![Page 1: Accredited, committed and probable capacity by state ... · Renewable energy project pipeline progress Accredited, committed and probable capacity by state (since 1 January 2016 –](https://reader034.vdocuments.site/reader034/viewer/2022052003/6016d46fd34f1c7b0d5a0040/html5/thumbnails/1.jpg)
Renewable energy project pipeline progressAccredited, committed and probable capacity by state (since 1 January 2016 – 31 December 2017)
NT
WASA
QLD
VIC
NSWACT
Accredited projects
43 MWCommitted
12 MWProbable
163 MW
Accredited projects
221 MWCommitted
471 MWProbable
345 MW TAS
Accredited projects
4 MWCommitted
1 MW
Accredited projects
107 MWCommitted
1864 MWProbable
65 MW
Accredited projects
60 MWCommitted
996 MWProbable
540 MW
Accredited projects
26 MW
Accredited projects
1 MWProbable
144 MW
Total 6532 MW
Accredited projects
529 MWCommitted
526 MWProbable
351 MW
MW = Megawatts