activities at the code analysis center - igs 2014 - ps01 - dach - 2160... · 2016-05-04 · zenith...
TRANSCRIPT
Fig. 1: Tracking network as considered in CODE’s GNSS final analysis for GPS week 1795.
Fig. 2: Number of GNSS satellites since 1994 as considered in CODE’s analysis. With a total of 56 operational GPS+GLONASS satellites, two full constellations were reached on February 2, 2012 (see IGS Mail #6538).
Fig. 3: Polar motion from 19-Jul-1993 to 10-Jun-2014 as monitored by CODE.
Fig. 4: Global mean TEC extracted from the Global Ionosphere Maps (GIMs) produced by CODE covering almost two solar cycles. The red curve shows the interpolated mean TEC based on a least-squares collocation. The daily averaged mean TEC values, namely the zero-degree coefficients of the spherical harmonic expansion used to represent the global TEC, are indicated by black dots.
Fig. 7: Differential code biases (DCB) results as computed at CODE: GPS P1-C1 from indirect estimation (as provided to the IGS, top left), GNSS P1-C1 from the direct approach (bottom left),
Highlights
Two consistent solution series, a clean one-day (COF) and a three-day long-arc (COD) solution, are generated in parallel.Rigorously combined processing of GPS and GLONASS observations has been performed since mid of 2003 as an essential step towards multi-constellation analysis. Meanwhile the GPS-only tracking stations are in the minority in our network (see Fig. 1 and 2).Continuous parameterization, particularly for Earth orientation parameters (EOP, Fig. 3), troposphere zenith path delays (ZPD) and horizontal gradients, as well as for ionosphere parameters (Fig. 4), allows the connection of the parameters at day boundaries.Completion of GNSS orbit products with respect to all transmitting GPS and GLONASS satellites without exception. Reliable accuracy code information is provided.Generation of uninterrupted orbit information for the satellites being repositioned (Fig. 5). Corresponding events are identified with a maneuver flag in the SP3c orbit files. An orbit initialization procedure is implemented for easy inclusion of brand new GNSS satellites, even if they do not provide broadcast navigation messages.Automatic verification of IGb08 fiducial sites for consistent datum definition in the final, rapid, and ultra-rapid analysis chains.Comprehensive CODE analysis summaries with extended orbit validation information and datum verification results.Independent GNSS orbit validation on the basis of SLR data (see poster from Sosnica et al. in PS10).GNSS ambiguity resolution: ambiguities are resolved for GPS and GLONASS observations with a self-calibrating procedure for handling of GLONASS-DPCB (differential phase-code biases).Phase pre-processing for short(est) baselines: The test criteria for checking the geometry-free LC are a function of the baseline length. This ensures that the original L1 and L2 observations are clean for short(est) baselines (with less than 20km length).Monitoring parameters are set up in the final solutions for internal use: Satellite(-specific) antenna offset and pattern. GLONASS-GPS bias parameters with respect to
station coordinates and troposphere ZPD. Scaling factors for higher-order ionosphere (HOI)
and non-tidal atmosphere pressure loading (APL) corrections.
Geocenter coordinates (GCC).Note: These parameters are contained in the daily NEQs that are archived. For efficiency reasons the monitoring parameters are removed from the NEQs before generating the final solution (see Fig. 6).Differential code bias (DCB) retrieval for P1-C1, P1-P2, P2-C2 with different algorithms (e.g., direct and indirect P1-C1 retrieval, Fig. 7).GLONASS frequency numbers are verified on a regular basis.SINEX result files are generated in all processing lines: final, rapid and even ultra-rapid.Fully automated GNSS data processing with the latest development version of the Bernese GNSS Software including BPE (Bernese Processing Engine). The processing is embedded in a system of Perl modules. This includes instant alerting in case of BPE processing and technical failures, general data flow problems, changes in the GNSS constellations.
International GNSS ServiceWorkshop 201423 June - 27 June 2014, Pasadena, USA
1 2 2 1 1R. Dach , S. Schaer , S. Lutz , D. Arnold ,H. Bock , 1 1 1 1E. Orliac , L. Prange , S. Bertone , Y. Jean ,1 1 1 1U. Meyer , K. Sośnica , P. Walser and A. Jäggi
1Astronomical Institute, University of Bern, Switzerland
2Federal Office of Topography swisstopo, Wabern, Switzerland
Activities at the CODEAnalysis Center
Poster compiled by E. Orliac, June 2014Astronomical Institute, University of Bern, [email protected]
IGSWS2014-PS01
Contact addressRolf DachAstronomical Institute, University of BernSidlerstrasse 53012 Bern (Switzerland)[email protected]
Most important new developments and model changesare reported in poster contributions for this IGS workshop (same session): Lutz et al.:
Updating the CODE ultra-rapid procedure Steigenberger et al.:
CODE Contribution to the 2nd IGS ReprocessingSee also: IGS technical reports 2012 and 2013.
RINEX issue in final clock procedure
In 2013, the IGS final clock combination revealed some recurrent problems with the contribution from CODE, resulting in a high number of exclusions in the IGS combination protocol. After some investigations, it appeared that the problem was due to unexpectedly different contents of the RINEX files for one and the same station and time interval from different sources: either downloaded directly as daily/hourly RINEX files with a sampling of 30 s or reconstructed from the 15-minutes RINEX files with the 1 Hz sampling based on real-time stream data. The latter ones are used at CODE to produce the 5 s clock product. The clock procedure was therefore adapted to guarantee that the 1 Hz data is only used to densify the clocks down to 5 s but not for generating the 30 s products.
Fig. 5: Geographical locations (subprints) of all repositioning events of GPS satellites since 2004 as determined by CODE.
Fig. 6: Parameter types in the CODE final solution; the gray shaded parameters are so-called monitoring parameters that are removed from the NEQs before generating the final solution (in order to avoid potential numerical problems and to speed up the computation).
GNSS P2-C2 from direct approach (bottom right), and GNSS P1-P2 from the ionosphere analysis (top right).
The CODE Consortium
Astronomical Institute of the Federal Office of TopographyUniversity of Bern, AIUB swisstopo(Bern, Switzerland) (Wabern, Switzerland)
Federal Agency for Carto‐ Institut fuer Astronomische undgraphy and Geodesy, BKG Physikalische Geodaesie, IAPG
0.10.20.30.40.50.6
-0.2
-0.1
0
0.1
0.2
0.3
Y Pole Component (Arcseconds)
X P
ole
co
mp
on
en
t (A
rcse
con
ds)
Earth Rotation Axis as Monitored by CODE
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011 2012
2013
2014
2014/06/13
1993/07/19
-5
-4
-3
-2
-1
0
1
2
3
4
5
DC
B(p
1c1
) in
ns
Satellites
G0
3
G0
4
G0
8
G0
9
G1
0
G2
6
G3
2
G0
1
G0
6
G2
4
G2
5
G2
7
G3
0
G11
G1
3
G1
4
G1
6
G1
8
G2
0
G2
1
G2
8
G0
2
G1
9
G2
2
G2
3
G0
5
G0
7
G1
2
G1
5
G1
7
G2
9
G3
1
G0
3
G0
4
G0
8
G0
9
G1
0
G2
6
G3
2
G0
1
G0
6
G2
4
G2
5
G2
7
G3
0
G11
G1
3
G1
4
G1
6
G1
8
G2
0
G2
1
G2
8
G0
2
G1
9
G2
2
G2
3
G0
5
G0
7
G1
2
G1
5
G1
7
G2
9
G3
1
BLOCK IIA BLOCK IIF BLOCK IIR-A BLOCK IIR-BBLOCK IIR-M
-20
-15
-10
-5
0
5
10
15
20
DC
B(p
1p
2)
in n
s
Satellites
R26
G03
G04
G08
G09
G10
G26
G32
G01
G06
G24
G25
G27
G30
G11
G13
G14
G16
G18
G20
G21
G28
G02
G19
G22
G23
G05
G07
G12
G15
G17
G29
G31
R01
R02
R03
R04
R05
R06
R07
R08
R09
R10
R11
R12
R13
R14
R15
R16
R17
R18
R19
R20
R21
R22
R23
R24
R26
G03
G04
G08
G09
G10
G26
G32
G01
G06
G24
G25
G27
G30
G11
G13
G14
G16
G18
G20
G21
G28
G02
G19
G22
G23
G05
G07
G12
G15
G17
G29
G31
R01
R02
R03
R04
R05
R06
R07
R08
R09
R10
R11
R12
R13
R14
R15
R16
R17
R18
R19
R20
R21
R22
R23
R24
BLOCK IIA BLOCK IIF BLOCK IIR-ABLOCK IIR-B BLOCK IIR-M GLONASS-M
-5
-4
-3
-2
-1
0
1
2
3
4
5
DC
B(p
1c1
) in
ns
Satellites
R26
G03
G04
G08
G09
G10
G26
G32
G01
G06
G24
G25
G27
G30
G11
G13
G14
G16
G18
G20
G21
G28
G02
G19
G22
G23
G05
G07
G12
G15
G17
G29
G31
R01
R02
R03
R04
R05
R06
R07
R08
R09
R10
R11
R12
R13
R14
R15
R16
R17
R18
R19
R20
R21
R22
R23
R24
R26
G03
G04
G08
G09
G10
G26
G32
G01
G06
G24
G25
G27
G30
G11
G13
G14
G16
G18
G20
G21
G28
G02
G19
G22
G23
G05
G07
G12
G15
G17
G29
G31
R01
R02
R03
R04
R05
R06
R07
R08
R09
R10
R11
R12
R13
R14
R15
R16
R17
R18
R19
R20
R21
R22
R23
R24
BLOCK IIA BLOCK IIF BLOCK IIR-ABLOCK IIR-B BLOCK IIR-M GLONASS-M
-5
0
5
DC
B(p
2c2
) in
ns
Satellites
G0
1
G0
6
G2
4
G2
5
G2
7
G3
0
G0
5
G0
7
G1
2
G1
5
G1
7
G2
9
G3
1
R0
1
R0
2
R0
3
R0
4
R0
5
R0
6
R0
7
R0
8
R0
9
R1
0
R11
R1
2
R1
3
R1
4
R1
5
R1
6
R1
7
R1
8
R1
9
R2
0
R2
1
R2
2
R2
3
R2
4
G0
1
G0
6
G2
4
G2
5
G2
7
G3
0
G0
5
G0
7
G1
2
G1
5
G1
7
G2
9
G3
1
R0
1
R0
2
R0
3
R0
4
R0
5
R0
6
R0
7
R0
8
R0
9
R1
0
R11
R1
2
R1
3
R1
4
R1
5
R1
6
R1
7
R1
8
R1
9
R2
0
R2
1
R2
2
R2
3
R2
4
BLOCK IIF BLOCK IIR-M GLONASS-M
Receivers included: GPS/GLONASS (195) only GPS (60)
0
5
10
15
20
25
30
35
40
45
50
55
60
Num
ber
of sa
telli
tes
50000 51000 52000 53000 54000 55000 56000
MJD
0
5
10
15
20
25
30
35
40
45
50
55
60
Num
ber
of sa
telli
tes
50000 51000 52000 53000 54000 55000 56000
MJD
0
5
10
15
20
25
30
35
40
45
50
55
60
Num
ber
of sa
telli
tes
50000 51000 52000 53000 54000 55000 56000
MJD
94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14
GPSGLONASStotal
1 10 100 1000
Velocity changes in mm/s
Posters and other publications from theAIUB Satellite Geodesy Group:http://www.bernese.unibe.ch/publist