© ABB Group

October 23, 2014 | Slide 1

ABB in Kazakhstan Short Internal English

KAZAKHSTAN-SWITZERLAND FORUM, Oct 22, 2014 Igor Almazov

ABB in Kazakhstan Renewable Energy Sector

ABB in the World Key Facts and Figures

© ABB Group

October 23, 2014 | Slide 2

A global leader in power and automation technologies Leading market positions in main businesses

+145,000 employees

Present

in

countries +100

Formed

in

1988 merger of Swiss (BBC, 1891)

and Swedish (ASEA, 1883)

engineering companies

In revenue

(2013)

billion 42 $

© ABB Group

October 23, 2014 | Slide 3

Power and productivity for a better world ABB’s vision

As one of the world’s leading engineering companies, we

help our customers to use electrical power efficiently, to

increase industrial productivity and to lower environmental

impact in a sustainable way.

© ABB Group

October 23, 2014 | Slide 4

© ABB Group

October 23, 2014 | Slide 5

Ground-breaking and nation-building projects Pushing the boundaries of technology

Longest undegraund

power link

Longest underwater

power link

Largest Static Voltage

Compensator

Most remote offshore

wind farm linked to grid First platform connected

to mainland grid

Europe’s largest thermal

solar power plant

First commercial wave

power plant

Substation in world’s

tallest building

Automation of largest

alumina plant

Largest battery

Largest reverse-

osmosis

desalination plant

Commissioning of world

longest transmission line

ABB in Kazakhstan What We Are

© ABB Group

October 23, 2014 | Slide 6

© ABB Group

October 23, 2014 | Slide 7

ABB in Kazakhstan

Headquarter: Almaty

Branches and

representative offices

Astana

Atyrau

Aktau

190 Employees

ABB Kazakhstan: ABB LPP and JSC Energia Design Institute are representing ABB Group

© ABB Group

October 23, 2014 | Slide 8

ABB Power Products

ABB Kazakhstan supplies power transformers and

distribution transformers to the Utilities Industry throughout

Kazakhstan to help develop the country’s infrastructure and

improve its grid reliability.

© ABB Group

October 23, 2014 | Slide 9

ABB substations can be found in Kazakhstan power plants,

national power transmission grids and other places where

energy efficiency is critical for the operations of the power

projects.

ABB Power Systems in Kazakhstan

© ABB Group

October 23, 2014 | Slide 10

Many of ABB Process Automation integrated solutions are

used to provide high productivity for industrial plants in

industries, Oil and Gas, Minerals & Metals.

ABB Process Automation in Kazakhstan

© ABB Group

October 23, 2014 | Slide 11

ABB Low Voltage products are widely used to help deliver

major power savings in Kazakhstan’s infrastructure such as

buildings, construction, and transportation.

ABB Low Voltage Products in Kazakhstan

© ABB Group

October 23, 2014 | Slide 12

The Discrete Automation & Motion division provides

products, with related services, that are used as

components in machinery and automation systems. The

offering of the division covers a wide range of products and

services including power electronics systems, motors and

generators, drives and robots. Together we drive our

customer's industrial productivity and energy efficiency.

ABB Discrete Automation & Motion in Kazakhstan

Our Key Customers

© ABB Group

October 23, 2014 | Slide 13

Design Institute ENERGIA Current Competences

© ABB Group

October 23, 2014 | Slide 14

- Innovation and development of grid systems

- Design of relay protection and automation systems

- Design of emergency automation systems

- Design of supervisory and control systems

- Surveyor services (geodesic, geological, hydrological)

- Design of overhead and cable transmission line

from 6 kV to 1150 kV

-Design of AIS substations (6 - 1150 kV) and GIS

substations (6 - 500 kV)

- Design of auxiliary facilities and networks

- Civil construction design

- Engineering and consulting services

Established: 1962

Employees: 115

Joined to ABB Group: 1998

© ABB Group October 23, 2014 | Slide 15

Renewable energy Key growth driver for both power and automation

Generation and

transmission solutions for:

Hydro

Wind

Solar

Wave

Xiangjiaba-Shanghai (China)

Wind Capital (US)

Totana solar (Spain)

Pelamis wave energy (Portugal)

Project examples ABB scope

Grid connection

Transformers

Turnkey execution

Customized generators

© ABB Group

Renewable energy share of global electricity production

Source: REN 21

Renewables 2011

Global Status Report

Fossil fuel 67,6%

Renewables 19,4%

Nuclear 13%

November 08, 2011 | Slide 16

Reneable Energy.

Kazakhstan`s legislation.

1

Law of the Republic of Kazakhstan from

July 4, 2009 № 165-IV

«On Supporting the use of renewable

sources of energy»

«Renewed» renewable energy law ( went

into effect 21 July 2013)

Wind Power

1

ABB Kazakhstan. Design and feasibility study. Wind Parks. The folloing projects are in portfolio: Power delivery scheme of Erementau Wind Park, 50-300 MVA , Astana Power delivery scheme of Zhanatas Wind Park 100-400 МVA , South of KZ Power delivery scheme of Samal Wind Park Feasibility study of Wind Parc 51 MVA, Schelekhskiy Corridor, Almaty Feasibility study “Wind Park in Dzungar Gates”, 50-500 MVA Feasibility study 40-45 MVA , Erementau area Feasibility study “ Zhanatas in Zhambyl” Feasibility study “Samal”

Renewable Energy

Reference project in Kazakhstan

21

Almaty-area,

ТОО «Green Energy Almaty»

Feasibility study of Wind Power Park

of 51 MVA in Shelekhs Corridor

2014

Renewable Energy

Summary of works

22

•Power Delivery Connection Scheme

• Technical specification for connection to «Аlmaty Zharyk» 110 kВ

• Feasibility Study

• Approval of «StateExpertise»

• MINT approval ( Ministry of Industry and New Technologies)

• Fixed Tariff Approved

• At the present time «Green Energy Almaty» is in talks with investor

© ABB Group

October 23, 2014 | Slide 23

Strengthen the organization

Extend market coverage

Focus on Oil & Gas, Minerals & Metals industry

Focus on renewable energy

Strengthen services and engineering capabilities

ABB in Kazakhstan Strategic focus 2014 - 2016