AG2000 Center Pivot Installation

Upload: fred-thomas

Post on 13-Apr-2017

141 views

Category:

Marketing


1 download

TRANSCRIPT

Page 1: Ag pivot installation

AG 2 0 0 0 C e n t e r P i v o t

I n s t a l l a t i o n

Page 2: Ag pivot installation

Step 1You’ll Need:

Installing an AG2000

On a Center Pivot

Measure the vertical riser on the pivot. Ensure there is sufficient straight pipe to meet the

requirements of the meter (see note).

Important Note!

AG2000-400  22" min. AG2000-800 30" min.

AG2000-600   38" min.

AG2000-1000  48" min.

Tape Measure

Page 3: Ag pivot installation

Step 2You’ll Need:

Installing an AG2000

On a Center Pivot

Cut out a section of straight pipe, insuring there are at least two pipe diameters of straight pipe on the inlet side of the meter, and one pipe diameter of straight pipe on the outlet side of the meter.

Tape Measure

Welding Tools

Page 4: Ag pivot installation

Step 2You’ll Need:

Installing an AG2000

On a Center Pivot

Cut out a section of straight pipe, ensuring there are at least two pipe diameters of straight pipe upstream of the meter, and one pipe diameter of straight pipe downstream of the meter.

Tape Measure

Welding Tools

Page 5: Ag pivot installation

Step 3You’ll Need:

Installing an AG2000

On a Center Pivot

Weld the appropriate ANSI flanges on each open end of pipe, ensuring the flanges are parallel, and the flange bolt holes are aligned.

Allow the welds to cool to ambient temperature.

Tape Measure

Welding Tools

Level

Page 6: Ag pivot installation

Step 3You’ll Need:

Installing an AG2000

On a Center Pivot

Weld the appropriate ANSI flanges on each open end of pipe, ensuring the flanges are parallel, and the flange bolt holes are aligned.

Allow the welds to cool to ambient temperature.

Important Note!

WARNING: DO NOT USE THE METER AS

A WELDING FORM.

THE HEAT AND/OR ELECTRICAL CURRENTS FROM THE WELDER

WILL DAMAGE THE METER AND VOID THE WARRANTY.

Tape Measure

Welding Tools

Level

Page 7: Ag pivot installation

Step 4You’ll Need:

Installing an AG2000

On a Center Pivot

Install the meter, with the direction arrow on the side of the meter pointed "up", and the Power/Output cable pointing "down".

Cable DownFlow Arrow

Up

Wrench

Page 8: Ag pivot installation

Step 4You’ll Need:

Installing an AG2000

On a Center Pivot

Install the equalization wires and tabs from the lug to the top and bottom pipe flanges for proper electrical grounding.

Wrench

Wire Cutters

Screw Driver

Tab on pipe flangeNot

meter flange

Tab on pipe flangeNot

meter flange

Page 9: Ag pivot installation

Step 5You’ll Need:

Installing an AG2000

On a Center Pivot

Use a cable tie to secure the Power/Output cable to the pivot, ensuring there is a small loop at the meter strain relief. This will help prevent water running down the cable, and into the meter.

Cable Ties

Wire Cutters

Page 10: Ag pivot installation

Step 6You’ll Need:

Installing an AG2000

On a Center Pivot

Install the Weather Guard protective cap over the meter head. This is a force-fit, so measurable pressure will be required for a correct fit.

Hands

Page 11: Ag pivot installation

Step 7You’ll Need:

Installing an AG2000

On a Center Pivot

Route the Power/Output cable to the appropriate pivot manufacturers panel.

Consult the Seametrics Instructions "Connections, AG2000" for specific electrical connections.

Important Note!

Connections, AG2000

is available on our website!Click the link

below to see it now (document may

open behind presentation).

Computer

Page 12: Ag pivot installation

Step 8You’ll Need:

Installing an AG2000

On a Center Pivot

Your meter is installed! Refer to the Seametrics AG2000 Instruction Manual

for additional information and instructions.

Important Note!

Congratulations!

Your properly installed AG2000will provide years

of low maintenanceoperation.

A Cold One

Page 13: Ag pivot installation

For Additional Support Call: 800-975-8153