5/8/2019 1 THE UNIVERSITY OF UTAH Planning, Design & Construction Forum May 9th,2019 WELCOME Presenter: Robin Burr – Chief Facilities Officer INTRODUCTION o Our Organization o Where we’vebeen o Where we are today o Where we‘re going o General Updates o Practice Changes o Current and Upcoming Projects o Q&A MEETING GOALS

Upload: others

Post on 14-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

1

THE UNIVERSITY OF UTAHPlanning, Design & Construction Forum

May 9th, 2019

WELCOME

Presenter:Robin Burr – Chief Facilities Officer

INTRODUCTION

o Our Organization

o W here we’ve beeno W here we are todayo W here we‘re going

o General Updates

o Practice Changes

o Current and Upcoming Projects

o Q&A

MEETING GOALS

Page 2: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

2

o Changing Expectations

o Success with smaller, better integrated Project Teams

o Added Design & Construction Support Team

WHERE WE’VE BEEN…

o Continuous Improvement Mode

o Strong focus on Campus Planning

o More support for Project Delivery

o New Tools and Training

o Changes in Plan Check & Inspection

o Changes in Proposal Format

o Joining with Faci l i t ies Management and University Hospitals & Cl inics

WHERE WE ARE TODAY…

o Cont inued adaptat ion of Tools and Tra in ing

o Strong focus on Susta inabi l i ty

o Heavy up- f ront involvement a t beginning of pro jects

o Evolv ing Pro ject Del ivery methodology

o LEAN Pract iceso Target Value Designo Better in tegrat ion of AE, GC and

the U in pro ject de l ivery

WHERE WE’RE GOING…

Page 3: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

3

Robin BurrChief 

Facilities Officer

Ken NyeDeputy Chief Facilities Officer

TEAM. LEADERSHIP

Updated April 30, 2019

Contracts

Heather HendersonContracts 

Administrator

Polly AllesContracts 

Administrator

Unifier

Jeff RecordSr. Bus Analyst

John NaylorSr. Bus data Analyst

Records Management

(Vacant)IT Manager

Finance /BusinessSupport

Infrastructure, Energy, Red Butte 

Gardens

Rick JohansenPM

Shireen GhorbaniAssoc. Director,PR, Training, 

Communications

CommunicationsOrganizational Development

Wes MangumComm. Specialist

Mary Ellen Allen

Prog. Mgr. 

Andrew KingAssociate DirectorCampus Planning

Tami WolfgangPlanner

John ClosePlanner

Charles ShepherdPlanner

Campus Planning

Blaine OsborneAdministrative 

ManagerAdministrative 

Support

AdministrativeSupport

Shannon Failner

Admin Ass’t

Michelle KeddingtonAdmin Ass’t

Randi PorterReception

Gary GiglioDirectorDesign & 

Construction Support   Building Official 

Karen JanickiFinancial Analyst

Jeff KuehndahlFinancial Analyst

Nana Amoah Ewusi‐Emmim 

Fin. Analyst

Brenda DiazFinancial Analyst

Bob SimontonDirectorDesign & 

Construction

Christian JohansenAPM 2

Astrid ParedesPM

Jon JeffersonPM

Brett Petersen

PM

Scott Jefferson     

PM

Liz BlacknerDirectorDesign & 

Construction

Mark GrablPM

Andrea CavragPM

Christin RobbinsPM

Andrew HeinerPM

DesslieAndreason

PM

Main CampusResearch Park

Community Clinics

Lori KaczkaPM

Carley Bradbury

Project Ass’t

Rochelle RandazzoDirector

Project Finance/ Accounting

Shivali Khopkar

Accountant

Project Fin/Acct’gSupport

Mary DupaixAccountant

Steve Laraway

PM

Harry CorsiPM

Nils EddyProgram ManagerHealth Sciences 

Campus 

NirmanRajbhandari

PM

Mike Wessman

PM

Krin KirijasPM

Health Sciences Campus 

Barbara FamagelttoAPM 1

Sherri SomersAPM 1

Design & Construction 

Support

Michael BeckQC / Safety 

Mgr.

Colin Moore    Construction Estimator

Sam Jensen AugustineEnergy/ 

Sustainability Manager

Eric NewbyConstructionManager

Chris BlairBuilding Inspector

Sue PopeOpen Space Manager

Training

Stacia WorndleTraining Manager

Stacy HendricksenSkills Trainer

Facilities Service Center

Stacy HeinerCustomer Srvc. 

Specialist

Jodi SmithCustomer Srvc. 

Specialist

Katherine SomersStudent Intern

(vacant)Student Intern

FM/PDC Shared Services 

Facilities ManagementSteve Hoskins

Orfeo KostrencichDave Quinlivan

UUHC Facilities & EngineeringJerry North

Facilities Management

Rich MillerFinance & Data 

Analytics

OUR ORGANIZATION

Presenter:Ken Nye - Deputy Chief Facilities Officer

GENERAL UPDATES

Staff

- Heather Henderson- Polly Alles

o CM/GC – we are transitioning to a pre-set fee

o Multi-Project Selections for A/E and Contractor

o Performance Reviews

PROCUREMENT

Page 4: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

4

o Gifts

o Option to donate to U of U Student Food Bank or other charity of your choice

CONFLICT OF INTEREST

o Electronic signatures coming

o PlanGrid is a companion system to Unifier

Staff

- John Naylor- Jeff Record

UNIFIER

o New policy coming this summer

o Objective is to minimize impact of construction on parking availability

CONTRACTOR PARKING ON

CAMPUS

Page 5: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

5

o Permit required for parking anywhere on campus

o Sidewalk passes will carry a fee

o Designated parking areas for sidewalk passeso Limited to specific areas, according to

Commuter Services parking plan

o Use of parking areas for staging require written approval in advance

o Contractor contact info on staging area fence

CONTRACTOR PARKING

REQUIREMENTS

Presenters:Gary Giglio - Director of Design & Construction

Support/Building Off icial

Sam Jensen Augustine– Energy/Sustainability Manager

Colin Moore – Preconstruction Manager

CHANGES IN PRACTICE & EXPECTATIONS

Presenter:Gary Gigl io- Director of Design & Construction Support/Building Official

PROCESS IMPROVEMENT

Page 6: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

6

o LEAN Concepts for Design & Construction

CHANGES IN PRACTICE &

EXPECTATIONS

o OUR MISSION: Delivering projects on time, on budget with the expected quality and safety

o Creating value for clients by eliminating activities that are considered waste, focusing on process and flow, and continuous improvement

LEAN CONCEPTS FOR DESIGN &

CONSTRUCTION

o 1. Deployment/Use of interoperable technology, such as BIM, cost-estimating and scheduling tools

LEAN CONCEPTS FOR DESIGN &

CONSTRUCTION

Page 7: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

7

o 2. Use of prefabrication, preassembly, modularization, and off-site fabrication techniques and processes

LEAN CONCEPTS FOR DESIGN &

CONSTRUCTION

o 3. Effective performance measurement to drive efficiency and support innovation

LEAN CONCEPTS FOR DESIGN &

CONSTRUCTION

Presenter:Alex Demogines- Regional Manager, PlanGrid

PLANGRID

Page 8: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

8

Welcome to PlanGridChanging Project Delivery for the University of Utah

Centralize all project lifecycle documentation

၊ Errors & omissions၊ Change orders၊ Inaccurate as‐built 

drawings၊ Incomplete reporting၊ Missing asset management 

data

Solutions for owners from design to turnover

Page 9: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

9

Raymond GroupT-Mobile Arena

“PlanGrid allows me to collect and turn over ‘live working’ as‐builts that are invaluable to owners for the life of the building.”

Construction Turnover Operations

—Terry ColemanSuperintendent, Kraus-Anderson

Secure a complete turnover package

Granite ConstructionHighway 99 Realignment

✓ Proven project team adoption  

✓ Retain portable data for turnover

✓ Simplify team collaboration

✓ Deliver more predictable outcomes

✓ Control data for the lifecycle of the facility

3,672 ratings

2,014 ratings

Used by 52% of ENR top 400 GCs

Why PlanGrid?

PLANGRID Q&A

Page 10: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

10

Presenter:Sam Jensen Augustine – Energy/Sustainabi l i ty Manager

SUSTAINABILITY IN DESIGN & CONSTRUCTION

o Started July 1, 2018

o Visiting firms to have conversation about U’s evolving approach

o Owner’s Project Requirements updated

o Working with project team to tailor HBPS as appropriate

o Aligning upfront project decisions with LCCA

SUSTAINABILITY

Presenter:Gary Gigl io- Director of Design & Construction Support/Building Official

CODE REVIEW & INSPECTION SERVICES

Page 11: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

11

o Moe Heivand, Regional Operations Manager Facilities-Code Compliance West-Southwesto Chris Blair, Building Inspectoro Randy Moss, Plans Examiner and Inspectoro Craig Baptista, Director of Operations, Facilities-Code Compliance

o Building permit card

BUREAU VERITAS NORTH AMERICA

Presenter:Colin Moore- Preconstruction Manager

ESTIMATING MANUAL, TEMPLATE & COST

DATABASE

WHAT IS VALUE?1

WAYS TO INCREASE COST CERTAINTY2

UPDATED WBS CODES / ESTIMATING METHODOLOGY MANUAL3

COST DATABASE FOR BENCHMARKING4

TARGET VALUE DELIVERY5

PRECONSTRUCTION

Page 12: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

12

o Value is “what the customer is actually paying for the project to produce and install.”– Lean Construction Institute

o Value =   FunctionCost

o Planning, Design, & Construction:o State entity with a charge to gain best value for Utah tax payerso Understands – and assists to communicate and deliver on ‐ the client’s definition of value (program, schedule, cost, 

social)

o Architects & Engineers:o Understands ‐ and designs to ‐ client’s definition of value while collaborating closely with the client’s team

o Contractors:o Understands client’s definition of value and brings value by providing expert opinion, real‐time design and 

constructability feedback, and cost certainty while collaborating closely with the client’s team

WHAT IS VALUE?

o Cost certainty is high on every client’s value list. Cost overruns cause redesign, schedule delays, and decrease delivered value

o Ways to increase cost certainty:

o Establish consistent cost reporting tools, including Work Breakdown Structure (WBS) codes. Establish consistent times to report costs

o Maximize collaboration during preconstruction and construction – all team members are “linked” to the project budget

o Project “benchmarking” against similar projects to validate costs

o Continuous review & feedback of design documents for cost, constructability, & conflicts

o Immediate reporting of potential cost overruns, including market factors such as tariffs or commodity pricing increases

o Establish Target Values, with subgroups that report on how specific target values are tracking with design

WAYS TO INCREASE COST CERTAINTY

WORK BREAKDOWN STRUCTURE (WBS)

ESTIMATING METHODOLOGY MANUAL

o Establishes a uniform cost reporting system between University projects

o Reduces miscommunication and is more transparent

o Template based on Construction Specification Institute (CSI 2014)

o Will be used in University’s cost database

o Explains how to measure each of the line items in the WBS

o Defines scope of unit rates for database accuracy 

o Guides delineation of TI versus Shell & Core for renovation projects

UPDATED WBS CODES/ESTIMATING METHODOLOGY MANUAL

Page 13: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

13

Example of the WBS - Summary

WORK BREAKDOWN STRUCTURE

Detail Example

Div. Code Component Description Quantity Unit Cost $ Total $

9 09 00 00 FINISHES

9 09 20 00 Plaster And Gypsum Board9 09 21 00 Plaster And Gypsum Board Assemblies

9 09 22 00 Supports For Plaster And Gypsum Board9 09 22 00 Exterior Wall and Parapet Assemblies9 09 22 00 Steel stud, 18 ga - 6" SF9 09 22 00 Steel stud, 18 ga - 6" at parapet walls SF9 09 22 00 Exterior soffit framing SF9 09 22 13 Metal Furring9 09 22 13 Interior Wall9 09 22 13 Steel stud furring, 16 ga - 1 5/8" SF9 09 22 13 Steel stud furring, 20 ga - 2 1/2" SF9 09 22 16 Non-Structural Metal Framing9 09 22 16 Interior Wall9 09 22 16 Steel stud framing, 20 ga - 3 5/8" SF9 09 22 16 Steel stud framing, 20 ga - 6" SF9 09 22 16 Steel shaft wall framing, 20 ga - 2 1/2" CH SF9 09 22 16 Steel shaft wall framing, 20 ga - 4" CH studs SF9 09 22 16 Blocking and backing LF9 09 22 26 Suspension Systems9 09 22 26 Ceilings9 09 22 26 Gypboard ceiling framing SF9 09 22 26 Gypboard soffit framing, including kickers SF

9 09 24 00 Portland Cement Plastering9 09 24 23 Portland Cement Stucco9 09 24 23 Exterior stucco, integrally colored, including lath SF9 09 24 23 Plaster control joints, including continuous bent plate LF

9 09 28 00 Backing Boards And Underlayments9 09 28 13 Cementitious Backing Boards

Example of the WBS - Detail

WORK BREAKDOWN STRUCTURE

ESTIMATING METHODOLOGY MANUAL 6

SAMPLE OF THE EMM6

Curtainwall Systems (SF): 08 44 00

Exterior glazing systems are measured based on total area, and include both the glass and the frame. Fritted / spandrel glass is broken out as a separate line item from vision glazing. Curved glass is broken out as a distinct line item (with a premium unit cost) as are other specialty glazing systems. As a standard convention, exterior curtain wall systems do not deduct glass entrances.

Metal Decking 05 30 00

Material: Corrugated metal deck, Nelson/shear studs.Labor: Fabrication / installation of deck system, welding of Nelson/shear studs.Equipment: Hoisting equipment, welding equipment.Factors Affecting Cost:

Metal Deck (SF): 05 31 13

Unit cost includes the furnishing and installation of Nelson or shear studs. Penetrations larger than 50 square feet are deducted from the overall quantity, however smaller penetrations are not deducted. Unit cost includes penetration cutouts. Vented deck follow the same standards.

ESTIMATING METHODOLOGY MANUAL 6

Page 14: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

14

COST DATABASE FOR BENCHMARKING

TARGET VALUE DELIVERY (TVD)

Value & cost drive the design process instead of calculating the cost after design is complete.

Increases cost predictability vs. the traditional method of estimating at established design intervals only.

Teams work together to deliver value

Presenters:Rochelle Randazzo -Director of Finance & Account ing

Andrew King- Associate Director of Campus Planning

Bob Simonton - Director of Design & Construction

Liz Blackner - Director of Design & Construction

Nils Eddy - Program Manager, Health Sciences

Trent Cutler – Director of Planning, Design & Construct ion, Health Sciences

MEET THE TEAMS/PROJECTS

Page 15: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

15

Presenter:Rochelle Rondazzo- Director of Finance & Accounting

FINANCE & PROJECT METRICS

9  10  11  9  10  9  8 

227 

311 267  289  268 

241  247 

236 

321 278 

298 278 

250  255 

 ‐

 50

 100

 150

 200

 250

 300

 350

2018 2019 2020 2021 2022 2023 2024

Number of Project

Fiscal Year Number of Projects

The University of UtahPlanning, Design & Construction

Annual Number of Projects

Projects under $10M

$53 $75 

$116 $92  $91  $75  $71 

$167 

$206 

$182 

$151 $183 

$148  $174 

$220 

$281 $298 

$243 

$274 

$223 $245 

 $‐

 $50

 $100

 $150

 $200

 $250

 $300

 $350

2018 2019 2020 2021 2022 2023 2024

In M

illions

Fiscal Year Spending

The University of UtahPlanning, Design & Construction

Project Spending

Projects under $10M

Presenter:Andrew King- Associate Director, Campus Planning

CAMPUS PLANNING

Page 16: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

16

Planners Campus Planning Responsibilities

o Project Studies and Research

o Visioning and Master Planning

o Campus Transportationo Campus Parkingo Campus Site and

Landscapeo Cultural Resources /

Historic Preservationo Campus Signs and

Signage

o Charles Shepherd: Cultural Resource Manager

o Sue Pope: Open Space Manager

o Tami Wolfgang: Campus Planner

o John Close: Campus Planner

Andrew King, Associate Director, Campus Planning

CAMPUS PLANNING

Presenter:Bob Simonton - Director of Design & Construction

INFRASTRUCTURE TEAM

o Scott Jeffersono Steve Laraway o Brett Petersen o Jon Jeffersono Astrid Paredes

Financial Analyst

o Brenda Diaz

o Carley Bradbury

Project Managers

INFRASTRUCTURE, ENERGY & RED BUTTE

GARDEN

Project Assistant

o Energy Eff iciencyo Transportat iono Util it ieso Red Butte Gardeno Seismico Building Systems

Renewal

Types of Projects

Page 17: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

17

Presenter:Liz Blackner - Director of Design & Construction

MAIN CAMPUS, RESEARCH PARK & COMMUNITY

CLINIC TEAM

Project Managers

o Desslie Andreasono (Retiring May 17)

o Andrea Cavrago Mark Grablo Andrew Heinero Rick Johanseno Lori Kaczkao Christ in Robbins

Financial Analyst

o Christian Johanseno Sherri Somers

Types of Projects

o Academico Researcho Athleticso Community Spaceso Food Serviceo Administrationo Clinicso Housing o Performance Artso Tenant Improvementso Remodelso Additions

o Karen Janickio Nana Amoah

Ewusi-Emmim

Associate Project Managers

MAIN CAMPUS & RESEARCH PARK

Presenter:Nils Eddy - Program Manager,

Health Science

HEALTH SCIENCES & TRANSFORMATION TEAM

Page 18: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

18

o Krin Kirijaso Harry Corsio Mike W essmano Nirman Rajbhandari

o Sherri Somerso Barbara Famageltto

Project Managers

Construction Project Manager

o Eric Newby

HEALTH SCIENCES & TRANSFORMATION

Associate Project Managers

Financial Analysts

o Nana Amoah Ewusi-Emmimo Jeff Kuehndahl

Presenter:Trent Cutler- Director of Planning, Design & Construct ion,

Health Sciences

HOSPITALS & CLINICS TEAM

DavidDaining RebeccaWielder BlakeMcBride KristiannaPulsipher

CJKulp ChristianAllen JenniferBrownlee BenBlacker

DESIGN PROJECT MANAGERS

Page 19: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

19

Rod Randall Joe Cronin Destry Norman Scott Cummins

Mark Hunziker Jay Sarten Kathy Sirrine Jamie Hackworth

CONSTRUCTION PROJECT MANAGERS

Malory Devries Jenna Matheson Elaine Stowell

AESTHETICS TEAM

HOSPITALS & CLINICS

Types of Projects Geographically Spread

o Clinicalo Inpatiento Outpatiento Support Spaces

o Researcho Tenant Improvementso General Renovationso Infrastructure

o Main Medical Campuso Research Parko Community Clinics

o Salt Lake Countyo Davis Countyo Utah County

Page 20: AEGC Forum Presentation FINAL · 2019-05-13 · o Heavy up-front involvement at beginning of projects o Evolving Project Delivery methodology ... Colin Moore Construction ... 9 09

5/8/2019

20

Q&A