Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation. Darcy Bullock, P.E. Professor Purdue University. Requested Topics. What is Hardware-in-the-Loop (HITL) Why would you use it Historical Perspective Future Challenges. What is HITL. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/1.jpg)
Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation
Darcy Bullock, P.E.ProfessorPurdue University
![Page 2: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/2.jpg)
Requested TopicsWhat is Hardware-in-the-Loop (HITL)Why would you use itHistorical PerspectiveFuture Challenges
![Page 3: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/3.jpg)
What is HITLTesting and Evaluation of control equipment/algorithms with a simulated plant
![Page 4: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/4.jpg)
What is HITLGoal
Typical
HITL
SimulatedController
SimulatedPlant
Control Equipment
SimulatedPlant
Control Equipment
Real World Traffic
![Page 5: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/5.jpg)
Why would you want to use HITL
So you can make mistakes (and learn from them) in the lab, not the field. Then when you deploy, there should be fewer surprises.So you have a controlled environment in which to experiment and quantify benefits.So you have a facility for students to try things and learn from their mistakes.Probe the “corners” of a control system without worrying about the consequences of failure
![Page 6: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/6.jpg)
Functional Evaluation
![Page 7: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/7.jpg)
Hmm.What if we could control a suitcase tester with a computer.
Monitor 24 volt phase outputsGround loop detector inputs as directed.
![Page 8: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/8.jpg)
Performance Based Evaluation
![Page 9: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/9.jpg)
Still Do Suite Case Testing
![Page 10: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/10.jpg)
SystemSetupw/Master
ClosedLoop
Netw ork
Closed Loop Managem ent Software
Clo
sed
Loop
Com
mun
icat
ion
Inte
rcon
nect
Cab
le
RS
-232
from
Clo
sed
Loo
p S
oftw
are
to S
yste
m M
aste
r
RS
-232
from
CO
RS
IM to
Sim
ulat
ion
Inte
rface
Net
wor
k
RS
-422
CID
Net
wor
k
CORSIM Network S im ula tion
Controller InterfaceDevice (CID)
Netw ork
RealW orldModel
![Page 11: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/11.jpg)
Alternative to HITLSuitcase tester Ok feature individual tester Virtually impossible to evaluate
interaction of various features on a single controller much less a “system” of controllers
“Full Up Testing”…. Plug everything together and hope they work
![Page 12: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/12.jpg)
Historical PerspectiveHITL has been used extensively by other industries for several decades.1985 at University of Vermont when Prof Bob Dawson explained his simulation system for testing/developing the control system on a PDP-11 controlling the gravel washing/production system.
![Page 13: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/13.jpg)
Gate Control Logic1986 worked on a speed sieve design for gate control at the IBM Essex Junction Plant1987 senior design project worked with EE student and.. he built the control hardware.. I built a simulator in Modula II.
![Page 14: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/14.jpg)
1993Moved to LSU in Baton Rouge, LATom Urbanik invites me to participate with his team on the IVHS Research Center ProposalDeveloped HITL concept for Smart Diamond Testing
![Page 15: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/15.jpg)
Dec 1993 Smart Diamond Testing Concept
![Page 16: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/16.jpg)
1994 Smart Diamond Test Plan
![Page 17: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/17.jpg)
1994 Smart Diamond Equipment Concept
![Page 18: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/18.jpg)
Further DevelopmentsTexSIM developed for Smart Diamond Monty willl discuss nextCORSIM extended for hardware in the loop
![Page 19: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/19.jpg)
Controller Interface Device(CID) ~1997
![Page 20: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/20.jpg)
1997-Present CID Uses Testing ACS Lite algorithmsAlgorithm developmentController feature testingLaboratory Based Instruction
![Page 21: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/21.jpg)
1997 – Present HardwareTTI PlatformIdaha PlatformUniv. of Minnesota PlatformNaztec/Eagle PlatformPortland PLC PlatformEmergence of a Software Platform (Univ of Arizona, Siemens, Univ of Utah)
![Page 22: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/22.jpg)
Purdue HITL Laboratory
![Page 23: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/23.jpg)
Project SetupChoose a real system to design and simulateObtain plans, volumes, etc. from DOTSystems that are being constructed, need to be upgraded, or were recently upgraded are ideal
![Page 24: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/24.jpg)
Project Selections
![Page 25: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/25.jpg)
S B L T N B W B L T E B N B L T S B E B L T W B1 2 3 4 5 6 7 8
M a i n S t r e e t T h r o u g h 1 0 sS i d e S t r e e t T h r o u g h 7 sA l l L e f t T u r n s 5 s
Y e l l o w C l e a r a n c e
R e d C l e a r a n c e
P e d e s t r i a n C l e a r a n c e
P e d e s t r i a n W a l k 7 s e c o n d s
M a x 1 G r e e n M a x 1 = 1 . 3 * S y n c h r o S p l i t
V e h i c l e E x t e n s i o nF o r 3 s e c o n d V e h E x t : V e h E x t = 3 s e c - G a p A l l o w
T p = p e r c e p t i o n t i m e ( u s u a l l y 1 s e c . )V v = a v e r a g e v e h i c l e s p e e d o n a p p r o a c h ( m p h )
a = d e c e l e r a t i o n r a t e ( 1 0 f e e t / s 2 )W = a d j a c e n t a p p r o a c h w i d t h ( f e e t )L = a v e r a g e v e h i c l e l e n g t h ( u s u a l l y 2 0 f e e t )c = l a n e w i d t h ( f e e t )V w = a v e r a g e w a l k i n g s p e e d ( u s u a l l y 4 f e e t / s 2 )
M i n i m u m G r e e n
N o d e 1 6
P a r a m e t e r C a l c u l a t i o n
2aV * 1 .47 T Yellow v
p
vV * 1.47L W
Red
wV.5c - c) * Lanes of (#
Clr Ped
vAllow V * 1 .4 7
(f eet)Len g th D etecto r L G ap
Project: Design ProcessCalculate timing parameters
5 5 5 510 107 7
3.0 3.0 3.0 3.04.0 4.03.5 3.51.5 1.5 1.5 1.52.0 2.02.0 2.0
20 20 20 2050 5040 403.0 3.0 3.0 3.02.5 2.52.5 2.5
15 1515 157 77 7
![Page 26: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/26.jpg)
Project: Design ProcessObtain cycles, offsets, and splits from Synchro or Highway Capacity Software
![Page 27: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/27.jpg)
Project: Real-Time Simulation
Controllers are configured with the calculated timings and coordination timings
![Page 28: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/28.jpg)
Project: Real-Time Simulation
Simulation model is built using proposed geometries and vehicle volumes and imported into CORSIM
ITRAF CORSIM
![Page 29: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/29.jpg)
I/O MappingVehicle sensors are mapped to the corresponding phases by the students
DetectorCards
Controller
ControllerMapping
![Page 30: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/30.jpg)
“Final Lab Exam”1 controller plugged into 1 CID for each intersectionAll CIDs plugged in to 1 PC running CORSIMAll controllers plugged in to 1 PC running remote software
![Page 31: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/31.jpg)
Closed Loop Monitoring Screens
PC set up to monitor the system remotely Change
controller parameters
View signal and detector status
![Page 32: Advanced Evaluation Techniques and Hardware-In-The-Loop Simulation](https://reader035.vdocuments.site/reader035/viewer/2022062811/56816003550346895dcf023b/html5/thumbnails/32.jpg)
For future HITL ChallengesCommercially viable CIDs that supports both TS2 Type 1 and Type 2 I/O AND aWell supported integration with an accepted simulation model (CORSIM)Blurring of software/hardware in the loopFormally addressing the timing latency issue between simulation clock and controller.