    ABHIJEET GUPTA

    Present CTC - 2.4 Lac P.A

    Expected CTC - 3.0 Lac P.A

    Total Exp 7 years

    S/O Mr. R P GuptaB-118, karampura, New delhi-110015Email : [email protected]

    Cell No. : +918052171951, +919336329931

    Career Objective

    To put my best effort to my job honestly and sincerely and be an excellent professional as a Electrical

    Design Engineer.

    Key skills

    Preparation of single line diagram.

    Preparation of earthing layout, earthing calculation

    Preparation of Lighting Layout(indoor/outdoor ), Lighting calculation.

    Cable sizing calculation, cable scheduling

    Preparation of Equipment layout, cable trench layout.

    Transformer sizing calculation, DG sizing calculation.

    UPS sizing calculation, battery sizing calculation.

    Testing and commissioning of HV, MV and LV panels, Cables, Power transformer,

    Current Transformers and potential transformers, relays etc

    Installation, testing and commissioning PABX System, Paging system and Public address

    system in plants.

    Work Experience

    Presently working with Sai computers India (P) Ltd. As electrical engineer from 2010 till date

    Working as Engineer (Electrical) with Tractebel Engineers & Constructors Pvt Ltd, New Delhi,

    India. From May 11, 2004 to 2010.

    MARAFIQ IWPP(INDEPENDENT WATER AND POWER COMPANY)(JUBAIL

    PLANT IN SAUDI ARABIA)(FROM DEC 2008 TO JULY 2009)

  • 8/4/2019 AbhijeetGupta_ok

    2/4

    Worked as an Electrical supervisor forMarafiq IWPP (Independent Water and Power Plant)

    project from Dec 2008 to till July 31st 2009 . I was involved in testing and commissioning

    of lighting, HV, MV, LV switchgear panel and telecommunication system (Paging

    System, Public Address system and PABX system). The telecommunication system had

    power plant is comprised of 4 blocks and will be based on Combined Cycle generation Gas

    Turbines where extraction steam from the turbines supplies process steam to the desalinationplant which itself will comprise 27 units that will use Multiple Effect Distillation technology

    (MED). This project is of national importance and is set for achieving its completion in 2010.

    This will add 2,745 MW of power and 800,000 cubic meters per day of desalinated water to

    Jubail Industrial City and the Eastern Province of Saudi ArabiaThe project is implemented

    by a joint venture of Marafiq, SEC and PIF of Saudi Arabia and the Suez consortium

    (comprising Suez Energy International, Belgium, Gulf Investment Corporation, Kuwait and

    ACWA Power Projects Saudi Arabia), the successful bidder developer selected by Marafiq in

    December 2006.

    The system consisted of switchgear of following voltage levels

    Voltage level

    380 KV, 138KV, 18KV, 480V , 13.8 KV etc

    Worked as Site Engineer for High Voltage Distribution Project (HVDS) of Reliance Energy

    Ltd. Work involved Erection testing & Commissioning of the High Voltage Distribution

    system at the consumer end (July to September 2004)

    Involved as Testing and Commissioning engineer in CNG gas Distribution project and setting

    up of CNG station for the Client Bharat Petroleum Corporation Ltd. (BPCL) (November 2005

    February 2006)

    Prepared technical specification for tender purpose of Indore City gas Distribution Project

    for the Client Aavantika Gas ltd (AGL)(2007).

    Prepared technical specifications for tendering purpose Various projects of GSPL and GAIL

    like Anklav Dhuvaran pipeline project, Kalol Himmatnagar pipeline project. Done lighting

    calculation, cable sizing calculation, transformer sizing calculation, Earthing calculation.Preparation of hazardous area classification layout for pipeline, Earthing layout, Outdoor

    lighting layout, indoor lighting layout, wiring diagram, control scheme for circuits.(Mean

    while these projects were handled)

    Job Profile

  • 8/4/2019 AbhijeetGupta_ok

    3/4

    Preparation of Technical specification for Gas pipeline & power plant projects. Mainly

    worked on pipeline projects .

    Current CTC is 3.17 lacs

    Total experience is 5 years

    Notice Period: 2 weeks

    Educational Qualifications

    B.E. (Electrical): JSS Academy of Technical Education, Dr. B.R. Ambedkar University, Noida

    Year of passing: July 2003 AGGREGATE: 75.00%

    Projects worked on during Engineering

    Project

    Title: Control Of Electrical Equipment through PC.Place: Delhi

    Description: Control Of Electrical Equipment Using the parallel port of Computer with C language

    programming.

    Project

    Title: Traffic Light ControllerPlace: Delhi

    Description: Using PLC of Modicon & Ge Fanuc .

    Software Skills

    Package : MS Office

    Operating System : XP/98/NT/2000

    Education Board Year of Passing Marks obtained

    B.E.

    Dr. B.R.

    AmbedkarUniversity

    2003 76.1%

    12th Standard UP Board 1998 70.2 %

    10th Standard UP Board 1996 69.12 %

  • 8/4/2019 AbhijeetGupta_ok

    4/4

    Language : C/C++

    Subject Knowledge

    Preparation of Single line diagram.

    Cable Sizing Calculation.

    Transformer sizing calculation.

    Personal Details

    Date of birth : November 13, 1981

    Strengths : Positive attitude,Good analytical ability, Adaptable in nature.

    Language Known : English, Hindi.

    Current Location : New Delhi

    I hereby declare that all the information stated above is true and complete to the best of myknowledge and belief and nothing has been concealed / distorted.

    Abhijeet Gupta