Action Plan for DC Shift Phase 1 1. Determine Network Room Spacing & Sizing 2. Power Load Calculation 3. Floor Plan for Network room 4. Floor Plan for Markings Network Room (Network Points, Conduit bridges, Rack placement, Shelf & Cupboard placement) 5. Entrance/Exit Line for Data/Voice Cables for Office (Internal) 6. Entrance/Exit Line for Data/Voice Cables [Fiber Optic] to ISP (External) – Internal FDU if any 7. Determine the number of Fiber Optic Cables Required 8. Apply for FTTx installation with ISP (Determine Single Core/Multi Core cables) 9. Calculate UPS Requirement & Product Selection 10. Evaluate Cooling Requirement with Backup 11. Evaluate Ventilation 12. Determine Internal Voice/Data Cable Distribution 13. Estimate Network Equipments required (Rack, Shelves, Switches, Conduits, Misc) 14. Estimate Lighting & Security for network room if required 15. Floor Plan for Marking of Office User Network Points, conduit bridges, cable paths for Voice/Data 16. Telephone system Upgrade & Telephone Line Management

Upload: tupro-fessional

Post on 18-Jul-2016

4 views

Category:

Documents


2 download

DESCRIPTION

Action Plan for DC Shift

TRANSCRIPT

Action Plan for DC Shift

Phase 1

1. Determine Network Room Spacing & Sizing

2. Power Load Calculation

3. Floor Plan for Network room

4. Floor Plan for Markings Network Room (Network Points, Conduit bridges, Rack placement, Shelf & Cupboard placement)

5. Entrance/Exit Line for Data/Voice Cables for Office (Internal)

6. Entrance/Exit Line for Data/Voice Cables [Fiber Optic] to ISP (External) – Internal FDU if any

7. Determine the number of Fiber Optic Cables Required

8. Apply for FTTx installation with ISP (Determine Single Core/Multi Core cables)

9. Calculate UPS Requirement & Product Selection

10. Evaluate Cooling Requirement with Backup

11. Evaluate Ventilation

12. Determine Internal Voice/Data Cable Distribution

13. Estimate Network Equipments required (Rack, Shelves, Switches, Conduits, Misc)

14. Estimate Lighting & Security for network room if required

15. Floor Plan for Marking of Office User Network Points, conduit bridges, cable paths for Voice/Data

16. Telephone system Upgrade & Telephone Line Management

All stage & process to be documented for reference

Action Plan for DC Shift

Phase 2

1. Check List a- Fiber Opticb- Powerc- UPSd- Network Cable – Network Roome- Network Cable – Officef- Shelvesg- Racksh- Cupboardsi- Coolingj- Ventilationk- Network Equipments (Printers, Scanners etc)l- Tools Required

2. Prepare _____________ for change in Network Structure Observing the following:a- New Active Directory Server/DHCPb- New IP Address Rangec- Reconfiguration of all network equipments (Switches/Printers/Scanners etc)d- Reconfiguration of all End user devicese- Reconfiguration of Main Router for ________________

3. Apply for Migration of 1 of 2 Internet Connections in ___________ or apply for new connection

4. Preparation of ___________ for change in Network Structure Observing the following: a- Active Directory Server/DHCPb- IP Address Range Re configurationc- New Telephone System Setup & Configurationd- Telephone Lines Setup & configuration if being routed. e- Reconfiguration of Main Router for _______________f- Reconfiguration of Switches & other network equipments for new structure

5. System preparation Procedure to observed as following:a- Backup all Servers in Full (Data + Full Image) b- Backup of Router Configurationc- Unmounting all servers & d- Packaging of all servers, switches, routers & other equipmentse- Transportf- Mounting of all equipments in ________g- Test integrity of all systemsh- Test Network Connectivityi- Test VPN Connectivity with all offices including Dial-inj- Run final test for all servers, equipments & connectionk- Prepare Final Check list & Prepare migration Report for reference

All stage & process to be documented for reference