meeting is May 10th @ 2:30 pm.• Operations Committee: Next scheduled meeting is May 7th, @ 9:30 am.• Strategy Committee: Next schedules meeting is May 7th @ 8:30 am.• Commissioner Comments and Announcements

9:05 a.m. 12. Rural Operators Negotiations (Possible Executive Session)

9:30 a.m. 13. Adjourn

Next GMT Board meeting date: May 17th, 2018 @ 7:30 am.

NOTES: * Indicates an action agenda item.• Persons with disabilities who require assistance or special

arrangements to participate in programs or activities are encouraged tocontact John Robinson at 802-540-1746 at least 48 hours in advanceso that proper arrangements can be made. Hearing disabled patronscan contact GMT through the Vermont Relay Service (711).

• Free transportation to and from GMT Board Meetings is availablewithin the GMT service area. To make advance arrangements, pleasecall GMT’s Customer Service Representatives at 802-864-2282.

• Municipal Clerks: Please post this public meeting notice pursuant toAct 78 of the Acts of the 1979 Vermont Legislature. Thank you.

2

Page 3: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3

Page 4: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

In the 2017 Audit Report, Commissioner Dimitruk, not Chair Kaynor, seconded the motion. Under the 2017 Audit Report, change 'asterisk' to 'finding'. Under Treasurer election, change 'every' to ·ever' in reference to Commissioner Dimitruk's work on the GMT Board of Commissioners. Under Jeffersonville Commuter, Chair Kaynor attended the Cambridge Town Meeting in Jeffersonville, not the Jeffersonville Town Meeting.

Commissioner Sharrow inquired about the $43,000 for disposal of soil in the Check Register. Mr. Sousa, General Manager, stated the $43,000 was for the last trips to dispose of soil; soil disposal is a work in progress.

Chair Kaynor stated the Planning Report included the GMT Urban Customer Service Rider Survey Results were well documented and provide good information. Chair Kaynor asked for a short presentation on the results and how they work with NextGen at the April 2018 GMT Board Meeting.

It was asked how faulty fare boxes are affecting revenue and ridership counts. Mr. Moore, Director of Maintenance and Planning stated that issues were experienced with mostly third party passes. Drivers continued to do manual passenger counts in both urban and rural areas, making for minor disruptions.

Commissioner Waninger asked if action was being taken to address the deficit. Ms. Daley, Director of Finance and Grants, stated that the maintenance of the aged fleet largely contributes to the deficit. In FY 19 twenty-nine vehicles reach their useful life and we only expect State funding for ten new vehicles. Commissioner Waninger seconded that, saying riders have recently expressed frustration with buses breaking down due to mechanical issues and the inconvenience associated with that. Commissioner Waninger appreciated Ms. Daley and Mr. Sousa proactively looking into this and would like to see how this tracks with NextGen recommendations.

Chair Kaynor entertained a motion to approve the Consent Agenda as amended, moved by Commissioner Spencer and seconded by Commissioner Pouech. Approved

5. Employee IntroductionsMr. Sousa introduced GMT's new Senior Transit Planner, Ms. Kennedy, to the Board of Commissioners.The Board of Commissioners welcomed Ms. Kennedy.

6. NextGen UpdateMr. Moore said Ms. Kennedy will lead the NextGen implementation process:

GMT met with representatives from St. Albans and Barre and held a public meeting in Barre.

The NextGen Advisory Committee; met last week. It was decided to restructure therecommendations into a three-phased approach: short term, expansion and aspirational. TheNextGen Advisory Committees' comments are due by March 21, 2018 and the next meeting isscheduled for April 10, 2018 to present the three-phased approach. Draft recommendations will bepresented to the GMT Board of Commissioners in May or June 2018.

7. Medicaid DiscussionLeadership at the Department of Vermont Health Access (DVHA) agreed to a meeting and is nowworking on a way to make transit aencies whole and find a way to support costs going forward.

8. Employee Survey Follow-up

Ms. Redalieu, Director of Human Resources, held feedback meetings in Burlington. Meetings in St.Albans and Berlin will be scheduled today. The largest takeaway so far is that communication hasvastly improved over the past year. Mr. Sousa has started conducting monthly Managers Meetingsto further foster communication.

4

Page 5: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Ms. Redalieu has looked into what has stunted the internal growth of Bloomfire at GMT: Bloomfire e­mails were frequent and overwhelming, often leading to employees unsubscribing. Ms. Redalieu will ask employees to re-subscribe and fewer, more thoughtful posts will be made.

Secretary Barton asked if any comments had come about regarding the GMT Board of Commissioners. Ms. Redalieu stated no, but we can possibly add a question in the next survey.

9. Town Meeting Day ResultsMr. Sousa stated that on Town Meeting Day, all towns passed funding three to one. Chair Kaynor stated that staff being at the Town Meetings really raised support. Commissioner Moore stated it is increasingly important to articulate intangibles when speaking with towns.

10. Audit RFP and Contract*Thirteen firms requested the scope of work and two firms submitted proposals: RHR Smith & Company and Sullivan, Powers & Company. Both firms are equally responsive and qualified, the difference was cost; it came down to contract price. The Finance Committee recommended awarding a five-year contract to RHR Smith & Company.

Vice Chair Chittenden expressed concerns regarding auditor rotation and this was echoed by many of the GMT Board members.

Secretary Barton made a motion to approve awarding the contract, on a yearly basis, to RHR Smith & Company, pending reference checks by Ms. Daley, seconded by Commissioner Sharrow. Approved

11. GM & Committee ReportsGeneral Manager UpdateMr. Sousa stated the Route Shout 2.0 data import glitches have been taken care of and bay signs are being finalized.

Mr. Sousa is waiting on a Montpelier Downtown Transit Center meeting date.

The name change legislation has passed the House on the TBill and moving to the Senate.

Rural operator contract negotiations begin in April for a contract start date of July l , 2018.

Finance CommitteeFinance Committee discussed the RFP and Medicaid processes.

Leadership CommitteeLeadership Committee primarily discussed the General Manager Evaluation.

Chair Kaynor provided a reminder that Officers of the Board are up for election, effective July 1, 2018. Please communicate interest to Chair Kaynor.

Operations CommitteeOperations Committee discussed on-time performance, GMT's aging fleet, and ridership. Next Operations Committee meeting is scheduled for April 16, 2018.

Strategy CommitteeStrategy Committee did not meet.

Commissioner Comments and Announcements

5

Page 6: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

6

Page 7: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Document  Date

Vendor  ID Vendor  Name Document  Number  Document  Amount  

2/26/18 V1467 Charles  Schwab V1467  2018  0226 16,982.17         Retirement2/26/18 V265 ICMA V265  2018  0226 1,417.62             Retirement2/26/18 V266 IRS  -­‐  EFTPS V266  2018  0226 85,308.40         Federal Taxes2/26/18 V364 Vermont  Dept  of  Taxes V364  2018  0226 11,025.92         State Payroll Taxes3/2/18 V1025 Alter,  Charles 84430 287.81                     Volunteer3/2/18 V1615 Anderson,  Amy 84431 153.76                     Volunteer3/2/18 V1412 Andrews,  Mary 84432 33.80                        3/2/18 V156 Anthony,  Peter 84433 579.44                     Volunteer3/2/18 V1601 Antillon,  Jill 84434 39.24                        3/2/18 V1607 Berry,  Steve 84435 832.91                     Volunteer3/2/18 V471 Constantine,  Julia 84436 602.33                     Volunteer3/2/18 V555 Ernst,  Richard 84437 17.44                        3/2/18 V1573 Fairbanks,  Dori 84438 137.91                     Volunteer3/2/18 V168 Fay,  Carol 84439 31.62                        3/2/18 V203 Ladd,  Joyce 84440 107.94                     Volunteer3/2/18 V205 LeBlanc,  Alice 84441 64.32                        3/2/18 V1397 McGinnis,  Devan 84442 178.26                     Volunteer3/2/18 V1594 McHugh,  Daniel 84443 249.09                     Volunteer3/2/18 V181 Owen,  Helen 84444 1,426.47             Volunteer3/2/18 V1604 Pecor,  Jessica 84445 68.68                        3/2/18 V209 Pelkey,  Linda 84446 30.52                        3/2/18 V1611 Russin,  Tina 84447 95.76                        3/2/18 V1478 Starbuck,  Pammella 84448 26.72                        3/2/18 V1614 Vermont  Ride  Network,  Inc. 84449 344.47                     Volunteer3/2/18 V1324 Wales,  David 84450 19.62                        3/2/18 V1595 Waller,  Marlys 84451 107.92                     Volunteer3/2/18 V1549 Ware,  Michael 84452 45.24                        3/2/18 V853 Wilson,  Thomas 84453 49.06                        3/2/18 V1566 Wisell,  David 84454 30.52                        3/2/18 V944 Woodward,  Patricia 84455 454.04                     Volunteer3/2/18 V1045 Mead,  Christopher 84456 68.00                        3/2/18 V1165 Posner,  Jordan 84457 50.85                        

3/2/18 V1541 Young,  Robert 84458 128.40                     Mileage and meal reimburse

3/2/18 V219 Aubuchon  C/O  Blue  Tarp  Financial,  Inc.

84459 251.57                    

3/2/18 V696 BANG 84460 760.48                    3/2/18 V1571 Bloomfire,  Inc. 84461 450.00                    

7

Page 8: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/2/18 V1481 Blue  Flame  Gas 84462 419.20                    

3/2/18 V225 Burlington  Electric  Department

84463 1,143.46             5 Electric Bills

3/2/18 V226 Burlington  Public  Works-­‐Water

84464 162.65                    

3/2/18 V1369 Capitol  City  Auto  Mart  Inc  dba

84465 136.45                    

3/2/18 V851 Champlain  Medical 84466 400.00                    3/2/18 V293 Charlebois,  R.R  Inc. 84467 2,190.00             2 Tow Bills3/2/18 V220 Class  C  Solutions  Group 84468 1,372.82             4 Part Invoices3/2/18 V374 Clear  Choice  Auto  Glass,  A 84469 260.00                    3/2/18 V600 Cody  Chevrolet 84470 1,886.37             10 Part Invoices3/2/18 V239 Cummins  Northeast  LLC 84471 3,437.72             2 Part Invoices3/2/18 V245 DRIVE 84472 42.00                        3/2/18 V246 Duffy  Waste  &  Recycling 84473 57.52                        3/2/18 V250 Fisher  Auto  Parts 84474 4,276.40             27 Part Invoices3/2/18 V501 Flag  Shop  of  Vermont 84475 113.00                    3/2/18 V252 FleetPride,  Inc 84476 953.22                    3/2/18 V257 Gillig  Corp. 84477 5,889.11             4 Part Invoices3/2/18 V259 Grainger 84478 1,136.88             2 Part Invoices

3/2/18 V260 Green  Mountain  Kenworth,  Inc.

84479 1,206.21             3 Part Invoice

3/2/18 V1509 Lawson  Products,  Inc 84480 373.90                    

3/2/18 V473 Limoge  &  Sons  Garage  Doors,  Inc.

84481 1,511.51             Repair

3/2/18 V702 Lincoln  National  Life  Insurance  Company,  The

84482 12,269.73         Insurance

3/2/18 V693 MacMan  Inc. 84483 20.88                        

3/2/18 V1475 Management  Safeguards  &  Associates,  LLC

84484 300.00                    

3/2/18 V275 McNeil  Leddy  &  Sheahan 84485 1,490.50             Legal Invoice3/2/18 V1419 Middlebury  Fence  Co.,  LLC 84486 680.00                    

3/2/18 V1599 Miller,  Holly  &  Bob  2017  Charitable  Lead  Trust

84487 1,872.72             Lease

3/2/18 V278 Mohawk  Mfg.  &  Supply  Co. 84488 638.09                    

3/2/18 V280 Mutual  of  Omaha  Insurance  Co.

84489 118.77                    

3/2/18 V792 Myers  Container  Service  Corp.

84490 119.66                    

3/2/18 V349 NOCO  Distribution  LLC 84491 885.12                    3/2/18 V950 Northern  ToyotaLift 84492 37.41                        

8

Page 9: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/2/18 V223 O'Reilly  Auto  Enterprises,  LLC

84493 54.26                        

3/2/18 V232 Petty  Cash 84494 92.14                        

3/2/18 V408 Pitney  Bowes  -­‐  Purchase  Power

84495 250.00                    

3/2/18 V296 Rouse  Tire  Sales 84496 3,690.75             5 Part Invoices3/2/18 V854 S2Technology 84497 36.25                        3/2/18 V297 Safety-­‐Kleen  Systems,  Inc. 84498 167.26                    3/2/18 V298 Sanel  Auto  Parts  Co. 84499 396.90                    3/2/18 V300 Seven  Days 84500 1,166.50             Job Recruitment Ad3/2/18 V757 Spear,  William 84501 300.00                    3/2/18 V186 Tech  Group,  The 84502 450.00                    

3/2/18 V734Thermo  King  Northeast/Dattco 84503 1,166.37             1 Part Invoice

3/2/18 V1030 UniFirst  Corporation 84504 412.87                    3/2/18 V315 United  Parcel  Service 84505 27.38                        3/2/18 V391 Verizon  Wireless 84506 2,705.30             4 It Invoices3/2/18 V336 W.B  Mason  Co.,  Inc. 84507 293.99                    3/2/18 V1080 Young,  Michael 84508 71.98                        3/2/18 V153 Alburgh  Taxi EFT000000012967 2,250.60             Volunteer3/2/18 V974 Baker,  Kristina EFT000000012968 94.85                        3/2/18 V55 Boudreau,  James EFT000000012969 768.64                     Volunteer3/2/18 V1007 Bova,  Wendy EFT000000012970 602.30                     Volunteer3/2/18 V1150 Bruley  SR,  Mark EFT000000012971 973.02                     Volunteer3/2/18 V548 Burnor,  David EFT000000012972 537.41                     Volunteer3/2/18 V1291 Callan,  Linda EFT000000012973 683.59                     Volunteer3/2/18 V60 Farr,  Delores EFT000000012974 355.93                     Volunteer3/2/18 V1586 Gross,  Robert EFT000000012975 438.75                     Volunteer3/2/18 V1117 Hall,  John EFT000000012976 356.44                     Volunteer3/2/18 V170 Hertz,  Kenneth EFT000000012977 460.57                     Volunteer3/2/18 V67 Jewett,  Sheryl EFT000000012978 207.13                     Volunteer3/2/18 V174 Langlois,  Paulette EFT000000012979 535.74                     Volunteer3/2/18 V1420 Lawyer,  Ronald EFT000000012980 308.55                     Volunteer3/2/18 V70 LeClair,  Raymond EFT000000012981 416.46                     Volunteer3/2/18 V71 Lightholder,  Stephen EFT000000012982 184.23                     Volunteer3/2/18 V74 Markham,  Laurel EFT000000012983 196.77                     Volunteer3/2/18 V75 Martin,  Ronald EFT000000012984 717.84                     Volunteer3/2/18 V1440 Menard,  Leighanne EFT000000012985 175.00                     Volunteer3/2/18 V1018 Metivier,  Shelli EFT000000012986 647.46                     Volunteer3/2/18 V1570 Murphy  Sandra EFT000000012987 273.62                     Volunteer

9

Page 10: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/2/18 V82 Parah,  Donna EFT000000012988 512.95                     Volunteer3/2/18 V83 Parah,  Maurice EFT000000012989 909.15                     Volunteer3/2/18 V86 Pike,  Gail EFT000000012990 969.28                     Volunteer3/2/18 V1605 Rinaldi,  Michelle EFT000000012991 140.08                     Volunteer3/2/18 V89 Sayers,  Gail EFT000000012992 630.60                     Volunteer3/2/18 V1236 Sayers,  James EFT000000012993 323.28                     Volunteer3/2/18 V93 Timm,  Marta EFT000000012994 881.91                     Volunteer3/2/18 V522 Turcotte,  S  Jeanette EFT000000012995 66.50                        3/2/18 V97 Yandow,  Dennis EFT000000012996 337.97                     Volunteer3/2/18 V59 Armstrong,  David EFT000000012997 25.00                        3/2/18 V11 Asper,  Sheryl EFT000000012998 229.98                     FSA and Vision3/2/18 V14 Bruce,  Judith EFT000000012999 148.57                     FSA3/2/18 V29 Hirsch,  Alain EFT000000013000 71.16                        3/2/18 V124 Kimball,  Matt EFT000000013001 565.77                     Mileage 3/2/18 V49 Lyford,  Frank EFT000000013002 411.20                     FSA3/2/18 V35 McDonald,  Pam EFT000000013003 25.00                        3/2/18 V38 Moore,  Jon EFT000000013004 163.32                     DCAP3/2/18 V68   Vtrans 84509 9,432.60             Overpayment

3/9/18 V279 ABC  Bus  Companies-­‐Muncie 84510 3,786.78             5 Part Invoices

3/9/18 V217 Airgas  USA,  LLC 84511 178.45                    3/9/18 V1305 Allegiant  Care 84512 203,996.40     Insurance3/9/18 V332 Alliance  Bus  Group  Inc 84513 6,551.10             7 Part Invoices3/9/18 V214 AT&T  Mobility 84514 176.32                    

3/9/18 V1334 Background  Investigation  Bureau,  LLC

84515 138.00                    

3/9/18 V590 Barrett  Trucking  Co.,  Inc. 84516 367.14                    3/9/18 V1481 Blue  Flame  Gas 84517 561.50                    

3/9/18 V225 Burlington  Electric  Department

84518 5,030.71             Electric Bill

3/9/18 V226 Burlington  Public  Works-­‐Water

84519 130.42                    

3/9/18 V227 Burlington  Telecom 84520 2,070.57             IT Invoice3/9/18 V293 Charlebois,  R.R  Inc. 84521 325.00                    3/9/18 V235 Clark's  Truck  Center 84522 28.50                        3/9/18 V220 Class  C  Solutions  Group 84523 3,202.41             6 Part Invoices3/9/18 V1240 ClearChoiceMD 84524 62.00                        3/9/18 V600 Cody  Chevrolet 84525 1,898.13             6 Part Invoices3/9/18 V928 Conway  Office  Solutions 84526 155.02                    3/9/18 V239 Cummins  Northeast  LLC 84527 200.75                    3/9/18 V815 Curved  Glass  Distributors 84528 1,233.00             2 Windshield Invoices3/9/18 V241 D  &  W  Diesel,  Inc. 84529 6,874.45             4 Part Invoices3/9/18 V417 Dion  Security,  Inc. 84530 11.94                        3/9/18 V250 Fisher  Auto  Parts 84531 1,970.85             14 Part Invoices

10

Page 11: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/9/18 V252 FleetPride,  Inc 84532 1,365.23             5 Part Invoices3/9/18 V253 FleetWave  Partners,  LLP 84533 3,168.00             3 Radio Invoices

3/9/18 V799 Gauthier  Trucking  Company,  Inc.

84534 297.96                    

3/9/18 V256 Genfare 84535 185.57                    3/9/18 V257 Gillig  Corp. 84536 2,317.25             5 Part Invoices3/9/18 V259 Grainger 84537 583.77                    

3/9/18 V260 Green  Mountain  Kenworth,  Inc.

84538 250.50                    

3/9/18 V261 Green  Mountain  Power 84539 125.62                    

3/9/18 V262 Hall  Communication,  Inc. 84540 1,824.00             Advertising for mechanic

3/9/18 V328 Kirk's  Automotive  Inc. 84541 1,540.00             1 Part Invoice3/9/18 V1509 Lawson  Products,  Inc 84542 85.64                        

3/9/18 V473 Limoge  &  Sons  Garage  Doors,  Inc.

84543 135.00                    

3/9/18 V273 MCI 84544 103.82                    3/9/18 V274 McMaster-­‐Carr 84545 74.49                        3/9/18 V1068 Midwest  Bus  Corporation 84546 476.26                    3/9/18 V278 Mohawk  Mfg.  &  Supply  Co. 84547 177.06                    3/9/18 V283 Neopart  LLC 84548 817.27                    

3/9/18 V284 New  G.H.  Berlin  Oil  Company

84549 13,245.33         13 Part Invoices

3/9/18 V822 NRC  East  Environmental  Services,  Inc.

84550 3,108.71 Hazard Waste Disposal

3/9/18 V223 O'Reilly  Auto  Enterprises,  LLC

84551 1,066.94             4 Part Invoices

3/9/18 V1484 Parsons  Environment  &  Infrastructure  Group  Inc.

84552 28.73                        

3/9/18 V291 Prevost  Parts 84553 569.72                    3/9/18 V864 Rick's  Towing  &  Repair,  Inc. 84554 1,750.00             4 Tow Bills3/9/18 V854 S2Technology 84555 37.50                        3/9/18 V297 Safety-­‐Kleen  Systems,  Inc. 84556 595.22                    3/9/18 V298 Sanel  Auto  Parts  Co. 84557 85.38                        3/9/18 V299 SB  Collins,  Inc. 84558 34,401.54         Fuel3/9/18 V301 Sovernet 84559 1,135.22             IT Invoice

3/9/18 V302 Sports  &  Fitness  Edge  Inc. 84560 1,090.75             Employee paid Gym Membership

3/9/18 V312 Stowe,  Town  of 84561 544.90                    3/9/18 V311 Teamsters  Local  597 84562 8,807.00             Union Dues3/9/18 V1030 UniFirst  Corporation 84563 481.10                    3/9/18 V314 Unum  Life  Insurance 84564 604.10                    

3/9/18 V334 Vanasse  Hangen  Brustlin,  Inc.

84565 4,485.03             Professional Services

3/9/18 V876 Vehicle  Maintenance  Program,  Inc.

84566 333.81                    

3/9/18 V410 Vermont  Gas  Systems,  Inc. 84567 560.30                    

11

Page 12: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/9/18 V1459 Vermont  Information  Consortium  LLC

84568 270.00                    

3/9/18 V385 Vermont  Offender  Work  Program

84569 3,410.00             3 Work Crew Invoices

3/9/18 V1073 Villanti  &  Sons,  Printers  Inc. 84570 2,840.00             Marketing Invoice3/9/18 V1497 Yawkey  Family  Inn 84571 60.00                        3/9/18 V1080 Young,  Michael 84572 389.00                    3/9/18 V1585 Capital  Reman  Exchange 84573 14,150.00         Reman engine3/9/18 V303 SSTA EFT000000013005 25.00                        

3/9/18 V10 Vermont  Office  of  Child  Support

EFT000000013006 746.44                    

3/12/18 V1467 Charles  Schwab  V1467  2018  0312   17,023.76 Retirement3/12/18 V265 ICMA  V265  2018  0312   1,418.42 Retirement3/12/18 V266 IRS  -­‐  EFTPS  V266  2018  0312   86,705.73 Federal  Taxes3/12/18 V364 Vermont  Dept  of  Taxes  V364  2018  0312   11,092.26 State  Taxes3/16/18 V1025 Alter,  Charles 84574 409.88 Volunteer3/16/18 V1480 Andrews-­‐Ford,  Sheri 84575 207.68 Volunteer3/16/18 V156 Anthony,  Peter 84576 625.71 Volunteer3/16/18 V1607 Berry,  Steve 84577 746.25 Volunteer3/16/18 V935 Bourbeau,  Brittany 84578 133.51 Volunteer3/16/18 V1482 Cady,  Duane 84579 133.03 Volunteer3/16/18 V471 Constantine,  Julia 84580 238.2 Volunteer3/16/18 V554 Desarno,  David 84581 36.523/16/18 V1450 English,  Leslie 84582 63/16/18 V555 Ernst,  Richard 84583 37.063/16/18 V1573 Fairbanks,  Dori 84584 344.49 Volunteer3/16/18 V168 Fay,  Carol 84585 19.643/16/18 V1516 Gagnon,  Chaz 84586 255.6 Volunteer3/16/18 V203 Ladd,  Joyce 84587 192.41 Volunteer3/16/18 V1310 Lavigne,  Michelle 84588 53.423/16/18 V205 LeBlanc,  Alice 84589 91.563/16/18 V1397 McGinnis,  Devan 84590 236.05 Volunteer3/16/18 V1594 McHugh,  Daniel 84591 198.95 Volunteer3/16/18 V211 Michaels,  Carol 84592 25.083/16/18 V181 Owen,  Helen 84593 1,632.41 Volunteer3/16/18 V1138 Pease,  Charles 84594 205.92 Volunteer3/16/18 V1611 Russin,  Tina 84595 92.883/16/18 V165 Sanborn,  Raeline 84596 87.483/16/18 V1478 Starbuck,  Pammella 84597 15.813/16/18 V1614 Vermont  Ride  Network,  Inc. 84598 553/16/18 V1595 Waller,  Marlys 84599 98.663/16/18 V1549 Ware,  Michael 84600 53.973/16/18 V962 Williams,  Kenneth 84601 74.883/16/18 V1566 Wisell,  David 84602 21.83/16/18 V944 Woodward,  Patricia 84603 533.61 Volunteer3/16/18 V216 Advance  Auto  Parts 84604 138.863/16/18 V332 Alliance  Bus  Group  Inc 84605 54.78

12

Page 13: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/16/18 V219Aubuchon  C/O  Blue  Tarp  Financial,  Inc. 84606 243.37

3/16/18 V224 Burlington  Communications 84607 1,249.05 6  Radio  invoices

3/16/18 V1227Burlington  Public  Works-­‐NON  Water!!! 84608 5,705.25 Repaired  water  line

3/16/18 V226Burlington  Public  Works-­‐Water 84609 1,602.12 2  Water  Bills

3/16/18 V228 C.I.D.E.R.,  Inc. 84610 17,781.47 E  AND  D3/16/18 V851 Champlain  Medical 84611 2203/16/18 V293 Charlebois,  R.R  Inc. 84612 4503/16/18 V220 Class  C  Solutions  Group 84613 691.83

3/16/18 V236Colonial  Supplemental  Insurance 84614 34.95

3/16/18 V238 Crystal  Rock  Bottled  Water 84615 1403/16/18 V239 Cummins  Northeast  LLC 84616 55.133/16/18 V163 D  &  M  Petroleum,  Inc. 84617 2,380.50 1  Part  Invoice3/16/18 V242 Danform  Shoes 84618 251.93/16/18 V402 Fastenal  Company 84619 91.663/16/18 V250 Fisher  Auto  Parts 84620 567.183/16/18 V252 FleetPride,  Inc 84621 1,308.03 6  Part  Invoices3/16/18 V256 Genfare 84622 146.63/16/18 V257 Gillig  Corp. 84623 3,535.74 3  Part  Invoices3/16/18 V259 Grainger 84624 389.13/16/18 V261 Green  Mountain  Power 84625 1,753.18 3  Electric  Bills

3/16/18 V461 Green  Valley  Lock  Locksmith 84626 403/16/18 V263 Heritage  Ford 84627 760.583/16/18 V1204 Interstate  Batteries 84628 451.21

3/16/18 V1283 Kelley  Bros  of  NE,  LLC 84629 7,781.88Replaced  Office  Doors

3/16/18 V328 Kirk's  Automotive  Inc. 84630 87.52

3/16/18 V473Limoge  &  Sons  Garage  Doors,  Inc. 84631 1,831.70 1  Door  Repair  

3/16/18 V268 Loomis 84632 238.33/16/18 V270 Lowe's 84633 5.023/16/18 V1285 Loyer,  Chris 84634 56.143/16/18 V1191 Lucky's  Trailer  Sales  Inc. 84635 218.43/16/18 V278 Mohawk  Mfg.  &  Supply  Co. 84636 498.3

3/16/18 V284New  G.H.  Berlin  Oil  Company 84637 3,128.30 3  Part  Invoices

3/16/18 V345 North,  Kevin 84638 100 Shoe  Reimbursement

3/16/18 V611Northwestern  Occupational  Health 84639 115

3/16/18 V223O'Reilly  Auto  Enterprises,  LLC 84640 219.41

3/16/18 V594 Offset  House  The,  Inc 84641 572

3/16/18 V863 P  &  P  Septic  Service,  Inc 84642 1,766.75Pumped  Bus  wash  bay

13

Page 14: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/16/18 V545 Pitney  Bowes  -­‐  Leasing 84643 253.173/16/18 V291 Prevost  Parts 84644 63.83/16/18 V915 Puzic,  Aid 84645 90.483/16/18 V465 Queen  City  Printers,  Ins. 84646 8433/16/18 V296 Rouse  Tire  Sales 84647 2,032.08 1  Tire  Invoice3/16/18 V854 S2Technology 84648 72.53/16/18 V297 Safety-­‐Kleen  Systems,  Inc. 84649 152.313/16/18 V300 Seven  Days 84650 3593/16/18 V686 Shearer  Chevrolet 84651 1,353.88 7  Part  Invoices

3/16/18 V451Stowe,  Town  of  Electric  Department 84652 228.64

3/16/18 V734Thermo  King  Northeast/Dattco 84653 508.86

3/16/18 V1030 UniFirst  Corporation 84654 317.473/16/18 V535 VAS  Tools,  LLC 84655 599.013/16/18 V1073 Villanti  &  Sons,  Printers  Inc. 84656 4,635.00 Marketing  Invoice3/16/18 V336 W.B  Mason  Co.,  Inc. 84657 900.283/16/18 V569 Wall,  Kimberly 84658 286.91 FSA3/16/18 V251 Wex  Fleet  Universal 84659 25,988.03 Fuel

3/16/18 V1227Burlington  Public  Works-­‐NON  Water!!! 84660 25

3/16/18 V153 Alburgh  Taxi  EFT000000013007   1,892.55 Volunteer3/16/18 V974 Baker,  Kristina  EFT000000013008   129.73 Volunteer3/16/18 V55 Boudreau,  James  EFT000000013009   480.24 Volunteer3/16/18 V1007 Bova,  Wendy  EFT000000013010   534.18 Volunteer3/16/18 V1150 Bruley  SR,  Mark  EFT000000013011   1,098.83 Volunteer3/16/18 V1448 Buckley,  Barbara  EFT000000013012   81.213/16/18 V548 Burnor,  David  EFT000000013013   618.08 Volunteer3/16/18 V1291 Callan,  Linda  EFT000000013014   665.61 Volunteer3/16/18 V1575 Dudley,  Myron  EFT000000013015   271.47 Volunteer3/16/18 V60 Farr,  Delores  EFT000000013016   457.86 Volunteer3/16/18 V1586 Gross,  Robert  EFT000000013017   228.92 Volunteer3/16/18 V1117 Hall,  John  EFT000000013018   437.12 Volunteer3/16/18 V170 Hertz,  Kenneth  EFT000000013019   447.56 Volunteer3/16/18 V67 Jewett,  Sheryl  EFT000000013020   184.24 Volunteer3/16/18 V174 Langlois,  Paulette  EFT000000013021   485.05 Volunteer3/16/18 V1420 Lawyer,  Ronald  EFT000000013022   352.11 Volunteer3/16/18 V70 LeClair,  Raymond  EFT000000013023   554.89 Volunteer3/16/18 V1613 Lewis,  Jean  EFT000000013024   274.68 Volunteer3/16/18 V71 Lightholder,  Stephen  EFT000000013025   115.01 Volunteer3/16/18 V74 Markham,  Laurel  EFT000000013026   363.57 Volunteer3/16/18 V75 Martin,  Ronald  EFT000000013027   504.24 Volunteer3/16/18 V1440 Menard,  Leighanne  EFT000000013028   164.09 Volunteer3/16/18 V1018 Metivier,  Shelli  EFT000000013029   719.4 Volunteer3/16/18 V1570 Murphy  Sandra  EFT000000013030   161.35 Volunteer3/16/18 V82 Parah,  Donna  EFT000000013031   385.95 Volunteer3/16/18 V83 Parah,  Maurice  EFT000000013032   898.27 Volunteer3/16/18 V86 Pike,  Gail  EFT000000013033   765.29 Volunteer3/16/18 V1605 Rinaldi,  Michelle  EFT000000013034   37.06

14

Page 15: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/16/18 V691 Rogers,  Robert  EFT000000013035   182.16 Volunteer3/16/18 V89 Sayers,  Gail  EFT000000013036   699.89 Volunteer3/16/18 V1236 Sayers,  James  EFT000000013037   105.78 Volunteer3/16/18 V741 Steiner,  Timothy  EFT000000013038   65.43/16/18 V93 Timm,  Marta  EFT000000013039   950.59 Volunteer3/16/18 V522 Turcotte,  S  Jeanette  EFT000000013040   233.28 Volunteer3/16/18 V97 Yandow,  Dennis  EFT000000013041   397.92 Volunteer

3/16/18 V11 Asper,  Sheryl  EFT000000013042   1,026.42FSA  And  Vision  Reimbursement

3/16/18 V1182 Charissakis,  John  EFT000000013043   253/16/18 V29 Hirsch,  Alain  EFT000000013044   55

3/16/18 V38 Moore,  Jon  EFT000000013045   236.42FSA  and  Mileage  Reimbursement

3/16/18 V137 Plante,  Karen  EFT000000013046   165 FSA  Reimbursement3/16/18 V303 SSTA  EFT000000013047   87,030.30 ADA

3/23/18 V10 Vermont  Office  of  Child  Support

EFT000000013048 746.44                    

3/26/18 V1467 Charles  Schwab V1467  2018  0326 16,046.89         Retirement3/26/18 V265 ICMA V265  2018  0326 1,459.60             Reitrement3/26/18 V266 IRS  -­‐  EFTPS V266  2018  0326 87,483.84         Federal Taxes3/26/18 V364 Vermont  Dept  of  Taxes V364  2018  0326 11,294.39         State Payroll Taxes3/30/18 V1423 Alling,  Andrew 84662 45.78                        3/30/18 V1025 Alter,  Charles 84663 244.76                     Volunteer3/30/18 V1615 Anderson,  Amy 84664 31.62                        3/30/18 V1480 Andrews-­‐Ford,  Sheri 84665 248.02                     Volunteer3/30/18 V156 Anthony,  Peter 84666 122.64                     Volunteer3/30/18 V1099 Barnett,  Wendy 84667 221.76                     Volunteer3/30/18 V1607 Berry,  Steve 84668 633.96                     Volunteer3/30/18 V1482 Cady,  Duane 84669 121.57                     Volunteer3/30/18 V471 Constantine,  Julia 84670 433.88                     Volunteer3/30/18 V1573 Fairbanks,  Dori 84671 43.60                        3/30/18 V168 Fay,  Carol 84672 75.76                        3/30/18 V205 LeBlanc,  Alice 84673 33.80                        3/30/18 V1297 Lund,  Theresa 84674 38.88                        3/30/18 V1397 McGinnis,  Devan 84675 50.70                        3/30/18 V1594 McHugh,  Daniel 84676 197.31                     Volunteer3/30/18 V181 Owen,  Helen 84677 1,341.37             Volunteer3/30/18 V1588 Provost,  Meaghan 84678 30.96                        3/30/18 V1478 Starbuck,  Pammella 84679 37.06                        3/30/18 V1595 Waller,  Marlys 84680 86.66                        3/30/18 V1549 Ware,  Michael 84681 158.07                     Volunteer3/30/18 V944 Woodward,  Patricia 84682 466.59                     Volunteer3/30/18 V1617 Boes,  Jason 84683 118.91                     Food reimbursement3/30/18 V1487 Chamberlin,  Justin 84684 1,153.92             FSA Reimbursement3/30/18 V107 Costes,  Chris 84685 24.09                        3/30/18 V1354 Lavallee,  Katie 84686 33.19                        3/30/18 V129 Lawrence,  Richard 84687 166.81                     FSA Reimbursement3/30/18 V1365 Robinson,  John 84688 9.95                            3/30/18 V1233 Winnicki,  Eugene 84689 179.94                     Food reimbursement

15

Page 16: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/30/18 V1541 Young,  Robert 84690 190.75                     Mileage Reimbursement

3/30/18 V279 ABC  Bus  Companies-­‐Muncie 84691 2,187.49             4 Part Invoices

3/30/18 V316 Able  Paint,  Glass  &  Flooring  Co.

84692 1,932.00             1 shelter glass repair

3/30/18 V332 Alliance  Bus  Group  Inc 84693 226.00                    3/30/18 V590 Barrett  Trucking  Co.,  Inc. 84694 189.90                    3/30/18 V1481 Blue  Flame  Gas 84695 1,775.22             2 Propane Invoices3/30/18 V1610 Bolduc  Auto  Salvage,  Inc. 84696 225.00                    

3/30/18 V224 Burlington  Communications 84697 164.00                    

3/30/18 V225 Burlington  Electric  Department

84698 6,917.09             7 Electric Bills

3/30/18 V1231 Burlington  Parks  &  Rec  Dept.

84699 125.00                    

3/30/18 V226 Burlington  Public  Works-­‐Water

84700 168.92                    

3/30/18 V981 Burlington,  City  of 84701 80.00                        3/30/18 V229 Camerota  Truck  Parts 84702 1,534.65             5 Part Invoices3/30/18 V443 Central  Vermont  Chamber 84703 53.00                        3/30/18 V851 Champlain  Medical 84704 220.00                    3/30/18 V293 Charlebois,  R.R  Inc. 84705 285.00                    3/30/18 V220 Class  C  Solutions  Group 84706 888.49                    3/30/18 V1357 CleanPro,  Inc 84707 599.46                    3/30/18 V1240 ClearChoiceMD 84708 283.00                    3/30/18 V600 Cody  Chevrolet 84709 855.24                    3/30/18 V238 Crystal  Rock  Bottled  Water 84710 68.02                        3/30/18 V239 Cummins  Northeast  LLC 84711 1,178.31             3 Part Invoices3/30/18 V241 D  &  W  Diesel,  Inc. 84712 2,580.60             1 Part Invoice3/30/18 V401 Dell  Business  Credit 84713 876.25                    3/30/18 V245 DRIVE 84714 42.00                        3/30/18 V246 Duffy  Waste  &  Recycling 84715 57.52                        3/30/18 V320 EM  Cahill  Company,  Inc. 84716 302.94                    3/30/18 V250 Fisher  Auto  Parts 84717 2,684.55             29 Part Invoices3/30/18 V252 FleetPride,  Inc 84718 1,134.81             10 Part Invoices3/30/18 V1347 Foley  Distributing  Corp. 84719 1,450.08             8 part Invoices3/30/18 V394 Formula  Ford  Inc. 84720 704.67                    3/30/18 V256 Genfare 84721 464.07                    3/30/18 V257 Gillig  Corp. 84722 2,068.22             5 Part Invoices3/30/18 V258 Gordon  Stamp  &  Engraving 84723 27.70                        3/30/18 V259 Grainger 84724 98.06                        

3/30/18 V260 Green  Mountain  Kenworth,  Inc.

84725 419.10                    

3/30/18 V642 Haps  Service  Station  Inc. 84726 670.00                    3/30/18 V263 Heritage  Ford 84727 1,227.09             1 Part Invoice3/30/18 V446 Janek  Corporation,  The 84728 1,955.00             1 Part Invoice3/30/18 V328 Kirk's  Automotive  Inc. 84729 4,138.05             4 Part Invoices

16

Page 17: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/30/18 V826 LaRoche  Towing  &  Recovery 84730 350.00                    

3/30/18 V1509 Lawson  Products,  Inc 84731 313.08                    3/30/18 V267 Lincoln  Financial  Group 84732 10.21                        

3/30/18 V1475 Management  Safeguards  &  Associates,  LLC

84733 750.00                     voided  4/9/2018

3/30/18 V273 MCI 84734 152.48                    3/30/18 V274 McMaster-­‐Carr 84735 55.59                        3/30/18 V275 McNeil  Leddy  &  Sheahan 84736 666.67                    3/30/18 V1068 Midwest  Bus  Corporation 84737 97.19                        

3/30/18 V1599 Miller,  Holly  &  Bob  2017  Charitable  Lead  Trust

84738 936.36                    

3/30/18 V278 Mohawk  Mfg.  &  Supply  Co. 84739 141.36                    

3/30/18 V280 Mutual  of  Omaha  Insurance  Co.

84740 102.17                    

3/30/18 V792 Myers  Container  Service  Corp.

84741 194.66                    

3/30/18 V283 Neopart  LLC 84742 662.42                    

3/30/18 V996 New  England  Air  Systems 84743 2,929.00             Repaired plumbing Problem

3/30/18 V284 New  G.H.  Berlin  Oil  Company

84744 5,320.44             6 Part Invoices

3/30/18 V1192 NS  Corporation 84745 547.96                    

3/30/18 V223 O'Reilly  Auto  Enterprises,  LLC

84746 711.06                    

3/30/18 V534 Omega  Electric 84747 1,215.40             Repaired lights3/30/18 V993 Paws  Trucking,  LLC 84748 265.00                    

3/30/18 V289 People's  United  Businesscard  Services

84749 3,921.71             5 Business Credit Cards

3/30/18 V291 Prevost  Parts 84750 278.49                    3/30/18 V1368 Prime  Middlebury  LLC 84751 183.33                    3/30/18 V492 R&J  Trucking 84752 625.00                    3/30/18 V864 Rick's  Towing  &  Repair,  Inc. 84753 125.00                    3/30/18 V296 Rouse  Tire  Sales 84754 198.35                    3/30/18 V297 Safety-­‐Kleen  Systems,  Inc. 84755 127.03                    3/30/18 V298 Sanel  Auto  Parts  Co. 84756 179.43                    3/30/18 V299 SB  Collins,  Inc. 84757 72,715.27         Fuel3/30/18 V686 Shearer  Chevrolet 84758 1,021.31             6 Part Invoices3/30/18 V757 Spear,  William 84759 100.00                    

3/30/18 V1560 State  Industrial  Products  Corporation

84760 117.70                    

3/30/18 V308 Steadman  Hill  Consulting,  Inc.

84761 6,972.84             Consulting Invoice

3/30/18 V662 Stowe  Area  Association 84762 200.00                    3/30/18 V312 Stowe,  Town  of 84763 312.89                    

3/30/18 V734 Thermo  King  Northeast/Dattco

84764 481.36                    

3/30/18 V1503 Thingtech,  LLC 84765 19,000.00         Voided 4/9/20183/30/18 V313 Travelers 84766 154,144.00     Insurance

17

Page 18: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/30/18 V1030 UniFirst  Corporation 84767 1,137.14             7 Uniform Invoices

3/30/18 V334 Vanasse  Hangen  Brustlin,  Inc.

84768 2,682.78             Professional Services

3/30/18 V876 Vehicle  Maintenance  Program,  Inc.

84769 60.93                        

3/30/18 V391 Verizon  Wireless 84770 3,809.64             5 Tablets for the buses Invoices

3/30/18 V410 Vermont  Gas  Systems,  Inc. 84771 6,503.83             6 Gas Bills

3/30/18 V1564 Vt  Back  &  Body  Care  dba  VT  CDL  Exams

84772 665.00                    

3/30/18 V336 W.B  Mason  Co.,  Inc. 84773 610.44                    

3/30/18 V352 Wiemann-­‐Lamphere  Architects  Inc.

84774 6,960.62             Architect Consult

3/30/18 V1616 Kaynor,  Chapin 84775 362.40                     Reimbursement for Oct Flight

3/30/18 V153 Alburgh  Taxi EFT000000013049 2,164.05             Volunteer3/30/18 V55 Boudreau,  James EFT000000013050 45.78                        3/30/18 V1007 Bova,  Wendy EFT000000013051 587.06                     Volunteer3/30/18 V1150 Bruley  SR,  Mark EFT000000013052 774.03                     Volunteer3/30/18 V1448 Buckley,  Barbara EFT000000013053 243.63                     Volunteer3/30/18 V548 Burnor,  David EFT000000013054 765.25                     Volunteer3/30/18 V1291 Callan,  Linda EFT000000013055 629.62                     Volunteer3/30/18 V1575 Dudley,  Myron EFT000000013056 331.41                     Volunteer3/30/18 V60 Farr,  Delores EFT000000013057 154.25                     Volunteer3/30/18 V1586 Gross,  Robert EFT000000013058 585.38                     Volunteer3/30/18 V1117 Hall,  John EFT000000013059 194.58                     Volunteer3/30/18 V170 Hertz,  Kenneth EFT000000013060 360.37                     Volunteer3/30/18 V67 Jewett,  Sheryl EFT000000013061 114.01                     Volunteer3/30/18 V174 Langlois,  Paulette EFT000000013062 624.03                     Volunteer3/30/18 V1420 Lawyer,  Ronald EFT000000013063 334.18                     Volunteer3/30/18 V70 LeClair,  Raymond EFT000000013064 402.82                     Volunteer3/30/18 V71 Lightholder,  Stephen EFT000000013065 249.10                     Volunteer3/30/18 V74 Markham,  Laurel EFT000000013066 482.94                     Volunteer3/30/18 V75 Martin,  Ronald EFT000000013067 431.74                     Volunteer3/30/18 V1440 Menard,  Leighanne EFT000000013068 230.02                     Volunteer3/30/18 V1018 Metivier,  Shelli EFT000000013069 431.64                     Volunteer3/30/18 V1570 Murphy  Sandra EFT000000013070 224.54                     Volunteer3/30/18 V83 Parah,  Maurice EFT000000013071 956.59                     Volunteer3/30/18 V86 Pike,  Gail EFT000000013072 690.05                     Volunteer3/30/18 V1605 Rinaldi,  Michelle EFT000000013073 44.70                        3/30/18 V771 Sammons,  Chandra EFT000000013074 63.24                        3/30/18 V89 Sayers,  Gail EFT000000013075 443.74                     Volunteer3/30/18 V1236 Sayers,  James EFT000000013076 411.57                     Volunteer3/30/18 V741 Steiner,  Timothy EFT000000013077 58.32                        3/30/18 V93 Timm,  Marta EFT000000013078 739.12                     Volunteer3/30/18 V522 Turcotte,  S  Jeanette EFT000000013079 128.63                     Volunteer3/30/18 V97 Yandow,  Dennis EFT000000013080 307.43                     Volunteer3/30/18 V1182 Charissakis,  John EFT000000013081 122.73                     FSA Reimbursement

18

Page 19: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3/30/18 V108 Daley,  Michelle EFT000000013082 30.41                        3/30/18 V29 Hirsch,  Alain EFT000000013083 85.00                        3/30/18 V437 Maric,  Branko EFT000000013084 100.00                     Shoe reimbursement3/30/18 V38 Moore,  Jon EFT000000013085 224.61                     Dcap Reimbursement3/30/18 V137 Plante,  Karen EFT000000013086 35.97                        3/30/18 V1446 M  T  Wallets,  LLC EFT000000013087 2,700.00             Lease3/30/18 V303 SSTA EFT000000013088 42,588.83         E AND D

19

Page 20: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

To: GMT Board of Commissioners From: Michelle Daley, Director of Finance Kim Wall, Grants Manager Matt Kimball, Capital Projects Manager Date: April 12, 2018 RE: Finance/Grants/Capital Projects

The finance and grants department along with Paul Bohne, Treasurer of the Finance Committee, evaluated the bids for the Audit RFP and have recommended to the Finance Committee that we award the bid to RHR Smith & Company based on unanimous results of the evaluation. The results of this RFP and the recommendation to award the contract to RHR Smith was presented at the last board meeting. At the request of the Board, staff went back and did a through reference check for RHR Smith, we randomly selected agencies to speak with and all references were positive. Staff prepared the award letter and sent that to RHR Smith on March 27, 2018.

Jordan Nelle has resigned as GMT’s Controller effective last Friday April 6, 2018. She has

accepted a position with the Champlain Valley School District as their Finance Director. Jordan’s talents will be missed here at GMT, but we wish her well in her adventure.

Staff has begun the process of completing the Grant Application for our funding in FY19, The application is due by April 27, 2018 with funding awards by May 28, 2018. Staff met with the VTRANS staff and we will be requesting the appropriate level of funding to ensure the continuation of our existing services. The FY18 5307 funding was announced, we lost one of the STIC factors ($185,000) related to the passenger miles. Staff is working now to apply for the grants that are available through the FTA TrAMS system.

We have submitted GMT’s FY19 indirect cost rate calculation for approval, which has been calculated as 9.15%. For comparison, our approved indirect cost rate for FY18 is 9.865% and in FY17 the rate was 9.55%.

Attached are the February 28, 2018 financials for your review. The total reconciled balance of the operating cash balance for the month ended February 28, 2018 is $1,938,890. For comparison, the balance at January 31, 2018 was $3,000,519.

The aged trade Accounts Receivable balance for February 28, 2018 was $1,722,347. This

balance is broken out as $1,466,104 attributable to the Urban Program and $256,243 attributable to the Rural Program. For comparison, the aged trade Accounts Receivable balance on January 31, 2018 was $6,435,273. The large balance in January was directly attributable to the amount receivable from VTrans for the Gillig buses. The combined aging details are as follows:

Current Month As of 12/31/17 Current $1,681,551 $2,039,864 30-60 Days 19,164 4,366,943 61-90 Days 3,394 7,772 91 and Over 18,238 20,694

20

Page 21: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

2 | P a g e F i n a n c i a l s M e m o C o n t i n u e d

As of the date of this memo, we have collected 50.35% in subsequent payments on the aged receivables in the 61 days and over categories. Balances remaining in those categories, after taking these payments into consideration, are as follows:

Hannaford 1,051.38 Villa Rehab* 3,234.17 VTrans 6,454.21 *Villa Rehab is a facility in St. Albans that has had some financial difficulties, we have been in touch with the Executive Director and assured that they will pay this balance in full, it will take them some time as they reorganize their business model. We have been receiving small payments periodically. The last payment was on 2/26/2018 in the amount of $2,194.

As we review the revenues and expenses for the month ended February 28, 2018, we use a benchmark to determine how well we are following our budget. We calculate this benchmark as the percentage of the budget that we’d expect to be earned/spent if all revenues and expenses were spent/earned equally over twelve months. Therefore we would expect to see budgets at 67% for the Fiscal Year to date February 31, 2018.

The Federal, State and Local Revenues for the Urban system are tracking within the

budgeted revenues. The Urban operating budget is adjusted at the end of each month to reflect a net of zero, which is due to our Federal Urban Formula Grant (5307) which, at best allows us to breakeven. The Rural operating budget does not have a similar grant to break even, and since the Rural grants are prepaid, each month we recognize the revenue as it is earned based on the earnings percentages from the previous year, “catching up” when the actual billing is reported. The trend for Rural grants has typically been lower earnings at the beginning of the fiscal year, with higher earnings in the winter months, which is perfectly aligned with what these statements are reflecting. The Rural system is currently showing deficit spending of approximately $291K. Through February our losses in the Medicaid program are $105K, the remaining $186K, is from our other rural transportation programs. In December we did a projection of program spending for 5311 Operating and CMAQ and we are targeting a year end deficit in the amount of $188K by year end. In our current budget we projected a shortfall (usage of fund balance reserves) in the amount of $149K. For both the rural and urban systems we know that the maintenance department is struggling to keep the aging fleet in good running condition. With the influx of the 12 new vehicles in the urban system we are hoping to see the stress on the fleet decrease some in the next few months. However, the same cannot be said for the Rural system. Based on the current age of the fleet averaging at 92% of its useful life, it is fair to say we are barely keeping our head above water to make pullout. We should’ve replaced 10 cutaways in FY18, with an additional 9 in FY19, unfortunately the funding at the state was not available so we are faced with needing to replace 29 vehicles in FY19. The State of Vermont has been awarded 2.6 million in 5339 grant funds for bus replacements throughout the State. Areas of note for the Operating Revenues include:

• Fares are trending slightly below the benchmark in both the Urban and Rural System. Fares will likely come in way under the budget this year. When putting the 12 new buses into service, we experienced issues with the new fareboxes not being able to read our fare media and therefore operated fare free for a number of days in December. The fareboxes were not fully functioning until the beginning of February. It has also been noted that there are several nonfunctioning fareboxes in the Rural system and fares are frequently not collected as a result of this. We are working on purchasing some fareboxes for simple fare collection to alleviate this problem.

Total due as of the date of this memo

$10,739.76

21

Page 22: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

3 | P a g e F i n a n c i a l s M e m o C o n t i n u e d

• Advertising – It is not expected that Advertising revenue will meet budget projections and will therefore fall way short this year. The Marketing Department is working on a mailer and some hand out information to give out at mixers, as well as expanding advertising opportunities to include spaces at the DTC to bolster more interest.

• Planning Revenue – For the Rural system this revenue is exceeding the budget by $8,000. We learned after the budget was approved that we’d received funds from the Central VT Regional Planning Commission (CVRPC) for our Customer Service Survey that we were not anticipating at the time of the budget.

• Interest, miscellaneous, sale of equipment & warranty revenue – These are all trending below the benchmark for the Urban system. This is due to timing issues and the unpredictability of these types of revenues. The high balance on the sale of equipment for the rural system is due to insurance proceeds on Bus 366 which was totaled in a winter weather accident. Warranty Revenue is well exceeding its budget. This is due to losses sustained on Bus #282 and the insurance proceeds received to cover the warranty work.

For the operating expenses, most of the variances are timing issues since many expenses are not evenly spent throughout the year. While we recognize that there are several variances from the benchmark of 67% in the expense categories of the attached report, our focus for explanations below will be those of note, rather than those solely due to timing:

• Employee Development – These expenses appear to be over the benchmark for the Urban system and below the benchmark for the Rural system, however over all they are in line with the benchmark. We have a reimbursement grant for Rural training expenses that we have not yet billed for FY17. Due to the nature of our operations several of our administrative employees who are deemed to be Urban for our cost allocation plan also work on Rural tasks. After all true Rural employees are billed to this grant, we can also charge off training expenses for those administrative employees who also work on Rural aspects of the system. These expenses are coded to Urban and then reconciled as billing progresses, so we tend to look at this number as a whole when measuring it against the benchmark.

• Recruiting Expenses – This is low for the Urban system and slightly high for the Rural system. Urban drivers are fully staffed currently so our recruiting needs have been low. For the Rural system we actively recruited for the Mountain season during October and into November. Now that the season is nearing an end, we are starting to see this expense align more closely with the budget forecast.

• Dues and Subscriptions – While these are timing issues we wanted to draw attention to them as the variances from the benchmark are so high. In the Urban system we generally incur the majority of the dues expense at the beginning of the fiscal year, including our annual APTA dues of $20,304 which make up the vast majority of the budget. For the Rural system our dues are typically invoiced more heavily toward the end of the fiscal year, so we expect this expense to trend below the benchmark for the majority of the fiscal year.

• Travel and Meetings, Computer Services Expense and Legal Fees – These are as needed expenses and due to the nature of them they are difficult to budget and anticipate spending throughout the fiscal year.

• Audit Fees – The final invoices for the audit of FY17 have been paid, In May, we will have about 3 days of preliminary testing work for the FY18 audit.

22

Page 23: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

4 | P a g e F i n a n c i a l s M e m o C o n t i n u e d

• Background Checks & DOT Testing – These expenses are tied to hiring, and with the seasonal hiring and the annual background checks needing to occur for the Medicaid contract. The Medicaid contract focused on more background checks which has led to the overspent amount in the rural system.

• Drug & Alcohol Testing – Subsequent to setting the initial budget for this expense category we determined that there would be cost savings in joining the State of Vermont’s Drug & Alcohol Program. Our drivers are now tested as part of the larger State Driver Pool and the State incurs the expense. We were the only Transit Agency in the State of Vermont that was funding our own Drug & Alcohol Program. The approved budget is adjusted to reflect this change.

• Employee Recruitment Program – This is a variable expense incurred as current employees recommend new employees who are hired and subsequently are retained for certain lengths of time. This has proven to be a valuable recruitment tool for GMT and difficult to predict.

• Driver’s Uniforms –Large uniform orders are placed seasonally so this line is not expected to conform to monthly benchmarks.

• Other Planning Expenses and MPO Planning Expenses – These are high compared to their budgets due to the Comprehensive Service Analysis (CSA) discussed in the revenue section above. This project is carrying over from FY17 and is anticipated to be completed in FY18.

• Maintenance Expenses – In discussions with the Director of Maintenance our vehicle maintenance costs have been rising in recent years because of the inability to replace vehicles, especially in the rural area. We are working closely with VTRANS for the FY19 grant application to ensure we receive replacement buses, until then we are having to manage our current fleet the best we can with what we have.

The following is an update of the ongoing capital projects staff continue to work on:

Passenger Shelters: o Urban: Working with Town of Jericho staff to coordinate the construction of a new

pad and installation of stored shelter on Route 15. Continuing to evaluate bus stops within the service area for the installation of shelters, benches, and bike racks during the spring and summer.

o Rural: Working with planning to identify potential locations for a shelter that is in storage. Also looking into solar lighting possibilities for existing shelters in the rural area.

Downtown Transit Center:

o Getting quote for replacement of remaining platform heaters to upgrade to larger BTU units.

o Working on adding vents to IT room door to improve air circulation to cool space. o Getting an updated design and quote from Enseicom to convert one of the glass

shelters to covered bike storage. o Continuing to manage remaining DTC soil until commencement of the ramp

project and looking into alternative disposal methods of unused soil.

Industrial Parkway Driveway Ramp: o Continuing to work with VHB to finalize ramp design and determine ledge

removal method. Test pits showed that less ledge removal would be required than anticipated, but that ledge removal could not be completely avoided by

23

Page 24: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

5 | P a g e F i n a n c i a l s M e m o C o n t i n u e d

redesigning ramp path. Coordinating with staff and VHB to finalize site work designs to be incorporated into local permits and construction scope of work. Working to have an IFB ready to be issued in April.

GMTA Facility Renovation: o Budget estimates of the main office renovations and the new 4-Bay maintenance

garage have shown that work on both buildings will not be possible with the current funding in place. Staff has decided that we should move ahead with renovations to the main office this year and phase in the new garage at a later date. Currently working with Wiemann-Lamphere to incorporate additional items such as fixing the floors in the current maintenance garage, adjusting on-site water and sewer line connections, and paving the unpaved portion of the back parking lot. Working to have an IFB released by end of April or beginning of May.

Decommissioning of Former Cherry Street Terminal: o It has become apparent that securing a contractor to perform the remaining

paint and prep work of the OGE building is not possible. We have approached the building owner about incorporating the remaining work as part of a larger project undertaken by the building owner and reimbursing them for actual costs. A dollar amount has been verbally agreed upon and a written Memorandum of Understanding has been submitted to the building owner for review.

Facility Security Upgrades: o An Invitation for Bids has been issued and a pre-bid meeting is scheduled for 4/16.

Bids will be due on 5/1 and the goal is to have a contractor selected for approval at the May board meeting. Work is planned to commence in mid-May with an anticipated project time of 2-3 months. The security system will be of the same system currently in use at the DTC with card reader access and security cameras added to 15 Industrial Pkwy.

Electric Bus Buy: o Continuing to work with staff and VEIC to finalize the electric bus specification and

RFP. Sill working with VEIC to finalize specifications for major bus systems to ensure that vehicle performance is maximized. Continuing to work with Maintenance to ensure that GMT build specs and requirements are incorporated as much as feasible while not conflicting with electric bus builds. Reviewing language in the electric bus grants that have been received to ensure that any requirements of the grant are followed. Goal is to have an RFP ready for release in April.

Cutaway Bus Buy: o Working with staff to develop new statewide cutaway bus RFP using previous RFP

as a template. Maintenance and Operations are currently reviewing the cutaway bus spec to update based on any changes to vehicle preferences or configurations. Working with VTrans and VPTA to determine vehicle quantities and any other requirements. Goal is to have a new RFP ready for issue by late April or early May.

1 Industrial Parkway Renovations

o Reviewed concept design of building renovations with staff as a starting point to develop long range plans for renovations to the facility. Site work improvements are planned to be incorporated with the scope of the ramp project to achieve favorable mobilization and material costs. Meeting with Wiemann-Lamphere to evaluate current systems and structures to identify the short and long term renovation needs of the building. Working on having an initial long range renovation plan for the property developed by early May.

24

Page 25: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Chittenden County Transportation AuthorityStatement of Net Assets

As of 2/28/2018

4/9/2018

As Of 2018 As Of 2017

Current Assets:Cash and Investments 2,441,029.98 3,715,435.46Receivables: Grant 2,126,672.45 1,797,716.65 Other 1,775,749.46 1,875,263.56Deferred Cost Pool (327,701.68) (128,038.47)Inventories 639,116.36 636,045.69Prepaid Expenses 368,214.04 346,974.83Total Current Assets 7,023,080.61 8,243,397.72

Noncurrent Assets:Land, Structures And

Equipment - net of accumulated depreciation 31,704,067.39 28,614,769.94

TOTAL ASSETS 38,727,148.00 36,858,167.66LIABILITIES AND FUND EQUITY

Current Liabilities:Accounts Payable 404,641.14 398,303.45Accrued Payroll Expenses 152,669.57 335,499.91Other Accrued Expenses 84,744.73 89,541.74Deferred Revenue 2,940,405.58 3,563,910.39Total Current Liabilities 3,582,461.02 4,387,255.49

Long-Term Liabilities:Accrued Compensated Absences 767,415.60 698,656.50Total Long-Term Liabilities 767,415.60 698,656.50

Total Liabilities 4,349,876.62 5,085,911.99

Fund Equity:

Invested in capital assets, net of related debt 28,031,330.04 29,537,091.88Restricted 1,547,481.95 1,484,414.58Unrestricted 2,220,486.83 1,999,581.05Current Year Change in Net Assets 2,577,972.56 (1,248,831.84)Total Fund Equity 34,377,271.38 31,772,255.67

TOTAL LIABILITIES AND FUND EQUITY 38,727,148.00 36,858,167.66

ASSETS

25

Page 26: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Chi

ttend

en C

ount

y T

rans

port

atio

n A

utho

rity

and

CC

TA

dba

Gre

en M

ount

ain

Tra

nsit

Urb

an R

ural

Bud

get V

s. A

ctua

lsF

or th

e E

ight

Mon

ths

End

ing

Feb

ruar

y 28

, 201

8T

arge

t67

%U

rban

Rur

alC

ombi

ned

Urb

anR

ural

Com

bine

dU

rban

Rur

alC

ombi

ned

REVE

NU

ESFE

DER

AL, S

TATE

AN

D L

OC

AL R

EVEN

UE

Mun

icpa

l Mem

ber A

sses

smen

ts1,

519,

811.

200.

00$1

,519

,811

.20

2,27

9,71

5.00

0.00

$2,2

79,7

15.0

0 66

.67%

0.00

%66

.67%

Mun

icip

al P

arat

rans

it As

sess

men

ts41

8,60

5.28

0.00

418,

605.

28

627,

908.

000.

0062

7,90

8.00

66

.67%

0.00

%66

.67%

Loca

l Ope

ratin

g As

sista

nce

55,3

66.7

228

2,61

7.28

337,

984.

00

78,0

50.0

042

1,72

5.00

499,

775.

00

70.9

4%67

.01%

67.6

3%Fe

dera

l Urb

an F

orm

ula

Gran

t2,

211,

056.

080.

002,

211,

056.

08

2,70

6,09

8.00

0.00

2,70

6,09

8.00

81

.71%

0.00

%81

.71%

Fede

ral R

ural

Ope

ratin

g Gr

ant

0.00

778,

800.

0077

8,80

0.00

0.

001,

180,

000.

001,

180,

000.

00

0.00

%66

.00%

66.0

0%St

ate

Regu

lar S

ubsid

y O

pera

ting

Gra

nt1,

625,

075.

0059

4,00

0.00

2,21

9,07

5.00

2,

437,

612.

0090

0,00

0.00

3,33

7,61

2.00

66

.67%

66.0

0%66

.49%

E&D

Gran

ts a

nd L

ocal

Mat

ch0.

0072

7,80

3.28

727,

803.

28

0.00

1,11

7,69

8.00

1,11

7,69

8.00

0.

00%

65.1

2%65

.12%

Oth

er S

tate

Gra

nts

16,6

20.9

414

,397

.85

31,0

18.7

9 72

,122

.00

18,0

00.0

090

,122

.00

23.0

5%79

.99%

34.4

2%O

ther

Fed

eral

Gra

nts

1,71

2,37

5.57

576,

126.

842,

288,

502.

41

2,53

6,42

7.00

853,

118.

003,

389,

545.

00

67.5

1%67

.53%

67.5

2%Fu

nd B

alan

ce R

eser

ves

0.00

0.00

0.00

0.

0014

8,61

4.00

148,

614.

00

0.00

%0.

00%

0.00

%Ca

pita

l Res

erve

Rev

enue

117,

533.

3313

,333

.33

130,

866.

66

176,

300.

0020

,000

.00

196,

300.

00

66.6

7%66

.67%

66.6

7%To

tal F

eder

al, S

tate

and

Loc

al R

even

ues

7,67

6,44

4.12

2,98

7,07

8.58

10,6

63,5

22.7

0 10

,914

,232

.00

4,65

9,15

5.00

15,5

73,3

87.0

0 70

.33%

64.1

1%68

.47%

OPE

RAT

ING

REV

ENU

EPa

ssen

ger R

even

ue1,

424,

451.

1066

,859

.25

1,49

1,31

0.35

2,

320,

000.

0012

3,00

0.00

2,44

3,00

0.00

61

.40%

54.3

6%61

.04%

Para

tran

sit P

asse

nger

Far

es64

,930

.00

0.00

64,9

30.0

0 11

5,00

0.00

0.00

115,

000.

00

56.4

6%0.

00%

56.4

6%Ad

vert

ising

Rev

enue

48,3

89.0

060

0.00

48,9

89.0

0 20

0,00

0.00

50,0

00.0

025

0,00

0.00

24

.19%

1.20

%19

.60%

Plan

ning

Rev

enue

277,

621.

6438

,000

.00

315,

621.

64

362,

106.

0030

,000

.00

392,

106.

00

76.6

7%12

6.67

%80

.49%

Inte

rest

Ear

ning

s52

2.30

3,15

4.82

3,67

7.12

3,

000.

004,

000.

007,

000.

00

17.4

1%78

.87%

52.5

3%M

iscel

lane

ous R

even

ue3,

444.

6396

.57

3,54

1.20

19

,000

.00

0.00

19,0

00.0

0 18

.13%

0.00

%18

.64%

Sale

s Of E

quip

men

t4,

261.

847,

932.

0012

,193

.84

11,0

00.0

03,

000.

0014

,000

.00

38.7

4%26

4.40

%87

.10%

Med

icai

d Pu

rcha

se O

f Svc

0.00

924,

913.

7292

4,91

3.72

0.

001,

540,

000.

001,

540,

000.

00

0.00

%60

.06%

60.0

6%Pu

rcha

se o

f Ser

vice

34,0

15.2

012

2,73

0.10

156,

745.

30

43,8

44.0

022

5,71

6.00

269,

560.

00

77.5

8%54

.37%

58.1

5%W

arra

nty

Reve

nue

5,31

0.00

0.00

5,31

0.00

2,

000.

002,

000.

004,

000.

00

265.

50%

0.00

%13

2.75

%O

pera

ting

Reve

nue

1,86

2,94

5.71

1,16

4,28

6.46

3,02

7,23

2.17

3,

075,

950.

001,

977,

716.

005,

053,

666.

00

60.5

6%58

.87%

59.9

0%

Tota

l Rev

enue

9,53

9,38

9.83

4,15

1,36

5.04

13,6

90,7

54.8

7 13

,990

,182

.00

6,63

6,87

1.00

20,6

27,0

53.0

0 68

.19%

62.5

5%66

.37%

EXPE

NSE

SSA

LAR

IES

AND

WAG

ESO

ther

Wag

es1,

137,

044.

0862

3,89

0.07

1,76

0,93

4.15

1,

714,

621.

0098

4,25

5.00

2,69

8,87

6.00

66

.31%

63.3

9%65

.25%

Driv

er/O

pera

tor W

ages

2,75

3,29

2.90

939,

946.

563,

693,

239.

46

4,22

6,30

2.00

1,49

9,97

9.00

5,72

6,28

1.00

65

.15%

62.6

6%64

.50%

Vehi

cle

Repa

ir W

ages

588,

384.

0595

,899

.11

684,

283.

16

960,

901.

0016

3,78

4.00

1,12

4,68

5.00

61

.23%

58.5

5%60

.84%

Sala

ries a

nd W

ages

4,47

8,72

1.03

1,65

9,73

5.74

6,13

8,45

6.77

6,

901,

824.

002,

648,

018.

009,

549,

842.

00

64.8

9%62

.68%

64.2

8%

Cur

rent

Fis

cal Y

ear T

o D

ate

FY

18 A

djus

ted

Bud

get A

ppro

ved

Dec

201

7B

udge

t Var

ianc

e

26

Page 27: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Chi

ttend

en C

ount

y T

rans

port

atio

n A

utho

rity

and

CC

TA

dba

Gre

en M

ount

ain

Tra

nsit

Urb

an R

ural

Bud

get V

s. A

ctua

lsF

or th

e E

ight

Mon

ths

End

ing

Feb

ruar

y 28

, 201

8T

arge

t67

%U

rban

Rur

alC

ombi

ned

Urb

anR

ural

Com

bine

dU

rban

Rur

alC

ombi

ned

Cur

rent

Fis

cal Y

ear T

o D

ate

FY

18 A

djus

ted

Bud

get A

ppro

ved

Dec

201

7B

udge

t Var

ianc

e

PER

SON

NEL

TAX

ES A

ND

BEN

EFIT

SPa

yrol

l Tax

es (F

ICA/

MC)

345,

332.

7912

6,90

3.23

472,

236.

02

527,

990.

0020

2,57

3.00

730,

563.

00

65.4

1%62

.65%

64.6

4%U

nem

ploy

men

t Tax

Exp

11,3

69.1

39,

424.

6720

,793

.80

22,0

00.0

020

,000

.00

42,0

00.0

0 51

.68%

47.1

2%49

.51%

Med

ical

Insu

ranc

e/HR

A1,

104,

068.

8044

2,29

0.06

1,54

6,35

8.86

1,

519,

767.

0055

7,22

6.00

2,07

6,99

3.00

72

.65%

79.3

7%74

.45%

Pens

ion

Plan

Exp

ense

s19

6,55

6.76

45,6

16.8

024

2,17

3.56

28

7,11

6.00

60,9

04.0

034

8,02

0.00

68

.46%

74.9

0%69

.59%

Empl

oyee

Dev

elop

men

t33

,670

.94

11,5

68.4

245

,239

.36

35,5

00.0

032

,500

.00

68,0

00.0

0 94

.85%

35.6

0%66

.53%

Oth

er E

mpl

oyee

Ben

efits

173,

130.

9167

,635

.68

240,

766.

59

250,

407.

0092

,030

.00

342,

437.

00

69.1

4%73

.49%

70.3

1%Pe

rson

nel T

axes

and

Ben

efits

1,86

4,12

9.33

703,

438.

862,

567,

568.

19

2,64

2,78

0.00

965,

233.

003,

608,

013.

00

70.5

4%72

.88%

71.1

6%

GEN

ERAL

AN

D A

DM

IN E

XPEN

SES

Adm

in S

uppl

ies a

nd E

xpen

ses

33,9

47.1

19,

216.

5143

,163

.62

43,7

40.0

021

,600

.00

65,3

40.0

0 77

.61%

42.6

7%66

.06%

Recr

uitin

g Ex

pens

es12

,368

.78

8,50

2.42

20,8

71.2

0 18

,400

.00

12,0

00.0

030

,400

.00

67.2

2%70

.85%

68.6

6%Du

es a

nd S

ubsc

riptio

ns26

,686

.87

4,68

5.25

31,3

72.1

2 27

,838

.00

10,0

33.0

037

,871

.00

95.8

6%46

.70%

82.8

4%Tr

avel

and

Mee

tings

1,36

1.35

1,72

7.48

3,08

8.83

3,

500.

003,

500.

007,

000.

00

38.9

0%49

.36%

44.1

3%Bo

ard

Deve

lopm

ent

0.00

0.00

0.00

2,

000.

002,

000.

004,

000.

00

0.00

%0.

00%

0.00

%Co

mm

unic

atio

ns33

,751

.06

21,5

27.5

655

,278

.62

58,8

80.0

028

,336

.00

87,2

16.0

0 57

.32%

75.9

7%63

.38%

Com

pute

r Ser

vice

Exp

31,5

09.1

06,

493.

8838

,002

.98

124,

320.

0057

,164

.00

181,

484.

00

25.3

5%11

.36%

20.9

4%Le

gal F

ees

5,16

6.26

327.

905,

494.

16

10,0

00.0

03,

000.

0013

,000

.00

51.6

6%10

.93%

42.2

6%In

sura

nce

555,

614.

8823

2,85

7.81

788,

472.

69

758,

412.

0030

5,13

2.00

1,06

3,54

4.00

73

.26%

76.3

1%74

.14%

Audi

t Fee

s7,

245.

003,

105.

0010

,350

.00

19,4

25.0

08,

325.

0027

,750

.00

37.3

0%37

.30%

37.3

0%Co

nsul

ting

Fees

0.00

0.00

0.00

0.

000.

000.

00

0.00

%0.

00%

0.00

%G

ener

al a

nd A

dmin

Exp

ense

s70

7,65

0.41

288,

443.

8199

6,09

4.22

1,

066,

515.

0045

1,09

0.00

1,51

7,60

5.00

66

.35%

63.9

4%65

.64%

OPE

RAT

ION

S EX

PEN

SES

Back

grou

nd C

heck

s1,

558.

0010

,073

.00

11,6

31.0

0 1,

900.

008,

325.

0010

,225

.00

82.0

0%12

1.00

%11

3.75

%Dr

ug &

Alc

hol T

estin

g55

8.00

589.

001,

147.

00

13,7

55.0

07,

898.

0021

,653

.00

4.06

%7.

46%

5.30

%DO

T Te

stin

g4,

895.

004,

160.

009,

055.

00

5,85

0.00

7,92

0.00

13,7

70.0

0 83

.68%

52.5

3%65

.76%

Empl

oym

ent R

ecru

item

ent P

rogr

am1,

200.

000.

001,

200.

00

800.

0040

0.00

1,20

0.00

15

0.00

%0.

00%

100.

00%

Driv

er's

Uni

form

s19

,019

.97

7,87

9.59

26,8

99.5

6 24

,996

.00

20,1

70.0

045

,166

.00

76.0

9%39

.07%

59.5

6%Sa

fety

Exp

ense

936.

530.

0093

6.53

2,

050.

001,

700.

003,

750.

00

45.6

8%0.

00%

24.9

7%M

isc. O

pera

ting

Exp

3,25

0.47

1,18

1.17

4,43

1.64

7,

100.

002,

675.

009,

775.

00

45.7

8%44

.16%

45.3

4%O

pera

tions

Exp

ense

s31

,417

.97

23,8

82.7

655

,300

.73

56,4

51.0

049

,088

.00

105,

539.

00

55.6

6%48

.65%

52.4

0%

PLAN

NIN

G E

XPEN

SES

Oth

er P

lann

ing

Expe

nses

0.00

75,2

39.0

875

,239

.08

0.00

60,0

00.0

060

,000

.00

0.00

%12

5.40

%12

5.40

%M

PO P

lann

ing

Expe

nses

123,

275.

580.

0012

3,27

5.58

15

0,00

0.00

0.00

150,

000.

00

82.1

8%0.

00%

82.1

8% 27

Page 28: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Chi

ttend

en C

ount

y T

rans

port

atio

n A

utho

rity

and

CC

TA

dba

Gre

en M

ount

ain

Tra

nsit

Urb

an R

ural

Bud

get V

s. A

ctua

lsF

or th

e E

ight

Mon

ths

End

ing

Feb

ruar

y 28

, 201

8T

arge

t67

%U

rban

Rur

alC

ombi

ned

Urb

anR

ural

Com

bine

dU

rban

Rur

alC

ombi

ned

Cur

rent

Fis

cal Y

ear T

o D

ate

FY

18 A

djus

ted

Bud

get A

ppro

ved

Dec

201

7B

udge

t Var

ianc

ePl

anni

ng E

xpen

ses

123,

275.

5875

,239

.08

198,

514.

66

150,

000.

0060

,000

.00

210,

000.

00

82.1

8%12

5.40

%94

.53%

VEH

ICLE

/BU

ILD

ING

MAI

NTE

NAN

CE

EXP

(15

Indu

stria

l)Pa

rts E

xpen

se -

Non

-Rev

enue

Veh

icle

s5,

691.

341,

040.

806,

732.

14

7,00

0.00

4,80

0.00

11,8

00.0

0 81

.30%

21.6

8%57

.05%

Part

s Exp

ense

- Re

venu

e Ve

hicl

es49

8,80

3.59

262,

166.

8976

0,97

0.48

40

8,39

4.00

191,

000.

0059

9,39

4.00

12

2.14

%13

7.26

%12

6.96

%Ti

res

58,2

13.1

324

,449

.16

82,6

62.2

9 90

,000

.00

30,0

00.0

012

0,00

0.00

64

.68%

81.5

0%68

.89%

Faci

lity

Mai

nten

ance

70,3

25.7

645

,638

.63

115,

964.

39

70,0

00.0

079

,200

.00

149,

200.

00

100.

47%

57.6

2%77

.72%

Pass

enge

r Fac

ility

Exp

ense

s17

,390

.80

0.00

17,3

90.8

0 42

,988

.00

1,00

0.00

43,9

88.0

0 40

.46%

0.00

%39

.54%

Clea

ning

Exp

ense

10,0

00.0

08,

137.

2218

,137

.22

58,0

00.0

07,

200.

0065

,200

.00

17.2

4%11

3.02

%27

.82%

Repe

ater

Fee

s18

,036

.00

13,5

00.0

031

,536

.00

21,6

00.0

016

,200

.00

37,8

00.0

0 83

.50%

83.3

3%83

.43%

Ligh

t, He

at a

nd W

ater

107,

904.

3532

,419

.12

140,

323.

47

115,

000.

0055

,000

.00

170,

000.

00

93.8

3%58

.94%

82.5

4%Fu

el -

Vehi

cles

550,

858.

2825

6,32

9.17

807,

187.

45

971,

584.

0031

3,40

8.00

1,28

4,99

2.00

56

.70%

81.7

9%62

.82%

Mai

nten

ance

Too

ls/Su

pplie

s/U

nifo

rms

61,2

69.5

711

,939

.12

73,2

08.6

9 91

,075

.00

12,5

44.0

010

3,61

9.00

67

.27%

95.1

8%70

.65%

Misc

Mai

nt E

xpen

ses a

nd fe

es5,

118.

8478

4.50

5,90

3.34

5,

000.

001,

350.

006,

350.

00

102.

38%

58.1

1%92

.97%

Vehi

cle/

Build

ing

Mai

nten

ance

Exp

1,40

3,61

1.66

656,

404.

612,

060,

016.

27

1,88

0,64

1.00

711,

702.

002,

592,

343.

00

74.6

3%92

.23%

79.4

7%

CO

NTR

ACTO

R E

XPEN

SES

ADA/

SSTA

Par

atra

nsit

777,

333.

580.

0077

7,33

3.58

1,

266,

007.

000.

001,

266,

007.

00

61.4

0%0.

00%

61.4

0%Pa

rtne

r Loc

al S

hare

9,91

6.50

0.00

9,91

6.50

19

,833

.00

0.00

19,8

33.0

0 50

.00%

0.00

%50

.00%

Func

tiona

l Ass

essm

ent C

osts

5,81

0.72

0.00

5,81

0.72

10

,000

.00

0.00

10,0

00.0

0 58

.11%

0.00

%58

.11%

Volu

ntee

r Driv

ers

0.00

340,

918.

3434

0,91

8.34

0.

0060

0,00

0.00

600,

000.

00

0.00

%56

.82%

56.8

2%O

ther

Tra

nspo

rtat

ion

(incl

Cab

s)6,

824.

1043

8,23

0.90

445,

055.

00

21,3

31.0

070

0,00

0.00

721,

331.

00

31.9

9%62

.60%

61.7

0%Co

ntra

ctor

Exp

ense

s79

9,88

4.90

779,

149.

241,

579,

034.

14

1,31

7,17

1.00

1,30

0,00

0.00

2,61

7,17

1.00

60

.73%

59.9

3%60

.33%

MAR

KET

ING

EXP

ENSE

Bus T

icke

ts/F

are

Med

ia13

,768

.65

1,03

8.65

14,8

07.3

0 20

,000

.00

2,40

0.00

22,4

00.0

0 68

.84%

43.2

8%66

.10%

Mar

ketin

g Ex

pens

e11

,511

.07

12,1

00.7

623

,611

.83

52,0

00.0

045

,840

.00

97,8

40.0

0 22

.14%

26.4

0%24

.13%

Publ

ic I

nfor

mat

ion

12,0

07.5

011

,718

.06

23,7

25.5

6 37

,000

.00

23,0

00.0

060

,000

.00

32.4

5%50

.95%

39.5

4%M

arke

ting

Expe

nse

37,2

87.2

224

,857

.47

62,1

44.6

9 10

9,00

0.00

71,2

40.0

018

0,24

0.00

34

.21%

34.8

9%34

.48%

OTH

ER E

XPEN

SES

Debt

Ser

vice

/Cap

ital R

eser

ve46

,442

.51

0.00

46,4

42.5

1 50

,000

.00

0.00

50,0

00.0

0 92

.89%

0.00

%92

.89%

Capi

tal M

atch

117,

533.

3313

,333

.33

130,

866.

66

176,

300.

0020

,000

.00

196,

300.

00

66.6

7%66

.67%

66.6

7%O

ther

Exp

ense

s16

3,97

5.84

13,3

33.3

317

7,30

9.17

22

6,30

0.00

20,0

00.0

024

6,30

0.00

72

.46%

66.6

7%71

.99%

TOTA

L EX

PEN

SES

9,60

9,95

3.94

4,22

4,48

4.90

13,8

34,4

38.8

4 14

,350

,682

.00

6,27

6,37

1.00

20,6

27,0

53.0

0 66

.97%

67.3

1%67

.07% 28

Page 29: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Chi

ttend

en C

ount

y T

rans

port

atio

n A

utho

rity

and

CC

TA

dba

Gre

en M

ount

ain

Tra

nsit

Urb

an R

ural

Bud

get V

s. A

ctua

lsF

or th

e E

ight

Mon

ths

End

ing

Feb

ruar

y 28

, 201

8T

arge

t67

%U

rban

Rur

alC

ombi

ned

Urb

anR

ural

Com

bine

dU

rban

Rur

alC

ombi

ned

Cur

rent

Fis

cal Y

ear T

o D

ate

FY

18 A

djus

ted

Bud

get A

ppro

ved

Dec

201

7B

udge

t Var

ianc

e

Curr

ent Y

ear D

efer

red

Cost

s(1

47,1

82.7

9)0.

00(1

47,1

82.7

9)0.

000.

000.

00

0.00

%0.

00%

0.00

%AL

LOCA

TIO

NS

BETW

EEN

PRO

GRAM

S21

7,74

6.90

(217

,746

.90)

0.00

36

0,50

0.00

(360

,500

.00)

0.00

60

.40%

60.4

0%0.

00%

Bala

nce

Of O

pera

ting

Budg

et0.

00(2

90,8

66.7

6)(2

90,8

66.7

6)0.

000.

000.

00

0.00

%0.

00%

0.00

%

Capi

tal R

even

ueFe

dera

l Rev

enue

4,72

4,62

6.78

85,6

54.3

64,

810,

281.

14

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Stat

e Re

venu

e59

0,73

7.85

10,7

35.3

160

1,47

3.16

0.

000.

000.

00

0.00

%0.

00%

0.00

%Pa

ratr

ansit

Lea

se R

even

ue0.

003,

735.

603,

735.

60

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Loca

l Mat

ch R

even

ue0.

000.

000.

00

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Tota

l Cap

ital R

even

ue5,

315,

364.

6310

0,12

5.27

5,41

5,48

9.90

0.

000.

000.

00

0.00

%0.

00%

0.00

%

Capi

tal E

xpen

ses

Vehi

cles

5,72

0,78

2.82

59,1

28.0

05,

779,

910.

82

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Mai

nten

ance

Par

ts a

nd E

quip

men

t19

3,45

6.85

8,30

8.62

201,

765.

47

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Pass

enge

r Am

eniti

es41

,703

.32

5,79

8.93

47,5

02.2

5 0.

000.

000.

00

0.00

%0.

00%

0.00

%Fa

cilit

y Re

pairs

and

Impr

ovem

ents

123,

087.

5373

,501

.02

196,

588.

55

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Tota

l Cap

ital E

xpen

ses

6,07

9,03

0.52

146,

736.

576,

225,

767.

09

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Bala

nce

of C

apita

l Bud

get

(763

,665

.89)

(46,

611.

30)

(810

,277

.19)

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Tran

sfer

of P

urch

ases

to F

ixed

Ass

ets

5,70

6,87

6.45

123,

327.

335,

830,

203.

78

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Defe

rred

Cos

ts0.

000.

000.

00

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

Depr

ecia

tion

Expe

nse

(1,7

25,7

70.1

3)(4

25,3

17.1

4)(2

,151

,087

.27)

0.00

0.00

0.00

0.

00%

0.00

%0.

00%

S

ubto

tal

3,98

1,10

6.32

(301

,989

.81)

3,67

9,11

6.51

0.

000.

000.

00

0.00

%0.

00%

0.00

%

Curr

ent C

hang

e in

Net

Ass

ets

3,21

7,44

0.43

(639

,467

.87)

2,57

7,97

2.56

0.

000.

000.

00

0.00

%0.

00%

0.00

%

29

Page 30: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

To: GMT Board of Commissioners From: Michelle Daley, Director of Finance Donna Gallagher, Broker Services Manager Jordan Posner, ADA Coordinator Date: April 12, 2018 RE: ADA and Broker Services Through February, 2018 we are running a deficit for the Medicaid contract, totaling $105K. There is some good news to report on the meeting between VPTA and DVHA, they have agreed to a rate increase for the Medicaid contract to $34 PMPW. This is expected to allow us to breakeven by year end. The rate will be effective retroactive to April 1, 2018.

We have hired Saudin Bahonjic to handle the verification and billing for the brokerage services we provide in the rural system. He is working at the Berlin office and has hit the ground running. Saudin has a lot of technological experience which is very beneficial for us as we work to develop reports from our system.

Donna Gallagher has worked with RouteMatch for VPTA to test a system to make working the denials that are received by DVHA easier. This new component to the RouteMatch system has now been rolled out to the rest of the providers in VT. For the month of February we reported the following stats to VPTA as part of our monthly reporting for Medicaid.

Jon Moore attended the ADA Advisory Committee about the Next Gen project and its potential impacts on the ADA Service Area. One point of concern for the committee was the potential impact of changing from a number based route system to a color based system, and how that might impact individuals who have vision impairments or may suffer from color blindness. The committee also expressed concerns about potential College Street Shuttle changes, in particular the future of the fare free service on that route. The committee was very thankful for Jon's attendance and requested to be kept informed as this project progressed.

The Bus Buddy Program officially has 4 volunteers who have gone through the background check system, and now that the weather is warming up, will be starting to take rides with individuals looking for travel training. The program has some mass trainings in the works with organizations like AARP, and we will be updating the board as those events occur.

The ADA trip report again shows that ridership overall is aligned with FY17 total trips. The highest increase in ridership is still out of Colchester, while the biggest decrease in ridership is in Winooski.

30

Page 31: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Pri

nte

d o

n: 4

/11

/20

18

ADA

Rid

ersh

ip R

epor

t (by

Tow

n) :

FY18

% in

crea

se/(

dec

reas

e) f

rom

pri

or

year

Ben

chm

ark

fo

r co

mp

ari

son

is 7

5%

CIT

Y/TO

WN

July

A

ugu

stSe

pte

mb

erO

cto

ber

No

vem

ber

Dec

emb

erJa

nu

ary

Feb

ruar

yM

arch

Tota

l FY1

8 Y

TD

Tota

l

FY1

7

Rid

es

% o

f FY

18

YTD

com

par

ed t

o

FY1

7

BU

RLI

NG

TON

1,2

82

1,2

29

1,1

70

1,2

75

1,1

86

1,1

33

1,1

80

1,2

19

1,2

46

10

,92

01

4,3

98

76

%

-0.9

3%

-11

.58

%-4

.96

%0

.79

%1

0.1

2%

8.2

1%

3.3

3%

10

.72

%8

.73

%

CO

LCH

ES

TER

11

61

03

97

10

71

00

99

15

01

00

10

29

74

1,0

37

94

%

87

.10

%1

7.0

5%

42

.65

%4

6.5

8%

21

.95

%1

9.2

8%

31

.58

%2

6.5

8%

3.0

3%

ES

SE

X2

88

28

82

78

31

73

00

31

73

02

31

73

66

2,7

73

3,7

51

74

%

19

.01

%-6

.80

%-2

3.2

0%

-11

.20

%3

.09

%-1

.25

%-4

.73

%-4

.80

%2

2.8

2%

OTH

ER

99

46

12

92

92

82

21

28

20

76

2%

-62

.50

%-7

0.9

7%

-69

.23

%-6

2.5

0%

33

.33

%2

8.5

7%

93

.33

%1

00

.00

%-8

.33

%

SH

ELB

UR

NE

25

22

76

22

92

61

25

02

26

30

62

66

30

62

,37

23

,27

17

3%

-1.9

5%

3.7

6%

6.0

2%

5.6

7%

-3.4

7%

-22

.87

%5

.52

%-8

.59

%-5

.26

%

SO

. BU

RLI

NG

TON

96

31

,09

21

,09

11

,20

41

,13

21

,10

51

,08

39

02

1,1

40

9,7

12

13

,82

97

0%

1.4

8%

6.3

3%

-3.7

1%

-4.9

0%

2.5

4%

-2.8

1%

-4.1

6%

-19

.61

%-6

.48

%

WIL

LIS

TON

96

10

17

56

27

61

00

11

87

88

17

87

1,1

26

70

%

-21

.31

%-8

.18

%-4

1.8

6%

-32

.61

%-2

0.0

0%

21

.95

%2

6.8

8%

-13

.33

%-2

9.5

7%

WIN

OO

SK

I3

92

45

64

49

43

94

48

44

24

61

47

31

80

3,7

40

5,7

61

65

%

-12

.11

%-1

1.2

8%

-11

.26

%1

.86

%-5

.88

%-1

5.0

0%

-12

.52

%7

.74

%-6

1.8

6%

TOTA

L3

,39

83

,55

43

,39

33

,67

13

,50

43

,43

13

,62

93

,38

33

,44

33

1,4

06

43

,38

07

2%

Cos

t to

Mem

bers

84

,90

4.2

3$

8

9,4

16

.24

$

8

6,0

67

.45

$

9

3,9

02

.23

$

8

9,3

03

.77

$

8

8,1

76

.72

$

9

3,4

88

.04

$

8

6,2

52

.49

$

9

6,7

31

.20

$

6

25

,25

8.6

9$

Cos

t/Trip

24

.99

$

2

5.1

6$

25

.37

$

25

.58

$

25

.49

$

25

.70

$

2

5.7

6$

25

.50

$

2

8.1

0$

25

.44

$

Tota

l Rid

es

31

Page 32: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Month: March  2018

Urban  Data Data Notes

Miles  Operated: 165,063 Revenue  Vehicles

Major  Road  Calls: 11 Failure  prevented  a  vehicle  from  completing  or  starting  a  scheduled  revenue  trip

Major  Road  Calls/100,000  Miles: 6.7

Minor  Road  Calls: 7Vehicle  physically  able  to  continue  in  revenue  service  without  creating  a  safety  concern  (i.e.  fare  box,  HVAC)

Total  Road  Calls/100,000  Miles: 10.90

"C"  PM's  Completed: 24"C"  PM  is  a  major  inspection  consisting  of  a  PM  checklist,  brake  inspection,  chassis  grease  and  engine  oil  change,  preformed  every  6,000  miles

"C"  PM  On-­‐time  % 100% Within  10%  of  the  scheduled  mileage  per  the  FTA

Active  Fleet  Avg.  Age 7.51  years Transit  buses  have  a  12  year  life  expectancy  Rural  Data Notes

Miles  Operated: 117,590 Revenue  Vehicles

Major  Road  Calls: 13 Failure  prevented  a  vehicle  from  completing  or  starting  a  scheduled  revenue  trip

Major  Road  Calls/100,000  Miles: 11.1

Minor  Road  Calls: 7Vehicle  physically  able  to  continue  in  revenue  service  without  creating  a  safety  concern  (i.e.  fare  box,  HVAC)

Total  Road  Calls/100,000  Miles: 5.98

"C"  PM's  Completed: 28"C"  PM  is  a  major  inspection  consisting  of  a  PM  checklist,  brake  inspection,  chassis  grease  and  engine  oil  change,  preformed  every  6,000  miles

"C"  PM  On-­‐time  % 71% Within  10%  of  the  scheduled  mileage  per  the  FTA

Cut-­‐away  Active  Fleet  Avg.  Age 4.82  years Cut-­‐away  buses  have  a  5  year  life  expectancy

Monthly  Maintenance  Performance  Report

Steve  Simpson  has  been  hired  as  the  Berlin  Forman.    Steve  has  over  30  years  of  fleet  maintenance  and  supervisory  experience  at  UPS  and  has  spent  the  past  8  years  working  in  the  school  bus  industry.    We  are  excited  to  have  Steve  on-­‐board  and  the  level  of  experience  he  will  bring  to  the  Berlin  shop.

Motor  Coach  Industries  (MCI)  were  on-­‐site  in  Burlington  the  week  of  3/19  for  a  maintenance  training  focusing  on  electrical  systems,  preventative  maintenance,  steering  a&  suspension  and  doors.

32

Page 33: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

15 Industrial Parkway, Burlington, VT 05401 RideGMT.com RideGMT.com802-864-2282

Green Mountain Transit To: GMT Board of Commissioners From: Bob Young, Director of Operations Mev Bahonjic, Urban Operations Manager – Burlington Rich Gorton, Rural Operations Manager – FGI Jamie Smith, Rural Operations Manager - Berlin Date: 04/11/19 RE: GMT Operations Report _____________________________________________________________ We concluded the Seasonal Mountain Operations in Stowe and Mad River Valley (Sugarbush) on April 1st. There was a vast improvement over the previous seasons due to the quality service provided with having adequate staffing and training. Rural Operations held on-site barbecues at Stowe and Sugarbush to thank the staff for a great season, and to try and recruit them to return for next season. Actually, we have picked up a full time employee from the seasonal staff as well. We participated in testing some local routing concerns with Montpelier DPW and GMT Planning for the LINK buses that would be going in and out of the location for the future Montpelier Transit Center on Taylor Street. Burlington School District’s Director of Property Services reached out for our Urban Operations to meet with them and their architects with some school pick up and drop off location changes, which they are going to be making for security reason with numerous schools. They are going to have all the schools use one main entrance for safety control. There will be minimal changes for GMT with no real effects to our service. Plus, we were able to share some ideas to help improve the safety of the school children. Stay safe!

33

Page 34: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Date: April 4th, 2018 To: GMT Board of Commissioners From: Rachel Kennedy, Sr. Transit Planner Re: March Planning Report Transit Planner: Devin Mason has accepted the position of Transit Planner at GMT. Devin has an M.A in Urban and Regional Planning from the University at Albany. Devin will support Rachel Kennedy and the NextGen study through the coming phases. As a resident of Albany VT, Devin has helped assist in the revision of the Albany Vermont Town Plan. He was also an active member of the Albany Vermont Planning Committee for two years. We are very excited with the addition of Devin to the Planning department. Customer Service Survey: GMT conducted an on-board urban Customer Service Survey in the fall of 2017 in an effort to learn more about passenger background, incomes, need for transit and overall satisfaction with the current services provided by GMT. Please see attached for a summary of the results. Meetings & Outreach:

• Staff met with stakeholders from departments in the City of Burlington to discuss urban Nextgen service scenarios.

• Staff met with the CVRPC TAC committee to discuss Nextgen service scenarios. • Staff met with CATMA to discuss the roll out of the new bike share program. • Staff met with the Burlington Land Use Committee to discuss Nextgen service scenarios. • Staff met with the UVM Center for Sustainable Transportation to discuss a class project

researching ridership on Route 116. • Staff met with stakeholders from Bolton Ski Resort to discuss possible service expansion. • Staff attended monthly CCRPC TAC meeting.

34

Page 35: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

To: GMT Board of Commissioners From: Jamie L. Smith, Marketing and Public Affairs Manager Date: April 12, 2018 Re: Marketing and Public Affairs Report _____________________________________________________________________________

• Marketing staff has developed an outreach/Marketing campaign for the Jeffersonville Commuter route. The plan includes: direct mail piece featur-ing try-it passes, information about ticket outlet locations, schedule, etc. We are working on establishing ticket outlet locations along the route. The direct mail piece will hit mailboxes in June to correspond with the Bus Map and Guide, and try-it passes will be valid through July.

• Marketing staff ha extended the bus advertising campaign with Seven Days. In addition, we are working on revamping the entire program to in-clude digital ads, regional rates, etc.

• Youth Summer wristbands have been ordered for 2018. To kick off the program this year, we will again have a booth at Kid’s Day in Burlington. As part of our activity this year, we will create price packages, including a free wristband. Outreach will begin in May to groups like: YMCA, Parks and Recreation locations across the state, etc.

• Marketing is working on a recruitment/culture video with Human Re-sources. This is an exciting opportunity to collaborate with Seven Days to create a video that highlights how unique GMT is!

• Our first outreach event for 2018 has been decided! Marketing/Outreach staff has selected the Good Samaritan Haven in Barre as our first recipient. The GSH is Central Vermont’s only homeless shelter and they have several programs to help shelter, support, and provide a path forward for home-less folks. They have identified laundry supplies as their greatest need. As we move forward with planning, we will continue to update the Board of Commissioners. We have tentatively scheduled the event for June 1.

• Marketing is developing a passenger survey that will help us determine some passenger demographic information. The outcome of this survey will help determine the FY19 Marketing and Outreach Plan.

• Outreach staff has begun working on a plan for FY20 funding requests. We hope that developing the plan now will allow us to send letters out earlier than last year, and maybe allow us the opportunity to provide more out-reach to individual communities.

35

Page 36: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Green Mountain Transit

15 Industrial Parkway, Burlington, VT 05401 RideGMT .com RideGMT .com 802-540-2468

To:     GMT  Board  of  Commissioners    From:       Trish  Redalieu,  Director  of  Human  Resources    Date:     April  17,  2018    RE:     IT  Support,  Administrative  Support,  Training,  and  HR      

Human  Resources  and  Training    March  was  a  month  full  of  training  for  GMT  staff.  MCI  was  on  site  for  a  week-­‐long  training  that  included  troubleshooting  electrical,  steering,  and  suspension  systems,  and  preventative  maintenance.      The  Training  Supervisors  attended  a  PASS  (Passenger  Assistance  Safety  and  Sensitivity)  Train  the  Trainer  Certification  class.  VTrans  paid  for  the  majority  of  the  class  and  coordinated  bringing  the  trainer  to  SSTA’s  facility  in  Colchester  where  the  training  was  conducted.  VTrans  continues  to  create  training  opportunities  for  transit  agencies  in  Vermont  by  bringing  quality  and  affordable  training  here.          Jeremy  Whiting  Training  Supervisor,  also  attended  a  Transportation  Safety  Institute  (a  division  of  USDOT)  training  to  certify  him  as  a  Transportation  Trainer.      Brian  Miller,  Conflict  Consultant,  conducted  the  first  set  of  trainings  in  Effective  Conflict  Management  in  the  Workplace.  This  training  was  attended  by  staff  in  supervisory  roles,  and/or  those  who  may  encounter  difficult  conversations  in  the  course  of  their  workday.  There  are  two  remaining  training  sessions  on  April  18th  in  Berlin.      The  Executive  Leadership  Team  cooked  breakfast  for  staff  in  St  Albans  on  April  5th.  The  menu  included  Belgian  waffles,  bacon,  sausage,  and  scrambled  eggs.  It  was  fun  morning  and  the  team  appreciated  spending  time  with  the  St  Albans  team.  Our  time  there  included  a  frank  discussion  on  the  Employee  Satisfaction  Survey.    John  Robinson  attended  Career  fairs  at  Vermont  Technical  College  in  Randolph,  Franklin  county  Career  Fair  in  St  Albans,  and  the  Central  Vermont  Career  Fair  at  the  Barre  auditorium.    GMT  welcomes  Devin  Mason  as  our  Transit  Planner.  He  has  already  been  out  riding  the  routes  and  studying  the  NexGen  study.  Mike  Singer  has  also  joined  the  GMT  team  as  a  Sedan  Driver  in  the  Berlin  location.    

36

Page 37: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Customer  Service  Survey  

0.0%   5.0%   10.0%   15.0%   20.0%   25.0%   30.0%  

Stop/Route  Elimina7on  Access  

Capacity  Adver7sing/  Partnerships  

Other  Pricing/  Incen7ves  

Transfer  Safety/  Security  

Rou7ng  Bus  Amenity  

Customer  Service  Stop  Amenity  

Stop/Route  Addi7on  Technology/Interface  

Scheduling  Frequency/  Reliability  

Customer  Service  Survey  Response  by  Percentage  

 “During  the  fall  of  2017,  GMT  surveyed  approximately  6.1%  of  its  urban  weekday  riders  (486  completed  surveys  from  around  7,938  weekday  trips)  in  an  effort  to  learn  more  about  their  background,  incomes,  need  for  transit,  and  overall  satisfaction  with  the  current  services  being  offered.  GMT  chose  to  interview  passengers  rather  than  handing  out  questionnaires,  thereby  ensuring  a  high  response  rate  and  a  more  representative  sample.  Note  that  among  the  7,938  weekday  trips,  there  are  likely  only  about  3,200  individuals  making  these  trips  (since  most  people  make  more  than  one  trip  per  day),  so  the  survey  represents  about  one  out  of  every  six  people  who  use  GMT  urban  routes  on  a  regular  basis”  (“GMT  Urban  Customer  Service  Rider  Survey  Results”,  2017).  

Of  the  486  completed  surveys,  270  respondents  chose  to  provide  comments  about  GMT,  covering  a  variety  of  subjects.  Based  on  analysis  of  the  data  by  GMT  staff  listed  below  are  the  three  most-­‐common  topics:  

Frequency/Reliability:   Of  the  main  concerns  identified  from  the  2017  customer  feedback  survey,  frequency  and  reliability  were  of  greatest  concern;  of  this  type  of  feedback,  the  most  common  was  that  the  buses  either  did  not  run  at  sufficient  frequency  or  that  buses  departed  early,  departed  late,  or  never  arrived.              

Scheduling:   Scheduling  was  the  second-­‐greatest  concern  among  surveyed  riders.  The  most  common  schedule-­‐related  critiques  were  that  GMT  should  begin  operating  earlier,  stay  operating  later,  or  that  particular  routes  should  depart  earlier  or  later.              

Technology  Interface:   Technology  was  the  third-­‐most-­‐prevalent  concern,  expressed  by  22  percent  of  riders.  The  most-­‐prevalent  critique  related  to  RouteShout,  with  many  riders  stating  that  buses  often  were  not  visible  on  their  routes  or  that  the  application  is  flawed  in  general.  Another  major  technology-­‐related  critique  was  that  GMT  should  send  service  alerts  via  text  message,  especially  when  a  particular  route  has  been  delayed  or  cancelled.    The  absence  of  automated  stop  announcement  was  also  a  common  critique,  and  some  passengers  also  suggested  that  buses  be  equipped  with  onboard  weather  monitors.    

       

37

Page 38: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Customer  Service  Survey        

 

 

   

 

 

Glossary  

Scheduling  Non-­‐frequency  schedule  changes  (e.g.,  earlier  or  later  departures,  service  on  weekends)  

Routing  

Alterations  in  the  route  a  particular  line  takes.  Example:  Suggesting  that  a  bus  use  a  different  street,  or  that  a  particular  location  be  served  by  a  different  line.  

Stop/Route  Elimination   Elimination  of  a  particular  route  or  stop.  

Access  Factors  which  may  limit  a  passenger's  access  to  GMT's  system  (e.g.  insufficient  snow  removal  or  poor  handicap  accessibility).  

Stop  Amenity   Addition  of  amenities  such  as  bicycle  racks,  lighting,  or  heating  

Bus  Amenity  Addition  of  amenities  such  as  bicycle  racks,  better  heating  regulation,  rearranged  seating,  and  the  like.  

Capacity  Larger  buses.  Does  not  include  increased  capacity  through  increased  service  frequency.  

Frequency/Reliability  Requests  for  increased  frequency  or  critiques  about  buses  leaving  early,  arriving  late,  or  not  arriving.  

Transfer  (Internal,  External,  or  Between  Modes)  

Ability  to  transfer  from  one  GMT  route  another,  to  other  transit  providers,  or  to  other  modes  (e.g.  College  Street  Shuttle  to  Montpelier  LINK;  GMT  to  Greyhound,  Megabus,  or  Amtrak;  or  GMT  to  carshare,  bikeshare  or  personal  automobile;  and  the  reverse).  

Pricing/  Incentives  Higher  or  lower  fares;  Loyalty  programs,  discounts,  fare-­‐free  routes,  longer  pass  terms  (e.g.  6  months  or  a  year,  in  addition  to  1-­‐month  passes).  

Technology/Interface  Automated  stop  announcement,  weather  monitor,  text  alerts,  improve  Route  Shout.  

Customer  Service   Critiques  about  rude  drivers  or  requests  for  longer  call  center  hours.  Advertising/  Partnerships  

Better  publication  of  delays  and  cancellations.  Partner  with  employers  for  employer-­‐subsidized  passes.  

Safety/  Security   Lighting  for  security  reasons.  Better  enforcement  of  rules.  

Other  Miscellaneous.  Critiques  of  which  there  were  so  few  that  they  did  not  warrant  the  creation  of  a  new  theme.  

38

Page 39: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Customer  Service  Survey    

1A)  Origin-­‐Destination  pairs  for  trips  to  the  seven  core  communities.  

Column  headings  –  Origins  

Row  headings  -­‐  Destinations  

From                        To   Burlington   Colchester   Essex   S.  

Burlington   Shelburne   Williston   Winooski   TOTAL  

Barre   19                           19  

Bristol   2                           2  

Burlington   2,330   200   235   378   363   276   220   4002  

Colchester   246       5   29       5       285  

Duxbury   9                           9  

E  Calais   9                           9  

Enosburg   31                           31  

Essex   291       47           10   31   379  

Essex  Ctr   19                           19  Essex  Junction   132       16   5       39   5   197  

Ferrisburg   17                           17  

Ferrisburgh   5                           5  

Georgia   9                           9  

Hinesburg   9   2                       11  

Huntington                       29   2   31  

Jericho   38                           38  

Middlebury   15                           15  

Milton   22                           22  

Monkton   5                           5  

Montpelier   103   9   31   9               152  

Morristown   5                           5  

New  Haven   5                           5  

Northfield   9                           9  

Plymouth   29                           29  

S  Burlington   456   29   89   136   51   58   16   835  

S  Hero   5                           5  

Shelburne   316           75       17       408  

St  Albans   54                           54  

Stowe   9                           9  

Vergennes   9                           9  

Waltham   5                           5  

39

Page 40: AGENDA Green Mountain Transit Board of Commissioners April ... · Green Mountain Transit Board of Commissioners April th17 2018, 7:30 a.m. 15 Industrial Pkwy, Burlington, VT 05401

Customer  Service  Survey  Waterbury   28                           28  Waterbury  Ctr  

28                           28  

Weybridge               5               5  

Williamstown   9                           9  

Williston   147       5   34       5   5   196  

Winooski   356   5   62   103   17   44   64   651  

TOTAL   4,784   246   490   774   431   484   343   7552  

 

‘Comments: It is clear that the majority of GMT Urban riders either begin or end their trips in the city of Burlington. South Burlington is the second most common destination, followed by Essex (including Essex Junction), Williston, Shelburne, Winooski, and Colchester. Riders destined to Burlington come from many communities in Vermont and in other states. Note that the number of commuters from Montpelier and other Central Vermont communities is likely understated here because only the CCTA-operated trips on the Montpelier LINK Express were sampled. The trips originating at GMT in Montpelier, which are more oriented toward Chittenden County workers, were not included in the survey. In addition, surveys taken in the afternoon were “turned around” so that the destination is shown as Burlington or other core communities, even though that was the origin for the afternoon trip.” (“GMT  Urban  Customer  Service  Rider  Survey  Results”,  2017).  

40