a330neo flight test campaign - airbus · 10/19/2017 · a330neo flight test campaign patrick du...
TRANSCRIPT
19 October 2017 2
The First Flight crew
Thierry Bourges
Experimental
Test Pilot
Thomas Wilhelm
Experimental
Test Pilot
Alain Pourchet
Test Flight Engineer
Emiliano
Requena Esteban
Flight Test Engineer
Jean-Philippe Cottet
Flight Test Engineer
Head of Development
Flight Tests
Gert Wunderlich
Flight Test Engineer
19 October 2017 3
Key features impacting the Flight Test Program
New Wing Re-optimized
Aerodynamics
Cabin New interior and
Efficiency enablers
New Wing New Sharklets
Span extension to 64m
Powerplant New generation Rolls-Royce
Trent 7000 engine
Pylon, Nacelle & Air Inlet Optimised installation
Proven concepts and materials
Systems Updated to support
neo characteristics
Fuselage Weight Savings
19 October 2017 4
A330-900 Flight Test Program overview
MSN
1795
MSN
1813
5
3
TC
4 5
Rakes
No Tail Bumper, Rakes
Tail Bumper, No Rakes 1 2 3
1
HQ certification cycle
AFM certification cycle
Power Management certification cycle
Autoland Cat III certification cycle
Noise certification cycle
MSN1795
MSN1813 MS
N17
95
FF
MS
N18
13
FF
4
2 N Hi H H RP
ice C
EIS
1 – Initial Development 2 – Development tests 5 – EIS support 3 – Certification tests 4 – EIS prep.
ice shapes cold weather
natural icing hot weather
high altitude
route proving
hot weather
600 FH
500 FH
Overall FT Campaign ~1100 FH
N
external noise
19 October 2017 5
Early Flight Tests
130 FTH ON A330-200 MSN871
(Q4 2015 to Q2 2017)
• Validation of
upgraded flight
control laws
• Systems de-risking
• AIRSPACE cabin
component initial
checks
19 October 2017 6
Flight Test campaign aircraft
A330-900 MSN1795 – Flight Test Aircraft
Medium FTI
Dual HUD, FMS Honeywell, SATCOM Honeywell, Messier-Goodrich brakes, Avionics
function activated (FLS, GLS, ATSAW, T3CAS, ROPS, ..)
3 instrumented Flight
Test aircraft,
representative of
forthcoming production
aircraft with latest options
& First Production aircraft
to validate the cabin
installation
Maximize Maturity and
Readiness at Entry Into
Service
A330-900 MSN1813 – Flight Test Aircraft Medium FTI
Dual HUD, FMS Thalès, SATCOM Iridium,, Honeywell brakes, Avionics function
activated (FLS, GLS, ATSAW, T3CAS, ROPS, ..)
Airspace Refresh lavatories
A330-900 MSN1819 – First Prod. Aircraft with full Cabin Light FTI for production & cabin checks
Airspace Cabin
*FLS: FMS Landing System; GLS: Ground-based Landing System; ATSAW: Airborne Traffic Situation Awareness; T3CAS: Transponder-equipped Traffic & Terrain Collision Avoidance System; ROPS: Runway Overrun Prevention System
A330-800 MSN1888 – Flight Test Aircraft Medium FTI
Mainly dedicated to Flight Physics Tests, 300FTH forecasted
19 October 2017 7
A330-900 Flight Test Program overview
MSN
1795
TC
Tail Bumper, No Rakes 5 1 2 3 4 ice C
EIS
1 – Initial Development 2 – Development tests 5 – EIS support 3 – Certification tests 4 – EIS prep.
ice shapes cold weather FF
Ice shapes campaign
Cold weather campaign
External noise campaign
N
external noise
19 October 2017 8
A330-900 Flight Test Program overview
MSN
1813
Rakes
No Tail Bumper, Rakes
1 – Initial Development 2 – Development tests 5 – EIS support 3 – Certification tests 4 – EIS prep.
3 4 5 1 2 N Hi H H RP
natural icing hot weather
high altitude
route proving
hot weather TC EIS
Hot weather campaign High altitude campaign
19 October 2017 9
A330-900 Flight Test Program overview
MSN
1819
1 – Initial Development 2 – Development tests 5 – EIS support 3 – Certification tests 4 – EIS prep.
2
TC EIS
ATA 21 ventilation tests MSN 1819: First production aircraft
Flight Test Installation
19 October 2017 10
• Core FTI + Acquisition
Based on modular system and Remote Acquisition Units/Remote Power System
1375 on board measurements & more than 98 000 parameters
on the Flight Test Instrumentation database
• Trailing cone
Commanded from FTI station.
One for Low Speed, another for High Speed
• Heavy instrumented engine 2
• 60 GB of data recorded per flight hour
• 1 Flight Test Engineer Station for 2 Flight Test Engineers
• 1 dedicated Engine Monitoring Station for 2 engine specialists
• All crew members share an internal communication loop
19 October 2017 11
Flight Test Installation
MEMS (Micro Electro Mechanical Systems) give aero pressure distribution
over the wing surface.
Back to Back tests between NEO and CEO for wing structural validation
• Delta pressure Delta loads
• Structural analysis focused on those deltas
• Less flights to perform
• Less data analysis
19 October 2017 12
First Flight profile
FL100
FL200
FL300
TAKE OFF
Direct law
TOGA
INITIAL CLIMB 1st Approach &
Go around:
300ft
2nd App& LDG
LANDING
Direct Law
DESCENT FL100-150
HANDLING ASSESS &
ENVELOPE EXPANSION
FLIGHT ENVELOPE EXPANSION
+ A/C SYSTEMS CHECKS
FLIGHT ENVELOPE EXPANSION
FLIGHT ENVELOPE EXPANSION
IN APP CONFIG