accelerate network build
TRANSCRIPT
Presenter name/date
Welcome to the fast lane
ACCELERATEDNETWORK BUILD
Ericsson Internal | 2015-06-26 | Page 2
CONTENTS
© Ericsson AB 2016 | Accelerated Network Build | Page 2
›The leading network build partner
› Industry trends
›Operator challenges
›Traditional network build
›Building the network of the future
› Introducing Accelerated Network Build
›The Ericsson difference
›Summary
Ericsson Internal | 2015-06-26 | Page 3
THE LEADING network build Partner
*TechValidate survey of 187 users of Ericsson Network Roll-Out services
WHAT OUR CUSTOMERS
SAY*
Realize full ROI within
a year
67%Realize revenue
cycle up to 30 percent
faster
74%
© Ericsson AB 2016 | Accelerated Network Build | Page 3
Perceive our service as
higher quality
94%
Ericsson Internal | 2015-06-26 | Page 4
Industry trends
© Ericsson AB 2016 | Accelerated Network Build | Page 4
5G subscriptions by 2022
550million
Internet of Things devices to
Mobile broadband subscribers
to almostdouble by
2022Video to
account for75 percent
of mobile traffic
from 2016 to 2022
Annual traffic growth
of 40%
Urgent need for
Innovation becomesvital to growth
by 2018
surpass mobile phones
greater capacity
Ericsson Internal | 2015-06-26 | Page 5
Operator challenges
Predictability Speed Quality
© Ericsson AB 2016 | Accelerated Network Build | Page 5
›Capacity increase demands better economics
›Efficient delivery of network optimization
›Greater cost control needed
›Capex tied up in complex process
›Need for time and cost savings ›Need for faster time-to-revenue
›Users demand minimum downtime
›Frequent site visits cause opex burden
›Need for reduced error margins
Predictability›Capacity increase demands better economics
›Efficient delivery of network optimization
›Ability to minimize risks
Speed Quality ›Capex tied up in complex process
›Need for time and cost savings ›Need for faster time-to-revenue
›Users demand minimum downtime
›Frequent site visits cause opex burden
›Need for reduced error margins
Ericsson Internal | 2015-06-26 | Page 6
Build
TRADITIONAL NETWORK build
Labor-intensive, limited visibility and control
Complex process with multiple hand-overs
Follow-up visits often required
© Ericsson AB 2016 | Accelerated Network Build | Page 6
Cycle time in months
Equipment commissioning
Equipment Installation
Correctiveaction
Siteinspection
Final siteinspection
Call testing/alarm
clearingIntegrationConfigurationData
collectionReady for
optimization
Build Integrate
Ericsson Internal | 2015-06-26 | Page 7
BUILDING the network of the futureHow Ericsson’s transformative new network build helps you create the network of tomorrow
Cloud based, Network Deployment Delivery Platform
Supply Chain Engineering
Remote Activities
Streamlined
Process
Video Closeout Packages
© Ericsson AB 2016 | Accelerated Network Build | Page 7
Accelerated Network Build enables you to guarantee customers the best service quality, reduce TCO and cut time to revenue generation
Ericsson Internal | 2015-06-26 | Page 8
INTRODUCING ACCELERATED NETWORK build
Prepare
Integration preparation
Installation preparation
Data collection
Completed in 1-2 days
Execute
Remote integration
Equipment installation
Remote site supervision
Automatedchecks andverification
Completed in 1-2 weeksA
ccel
erat
ed
Net
wor
k B
uild
Ready foroptimization
100% verified in a single site visit
Shorter, simpler process
Remote site support for quality improvement
© Ericsson AB 2016 | Accelerated Network Build | Page 8
Ericsson Internal | 2015-06-26 | Page 9
THE ERICSSON DIFFERENCE
SPEED INCREASECut process time in half and free up capex that would be tied up in third party oversight
FIRST TIME RIGHT
Deploy a first time right build process with no need for repeat time and cost investments
FEWER SITE VISITS
Reduce opex through higher quality site visits and a greatly simplified process
50%
70%
99%
© Ericsson AB 2016 | Accelerated Network Build | Page 9
Ericsson Internal | 2015-06-26 | Page 10
summary
© Ericsson AB 2016 | Accelerated Network Build | Page 10
TRADITIONAL NETWORK BUILD
Months
99%First time right
70%Reduction in
revisits
50%faster time to revenue
1-2 WEEKS
ACCELERATED NETWORK BUILD