ADDITIONAL ATTACHMENTS TO FORM-1
FOR OBTAINING ENVIRONMENT CLEARANCE
For Proposed Commercial Complex “Surat Diamond Bourse”
M/S. SDB DIAMOND BOURSE
Block No. 177/P, Moje- Khajod, Taluka- Surat City,
District – Surat, State- Gujarat
Prepared by:
En-vision
Enviro Technologies Pvt. Ltd.
2nd Floor, Shree Ram Complex, Above Bank of India,
Near Kargil Chowk, Surat Dumas Road,
Piplod, Surat-395007, Gujarat, India
Contact No: +91 2612223003, 2224004
E-mail: [email protected]
Website: www.en-vision.in
November 2017
INDEX
ANNEXURE PARTICULARS PAGE NO.
Annexure – 1 Plant Layout 3
Annexure – 2 Parking Layout of Ground Level & Lower Basement 4
Annexure – 3 Parking Layout of Upper Basement 5
Annexure – 4 Typical Floor with Refugee Layout 6
Annexure – 5 Typical Layout without Refugee 7
Annexure – 6 Water Requirements and Waste Water Generation 8
Annexure – 7 Solid Waste Generation And Management 9
Annexure – 8 Traffic Movement 10
Annexure - 9 Soil Testing report 12
Annexure – 10 Key Plan 15
ADDITIONAL ATTACHMENTS TO FORM-1 OF M/S SDB DIAMOND BOURSE
4
ANNEXURE – 2 PARKING LAYOUT OF GROUND LEVEL & LOWER BASEMENT
ADDITIONAL ATTACHMENTS TO FORM-1 OF M/S SDB DIAMOND BOURSE
5
ANNEXURE- 3 PARKING LAYOUT OF UPPER BASEMENT
ADDITIONAL ATTACHMENTS TO FORM-1 OF M/S SDB DIAMOND BOURSE
6
ANNEXURE- 4 TYPICAL FLOOR WITH REFUGEE LAYOUT
ADDITIONAL ATTACHMENTS TO FORM-1 OF M/S SDB DIAMOND BOURSE
7
ANNEXURE-5 TYPICAL LAYOUT WITHOUT REFUGEE
ADDITIONAL ATTACHMENTS TO FORM-1 OF M/S SDB DIAMOND BOURSE
8
ANNEXURE- 6 WATER REQUIREMENTS AND WASTE WATER GENERATION
WATER REQUIREMENT AND ITS SOURCE
During Construction Phase water requirement 575 KLD shall be met through Dream city network.
180 KLD domestic wastes shall be generated during construction phase which will be disposed off
through underground drainage of dream city.
During Operational Phase water requirement will be approx 1790 KLD (Fresh- 900 KLD + Recycled
– 890 KLD) shall be met through Dream City network. 928 KLD domestic wastes shall be generated
during operational phase which will be further treated into the adequate capacity STP and the treated
waste water will be reused for flushing, cooling and gardening work.
DETAILS OF WATER REQUIREMENT
WATER REQUIREMENT AND WASTE WATER GENERATION: (CONSTRUCTION
PHASE)
SR.
NO. PURPOSE
WATER REQUIREMENT
(KLD)
WASTEWATER
GENERATION
(KLD)
1. Domestic 225 180
2. Construction &
Sprinkling activity 350 --
TOTAL 575 180
WATER REQUIREMENT AND WASTE WATER GENERATION: (OPERATION PHASE)
NO. PARTICULAR WATER CONSUMPTION
(KLD)
WASTE WATER
GENERATION
(KLD)
1. Permanent staff 1160
Fresh – 900
Recycled - 260
890 2. Visitor
3. Gardening and other 120 --
4. Chilling unit 510 --
TOTAL 1790 890
ADDITIONAL ATTACHMENTS TO FORM-1 OF M/S SDB DIAMOND BOURSE
9
ANNEXURE-7 SOLID WSATE GENERATION AND MANAGEMENT
Estimated Qty. of domestic waste generated due to the construction workers will be (5000 person x
200 gm / Person / Day) = 1000 kg/day. Separate bin will be provided for collection of Municipal Solid
Waste (MSW) at different places and the same will be collectively disposed off to dream city.
Construction waste will consist of construction debris along with cement bags, steel scrap, packing
materials etc. Construction debris will be reused for backfilling and internal road development. Steel
scrap will be sold to authorized recyclers. Cement Bag, packing material, etc. will be sold to
authorized recyclers.
DETAILS OF SOLID WASTE GENERATION AND ITS DISPOSAL METHOD
Type of waste Generation
Quantity (Kg/day) Mode of waste collection Mode of Disposal / Reuse
Dry waste 6225 kg/day Collection in specific bins
and Segregation at
Common
Handover to Relevant
Local authority
Wet waste 4300 kg/day Collection in specific bins
and Segregation at
Common OWC/Garbage
processing Room.
Composting and Utilizing
as fertilizer for landscape.
STP Sludge 144 kg/Day OWC & STP Located close
to each other
Composting and utilizing
as manure.
ADDITIONAL ATTACHMENTS TO FORM-1 OF M/S SDB DIAMOND BOURSE
10
ANNEXURE- 8 TRAFFIC MOVEMENT
Sr.
No. Particulars Details
1. Traffic
Management
(1)Width of adjacent public roads:
• National Highway 6 : (Operates as four lanes two way divided road)
• Althan Canal Road: (Operates as four lanes two way undivided road)
• Khajod Village Road: (Operates as two lanes two way undivided road)
• Proposed 90m Wide Road(i.e. To the North and West of the proposed
development): 90m ROW (Considered as eight lanes two way divided road
with two lanes service road on either side of the road.
• Proposed 45m Wide Road (i.e. To the East and South of the proposed
development): 45m ROW (Considered as six lanes two way divided road)
(2)Number of Entry & Exit provided on approach road/s:
Vehicular Movement
• Entry Gates : Five
• Exit Gates : Four
• Customs Entry/Exit Gate : One Entry + Exit Gate
• Service Entry/Exit Gate : One Entry and One Exit Gate
Pedestrian Movement
• Entry/Exit Gate : Five Entry + Exit Gates
(3)Width of Entry & Exit provided on approach road/s:
Vehicular Movement
• Entry Gates : 12-13m Width
• Exit gates : 12m width
• Customs Entry/Exit Gate : 13m width
• Service Entry & Exit Gate : 7m width
Pedestrian Movement
• Entry/Exit Gates : 9m width
(4)Minimum width of open path all around the buildings for easy access of fire
tender(excluding the width for the plantation):
6m width (three lanes)
(5)Width of all internal roads:
6m width (three lanes)
(6)Measures for traffic management:
• Multiple entries and exits on multiple roads will help in better traffic
dispersion particularly during peak hours.
• Most of the vehicular entries and exits are segregated to avoid conflicting
vehicular movements
ADDITIONAL ATTACHMENTS TO FORM-1 OF M/S SDB DIAMOND BOURSE
11
Sr.
No. Particulars Details
• Separate Pedestrian Entry + Exit Gates to provide safe movement for
pedestrian
• Entry and exit radii provided are larger than or equal to 90 degree to allow
smooth entry and improved merging on exit.
• Queuing and storage at the entrance are provided within the car
park/premises and not on the external roads. It is designed based on peak
hour arrival.
• Pedestrian facilities are provided like pedestrian strip and pedestrian
crossing
• Dedicated two wheeler entry at all the Entry gates
• Dedicated ramps for two wheeler are provided to segregate two wheeler
traffic movements.
• 4-Arm junctions are avoided in the parking layouts to provide safe
movement and avoid conflicting vehicular movements. Most of the
junctions inside the premises are made 3-arm junctions.
• Speed control and traffic calming devices are used including ripple painted
areas and rumble strips.
• Convex Mirrors at Blind Corners are provided.
• Adequate traffic signs provided to notify people.
• Traffic Wardens will be provided during peak hours to ensure efficient
traffic movement.