Add phograph of project card as Appendix XI
NEXT PAGE ONWARDS FIND PROJECT REPORT FORMAT AND ALSO FIND FORMATS OF SELF EVALUATION
SHEETS
FORMAT FOR PREPARATION OF PROJECT REPORT SEM 2
FOR
PROJECT STAGE-I REPORT ON
<<PROJECT TITLE>>
SUBMITTED TO THE S AVITRIBAI PHULE PUNE UNIVERSITY, PUNE
IN THE PARTIAL FULFILLMENT FOR THE AWARD OF THE DEGREE OF
BACHELOR OF ENGINEERING
IN
ELECTRONICS AND TELECOMMUNICATION
BY
<<NAME OF <<EXAMINATION SEAT STUDENT NO.:1>>(14/BOLD/UPPERCASE) <<NAME OF <<EXAMINATION SEAT NO.:2 >>
STUDENT
(Two blank space)
UNDER THE GUIDANCE OF
<<Guide Name>>(14/bold/uppercase)
ACADEMIC YEAR: 2019-20
(Same Font and Size as per the above page)
CERTIFICATE
(Font -16-Times New Roman-Centered)
This is to certify that Project Report entitled
(Font-14-Times New Roman-Centered)
“PROJECT TITLE”
(Font-14-Times New Roman-Italic-Bold)
Submitted by
(Font-14-Time New Roman-Centered)
Ms. Name of student (Exam No.)
Ms. Name of student (Exam No.)
(Font-14-Times New Roman-Italic)
is the record of bonafide work carried out by them in partial fulfillment of the
requirement for the award of the Degree of Bachelor of Engineering (Electronics and
Telecommunication), as prescribed by the Savitribai Phule Pune University in the Academic
Year 2019-2020.(14-Times new Roman)
This project report has not been earlier submitted to any other Institute or University for the
award of any degree or diploma.(12/ sentence case)
<<Name >> Dr.M.P.Sardey
Internal Guide Head of Department
Department of E&TC Engg.
Department of E&TC Engg.
<<Name >> Dr.P.B.Mane
External Examiner Principal
Date :
AISSMS Institute Of Information Technology,
Pune.
.
COMPANY CERTIFICATE
(It has to be on the letter head of the Company)
Acknowledgement
It is my great pleasure in expressing sincere and deep gratitude towards my guide
Mrs/Mr (12/bold) ,Assistant Professor Electronics & Telecommunication Engineering
Department for her/his valuable guidance and constant support throughout this work and
help to peruse additional studies in adaptive signal processing and MATLAB(domain of
project).
We take this opportunity to thank Head of the Department Dr.M.P.Sardey and
Project coordinator Mrs/Mr (12/bold) (Name of your Project coordinator)and all staff
members of department of Electronics &Telecommunication Engineering AISSMS IOIT,
Pune, for cooperation provided by them in many ways.
The motivation factor for this work was the inspiration given by our honorable
principal Dr. P.B.Mane.
//(For sponsored projects)………….
I would also like to thank our external Guide Mrs/Mr (12/bold) for the project
idea and for providing data. We would like to thank for her/his immense help and numerous
suggestions during my work and verify result of //
Lastly I am thankful to those who have directly or indirectly supported for our work.
Sign Sign Sign
Name of Student (12/bold) Name of Student(12/bold) Name of Student(12/bold)
INDEX
CHAPTER TITLE PAGE NO.
NO.
List Of Tables
List Of Figures
List Of Abbreviations
1 Introduction 1
2 Literature Survey
3 Aim and Objectives
3.1 Aim
3.2 Objectives
3.3 Methodology
3.4 Specifications of the System
4 Block Diagram of the System and its Explanation
5
Hardware Design (Include circuit diagram simulation , PCB design
in appropriate software)
6 Software Design
7 Operating Instructions
8 Test and Results
9
Conclusion and Future
Scope
References
10
11 Appendix
Attach the List of Certificates.
Hard copy of papers presented at
National/International conferences/journals
and Project Competitions
Important Datasheets
Also attach the CD at the end of report. (Including Presentation, Report,
software codes ,hardware arrangement,Literature Survey papers, Video of
working of the project.)
LIST OF TABLES
TABLE TITLE PAGE NO
NO
LIST OF FIGURES
FIGURE TITLE PAGE NO
NO
LIST OF ABBREVIATIONS
1. INTRODUCTION
o 2 to 4 pages
o Information about the system (Brief summary of the problem being
addressed.)
o Overview of the target for the final system (where is it going to be used?)
o Overview of the technical area (background technical and theoretical context).
o Summary of the system functionality (what is it going to do?)
o Overview of report/ A brief overview of the rest of the chapters.
2. LITERATURE SURVEY
Include papers referred, patents, white papers, technical reports, Datasheets etc.
SUMMARY OF LITERATURE SURVEY:
Find the latest material relevant to the project topic which is being explored.
1. Identify the “big names or researchers” and best publications in your working
area. (Papers or thesis will be most helpful for developing the project.)
2. Collect the most recent books, most popular publications from IEEE
Transactions, Elsevier, Springer.
3. The minimum number of the papers to be collected is between Ten (10) to
Twenty (20).
Explain each paper in one paragraph that should include following points:
1. Summarize all major points of your selected paper i.e. new work, results, its
conclusion (Findings and conclusion)
2. Write the strengths and limitations of your selected paper.
3. Cite this paper by numbering inside the square bracket [].
4. Make comparisons of the selected papers and give technical comments.
5. Summary of comparison is to be given in a tabulated form in the last page.
Sample (For your reference)
3. AIM AND OBJECTIVES
3.1Aim
3.2Objectives 3.3 Methodology
3.4 Specifications of the System
4. BLOCK DIAGRAM OF THE SYSTEM AND ITS EXPLANATION
o Describe the design of what you have created.
Start with application block diagram and the electronic components
Give a description of the design of the component that make up the block
diagram of system.
5. HARDWARE DESIGN
(Should cover details of theoretical model include mathematical/computational
simulation model, limitations and assumptions, possible design options for
circuit level project design and design of enclosure?)
5.1 Circuit level design
* In this section add ample amount of circuit level simulation software
screenshots, of your own project and also add design steps with datasheet cross-
referenced /cited.
5.2Enclousure design
*As it is compulsory to well finish the project with wooden /fiber/any other
appropriate enclosures.
In this section , Add the related design about weight, material, drawing of
enclosure etc with photographs.
The enclosure should be designed such that the project will be presented as
finely finished product. No wire or internal connections should be visible
.For demonstrating the project at external examination, keep provision of
unscrewing the box.
6. SOFTWARE DESIGN
Add Stepwise Algorithm/ Flowchart ,output screenshots
7. OPERATING INSTRCUTIONS
(How your project as complete product/solution will work?
What steps should be taken by end user? Write stepwise
procedure if any layman uses the product/solution with
photos and appropriate description)
8. TEST RESULTS
Add ample amount of observation tables
with varying parameters
Add photographs of system while testing
9. CONCLUION AND FUTURE SCOPE
REFERENCES (IEEE Format)
[1]K.D.shinde and Dr.P.B.Mane, “Augmenting rooftop solar energy penetration ratio with
secondary distribution network using smart inverter for maximum power transfer capacity for subordinate grid- A review”, Taylor & Francis, vol-41, issue-6, 2019, DOI:https://doi.org/10.1080/15567036.2018.1520353.
APPENDIX
FORMATS OF SELF EVALUATION SHEET (I,II,III)
AND
FORMAT OF FIELD VISIT TO SPONSOR COMPANY
All other formats of appendices are available with individual guides.
Ac. Year: Group No: ______ Date:
Project Title:____________________________________________________
1. Describe your feelings about working on your project. Did you enjoy working on it?
2. What was the hardest part about working on your project?
3. List some of the things you learnt while working on your project.
4. Were you satisfied with your final project?
5. What did you like best about your final project?
6. What did you like least about your final project?
Name and Signature of the Pro jec t Guide: Pro jec t Co o rdina t o r : V.K.P .
Name and Signature of the H.O.D. :MPS
Name and signature of students:
1 2
3 4
DEPARTMENT OF Electronics &Telecommunication ENGINEERING
AISSMS IOIT
FORM F- SELF EVALUATION OF PROJECT by students
Rev.
Name Of Department: Electronics and Telecommunication
Ac. Year: Group No: ______ Date:
Project Title:____________________________________________________
TOOL
*Level s o f Achievem ent(EXCELLENT(5) ,VERY GOOD
,GOOD,SATISFACTORY,BAD(0)) Score
*Highes t Level 5 *Lowest Leve l 0
Co mprehens ion Capable to expla in an d give
re l evant in format ion . Able to
d is t in guish and conver t es sen t i a l
in format ion for co mp let ing the
pro jec t .
Unable to se l ect th e r e levant
and essen t i a l in format ion to
co mplet e the pro ject . Man y
factual er rors are d etect ed .
Qual i t y o f
conten t
Topic was d ea l t wi th in enough
depth , i . e . po in ts c lear ly made,
enough examp les given and
sho ws a good under s tand ing o f
concepts , fact s and t erms
A very sup er f ic i a l p ro jec t wi th
no kno wled ge o f the sub ject
under s tud y, i . e . con cept s , facts
and terms .
Or igina l i t y and
Creat ivi ty
Disp l ay or ig inal i t y and
creat iv i ty o f idea; a un ique
approach that t ru ly enhan ced th e
pro jec t
Unable to develop ideas in
in teres t ing ways. Show
unwi l l in gness to l ea rn and
overco me d i f f i cu l t i es .
Accuracy P rovide accura te and updated
in format ion ; a l l fact s were
prec ise and expl ic i t .
P rovide co mplet e ly inaccura te
and ou tdated in format io n ; the
facts in th i s p ro j ect are
mis lead ing to the audien ce .
Organizat ion Relevant and essen t i a l
in format ion presen t in logical
and in te res t in g sequence.
Remarkable ab i l i t y in d rawing
conclus ions .
Incorporate i r r e levant
in format ion in to the conten t ;
make no a t t emp t to o rganize the
scat t er ed and f r agmented
in format ion .
Cr i t i ca l
Thin kin g
Lively d iscuss ion of
a l t erna t ives . Consid er several
a l t erna t ives . Conc lusion goes
beyond docu ment s and adds
several ideas .
Do not consider a l t ern at ives .
Consider on ly one asp ect o f
i ssu e. Conclu sion re l i es o n own
opin ions on ly.
Total
Name and Signature of the Pro jec t Guide: Pro jec t Co o rdina t o r : V.K.P .
Name and Signature of the H.O.D. :MPS
Name and signature of students :
FORM P1 PROJECT EVALUATION BY Evaluation Commitiiee Rev. # 1
Self evaluation sheet 3 for marks is attached :
ADD THE PHOTOS OF
PROJECT SHEET OF YOUR GROUP HERE