Page 1: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

1

Accelerated Concrete Bridge Decks

Presented by: Robert Rugg

Page 2: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

2

1 hour mix:- Pre-bagged product mixed on site.- Trial batch should be performed.- Coarse aggregate may be added for application

that exceed 2 inches.

- Pro: 1 hr to achieve 3000 PSI, 5000 PSI at 24 hrs.

- Cons: Limited to areas no larger than 10 SF. and should not be used for long term durability.

Accelerated Concrete Mixes

Page 3: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

3

2-4 hour mix:- Uses rapid hardening cement (RHC).- 0.37 W/C ratio. - Trial batch should be performed.

- Pro: Can be mixed on site, transit mixed or delivery from a ready mix concrete plant (RMC).

- Con: Mixed results on Freeze/Thaw & long term durability.

Accelerated Concrete Mixes

Page 4: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

4

4-6 hour mix:- Can be produced from by standard practices at

RMC Plant.- 0.35 W/C ratio.- Trial batch should be evaluated prior to use.

- Pro: Reasonable F/T durability can be expected.

- Con: Type III cement can be limited to certain producers.

Accelerated Concrete Mixes

Page 5: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

5

24 hour mix:- Mix type used on the I-690 bridge decks.- Class H (modified) mix achieving 3000 PSI in 24 hrs.- Maximum 0.40 W/C ratio.- Slump – 3-5”- Air Entrainment – 5-8%- 24 hour wet cure or until compressive strength is

met.- 10 year minimum service life can be expected.

Accelerated Concrete Mixes

Page 6: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

6

Case Study – I-690 EB3 Bridge Decks in the City of Syracuse

BIN 1051000, Spans 4 and 5 – Salina St. and Community LotBIN 1050852,

Franklin Street

Page 7: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

7

- I-690 EB was closed through the City of Syracuse.- 10 day target completion from time of I-690 closure to

the reopening of I-690 EB .- Incentive/Disincentive clauses were used.- Expected service life of deck to be 10+ years.- Bridges are expected to eventually be replaced with

the viaduct project.- Lot of press coverage and public outreach occurred.- Bridges (121’, 110’ & 62’) were re-opened after 8 days.- Parapets remained in place with some spot repairs.

Highlights of Project

Page 8: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

8

Page 9: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

9

Page 10: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

10

Project Photos

Page 11: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

11

Page 12: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

12

Page 13: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

13

Page 14: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

14

Page 15: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

15

Page 16: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

16

Page 17: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

17

Page 18: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

18

Page 19: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

19

Page 20: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

20

Page 21: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

21

Page 22: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

22

Page 23: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

23

Page 24: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

24

Page 25: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

25

Page 26: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

26

Page 27: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

27

Page 28: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

28

Page 29: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

29

Page 30: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

30

Page 31: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

31

Page 32: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

32

Page 33: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

33

Page 34: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

34

Project Feedback

Page 35: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

35

What Went Smoothly- Work was accomplished safely.- Road closure duration was less than 8 days.- Project quality and finished ride quality are good.- Trucks used to catch deck removal made cleanup

easier/quicker avoided repairs to under bridge areas.- Rubber mats placed where trucks could not access

limiting the impact from falling debris.- Traffic was only slightly impacted w/ minimal

complaints. - WZTC was clear, public outreach was good.- Maintenance used closure to work on adjacent decks.

Page 36: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

36

What Could Have Been Improved?- Placing underdecking after the deck was removed

was cumbersome and time consuming.- Slurry ran down scuppers to under bridge areas

and left a film (later cleaned up). Methods to contain the slurry should could have been detailed.

- Penetrating sealer absorbed very fast. Special specification states 24 hours of air dry after saw cut grooving, manufacturer’s instruction say surface only needs to be clean and dry.

- Contractor’s communication/coordination between day and night crews could have been better.

Page 37: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

37

Material Observations- 24 hr. mix behaved unusually. Slump seemed to

increase during unloading, but then become unworkable within 30 minutes of discharge from the pump.

- Cylinder strength obtained (3000 psi) around 25 hours.- Pour ran smoother when discharge was at high end of

slump range (5”). Consideration should be given to allowing a higher range slump.

- Placement went well until the sun began hitting, at which point finishing became difficult and concrete began setting up quickly.

Page 38: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

38

Placement Feedback- Once the deck pour began, rejecting trucks would

have resulted in a cold joint due to the quick setup time.

- Rails were pulled after the deck set, leaving a grease residue in hole, which was grouted. The grout could pop out, but as this area is out of the wheel path and we’re only looking for 10 years it is unlikely to be an issue.

- Leaving a few feet of deck in place (from parapet) would provide a work area and a place to run rails.

- Deck was found to be 9” (8” per plan).

Page 39: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

39

Other Project Feedback- A 48 hour mix would have delayed the overall work

by only 1 more day. This mix would have given one more day of additional wet cure (longer service life expected) and is a mix that DOT has more experience with.

- With the jack hammering and full deck removal it didn’t seem that pointed tips were a detriment.

- Misting or placement at night would have helped with the deck pour.

- 50% expected camber was used.- 16” development length was calculated (vs. 24”).

Page 40: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

40

PDH Questions

Page 41: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

41

Question #1

What is one of the advantages of using Accelerated Concrete Mixes on roadway and bridge repairs?

A. Longer Service Life.B. Quicker reopening of the repaired area.C. Increase resistance to freeze/thaw.D. B & C.

Page 42: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

42

Question #2

As you significantly accelerate the time required to achieve compressive strength, you (generally) can expect the following:

A. Higher water to cement ratio.B. Higher air voids.C. Decreased durability.D. Easier finishing.

Page 43: Accelerated Concrete Bridge Decks...2-4 hour mix: - Uses rapid hardening cement (RHC). - 0.37 W/C ratio. - Trial batch should be performed. - Pro: Can be mixed on site, transit mixed

43

Question #3Observations from the I-690 Accelerated Bridge Deck Project revealed what?

A. Bridge decks can be removed and replaced in less than 10 days

B. An accelerated mix can create difficulties and challenges in placing bridge decks.

C. Acceptable ride quality can be accomplished with a 24 hour mix.

D. All of the above.