    Content

    Introduction

    Drilling and blasting

    ExplosivesCrusher plant

    Cost analysis

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    3/27

    Click to edit Master subtitle style

    5/1/12

    Introduction

    Mining and mineral

    industry is an extremely

    important field in the

    world industrial sector.

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    4/27

    Click to edit Master subtitle style

    5/1/12

    Location

    35km from the Kalutara and

    20km from Matugama

    Area

    extended in 50 acres.

    Aim

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    5/27

    Click to edit Master subtitle style

    5/1/12

    General quarrying procedure

    For the one year we are going

    to operate the plant 312 days

    and the quarry 300 days.

    operate the plant 26 daysand the quarry 25 days per

    month.

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    6/27

    Click to edit Master subtitle style

    5/1/12

    Rock dimensions

    Dimensions of rock are very

    useful details to estimate the

    lifetime, monthly production, no

    of blasts per day and etc. below

    mentioned four dimensions of

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    7/27

    Click to edit Master subtitle style

    5/1/12

    Bench parameters & detailsGreen belt has been driven in between crusher plant

    and administration segment.

    Stock piles are located very close to production

    stream lines

    Quarry is advanced using horizontal bench method

    using four separated benches and two working lines.

    Safety benches also have established

    =

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    8/27

    Click to edit Master subtitle style

    5/1/12

    Opportunities created

    50 job opportunities are

    created through this project.

    Entire working crew receiveshigh wages and allowance.

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    9/27

    Click to edit Master subtitle style

    5/1/12Organizational structure

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    10/27

    Click to edit Master subtitle style

    5/1/12

    Work force

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    11/27

    Click to edit Master subtitle style

    5/1/12

    Transportation system

    1 Front end loaders forloading of rocks to dump

    trucks

    3 320 caterpillar excavators

    Dump trucks

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    12/27

    Click to edit Master subtitle style

    5/1/12Measures to prevent

    environmental pollutionMaintenance and repair of

    vehicles and machinery can

    create wastes as can office

    operations.

    Each of the guide sheets has

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    13/27

    Click to edit Master subtitle style

    5/1/12

    Purchase the largest practical container

    (containers usually end up as waste), but

    do not Purchase more than is needed.

    Purchase the least toxic or hazardous

    product available. Check the material

    safety data

    Sheets for products you purchase. If the

    product is toxic or hazardous, ask your

    supplier for alternatives.

    See if the supplier can take back excess

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    14/27

    Click to edit Master subtitle style

    5/1/12Inspect storage areas regularly for leaks.

    Make sure all items are clearly labeled.Store products in original containers.

    Store wastes separately and be sure they

    are properly labeled to make it easier to

    reuse or recycle them.

    Store items that could leak in a place

    where leaks will be contained and easily

    spotted.

    Make a list of your wastes. Then try to

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    15/27

    Click to edit Master subtitle style

    5/1/12

    The access roads for the aggregate stock

    pilesand quarryhave been well defined to

    minimize the freight traffic in the

    crusher plant site and parking points.

    Crusher plant is 150m away from the

    administration segment.

    The distance between crusher plant and

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    16/27

    Click to edit Master subtitle style

    5/1/12

    Production and the Life time of

    the quarry

    Production is depending on the

    demand of the outside (buyers)

    and the production rate of the

    machines (crushers, screens,

    loader).

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    17/27

    Click to edit Master subtitle style

    5/1/12

    Volume of the rock= 100*100*85

    = 850000

    Life time of the quarry =

    850000/6172.84

    = 137.7 months

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    18/27

    Click to edit Master subtitle style

    5/1/12

    Drilling

    Staggered pattern

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    19/27

    Click to edit Master subtitle style

    5/1/12

    Parameters

    Diameter of blast hole = 40 mm

    (D)

    Depth of hole = 3 m (L)

    Drill angle = 800 (horizontalangle)

    Spacing = 1.6m

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    20/27

    Click to edit Master subtitle style

    5/1/12

    Drilling Equipments & Cost

    Equipment Total Cost

    Hand held drills Rs 180,000

    Compressors Rs.150,000.00

    Drill rods Rs.63, 000.00

    Drill bits Rs.3800.00

    Hoses Rs 50,000.00

    Additional Parts Rs. 11,900.00

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    21/27

    Click to edit Master subtitle style

    5/1/12

    Other cost

    Mode of cost Monthly Total cost

    Diesel 2,250.00

    Oil for compressor 12,600.00

    Oil for jackhammers

    6,050.00

    Labor 240,000.00

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    22/27

    Click to edit Master subtitle style

    5/1/12

    ExplosivePrimary explosive = Dynamite

    Secondary explosive = ANFO

    25ms Electric detonators

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    23/27

    Click to edit Master subtitle style

    5/1/12

    Explosive cost

    Monthly usage Monthlycost(Rs.)

    Dynamite 130Kg 143000.00

    NH4NO3 1700Kg 272000.00

    Fuel 136l 9928.00

    Electricdetonators

    1200 180000.00

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    24/27

    Click to edit Master subtitle style

    5/1/12

    Cost analysisAssets

    Fixed Assets

    Land Rs. 125,000,000.00

    Buildings Rs. 6,100,000.00

    Vehicles Rs. 114,200,000.00

    Furniture Rs. 2,620,000.00

    Tools Rs. 8,000,000.00

    Plant Machinery Rs. 3,500,400.00

    Installation cost Rs. 6,500,000.00

    Other cost Rs. 2,600,000.00

    Drilling EquipmentsRs. 59,632.00

    Blasting Machine Rs. 48,950.00

    Total fixed assets Rs. 268,688,982.00

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    25/27

    Click to edit Master subtitle style

    5/1/12

    Currentassets

    Inventories Rs. 10,000,000.00

    Cash and equivalent Rs.

    15,000,000.00

    Other current assets Rs.

    500,000.00

    Total current assets Rs. 25,

    500,000.00

    Total Annual Revenue Rs.152,650,800.00

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    26/27

    Click to edit Master subtitle style

    5/1/12

    Unit Operation Annual cost (Rs.)

    Drilling cost 8,400,000.00

    Blasting cost 8,159,136.00

    Loading cost 11,081,280.00

    Hauling cost 5,695,200.00

    Crushing cost 13,035,360.00

    Testing 500,000.00

    Total 46,870,976.00

    Cost of Sales =(46,870,976.00 +

  • 8/3/2019 ABC Aggregate (Pvt) Ldt

    27/27

    Click to edit Master subtitle style

    5/1/12

    Forecasted income statement for 2011

    Revenue 152,650,800.00Cost of sales (41,370,976.00)

    Gross profit 111,279,824.00

    Discounts 500,000.00Royalty 1% (1,526,508.00)

    Administrative expenses (7,463,600.00)

    Other expenses (8,717,600.00)Operating profit 94,072,116.00

    Finance costs (10%) 4,000,000.00)

    Profit before tax 90 072 116 00