3 Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry 18th November 2013 Accelerator sector structure (3 departments schema) Department Heads and deputies BE: Paul Collier Roland Garoby EN: Roberto Saban Simon Baird TE: Miguel Jimenez Volker Mertens New group leaders: TE-ABT : Brennan Goddard TE-VSC : Paolo Chiggiato Changes: Survey unit : from BE-ABP to EN-MEF Project support Office: QAP to EN-MEFTRANSCRIPT
Accelerator and Technology sector organization from January, 1st, 2014Frédérick Bordry 18th November 2013
2Accelerator and Technology sector organization from January, 1st, 2014Frédérick Bordry 18th November 2013
Accelerator and Technology sector organization from January, 1st, 2014 Frédérick Bordry
CLIC-LC project organization Steinar Stapnes
HL-LHC project organization Frédérick Bordry, on behalf of Lucio Rossi who is on a duty trip
LIU project organization Malika Meddahi
FCC project organization Michael Benedikt
What is changing in EN ? (EN-MEF group) Roberto Saban
Superconducting RF activities Miguel Jimenez
Discussion
Agenda
2
3Accelerator and Technology sector organization from January, 1st, 2014Frédérick Bordry 18th November 2013
Accelerator sector structure (3 departments schema)
Department Heads and deputiesBE: Paul Collier Roland GarobyEN: Roberto Saban Simon BairdTE: Miguel Jimenez Volker Mertens
New group leaders: TE-ABT : Brennan GoddardTE-VSC : Paolo Chiggiato
Changes: Survey unit : from BE-ABP to EN-MEFProject support Office: QAP to EN-MEF
4Accelerator and Technology sector organization from January, 1st, 2014Frédérick Bordry 18th November 2013
c) Europe’s top priority should be the exploitation of the full potential of the LHC, including the high-luminosity upgrade of the machine and detectors with a view to collecting ten times more data than in the initial design, by around 2030. This upgrade programme will also provide further exciting opportunities for the study of flavour physics and the quark-gluon plasma.
HL-LHC from a study to a PROJECT300 fb-1 → 3000 fb-1
including LHC injectors upgrade LIU (Linac 4, Booster 2GeV, PS and SPS upgrade)
The European Strategy for Particle Physics Update 2013
5Accelerator and Technology sector organization from January, 1st, 2014Frédérick Bordry 18th November 2013
with emphasis on proton-proton and electron-positron high-energy frontier machines. These design studies should be coupled to a vigorous accelerator R&D programme, including high-field magnets and high-gradient accelerating structures, in collaboration with national institutes, laboratories and universities worldwide.
HFM HGA
And also R&D on Proton-Driven Plasma Wakefield Acceleration (AWAKE Expt at CERN)
“to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”d) CERN should undertake design studies for accelerator projects in a global context, d) CERN should undertake design studies for accelerator projects in a global context,
6Accelerator and Technology sector organization from January, 1st, 2014Frédérick Bordry 18th November 2013
Projects:- CLIC Study Steinar Stapnes
- HL-LHC project: Lucio Rossi Oliver Brüning- LIU project: Roland Garoby Malika Meddahi
- FCC study Michael Benedikt Frank Zimmermann
- ACC consolidation project : TBD
- International relations % A&T sector Maurizio Vretenar Eucard 2, ESGARD representative
Administrative support and physical location
7Accelerator and Technology sector organization from January, 1st, 2014Frédérick Bordry 18th November 2013
Giving support to the Director for Accelerators and Technology in his mission by ensuring the follow-up of technical and administrative files, following-up the implementation of decisions of the Director for Accelerators and Technology;
Ensuring the reporting and information exchange among the Director, Department Heads and Project Leaders of the Accelerator and Technology sector;
Analysing quantified data for the Director for Accelerators and Technology, designing and budgeting the implementation of measures considered by the Director; preparing annual documents at the level of the A&T sector (MTP, MPP, APR, Annual Report, …) with the help of Department Heads, Project Leaders and DPOs;
Preparing Director’s negotiations and arbitration inside the sector of Accelerators and Technology or between sectors;
Participating to discussions for the Director for Accelerators and Technology.
Executive Assistant - Benoît Delille
Not a deputy, not a super DSO,…
8Accelerator and Technology sector organization from January, 1st, 2014Frédérick Bordry 18th November 2013
- A&T management (weekly meeting): - DHs, - Project Leaders, - DH+Project Leaders
- Committees: LSC in 2014 , LMC, IEFC
- LHC and injectors performance workshop :June or September 2014