about landis + gyr - optcl · one-stop solution provider for smart community… 2 …linking...
TRANSCRIPT
One-Stop Solution Provider for Smart Community…
2
…linking best-of-breed from Landis+Gyr and Toshiba
Smart Grid applications:Building
ManagementDistributionAutomation
Renewable Integration
EV Charging &Infrastructure
Home EnergyMgmt Systems
New Related Markets
Devices & systems that enable intelligent building management to save energy and cost
Remote monitoringand control of electric distribution system operations
Systems and technologies that enable the grid to remain stable
Devices and systems that enable homes to manage energy more sustainably
Devices and servi-ces for electric vehicle infrastruc-ture, incl. charging cycles management and billing
Emerging needs opportunities incl. Smart Streetlight, Distributed Load Control, Smart Gas and Smart Water
L+G India AMI Journey so far and Way forward
3
RF Deployment Readiness
• RF Approval process for National Lab Certification
• RF Module usage Approval and WPC certification.
Field Trial / Indian scenario understanding
• PVVNL Pilot for 250 1Ph and 3Ph direct connected meters spread over 5 km periphery
• Understanding of RF network behavior in 2 MHz (865-67 MHz) de-licensed band
1st AMI End-to-End Commercial Pilot with TPDDL
• 250 I&C Smart Meters• RF Network 865-67 MHz.• HES - Gridstream CC• MDMS – Gridstream MDMS
Way Forward
• CEA Specified 1Ph and 3Ph Resi. Smart Meters
• RF Network 865-67 MHz.• Gridstream HES & MDMS • Deployment and Manage
Services
Aug 2012 – Jan 2013 Apr 2013 – On going July 2013 – On going 2014+
Utility
Vendor
Customer
Regulator
Creating AMI Eco-System
Gridstream™ Solution – All AMI Offering under one roof
4
FANIPv6 RF or PLC Mesh (RPL/ROLL)
Demand Response Residential and C&I Smart Metering PEV and Distribution GenerationVirtual Sub-meteringGrid/Substation
WAN (TCP/IP)
All AMI Offering Under One Roof in INDIASegment Item Model / Type Usage / Feature/ Remarks
I&C Metering
HT and LT meter
E650 IS-14697, DLMS IS-15959 Category A & C, Retrofitted with RF Mesh module (865-867MHz) in enclosure
RLC Metering 1Ph and 3Ph WC meter
E250, E350 andE450
IS-13779, in-built latching relay (optional), modular RF comms card, bi-directional energy (optional)
Network Management
RouterCreates super highway of data, collects multiple end points data; transmits upstream to Collector; 10 hours battery
Collector Collects data from Router and sends to HES via TCP/IP channel; 18 hours battery
HESCommand Centre
One global software supporting 28Million + end points; supports Oracle 11g, SQL Server 2008, Multi-Speak and CIM 61968
MDM Ecologic Analytics Analytic Software which supports standard interfaces
Managed Services
Maintain the deployed AMI network for utility
5Note – Different Colour is for identification only
PVVNL Noida - Deployment: Planning+Resources+Execution
9
Getting Required Inventory
Area of Interest Selection
RF Noise Analysis
Approvals
Customer Interactions
Network Design
Deployment
Infrastructure Setup
Debug & Brainstorm
Analytics
Deployment Map : 250 EP’s PVVNL
10
3.7 Kms
Router 2 :Distance : 500 meterHeight : 23 meters
Router 1:Distance : 3500 meterHeight : 14 meters
CollectorHeight of Collector : 15 meters
Endpoints near the collectorMax distance of endpoint is 1.5 Kms
Endpoints IslandMax distance of endpoint is 3.6 Kms
All AMI Use Case
11
Self Healing RF Mesh
Layer/ Hopping Information
Outage Management
Demand Response / Load Curtailment
Connect / Disconnect
Over The Air (OTA)
Reporting Engine, Alerts
Gridstream MDM : Importance
14
Automate and streamline the complex process of Multiple HES integration
Evaluate the quality of that data and generate estimates where errors and gaps exist
Common system to integrate with utility business systems and deliver “Single source of Truth” in the uniform format to utility sub-system
Project Scope TPDDL wants to perform Demand Response on its Key Consumer Group i.e. HT meters at 11kV Pilot Project to cover 250 nos. of high end consumers having sanctioned load of 300 KW andabove. (70% revenue)Target reduction by ADR of 34MW of power during the peak demand is the goal.Communications between meter to head end system to be in unlicensed radio frequency band.
L+G Scope of Work Complete end-2-end AMI solution HT meters (E650) with modular RF module (865-867MHz) – 250 no’s Network Components (Router + Collector) – 70 no’s approx. Head End Software – Command Centre Gridstream MDM - Ecologic Analytics HES and MDM to be deployed at TPDDL Data Centre, Pitampura
16
Deployment Area
17
Island 1Length : 5 KmsBreath : 7 KmsEndPoints : apprx 40
Island 2Length : 15 KmsBreath : 15 KmsEndPoints : apprx 210
5 Kms
7 Kms
15 Kms
15 Kms
Ball Park Statistics:
Area : 187 sq KmsEndpoints : 250Routers : 60Collectors: 5
TPDDL Site Pictures : Commercial Mall - Basement
18
Tentative Deployment Scenario • Install HT Meter with RF
module in an enclosure• Extend RF module antenna
outside