about us - bvsr 2013.pdfabout us bvsr constructions pvt. ltd is one of the leading and fast growing...

24

Upload: others

Post on 27-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

ABOUT USBVSR Constructions Pvt. Ltd is one of the leading and fast growing ISO 9001-2008 Construction Company in India having established a strong reputation at National level in executing medium to large civil projects and in providing turnkey solutions for its valued clients.

BVSRCPL’s cutting edge capabilities cover a wide range of Civil Engineering -Concept, Design, Construction and Commissioning on EPC and BOT modes. Highways, among Bridges, Earth Dams, Spillways and Aqueducts etc, remain our core competence.

At BVSRCPL we combine financial soundness, technological competence, quality and safety oriented construction methodology, good resource planning and an efficient construction management. The Streamlined, cost-effective systems & processes have enabled the company to deliver projects within time and budget, adhering to strict quality control and safety measures.

BVSRCPL has contributed to the many prized land marks of the Andhra Pradesh & Telangana - some of the exquisite Roads, ROBs, Earthen bunds, Canals and Spill ways having been executed by BVSRCPL. Notable projects also have been executed in other states which have earned laurels for the Company.

BVSRCPL has PAN India operations; some of Infrastructure projects being handled by BVSRCPL are spread over states of Tamilnadu, Madhya Pradesh, Odisha, Sikkim and Karnataka.

BVSRCPL is also adjudged in Andhra Pradesh as one of the best managed and a respected Company on various attributes of client delight.

BVSR Constructions Pvt. Ltd.

3

STATE-WISE ACTIVITIES OF BVSR AT A GLANCE:

ANDHRA PRADESHCOMPLETED PROJECTS ONGOING PROJECTS

HIGHWAY PROJECTS Forming Four Lane road to Krishnapatnam port with expan-sion of Six Lane in Nellore District.

Widening and Strengthening of Pedana-Nuzvid-Vissannapet Road in Krishna District.

Design, Construction for Improvements, Upgrading to Four Lanes Carriageway Kadapa – Pulivendula Road in Kadapa District on BOT Annuity basis

Widening and Strengthening of Kurnool-Devanakonda Road in Kurnool District.

Formation of new Ghat road from Km 16/0 of Pulivendula-Ambakapalli-Murarichintala road in Kadapa District to join Mudigubba (via) Dorigallu

Rehabilitation and Upgradation of National highway 565 from Davulapally to Markapuram Road section to Two lanes with paved shoulders under NHDP-IV on EPC Basis

Design, Construction for improvements, upgrading to 2 lane carriageway Pulivendula-Ramireddypalli-Palagiri Road in Kadapa District on B.O.T. annuity basis

Output and Performance Based Road Contracts for the Maintenance of Package – 29, roads in Nellore District.

I m p rove m e n t s , u p gra d i n g to 2 l a n e c a r r i a g e w ay, Pulivendula-Ambakapalli-Murarichintala Road in Kadapa District on B.O.T. annuity basis

Improvements and Upgradation to two lanes of road from Km 44/2 on Vempalli-Rayachoti Road up to Kadapa Dist border of Batrepalli –Talupulla –Gandi road including bypass road in Kadapa District.

Improvements and Upgradation to two lanes of road from Kamalapuram to Ayyavaripalli (via) Payasampalli including by pass roads in Kadapa Dist.Strengthening of Nellore - Krishnapatnam Road in SPSR Nellore District.

FLYOVERS AND BRIDGESConstruction of ROB at Milk Project at LC No.315A, 315B of Vijayawada – Vissannapet road .

Construction of High Level Bridge across River Nagavali in Km 1/8 of Etcherla - Ponnada in Srikakulam town limits in Srikakulam District

Construction of Road Over Bridge at Kovur gate (near polytechnic college) in Lieu of L.C. No. 119 of Nellore – Bellary – Bombay Road in Nellore District

Construction of ROB @ Bobbili in lieu of L.C. No. RV/306 of Chilakalapalem- Ramabhadrapuram – Rayaghada road

Construction of Road Over Bridge at LANKELAPALEM in lieu of L.C. No. 490 of Parawada – Asakapalli road in Visakhapatnam District

Construction of major Bridge across river Vattigadda at Km 492/2-4 of Raipur-Visakhapatnam section of NH - 43 (New NH No. 26) including its Approaches

Construction of HLB across Penna river in Km. 16/0 to 2/4 of the road from GNR college at Chennur village to kondapeta in Kadapa District

Reconstruction of Bridge at Km 118/8 and 132/4 of Anantapur - Chennai Road NH-205

Construction of ROB @ Yerraguntla yard in lieu of L.C. No. 138 of Yerraguntla - Prodddutur Road in Kadapa District

Construction of ROB at Km 3/6-8 of Gooty - Pathikonda - Adoni Road (LC NO 179 A) in Anantapur District.

Construction of ROB at Kolakaluru in lieu of LC No. 255 of Guntur - Hanumanpalem road in Guntur District

Construction of Skew Bridge near Karlapudi across Vamsadhara left canal in Km 2/0 of NH5 to NP Road in Srikakulam District.

Construction of 2nd R.O.B in Tadepalligudem Municipal limits in West Godavari DistrictConstruction of HLB across Chennaimadugu at Km. 16/4-6 of Gudur - Varagali Road in Nelllore District

BVSR Constructions Pvt. Ltd.

4

COMPLETED PROJECTS ONGOING PROJECTSRAILWAY PROJECTS

Proposed new BG l ine between Obulavaripal le and Venkatachalam in South Central Railway

Construction of New BG Line from Nandyal to Yerraguntla station in Phase – II Works between Nossam (EXCl. Yard) and Banaganapalli.

IRRIGATION PROJECTSConstruction of Viaduct from Km 36.062 to Km 38.262 of Right Main Canal of Vamsadhara Project

Rehabilitation and Modernization of Canals Distributory system of Nagarjunasagar Lal Bahadur & jawarlal Nehru Canals, A.P.

Improvements to 4 Nos of Aqueducts in Reach – I of K.C. Canal (Package No. ICB – 07A)

Dredging works in Krishna & Godavari Delta in Krishna, Guntur, E.Godavari and W.Godavari Districts.

Formation of D bund (balance portion) including protection works from Km.0.00 to Km.0.900 of TGP main canal

APILIP – JBIC – Modernization of Canal System and System tanks under Lower Sagileru Project (Medium Irrigation) in Kadapa District.

Excavation and construction of surplus escape for subsidiary Reservoir-II of TGP Main canal

Formation of Reservoir across Gangamma Sirassu vanka near Nalagampalle in Chittoor District.

Construction of river training walls on left and right flanks of Nagarjuna Sagar Tail Pond Dam across river Krishna near Satrasala(V), Guntur District

Modernization of Araniar Proejct near Pitchatur Village and Mandal, Chittoor District.

TELANGANACOMPLETED PROJECTS ONGOING PROJECTS

HIGHWAY PROJECTS

Two-Laning of Bhadrachalam-Chandupatla road in Khammam District under LWE scheme.

Widening and Strengthening of Mudigonda to Vallabhi road from Km 5/9 to 24/0 in Khammam District.

BRIDGES

Re-construction of major bridge @ Km 124/10 of Vijayawada-Jagadalpur road on NH 221 in Kammam District

Construction of HLB across river Manjeera at Birkur Village in Nizamabad District.

IRRIGATION PROJECTS

Construction of Aqueduct across Peddavagu @ Km.16.150, of Flood Flow Canal from S.R.S.P in Karimanagar

Investigation, Design and execution of Mothe Vagu Reservoir including all other allied works across Mothe Vagu near Koratpalli(V), Ramadugu (M) of Karimnagar District.

S.B.B.R – Construction of OGEE spillway from Km 0.668 across Maganur Vagu in Mahaboobnagar District.

Formation of Gouravelly Reservoir with gross capacity of 1.410 TMC near Gouravelly (Village), Husnabad (Mandal), Karimnagar District.

F o r m a t i o n o f e a r t h d a m o f J o n n a l a b o g u d a balancing reservoir from km.0.450 of Kalwakurthy lift irrigation scheme Mahaboobnagar District.

APILIP – JBIC – Modernization of Dindi Medium Irrigation Project, Dindi Village and Mandal, Nalgonda District.

BVSR Constructions Pvt. Ltd.

5

TAMIL NADUCOMPLETED PROJECTS ONGOING PROJECTS

HIGHWAY PROJECTSUpgradation of Cement Concrete Pavement road at Devanampattanam, Manjakuppam, Thiruppapuliyar, Chellankuppam, vandipalayam & old town in Cuddalore Municipal town limits

Upgradation of Cement Concrete Pavement road at Sonankuppam, Akkarai ghori old town in Cuddalore municipal town limits

IRRIGATION PROJECTSFormation of a reser voir across Chey yar r iver near Kuppanatham vil lage with al l ied component works diversion road, construction of cross masonry works

Improvements to South Buckingham Canal to Muttukkadu back water (North Lock) Reach III, Tamilnadu.

Construction of Rubble mound seawell along Ennore Expressway in North Chennai for a length of 2270m (LS 12/6800 to 13/950 & 14/280 to 14/740 & 14/960 to 15/200 Km)

ODISHACOMPLETED PROJECTS ONGOING PROJECTS

HIGHWAY PROJECTSRairangpur-Jashipur road in Mayurbhanj District under Vijayawada - Ranchi Corridor.Gunupur - Kashinagar-Parlakhemundi road in Gajapati District under LWE scheme.

MADHYAPRADESHCOMPLETED PROJECTS ONGOING PROJECTS

HIGHWAY PROJECTSSausar-Mohagaon-Mordongri road under DBFOT ( Annuity) Basis.Sonapipiri - Umreth - Monari - Umba road under DBFOT (Annuity) Basis.Gadarwara – Tendukheda road Under DBFOT (Annuity) BasisHarda - Chipanner Road Under DBFOT (Annuity) Basis.Betul - Atner road under DBFOT (Annuity) Basis.

Formation of Earth Dam from Km. 1.900 across Maganur Vagu near Sangambanda (V), Makthal (M), Mahaboobnagar District.

Rehabilitation and Modernization of Canals Distributory system of Nagarjunasagar Lal Bahadur canals.

Formation of New Tank across local stream near Itikyala (V), Asifabad (M), Adilabad (Dist.)

BVSR Constructions Pvt. Ltd.

6

SIKKIMCOMPLETED PROJECTS ONGOING PROJECTS

HIGHWAY PROJECTSMelli-Nayabazar & Nayabazar-Namchi road in South Sikkim District

KERALACOMPLETED PROJECTS ONGOING PROJECTS

HIGHWAY PROJECTSConstruction of Roads & Drains including Earthwork in Pathanam mitta District.

HYDRO POWER PROJECTSExecution of balance civil works of chimmony small hydro electric project

WEST BENGALCOMPLETED PROJECTS ONGOING PROJECTS

RAILWAY PROJECTSExecution of foundation & Substructure of Br No.3, No.11, Br No.21 & Br No.52 in connection with Bowaichandi-Arambag new line under the jurisdiction of Dy. Chief Engineer, Construction, Bardhaman.

BRIDGESHigh Level Bridge across river Baitarani in Jajpur District High Level Bridge across river Brahmani in Dhenkanal

District.High Level Bridge across river Ramial in Dhenkanal District. High Level Bridge across river Subarnarekha in Balasore

District.IRRIGATION PROJECTS

Construction of Earth Dam (Left Flank) of RET Irrigation Project in Bhawanipatnam

Construction of Earth Dam (Right Flank) of RET Irrigation Project in Bhawanipatnam

BVSR Constructions Pvt. Ltd.

7

FINANCIAL CAPABILITY In Millions

Description 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14

Authorised Capital 10 30 30 30 30 30 30

Paid up Capital 10 30 30 30 30 30 30

Reserves &Surplus 158.1 238.3 339.2 510.5 580.3 751.8 846.6

Turnover 1213.8 2067.8 1799.2 2929.9 3139.9 4435.2 4046.4

Profit before tax 91 152.8 154.2 359.7 208.7 254.3 166.5

Profit after tax 59.6 100.2 101.7 242.5 142 171.5 110.1

Current Assets 366 600.9 825.5 1434.7 1238 1375.6 1381.5

Total Assets 501.9 734.6 1195.4 1847.6 2122.3 2532.9 2610.5

Current Liabilities 119.6 339.8 288.6 606.2 1020.7 1099.5 1070.6

Net worth 168.1 268.2 369.2 540.5 610.2 781.8 876.6

Working Capital 246.4 261.1 536.9 828.5 217.3 276.1 310.9

FINANCIAL TURNOVER In Millions

Financial Year 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14

Rs. In Millions 1213.8 2067.8 1799.2 2929.9 3139.9 4435.2 4046.4

1213.8

2067.84046.4

2929.93139.9

4435.2

4046.4

BVSR Constructions Pvt. Ltd.

8

Description Qty. in No.s

Excavators 21

Dozers 11

Sensor Pavers 6

Back hoe loader - JCB 3DX 4

Motor Graders 8

Vibratory Earth Compactors 13

Loaders 7

Tandem Vibratory Roller 6

Bitumen Sprayer 4

Dumpers 69

Water Tankers 8

Trailers 4

Diesel Tankers 4

Transit Mixers 14

Crane 4

Kerb Casting Machine 6

Wet Mix Plant 6

Hot Mix Plant 2

Hot mix Plant Batch Type 2

Concrete Pneumatic Pump 7

Bitumen Hot Mix Plants 6

Pad foot Roller 1

Power Generator 34

Concrete Batching Plants 9

Weigh Bridge 60 MT 14

Slope Compactors 9

Earth Rammers 12

Vibrators 56

Steel shuttering Plates 23000 Sqm

WM- 6 HES- 4.5M width Power Finisher (Mechanical) 2

IMS Dredgers 2

PLANT AND EQUIPMENT OWNED

BVSR Constructions Pvt. Ltd.

9

RESOURCES

Key Personnel in Nos

Years of Experience

S.No. Category 20 & Above 15-20 10--15 Below 10

1 Administrative Executive 15 10 5 3

2 Technical Staff 30 40 58 80

3 Administrative staff 12 26 34 36

Manpower in Nos Years of Experience

S.No. Category 20 & Above 15-20 10--15 Below 10

1 Mechanical Crew 16 13 6 4

2 Skilled Persons 28 46 54 80

Major Works On Hand (HighWays)

S.No Name of Work Client Value in Rs. Millions

1 Widening and Strengthening of Kurnool - Devankonda Road from KM 4/400 TO 65/300 in Kurnool Dist., AP

CE (R&B) CRN & MD, APRDC, Hyderabad

1335.40

2 Rehabilitation and Upgradation of NH-565 from Km 154.900 to 198.694 (Design Chainage from Km 153.939 to km 197.318) i.e., Davulapally to Markapuram on Nakrekal-Erepedu Road section to two lanes with paved shoulders in the State of Andhra Pradesh.

SE NH, R&B Circle, Vijayawada 1129.80

3 Widening and Strengthening of Pedana –Nuzvid – Vissannapet road from Km. 62/250 to Km.95/460 in Krishna district, A.P, under invitation of Bids No. APRDC/APRSP/ICB/PNV-09

CE (R&B) CRN & MD, APRDC, Hyderabad

824.63

4 Improvement and upgradation of Road Section of Melli-NayaBazar (Section from K17.10 to Nayabazar (SK01) and nayabazar to Namchi (SK02) (Tranche-1 roads in the state of Sikkim)

PD-ADB projects, PIU Roads and Bridges Department, Gangtok, Sikkim.

696.76

5 Output and Performance based road contracts for the Maintenance of Package-29 roads in Nellore District of Andhra Pradesh

CE (R&B) CRN & MD, APRDC, Hyderabad

349.93

BVSR Constructions Pvt. Ltd.

10

Major Works Completed (Highways)

S.No Name of Work Client Value in Rs. Millions

Year of Com-

pletion

1 Intermediate / Two - Laning three Major District Road under Package - V ( Construction of 3 Major District Roads under Package - V(i) Sausar - Mohgaon - Mordongri (29.58 Km) (ii) Sonapipari - Umereth - Monari - Umbah (22.25 Km) (iii) Gadarwara - Tendukheda (32.12 Km) ( Total Length 83.95 Km) in the State of M.P on Design, Build, Finance, Operate and Transfer (DBFOT) on Annuity Basis.

Managing Director Madhya Pradesh Road Development Corporation Ltd.,

1456.10 March 2014

2 Forming Four Lane Road from Venkatachalam (Km 151/4 of NH 5) to Krishnapatnam Port from Km 0/0 to 19/380 with a Provision for expansion of Road to 6 Lane in future.

Superintending Engineer R&B Circle, Nellore

1108.85 March 2009

3 Design, Construction for Improvement and upgrading to Four lane carriageway, Finance, Operation and Maintenance of Kadapa - Pulivendula road(KP-03) from Km. 28/0 to 46/2 in Kadapa District in Andhra Pradesh on BOT Annuity Basis

Chief Engineer (R&B), and MD APRDC, Hyderabad

880.00 Aug 2010

4 Intermediate - Laning / Two - Laning of 2 Major District Roads under package - VII ( Construction of 2Major District Roads under Package - VII Harda - Chhipaner (29.30 Km) & Betul - Atner (34.50 Km) in the state of M.P. on Design, Build, Finance, operate and Transfer (DBFOT) on Annuity Basis.

Managing Director Madhya Pradesh Road Development Corporation Ltd.,

820.00 March 2014

5 Widening to Two Lane and Improvements from Km 51/0 to 98/620 of Bhadrachalam - Chandrupatla road in Khammam District under LWE Project

Superintending Engineer R&B Circle, Khammam

776.30 June 2011

6 Widening To 2-Lane and improvement from KM 25/2 To 102/0 KM excluding 40/2 KM To 48/0 KM and 52/8 To 57/0 KM of Gunupur-Kashinagar – Paralakhemundi Road (SH-4) under LWE Scheme

Executive Engineer (R&B), Paralakhemundi, Orissa

701.90 Nov 14

7 Design, Construction for Improvement and upgrading to two lane carriageway, Finance, Operation and Maintenance of Pulivendula - RamiReddy Palli - Palagiri road(PRP) from Km. 2/5 to 27/0 in Kadapa District in Andhra Pradesh on Build, Operate and Transfer(BOT) Annuity Basis

Chief Engineer (R&B), and MD APRDC, Hyderabad

366.10 May, 2010

8 Implementation of R&R package for Providing Relief and Rehabilitation benefits to the Project affected Families / Project Displaced families of Kodurupaka, Neelojipally H/O of Kodurupaka villages of Boinpally Mandal – Providing Infrastructure facilities at R&R Colony in Karimnagar District – Laying of internal roads (C.C. Pavements) and construction of C.C. Drains

Superintending Engineer R&B Circle, karimnagar

277.87 March, 2014

BVSR Constructions Pvt. Ltd.

11

9 Design, Construction for Improvement and upgrading to two lane carriageway, Finance, Operation and Maintenance of Pulivendula - Ambakapalli - Murarichintala road(PAM) from Km. 5/2 to 16/0 in Kadapa District in Andhra Pradesh on Build, Operate and Transfer(BOT) Annuity Basis

Chief Engineer (R&B), and MD APRDC, Hyderabad

265.00 March, 2010

10 Forming of new Road from Km 16/0 of Pulivendula Ambakapalli - Murari chintala Road in Kadapa District to join Mudigubba (Via) Dorigallu in Km 57/6of Anantapur - Chennai road (NH - 205) Sub work Formation of new Road from Ch. 0.000 to 11.215 from Km 16/0 of PAM to Dorigallu.

Superintending Engineer R&B Circle, Kadapa

219.08 March 2009

11 Improvements and upgradation to two lanes of road from Kamalapuram to Ayyavaripalli via payasampalli including Byepass road in Kadapa District

Superintending Engineer, R&B Circle, Kadapa

212.04 March, 2012

12 Upgradation Cement Concrete Works and cross Drainage work and Providing Street Lights and Timer Switches for affected roads at Devanmapaltinam. Manjkuppam, Thirupapuliyar, Chellankuppam, Vandipalem and Old Town in Cuddalore Muncipal Limit (Package no. TNMA/RD/04/TEAP/003)

Muncipal Commissioner, Cuddalore Muncipality, Cuddalore

100.98 Apr 2009

13 Formation of Two Lane Road of Venkatachalam (Km 151/ 400 of NH - 5) to Krishnapatnam Port Road from km 0/0 to 23/325 Sub work Reach -1, from Km6/2 to 10/850.

Superintending Engineer, R&B Circle, Nellore

99.30 March 2009

14 Improvements to Rayachoti - Angallu Road from Km. 39/500 to 60/200 in Chittor District

Superintending Engineer, R&B Circle, Chittoor

94.05 March, 2012

15 Upgradation Cement Concrete Pavement with cross Drainage work and Providing Street Lights, Energy Savers and Timer Switches for affected Roads at Sonamkuppam, Singarathoppu, Akkarighori and old Town in Cuddalore Muncipal Limit (Package No. TNMA/RD/004/TEAP/004).

Muncipal Commissioner,Cuddalore Muncipality, Cuddalore

78.90 Oct 2008

Major Works On Hand (Bridges)

S.No Name of Work Client Value in Rs. Millions

1 Construction of High Level Bridge across Manjeera River at Birkur in Nizamabad District.

Superintending Engineer, (R&B) Circle, Nizamabad

363.87

2 Construction of ROB at Km 3/6-8 of Gooty-Pathikonda-Adoni Road (LC No.179 A) at Railway Km 415/5-6 of Gooty-Guntakal at LC No.179/A in Anantapur District

Superintending Engineer, (R&B) Circle, Ananthapur

260.51

3 Construction of high level bridge across Nagavali in Km 1/8 of Etcherla-Ponnada road connecting Ponnada road with Kalingapatnam - Srikakulam - Parvathipuram road in Srikakulam town limits in Srikakulam District (3rd call)

Superintending Engineer, (R&B) Circle, Srikakulam

203.57

4 Constuction of major bridges across river Vattigadda at Km 492/2-4 of Raipur - Vishakhapatnam section of NH-43 (New NH No.26) including its approaches in Andhra Pradesh.

Superintending Engineer, (R&B) , National Highways Circle, Vijayawada

68.15

BVSR Constructions Pvt. Ltd.

12

Major Works Completed (Bridges)

S.No Name of Work Client Value in Rs. Millions

1. Construction of Road Over Bridge at Kovur gate (near polytechnic college) in Lieu of L.C.No.119 at Railway Km.176/12-15 of Gudur - Vijayawada section at Km. 0/2 of Nellore – Bellary – Bombay Road in Nellore District

Superintending Engineer, R&B Circle, Nellore

309.61

2 Construction of ROB at Milk Project, Vijayawada at LC No. 315 A, 315 B, & G6 at railway Km .581/20-22, 581/01-03 of Kazipeta - Vijayawada at Km. 5.640 of Vijayawada - Vissannapet road in Krishna district

Superintending Engineer, R&B Circle, Vijayawada

205.80

3 Construction of 2nd ROB in Tadepalligudem Municipal Limits in WG district at 160 m towards Tadepalligudem Railway station from LC No. 371(At Railway Km. 534/28-31) at Km. 112/8 of old NH - 5 and ends at Km. 60/10 of NA Road

Superintending Engineer, R&B Circle, Eluru

203.11

4 Construction of ROB @ Lankelapalem in Lieu of LC No. 490 @ railway Km 755/3-6 of Vijayawada - Visakhapatnam section @ Km 7/ 4 on Parawada - Asakapalli Road in Visakhapatnam District

Superintending Engineer, R&B Circle, Visakhapatnam

172.50

5 Construction of ROB at Kolakaluru in lieu of LC No. 255 at Railway Km. 403/14-16 of Vijayawada - gudur at Km. 19/2 of Guntur - Hanumanpalem road in Guntur district

Superintending Engineer, R&B Circle, Guntur

6 Construction of ROB in lieu of L.C.No.487 at Km 1/2 of Anakapalli - Sabbavaram Road corresponding to Railway Km 747/5-8 in Visakhapatnam District

Superintending Engineer, R&B Circle, Visakhapatnam

92.60

7 Construction of Four lane Road Over Bridge in Guntur Town Limits at L.C.No. 250 A on Guntur - Vijayawada Road in Guntur District, AP

Superintending Engineer, R&B Circle, Guntur

79.10

8 Construction of ROB near Ayyappagudi in Nellore town limits in lieu of L.C.No.110 on Mini Bypass Road in Nellore District , A.P.,

Superintending Engineer, R&B Circle, Nellore

72.10

9 Construction of ROB at TANUKU at Km 131/914 of old Vijayawada - Visakhapatnam road in lieu of L C No.153 at Railway Km 138/6-7 of Bhimvaram - Nidadavolu section in West Godavari District.

Superintending Engineer, R&B Circle, Eluru

65.18

10 Construction of ROB at Peddavadlapaudi at LC No.301 on Tenali- Mangalagiri road in Guntur District, AP

Superintending Engineer, R&B Circle, Guntur

56.20

Major Works On Hand (Dredging)

S.No Name of Work Client Value in Rs. Millions

1 Modernization - Krishna Delta System – Krishna District – Drainage - “Modernization of Dredging of Pedalanka major drain from Km (-)5.50 to (+)4.50” including Detailed Investigation, Sub-Soil Exploration, Preparation of H.Ps, Preparation of L.P. Schedules, and Operation and Maintenance of the System for Two years after completion of the work on E.P.C. Turn Key System

Superintending Engineer, Irrigation Circle, Vijayawada

213.19

BVSR Constructions Pvt. Ltd.

13

2 Modernization-Krishna Delta System– Krishna District – Drainage - Modernization of Dredging of Gunderu major drain from Km 0.00 to Km 15.00. including Detailed Investigation, Sub-Soil Exploration, Preparation of H.Ps, Preparation of L.P. Schedules, and Operation and Maintenance of the System for Two years after completion of the work on E.P.C. Turn Key System

Superintending Engineer, Irrigation Circle,Vijayawada

183.76

3 Modernization- Krishna Delta System – Guntur District – Drainage - Dredging of Romperu Right Arm from km 30.450 to 37.600 in Prakasam Distirct. including Detailed Investigation, Sub-Soil Exploration, Preparation of H.Ps, Preparation of L.P. Schedules, and Operation and Maintenance of the System for Two years after completion of the work on E.P.C. Turn Key System

The Superintending Engineer, Irrigation Circle, Guntur

146.94

4 Modernization - Krishna Delta System – Guntur District – Drainage - Dredging of Nallamada diversion from km (-) 1.300 to km 2.900 including Detailed Investigation, Sub-Soil Exploration, Preparation of H.Ps, Preparation of L.P. Schedules, and Operation and Maintenance of the System for Two years after completion of the work on E.P.C. Turn Key System

The Superintending Engineer, Irrigation Circle, Guntur

116.68

5 Modernisation of Godavari Western Delta System-Improvements to Yenamadurru Drain From Km 54.000 to 60.330 (Dredging) in W.G.District

Superintending Engineer, Irrigation Circle, Eluru

104.67

6 Modernisation of Tulyabhaga Major drain from Km.(-)2.300 to 7.400 by dredging in Tulyabhaga basin in G.E. Delta

The Superintending Engineer,I&Cad, Dawaleswaram, East Godavari District

93.00

Major Works On Hand (Irrigation)

S.No Name of Work Client Value in Rs. Millions

1 Investigation, Design and execution of Mothe Vagu Reservoir including all other allied works across Mothe Vagu near Koratpalli(V), Ramadugu (M) of Karimnagar District.

SE, IFFC Circle-1, Dharoor Camp, Jagtial

1398.08

2 Improvements to South Buckingham Canal to Muttukkadu back water (North Lock) Reach III, Tamilnadu

Superintending Engineer WRD, Palar Basin Circle, Chennai

857.20

3 Rehabilitation and Modernisation of Distributory system under Musunuru Distributory committee of Nagarjunasagar Lal Bahadur Canal, A.P.India Pkg No.LC-KRI-DC-32

The Superintending Engineer, NSLBC, O&M Circle, Tekulapally, Khammam District

466.36

4 Formation of Gouravelly Reservoir with gross capacity of 1.410 TMC water including Construction of H.C Weir, Forming Earth Dam, Head Regulators on Left and Right Side, Formation of Diversion Road including construction of DLR Bridge, Investigation, Designing and Estimation, near Gouravelly(Village), Husnabad (Mandal), Karimnagar District

Superintending Engineer,FFc Circle-II,LMD Colony, Karimnagar.

431.33

BVSR Constructions Pvt. Ltd.

14

S.No Name of Work Client Value in Rs. Millions

5 APILIP – JBIC – Modernization of Canal System and System tanks under Lower Sagileru Project (Medium Irrigation) in Kadapa District

Superintending Engineer, Irrigation Circle, Kadapa

172.8

6 Rehabilitation and Modernisation of Distributory system under Distributory committee No. 6 Tangeda of Canal, Andhra Pradesh. India vide Package No. RC-GNT-DC-38

The Superintending Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District

145.04

7 Rehabilitation and Modernisation of Distributory system under Janapadu Distributory committee of Nagarjunasagar Lal Bahadur Canal, A.P.India Pkg No.LC-NLG-DC-5

The Superintending Engineer, NSLBC, O&M Circle, Miryalaguda, Nalgonda District

129.42

8 Rehabilitation and Modernisation of Distributory system under Distributory committee No.5, Piduguralla of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT-DC-37

The Superintending Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District

103.40

9 Rehabilitation and Modernisation of Distributory system under Distributory committee No.24, Rompichirla of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT-DC-56

The Superintending Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District

98.78

10 Rehabilitation and Modernisation of Distributory system under Distributory committee No.17,Guntur of Nagarjunasagar Jawahar Canal, Andhra Pradesh. India vide Package No. RC-GNT-DC-49

The Superintending Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District

91.68

11 Construction of Earth Dam from RD 720m to 1054m (Right flank) of RET Irrigation Project

Executive Engineer, Ret Irrigation Division, Bhabanipatna

76.14

12 Rehabilitation and Modernisation of Distributory system under Distributory committee No.20, Chilakaluripet-1 of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT-DC-52

The Superintending Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District

63.72

13 Rehabilitation and Modernisation of Distributory system under Distributory committee No.28, Inavolu of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT-DC-60

The Superintending Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District

62.39

14 Rehabilitation and Modernisation of Distributory system under Distributory committee No.09,Chamuru of Nagarjunasagar Jawahar Canal, Andhra Pradhesh. India vide Package No. RC-GNT-DC-41

The Superintending Engineer, NSJC, O&M Circle, Lingamguntla, Narsaraopet, Guntur District

59.12

BVSR Constructions Pvt. Ltd.

15

Major Works Completed (Irrigation)

S.No Name of Work ClientValue in Rs.

Millions

Year of Completion

1 Construction of Aqueduct across Peddavagu @ Km 16.150, Earth Work Excavation 15,000 to Km. 15.985 and From Km 16.325 to Km 17.000 of Flood Flows Canal from SRSP

Superintending Engineer, SRPS, FFC Circle Jagitial

1217.70 July 2008

2 Construction of Earth Dam (Left Flank) of RET Irrigation project in Kalahandi District.

EE, RET Irrigation Division, Bhvaniptnam

283.3 Nov 2014

3 Formation of Reservoir across Cheyyar River near Kuppanatham Village with allied Component Works. Diversion Road and Construction of cross masonry works in Chengam Taluk of Tiruvannamalai District.

Superintending Engineer, PWD WRO, Project Circle,Vellore, Tamilnadu

257.28 Aug 2008

4 Nagarjunasagar Tail Pond Dam – Construction of river training walls on left and right flanks of Nagarjuna Sagar Tail Pond Dam across river Krishna near Satrasala(V), Guntur Dt. A.P .

SE/CIVIL, NTPDC, AP GENCO, Nalgonda District

168.8 Dec 2013

5 S.B.B.R. - Construction of OGEE Spillway from Km 0.668 to Km 0.834 N.O.F. Blocks from Km 0.648 to Km 0.668 Head Regulator at Km 0.575 and formation of left Earth Dam from Km 0.555 to Km 0.648 and Right Earth Dam from Km 0.834 to Km 1.00 across Maganur Vagu

Superintending Engineer, BLIP Circle, Pebbair

146.06 May 2003

6 Construction of Viaduct from Km 36.062 to Km 38.262 of Right Main Canal of Vamsadhara Project

Superintending Engineer, Vamsa-dhara Project Circle, Srikakulam.

144.91 Feb 2006

7 Formation of Earth Dam of Jonnalaboguda Balancing Reservoir from Km 0.450 to Km 0.850 including Earth Work, Excavation & Forming Embankment of Gravity Canal from Km 8.000 to Km 9.000 of Kalwakurhy Lift Irrigation Scheme, Mahabubnagar District.

Superintending Engineer, NKLISI Circle, Mahabubnagar.

131.40 Sep 2006

8 Improvements to 4 Nos of Aqueducts in reach - 1of K.C. Canal (Package No. ICB-07A).

Superintending Engineer, Con-struction Circle No.1, KCCMP, Kurnool.

56.77 Oct 2004

9 Formation of D Bund (balance portion) including Protection Works from Km.0.00 to Km0.900 of TGP main canal.

Superintending Engineer, T.G.P. Circle, Kadapa

56.29 Mar 2005

10 NABARD - Formation of Earth Dam from K.1.900 to Km 2.375/2.400 across Manganurvagu near Sangambanda (V). Makthal (M), Mahaboobnagar District.

Superintending Engineer, BLIP Circle, Pebbair

47.64 Aug 2004

BVSR Constructions Pvt. Ltd.

16

Major Works On Hand (Railways)

S.No Name of Work Client Value in Rs. Millions

1 Construction of new BG from Nandyal to Yerraguntla stations-Earth work in formation, construction of minor bridges and execution of miscellaneous works in Phase-II works

Chief Administrative Officer (Constructions), Chief Engineer, SCR Secunderabad

66.34

2 Execution of foundation & Substructure of Br No.3, No.11, Br No.21 & Br No.52 in connection with Bowaichandi-Arambag new line under the jurisdiction of Dy Chief Engineer, Construction, Bardhaman.

CAO (Constructions),SER, Kolkata 41.59

Major Works Completed (Railways)

S.No Name of Work Client Value in Rs. Millions

1 Proposed new B.G. line between Obulavaripalle and Venkatachalam in South Central Railway

Chief Project Manager, RVNL, Chennai

921.5

BVSR Constructions Pvt. Ltd.

17

Construction of ROB at Milk Project in Vijayawada, Andhra Pradesh

Dredging of Romperu Right Arm Guntur Dist., Andhra pradesh Retaining Wall Formation of Ghat Road from Km 16/0 of Pulivendula - Ambakapalli - MurarichintalaRoad to Join Mudigubba in Kadapa Dist., A.P.

BVSR Constructions Pvt. Ltd.

18

Dredging of Pedalanka major Drain, Krishna District, Andhra Pradesh

Aqueduct across Pedavagu in Flood FlowCanal of Sriram Sagar Project, Karimnagar Dist. Telangana

Construction of Viaduct from km 36.062 to 38.262of Right Main Canal of Vamsadhara Project,

Srikakulam Dist. A.P.

BVSR Constructions Pvt. Ltd.

19

Pulivendula-Ambakapalli-Murarichintala Road (PAM) from Km 5/2 to 16/0, Kadapa District, Andhra Pradesh

Construction of ROB at Lankelapalem in Visakhapatnam District

Construction of OGEE spilway from 0.668 to Km 0.834 and formation of left Earth Dam km 0.555 to Km 0.648

across Maganur Vagu near Sangambanda (V), Mahaboobnagar District., Telangana

BVSR Constructions Pvt. Ltd.

20

Construction of ROB near Ayyappa Gudi in Lieu of 110 at Railway Km 166/22-24 in Nellore District, A.P.,

Formation of new Ghat Road from Km 16/0 of Pulivendula-Ambakapalli-Murarichintala in

Kadapa District.

Construction of ROB at Kovur Gate in Lieu of L.C. No. 119 at Railway Km 176/12-15 in Nellore District.

Andhra Pradesh