aerovale at a glance · about the current status of the project and assist in their decision on...
TRANSCRIPT
![Page 1: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/1.jpg)
Aerovale Project (ICAO SWPW)September 2018
São Paulo (Caçapava) Private Airport
![Page 2: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/2.jpg)
This material was prepared to support a business opportunity offering and pursuit conducted by Acosta Aerospace on behalf of Centro Empresarial Aeroespacial (“CEA”) – Aerovale, majorly owned by Penido Construction Company. The material is being presented in an “as is” base. The sole purpose of this presentation is to inform potential interested parties about the current status of the project and assist in their decision on proceeding with further talks about the project.
By accepting this presentation, the recipient agrees to maintain the confidentiality of the information contained in this document or made available in association with any further investigation of the Company. This document may not be photocopied, reproduced or distributed to other organizations at any time without prior written consent of Acosta Aerospace.
The information contained herein was prepared to assist CEA-Aerovale in the negotiation of a strategic partnership, association, or other type of business arrangement and is not intended to meet all informative demands that an interested business partner might have. In all cases, the interested parties must conduct their own investigations and analyses of the reports and data in this document and of any other information they might judge relevant. Acosta Aerospace and CEA-Aerovale do not assume any kind of responsibility towards the accuracy or wholeness of this material and will not be held responsible for any liabilities (explicit or implicit) on account of the information contained herein or any other that may have been passed in verbal form during the execution of the project carried out for CEA-Aerovale. The information contained herein is accurate up to the date of this presentation (except when otherwise mentioned) and Acosta Aerospace is not obliged to update the data contained here.
This presentation may include certain financial reports, estimates and calculations supplied by Acosta Aerospace concerning CEA-Aerovale. These reflect a series of assumptions that may or may not become true. Based on the current market environment, economic conditions and other assumptions, these calculations are only estimates by Acosta Aerospace describing an expectation of financial performance. When included, these projections are not necessarily an indication of value or future performance, which can be significantly higher or lower than what is presented here. For these reasons, these financial reports, estimates and calculations cannot be taken as a guarantee of future value or results.
By sharing this presentation, neither CEA nor Acosta Aerospace undertakes any obligation to provide interested parties with access to any additional information. CEA and Acosta Aerospace reserve the right to modify or terminate the process or to reject any or all proposals. This presentation shall not constitute an indication that there has been no change in the business or affairs of the Company since the date hereof.
Inquiries and requests for more information relating to these materials should be directed to Acosta Aerospace.
Acosta Aerospace – Acosta Aeroespaço, Engenharia e Serviços Especializados Ltda.Rua Comendador Remo Cesaroni, 135 – 12243-020 – São José dos Campos - SP• Luis Acosta – General Manager |[email protected] | www.acosta-aerospace.com
CONFIDENTIALITY AND DISCLAIMER
2
![Page 3: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/3.jpg)
Heli-field
Entrance Gate
PAX terminal
Plots at taxiways: Direct access to the
runway. Best for aviation businesses.
Service / Industry / Logistic
plots: No access to taxiways but
inside the condo.
Services, non-runway-accessbusinesses
EntranceGate
Runway
Taxiway
Taxiway
Aerovale: Multi business condo with aviation core• Unique private airport in a prime
location between São Paulo and Rio de Janeiro, surrounded by the country´s top Aerospace assets (experienced work force and aviation culture) and excellent infrastructure.
• Opportunity for the establishment and operation of top tier companies to explore aviation businesses, benefiting from a private runway and direct access to the logistics solutions surrounding the project.
Refuling
FBO Hangaring MRO
Flight instruction
Aircraft manufacturing
Completion center
Components R&O
Aviation fair and expo
Freight opps
Convention center
Car rent
Restaurant
Hotel
Health clinic Shopping mall Distribution center 3
![Page 4: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/4.jpg)
Distance to selected cities:
City Car Helicopter
São Paulo 107km 25 min.
Rio de Janeiro 319 km 100 min.
Belo Horizonte 451 km 120 min.
S. J. Campos 23 km 5 min.
Campinas 174 km 70 min.
Santos (Port) 161 km 60 min.
CEA-Caçapava | ICAO (SWPW) | 23° 07' 36" S / 045° 39' 46" W
Country State Region Location
BR-116(Dutra Highway)
SP-070(Carvalho Pinto
Highway) 4
![Page 5: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/5.jpg)
São Paulo at reach: 25 min (Helicopter) – 60 Min (Car)
Aerovale Airport
Major business city in the country
Tourism/Mountain
Aerospace Technology Cluster
5
![Page 6: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/6.jpg)
Aero view
6
![Page 7: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/7.jpg)
Entrance - Gate
OverviewRunway construction
7
![Page 8: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/8.jpg)
8
Pax Terminal (Concept)
Pax Terminal (Concept)
![Page 9: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/9.jpg)
Corporate offices building(Concept)
Entrance GateHangar (Concept)
9
![Page 10: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/10.jpg)
2008 2018
Today
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
ANAC Airport Construction Permit9/27/2008
Environment License for Instalation7/13/2012
Real Estate Development Registered6/5/2013
Authorization for Commercial Use2/17/2014
ANAC Authorizes Air Traffic at CEA-Aerovale12/30/2014
Environment License Certificate
12/14/2015
ANAC Renews Air Traffic Authorization12/12/2017
Runway Painting Completion8/11/2018
Airport RunwayCertified9/13/2018
Award: 2012 Autodesk Excellence in Infrastructure (Top Worldwide)
6/24/2012
CEA- Aerovale Timeline
10
Airport Runway ANAC Certified
![Page 11: Aerovale at a glance · about the current status of the project and assist in their decision on proceeding with further talks about the project. By accepting this presentation, the](https://reader033.vdocuments.site/reader033/viewer/2022041421/5e1f6408d1f03a5907667317/html5/thumbnails/11.jpg)
Ready for TAKE OFF
!!!
Runway characteristics
Runway length 1.550 m x 30m
Longitude 45º 39’ 46” W
Latitude 23º 07’ 36” S
Paviment Asfalt
PCN – Pavement Classification
Number42 / F / B / X / T
Magnetic Headings - Threshold 16-34
Airfield altitude 670 m (2.198 ft)
Class Category V runway
Operational condition Day and night - Visual VFR
11
Real picture at location