Page 1: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

41N08SE0042 RUNNALSISAI RUNNALLS 010

A.C.R. (1963) OPTION

REPORT ON GEOPHYSICAL SURVEYS

CONDUCTORS E-3 AND E-6, TWP. 25. R.XV. ONTARIO

N.T.S. 41-N-8

BY

HAROLD O. SEIGEL

TORONTO. ONTARIO 18th FEBRUARY. 1965.

Page 2: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

•*iN08SEee*a RUNNALSIBAI RUNNALLS 010C

TABLE OP CONTENTS

INTRODUCTION . . . . .

GEOLOGY . . . . . . .

DISCUSSION OP RESULTS

CONCLUSIONS AND RECOMMENDATIONS

PAGE NUMBER

One

TWO

Three

Pour

LIST OF ILLUSTRATIONS

DWG. NO. L-2336 LOCATION MAP

DWG. NO. E-4097-1 PARALLEL LINE E.M. SURVEY

DWG. NO. E-4098-1 DETAIL E.M. SURVEY

/DWG. NO. M-4099-1 MAGNETOMETER SURVEY

/DWG. NO. GR-4100-1 GRAVITY SURVEY

SCALE

l" -

l" -

l" -

l" -

200'

200"

200*

200*

••"^- i' 'Vt,~'V4--* - 'i*:-B-^-ui..^ /ft. 'ji'"

Page 3: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

A. C. R. (1963) OPTION

REPORT ON GEOPHYSICAL SURVEYS

CONDUCTORS E- 3 AND E-6. TWP. 25. R. XV. ONTARIO

INTRODUCTION

Over the period of July 10th to 26th, 1964, a

geophysical party, under the direction of Mr. H. Beckmann,

carried out electromagnetic, magnetic and gravity surveys

of an area in Township 25, R. XV, Sault Ste. Marie Mining

Division, Ontario. The object of these surveys was to

precisely locate, delimit and investigate two conductors

indicated by an earlier electromagnetic survey and designated

E- 3 and E-6.

The area covered by these surveys includes all or

part of unpatented claims 67112, 67113, 67114, 67115 and

It lies about one mile northwest of Doyle Lake.

Access is by means of charter aircraft from Sault Ste. Marie,

Ontario, a distance of approximately 45 miles due south, to

Doyle Lake. (See location map Dwg. L-2336)

An Electronic Associates E. M. 5 portable vertical

loop unit was employed on the electromagnetic survey with

an operating frequency of about 1000 c. p. s. The transmitter

coil is maintained with its plans vertical and oriented towards

the receiver location. The receiver coil is tilted about a

Page 4: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

- Page Two -

a horizontal axis joining it to the transmitter to obtain

the dip of the resultant electromagnetic field. Conductors

are deduced from the presence of appreciable tilt angles of

the electromagnetic field from the horizontal plane.

The survey lines were initially covered by a

reconnaissance parallel line technique, followed by fixed

transmitter locations to improve the conductor definition.

An askania torsion vertical component magnetometer

was employed on the magnetic survey. Appropriate corrections

for diurnal varriations were made by tying back, about once

per hour, to a base station previously occupied.

A World Wide gravimeter was employed on the gravity

survey. Station elevations were measured to a relative

accuracy of about 0.1'. Appropriate corrections were made to

the observed gravity values for instrumental drift and station

elevation.

GEOLOGY

Mapping of the grid area has revealed it to be

underlain largely by acid to intermediate volcanic and minor

sediments, intruded by diabase dykes and granitic bodies of

uncertain extent.

The observed strike direction is approximatelyx.

N 400 W and dips are steep to the northeast, in general.

't.

Page 5: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

- Page Three -

DISCUSSION OF RESULTS

The electromagnetic results (Dwg. Nos. E-4097-1

and E-4098-1) are presented on two plans, each on the scale of

l" - 2O0 , and the second shows the detail (fixed transmitter)

tilt angle profiles, on the same scale. The latter shows

the conductors deduced from the electromagnetic data.

Two conductors have been located with certainty

and a third possible conductor as well, all strike about

N 400 W. There is one main conductor 2,000 feet in length

and still open to the southeast. It is of very strong

amplitude. The second definite conductor is only about 400

feet in confirmed length and moderately strong.

The magnetometer survey results are presented on

Dwg. M-4099-1, in profile form, on the profile scale of

l" - 1000 gammas. There is considerable magnetic relief,

rangin from 4600 gammas positive to 5400 gammas negative.

The E-3 - E-6 Conductor System displays direct magnetic

correlation on a number of sections, up to 2200 gammas peak

amplitude.

The gravity and elevation survey results are shown

on Dwg. GR-4100-1, in profile form, on the profile scale of

l" - l milligal. There is no significant positive gravity

expression corresponding to any conductor indication on E-3

or E-6. In fact several sections exhibit a negative gravity

correlation.

. .*Vi'*U:^

Page 6: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

- Page Four -

CONCLUSIONS AND RECOMMENDATIONS.

Two conductors have been confirmed which are

undoubtedly caused by graphite and/or very narrow sulphide

zones.

It is recommended that each of these conductors

should be examined by trenching, if possible, or by

drilling if trenching is not feasible, in order to determine

the conductor cause.

follows:-

Suitable exploratory drill holes would be as

(a) Collar on line 12W at 250 feet north.

Orient southwest along the line for

400 feet @ 45O dip.

(b) Collar on line 16W at 225 feet south.

Orient southwest along the line for

300 feet @ 45O dip.

HOSrdfToronto, Ontar io.18th February, 1965,

Respectfully submitted,

f̂ / y(\^LdLG *d**cHarold O. Seigel, Ph.D., P.Eng. Consulting Geophysicist._____

Page 7: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

41N08SE0e48 RUNNALS1SAI RUNNALLS

Us* for on* type of survey only

Assessment Werli Bf**hd*wii

1. Type of Survey...........

2. Township or Area ....

3. Mining claim numbers ..B8M 67112j

900

Submit in eVipllc*f*

2.71

I.A. ..1M.5...

4. Number of miles of line cut

* 5. Type of instrument used . .

* 6. Scale constant or sensitivity

* 7. Number of stations established .

8. Summary of days worked ( details on reverse side )

Total technical ( include consultants, draughting etc.

Total line-cutting ( maximum S man days per claim )

Total man-days ( technical plus line-cutting ) .

Assessment days credit per claim .. . . .

142

113*5. .P*Jf!i.

. .22*7. .

(Total man-days multiplied by assessment foctoiBCdivided by total number of claims traversed)

9. Dared. Signed

* Complete only if applicable Complete list of names, addresses and dotes on reverse sia*

'-ffc

Page 8: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

Us* for on* typo of survey onlyk

Assessment WoHt Br**lt*Wii

1. Technical

Typo of Work Nome 4 Address Dot** Worked

I M o-. - -- *--— w o--* — — - ^^CT *— * — -*- - -- wji w luiu ^n tc*fe 4mrt* M* upuMotr a* MonBunp 1*57 UUBMDOTV wu B* **uy J*'1'*?*** uUf

Fort Orvdit. Oat.

t B M* AMiatmt J. Vylte* lax Vfo. ABM Qua. July 10*15th iaqlt•. .jiniiVl..MmilllMMIIJI^MMIiH.. -.... W. M. . . W^e^B^*^^...^*"^^^-.-"^**^^^^^- .^^^^•^^•..,*^^^^*).....................BK^^^S^..^^^ii' ̂ ^^'" iiw..^^ ii^ f

Total*

Hours

M

W

96

2sr* ,t^

-...d.™

J*

Consultants

Nome A Address

.,^P.*...?B.*...^R^Swi^*^ftw..

Dotes Worked (specify in field or office)

P. ..O* Boot 158|, liaHtmy^f J^it:

Hours Doys

a

Totals 8

Drooflhtsmon, Typing, others (specify)

Name a\ Address

D. B. Stoa*

^373Jwws*

Type of Work Dotes Worked

Dor Muriitlnfl AuAWt 12th ft lHth/6^

i...Ai!i.*.jAjL.....l*iiailXljL..Oj*!fe*

Totals

Hours

12

^JUL.

Days

1-5

....1*5..-

2. Line-Cuttir•i^H^BHM^

Nome Address Dotes Worked

..Jte..lflZl*..Awt*QBt*........-........... - JVOy.^th..-.flWiXft.lBQl^

J!m.ffla3ju.Mll*,flft*......................™^

,,jdf^ffML..wl^B.,,^WTsJ[fwW ̂ ....^•ft^SJY.... .........................*

Hours Doys

.Jto...JML

......5.......

2

Total*

Page 9: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

UM for on* type of survey only SwUit in dvpll

1. Type of Survey ..Hevgoatoaattjr^QravXty.-

^ Township or Areo ,....q^p,....2S......Il,.-15- - ---.--.--.—————.

3. Mining claim numbers SBK 67112* 67H3+.-.. 61U4+-....6711S

4. Number of miles of lite cut

* 5. Type of instrument used ......

* 6. Scale constant or sensitivity ......................................................_................................

* 7. Number of stations established ,. KUsfl. 260^ . .OrJLVity...BS

8. Summary of days worked ( details on reverse side )

Total technical (include consultants, draughting etc.) ——22.?3 * 7 - 135.75

Total line-cutting ~.........._M_.....-_.....,-..-.-_......... , _,™—™--._ nA \

Total man-days ( technical plus line-cutting ) . ............M................................__.

Assessetent days credit per claim ................ ......................-..............................___..m....

9. Doted.

* Complete only if applicable Complete list of names, •oMro**** and 4o**t *n revert* side

•- ; .-X*z. r ft - .

Page 10: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

DM for on* type of survey only Ocophyslcal Conductor B 3*6Assess*e*t Work Brsokde**

1. Technicol

Type of Work Nome i Address Dotes Worked

flrftvity 8urv*y R.todcMtnn JUly 10- IS* 64

^2J7 LakitBhor* Rd.B.

Port Credit. On t.* * p t pouMtfefc July JLQ~1S* fr4

Magn*tOMt*r Survey B.BedkMunn July 20-26D. DouMtt July 16-26

Hours

25

.....3A......

.....li.....72

Doys

3,50 i

. _ . _ ....

2.50

...................

2.239.00

Consultants

Nome PI Address Dotes Worked (specify in field or office)

H. O. 8*10*1 79 Martin Ross Av*. T^J. 13* 16165

Totals

Hours Doys

16

16

Droughtsmon, Typing, others (specify)

Nome tt Address *"*yP* o' Work Dotes Worked

D.R f lton* DraughtmMsn Aug/19,,20'64

4373 L*wr*nc* Av*. E,jW*st Hill, On t.

..P..,..Bu.t*pn... r.R..R*.f.l*^.ri|l*yj.QD.t.,... ...,Typiing................,...,......,.)llW.t...2a.^64......................

Totois

Hours

.....8...........

Doys

....1.........

Address Dates Worked Hours Doys

t—

...L.

Totals

Page 11: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

FOR.RES.INV.

MO TINTO CANADIAN EXPLORATION UD

A.&R. 1963 OPTION.-ONTARIO.

Page 12: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

M ci.

|iriM j*7i*sj*n*r [Ir.tt

!x!^iJfi?xJ a iJp-JssJ

TWP. 25 R. 15DISTRICT OF

ALGOMA

SAULT STE. MARIE MINING DIVISION

SCALE: 1-INCH-4O CHAINS

S\

CMlcol

Page 13: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

SEE(5) IbEK/TiF/eb

"Tfe

C

- T * J

Page 14: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

SSM 67113

SSM 67112

SSM 67174

GO/?-/?/RIO TINTO CANADIAN E XPLORATION LIMITEDLegend

Profile- Scale l" s 1000 b Base value -Ob

A.C.R. OPTION (I963)-TWP25 , RXV - ONT

E-2,E-3,E-5BE-6

MAGNETOMETER SURVEY

One Inch *200 Feet

Page 15: A.C.R. (1963) OPTION REPORT ON GEOPHYSICAL SURVEYS

\ RUNNALLS- 00'

SSM 67115

SSM 67114

8

210

,

il LegendGR/WITY- ' f 8

(.^^" Profile - Scot* l" s 1 mgol

ELEVAT10N-

^-- Prof.te ;Scote l" z 50' | NDEX

7

1

fi

5

2

3

4

y(ft*A/ frJAl*L- S" GO /^ '~rr/ Jt'+L' yNTSii N -e

y /"'- — V7 1 ^***^ X

- *~"// J' ?( \J^p(Jr j - J/'y

SCALE290 0 300 400 600 8^0

"" One inch *200 Feel feet

. ' , - 'r:^i" . ' - '"'"'•'••^'^^^.

- . ' . '' ; ' - 1

- - - -'- '-' : - v". *;- -' '' '. J;' ffi

- . ; - ^ f , .

•' 1- , s J

•* " ' ' "' i\ - ' ' -T: - ' -

' . ' " . - , , i

; . ' '... "~,'

•- - '- '' '\

. ' . . ^

.•-.-'" ,. "

RIO TINTO CANADIAN EXPLORATION UMtflO

A C,R . OPTION (1963) - TWP 25 , RX V - ONT; ', -i - -. ,.

E"2.E"'3 E~5 S E*6 ;GRAVITY ft ELEVATION

SURVEY———————————— P ————— ' —————— : —— l ————————— r^-

JULY 1964 H8 /drs DWG. OR 4IQQVIi i '. .-. . - -'\ -- -

''^m

iM"W; 1tttf's- *i;. ^^•:*: ut-*wk#4rx^•^•J-;^

K X* -J

r'

f.vK,

^-^-

, ''j

'i ;,s /

, :^. 'rv

. ' ; ','t

^——

^