ad hoc meeting wp3 progress received information and future plan 28 june 2010, budapest

30
Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

Upload: flora-foster

Post on 01-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

Ad hoc meeting

WP3 progress

Received information and future plan

28 June 2010, Budapest

Page 2: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

Partners in charge of WP 3

WP 3 Nikos (IGME)WP 3.1 best practice / Zach (TUC)WP 3.2 illegal quarrying / Marcel (IGR)WP 3.3 recycling / Gian Andrea WP 3.4 stakeholders manual / Fotini (IGME)IT group Katarina ( GeoZS)

Page 3: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

Questionnaires & templates• Questionnaires were collected in February,

and in recent time there were no activities. Six types of questionnaires were collected:

– SQ/ SARMa Questionnaire

– SQ-R/ SARMa Questionnaire recycling

– SDB/ SARMa Database

– SDB-R/ SARMa Database recycling

– BSR/ Baseline Study Report

– BSR-R/ Baseline Study Report recycling

Page 4: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

 Partner/ activity

LP GEOZS

PP1 MUL

PP2 PELLA

PP3 IGME

PP4 TUC

PP5 MBFH PP6 ER

PP7 PARMA

PP8 IGR PP9 FGG

IPA1 MGK10 IPA2 RGF

10%1 MINGORP

10%2 METE

WP3 questionna

ires 

A3.1 - SDB, BSR                      

only SDB, BSR 

missing    

A3.2 - SDB, BSR    

only SDB, BSR 

missing                      

A3.3 - SDB, BSR - R      

BSR of Tormani & Vermio missing

                   

A3.3 - SQ-R                            

A3.4 - SQ                            

Page 5: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

COMPLETED ACTIVITIES

1. Creating table of received questionnaires2. Reviewing questionnaires – which were

missing3. Sending reminder to partners for missing

questionnaires4. Put SQ, SQ-R, SDB and SDB-R

questionnaires into excel files and PDF format

Page 6: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 7: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 8: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 9: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 10: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 11: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 12: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 13: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 14: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest
Page 15: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

• 3.1: Best practices (TUC)5 Preparatory Reports = BSR case

study reports 1 Synthesis Report2 Study visits2 Prepared Recommendations

SARMa outputs from Application Form

Page 16: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

SARMa outputs from Application Form

• 3.2: Illegal quarrying (IGR)5 Preparatory Reports = BSR case

study reports 1 Synthesis Report1 Study visit1 Action plan for social license to quarry 1 Database framework for illegal

quarrying

Page 17: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

• 3.3: Recycling (ER) 5 Preparatory Reports = BSR case study

reports 1 Synthesis Report 2 Study visits 1 Manual on life cycle analysis 1 Prepared Recommendation on quarry

waste 1 New service developed: Scheme for LCA

SARMa outputs from Application Form

Page 18: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

• 3.4: Outreach/Communication (IGME)

Joint Manual for stakeholders’ decision making at local level (a common manual covering all 3.1, 3.2 and 3.3 issues)

SARMa outputs from Application Form

Page 19: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

PLANNED ACTIVITIES WITHIN WP 3Partners responsible for preparation of BSR case study reports per each activity

A3.1: Preparatory reports/BSR

•GR: Lakka, Mandalos, Araxos: Nikos Arvanitidis, Jannis Hatzipanagis, Kiki Hatzilazaridou (must be one report, can contain more than one location)•IT: Lanca dei Francesi: Ubaldo Cibin•SR: Fruska gora,(Kovilovaca quarry): Vladimir Simic•RO: Iacobdeal, Luminita-Tasaul: Marcel Maruntiu•HR: Terstenik: Slobodan Miko

Page 20: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

PLANNED ACTIVITIES WITHIN WP 3Partners responsible for preparation of BSR case study reports per each activity

A3.2: Preparatory reports/BSR

• RO: Gostavatu: Marcel Maruntiu

• GR: Lakka: Nikos Arvanitidis, Jannis Hatzipanagis

• IT: Taro River: Ubaldo Cibin

• AL: Fushe Kruje: Lavdie Moisiu

• HR: Terstenik: Slobodan Miko

Page 21: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

PLANNED ACTIVITIES WITHIN WP 3

A3.3: Preparatory reports/BSR-R

•AL: Bulqiza: Avdie Moisiu•GR: Vermio, Vavdos/Gerakini: Nikos Arvanitidis, Jannis Hatzipanagis, Fotini Chalkiopoulou•IT: Nerviano, Legnano: Ubaldo Cibin•RO: Moldova Noua, Deva: Marcel Maruntiu•SI: V. Piresica, Sezana, Hotavlje, Dogose, Novo mesto, Stahovica: Slavko V. Solar, Ana Burger

Page 22: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

• Create model for Preparatory report (based on BSR and BSR-R & SDB and SDB-R)–Who: Nikos–Deadline: 30. April 2010–Notification: 30. April 2010 / Urska, Slavko–Review: 7. May 2010 / Task leaders (Zach, Marcel, Gian Andrea for R)–Confirmation: 10. May 2010 /Slavko

• Modify Preparatory reports (BSR and BSR-R) –Who: Partners in charge of reports (see above)–Deadline: 15. June 2010 –Notification: 15. June 2010 –Review: 30. June 2010 / Nikos, Gian Andrea for R –Confirmation: 15. July 2010 / Slavko

ONGOING ACTIVITIES

Page 23: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

• Prepare instructions (draft structure) for synthesis report

–Who: Nikos–Deadline: 15. May 2010–Notification: 15. May 2010 / Urska, Slavko–Review: 20. May 2010 / Zach, Marcel, Slavko–Confirmation: 20. May 2010 /Slavko

• Prepare synthesis report on SQ, SQ-R, SDB, SDB-R

–Who: SQ (Zach/Nikos); SDB (Marcel); –R (Gian Andrea) –Deadline: 2. July 2010 –Notification: 2. July 2010 / Nikos, Slavko–Review: 1. August/ Quality Management Board (QMB) –Confirmation: 15. August/ Slavko

DELAYED & PLANNED ACTIVITIES

Page 24: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

PLANNED ACTIVITIES

• Collect Preparatory reports and draft Synthesis reports (part for BSR & BSR-R is added to the synthesis report)

– Who: Nikos– Deadline: 20. September 2010 + send to

QMB members in advance before the meeting

– Notification: 20. September 2010 / Quality Management Board (QMB)

– Review: 1.11.2010 / QMB – Confirmation: 5.11.2010 / Slavko QMB

Page 25: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

PLANNED ACTIVITIES• Study visits

–Who: Task leaders–Deadline: for plan 1.5.2010 / last visit 31.5.2011 –Notification: 1.5.2010 / 31.5.2011 - Urska–Review: 1.5.2010 / 31.5.2011 / QMB–Confirmation: 15.6.2011 / Slavko QMB 

• Recommendations–Who: Task leaders –Deadline: 1. December 2010–Notification: 1. December 2010 / Nikos, Urska–Review: 15.1.2011 QMB–Confirmation: 20.1.2011 / Slavko QMB

Page 26: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

PLANNED ACTIVITIES• Action plan for social license to quarry

– Who: Task leader - Marcel – Deadline: 1. December 2010 – Notification: 1. December 2010 / Nikos, Urska – Review: 15.1.2011 QMB– Confirmation: 20.1.2011 / Slavko QMB

• Database framework for illegal quarrying– Who: Task leader – Marcel, IT group Katarina – Deadline: 1.10. 2010 – Notification: 1.10.2010 Nikos, Urska– Review: 15.10.2010 QMB– Confirmation: 20.10.2010 / Slavko QMB

Page 27: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

• Manual on LCA–Who: Task leader – Gian Andrea –Deadline: 1.11.2010 –Notification: 1.11.2010 Nikos, Urska–Review: 15.1.2011 QMB–Confirmation: 20.1.2011 / Slavko QMB

• Scheme for LCA–Who: Task leader – Gian Andrea–Deadline: 1.11.2010 –Notification: 1.11.2010 Nikos, Urska–Review: 15.1.2011 QMB–Confirmation: 20.1.2011 / Slavko, QMB

PLANNED ACTIVITIES

Page 28: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

• Joint Manual for stakeholders’ decision making –Who: Fotini–Deadline: 1.2.2011–Notification: 1.2.2011 /Task leaders, Nikos, Urska–Review: 15.2.2011 /Task leaders, QMB–Confirmation: 1.3.2011 / Slavko, QMB

PLANNED ACTIVITIES

Page 29: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

PATRAS INFODAY

Page 30: Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest

INVITATION CARD