a tale of three projects - university of idaho...a tale of three projects 47th annual asphalt...

8
A Tale of Three Projects 47 th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 US-95, MP 300.09 to MP 304.090, 4.0 Mile Length Approx. 14 mile haul 0.2’ Super Pave Plant Mix Overlay Included: Guardrail, Bridge Deck Repair, and Rumble Strips M.P. 300.090 and Rumble Strips. 70 Working Days Awarded Feb. 7, 2007 Poe Asphalt Paving, Inc., Lewiston, Idaho Contract Amount: $1,795,695.97 Bear Ridge Grade M.P. 17.85 S H 3 MP 13 86 to MP S.H. 3, MP 13.86 to MP 17.85, 3.99 Mile Length Approx. 33 mile haul 0.2Super Pave Plant Mix 0.2 Super Pave Plant Mix Mill & Inlay Included: Guardrail Ends and Street Monuments. 40 Working Days Awarded April 26, 2007 Poe Asphalt Paving, Inc., M.P. 13.86 Lewiston, Idaho Contract Amount: $898,424.65 Bear Ridge Grade M.P. 17.85 Lauer Rd To Westlake Rd M.P. 273.900 U.S. 95, MP 271.500 to MP 273.900, 2.40 Mile Length M.P. 13.86 M.P. 271.500 Approx. 43 mile Haul 0.2’ Super Pave Plant Mix Overlay Included: Smoothness Grinding, Rumble Strips and Street Monuments. 40 Working Days Awarded June 12, 2007 Poe Asphalt Paving, Inc., Lewiston, Idaho Contract Amount: $720,378.10

Upload: others

Post on 13-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A Tale of Three Projects - University of Idaho...A Tale of Three Projects 47th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 • US-95, MP 300.09 to

A Tale of Three Projects47th Annual Asphalt Conference

Joe Schacher, P.E.

Lapwai To Spalding

M.P. 304.090

• US-95, MP 300.09 to MP 304.090, 4.0 Mile Length

• Approx. 14 mile haul• 0.2’ Super Pave Plant Mix Overlay• Included: Guardrail, Bridge Deck Repair,

and Rumble Strips

M.P. 300.090

and Rumble Strips.• 70 Working Days• Awarded Feb. 7, 2007• Poe Asphalt Paving, Inc., Lewiston, Idahop g• Contract Amount: $1,795,695.97

Bear Ridge GradeM.P. 17.85

• S H 3 MP 13 86 to MPS.H. 3, MP 13.86 to MP 17.85, 3.99 Mile Length

• Approx. 33 mile haul• 0.2’ Super Pave Plant Mix0.2 Super Pave Plant Mix

Mill & Inlay• Included: Guardrail Ends

and Street Monuments.• 40 Working Days• Awarded April 26, 2007• Poe Asphalt Paving, Inc.,

M.P. 13.86

Lewiston, Idaho• Contract Amount:

$898,424.65

Bear Ridge GradeM.P. 17.85Lauer Rd To Westlake Rd

M.P. 273.900

• U.S. 95, MP 271.500 to MP 273.900, 2.40 Mile Length

M.P. 13.86

M.P. 271.500• Approx. 43 mile Haul• 0.2’ Super Pave Plant Mix Overlay• Included: Smoothness Grinding, Rumble Strips and Street

Monuments.• 40 Working Days• Awarded June 12, 2007• Poe Asphalt Paving, Inc., Lewiston, Idaho• Contract Amount: $720,378.10

Page 2: A Tale of Three Projects - University of Idaho...A Tale of Three Projects 47th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 • US-95, MP 300.09 to

Ch O d d f Off Sit T tChange Orders were approved for an Off-Site Test Strip and the New S405 Super Pave Specification for all 3 projects Poe Asphalt used the same Mixfor all 3 projects. Poe Asphalt used the same Mix

Design for these projects, thus the same Test Strip.

Mix Designs & Test StripsMix Designs & Test StripsMix Confirmation FAIL FAIL FAIL FAIL PASS

Initial JMF Confirmation Sample submitted 5/11/07. The first two submittals failed on D/A and Gradation.

Mix Confirmation FAIL FAIL FAIL FAIL PASSProperties Target - JMF Tolerance JMF-C #3 TS#1 TS#2 TS#3 TS#4 TS#5

Date Tested 05/23/2007 05/25/2007 05/31/2007 06/04/2007 06/06/2007 06/11/20071" 100 94-100 100 100 100 100 100

3/4" 98 92-100 100 99 96 99 981/2" 82 76-88 87 86 84 87 863/8" 71 65-77 78 74 72 78 Not 75#4 50 44-56 54 50 51 59 Tested 51#8 33 28-38 36 32 32 41 by agrmt 33#16 23 18-28 24 21 21 29 22#30 16 11-21 17 14 14 22 16#50 11 7-15 12 11 11 15 12

#100 8 4-12 8 8 8 10 8#200 5.7 3.7-7.7 5.6 5.5 5.6 6.7 5.9

% Asphalt Content 5.4 5.0-5.8 5.7 5.2 5.4 6.4 6.2 5.5pBulk Gmb 2.485 2.464 2.443 2.521 2.492Rice Gmm 2.586 2.601 2.595 2.548 2.584

Va 4 3-5 3.9 5.2 5.9 1.1 3.6VMA 13 min 15.4 15.7 16.6 14.9 15.1VFA 65-75 75 66 65 93 76D/A 0.6-1.2 1.17 1.3 1.2 1.2 1.2

Location: Off-Site Project Project Project Off-SiteContractor Adjustments:

Coarser Gradation

Coarser Gradation

Finer Gradation, increased #100 & #200, increased AC by 0.3%

Increased AC and finer gradation

Decreased AC, coarser gradation

Test Strips that failed on the “Project” were removed.

Note: Compaction Test Strips completed on each project to establish roller pattern/effort.

Paving SchedulePaving Schedule

Belly Dumps &

MTDMTD

End Dumps To Paver

End Dumps & MTD

* MTD = Material Transfer Device

Lapwai To SpaldingLapwai To Spalding

The use of Belly Dumps & a Material Transfer Device (MTD) provide improved pavement quality

Page 3: A Tale of Three Projects - University of Idaho...A Tale of Three Projects 47th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 • US-95, MP 300.09 to

Lapwai To SpaldingLapwai To Spalding

Special screed extension allowed paving under the guardrail

Lapwai To SpaldingLapwai To Spalding

Sampling behind the paver is an issue

Lapwai To SpaldingLapwai To Spalding

Establishing compactive effort

Lapwai To SpaldingLapwai To Spalding

The contractor achieved the goal of a smooth & consistent surface

Page 4: A Tale of Three Projects - University of Idaho...A Tale of Three Projects 47th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 • US-95, MP 300.09 to

Lapwai To SpaldingLapwai To Spalding

longitudinal joints were double tacked and then “Pinched” withtacked and then Pinched with rollers. Density at joint between 92% -94%

Lapwai To SpaldingLapwai To Spalding

Finished surface

Lapwai To SpaldingLapwai To Spalding

Finished surface

Bear Ridge GradeBear Ridge Grade

Pneumatic rolling did not work for this situation

Page 5: A Tale of Three Projects - University of Idaho...A Tale of Three Projects 47th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 • US-95, MP 300.09 to

Bear Ridge GradeBear Ridge Grade

Pinching the joint

Bear Ridge GradeBear Ridge Grade

Double tacking the joints

Bear Ridge GradeBear Ridge Grade

Finished surface

Bear Ridge GradeBear Ridge Grade

Finished surface –the short radius, super-elevated curves were a problem

Page 6: A Tale of Three Projects - University of Idaho...A Tale of Three Projects 47th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 • US-95, MP 300.09 to

Bear Ridge GradeBear Ridge Grade

Finished surface

Lauer Road To Westlake RoadLauer Road To Westlake Road

Start of work

Lauer Road To Westlake RoadLauer Road To Westlake Road

MTD used with End Dumps

Lauer Road To Westlake RoadLauer Road To Westlake Road

End Dumping to MTD worked well for reducing segregation, but still increases surface roughness.

Page 7: A Tale of Three Projects - University of Idaho...A Tale of Three Projects 47th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 • US-95, MP 300.09 to

Lauer Road To Westlake RoadLauer Road To Westlake Road

Experimenting with FLIR Thermal Camera. Difficult to p gdetect thermal segregation when air temperature is 100

degrees plus

Lauer Road To Westlake RoadLauer Road To Westlake Road

Drinking Water Spill

The cameras sensitivity and accuracy were veryThe cameras sensitivity and accuracy were very good

Production Test DataProject No. Item Description Job Name

Out of spec = shaded area

NH-4110 (144) SuperPave Plant Mix Lapwai to SpaldingALLWEST MOVING AVERAGE (as per 4 most recent tests)

Paving Dates 6/12/07 6/12/07 6/12/07 6/13/07 6/13/07 6/13/07 6/13/07 6/14/07 6/14/07 6/14/07 6/14/07 6/15/07 6/15/07Sample No. Tolerance 1 2 3 4 5 6 7 8 9 10 11 12 13

1" 94-100 100 100 100 100 100 100 100 100 100 1003/4" 92-100 97 97 97 97 98 98 98 97 97 971/2" 76 88 81 82 83 82 83 83 81 81 80 791/2" 76-88 81 82 83 82 83 83 81 81 80 793/8" 65-77 70 71 72 71 72 72 71 70 69 68#4 44-56 47 47 48 48 48 48 47 46 45 45#8 28-38 31 31 31 31 31 31 31 31 30 30#16 18-28 20 20 20 20 20 20 20 20 20 20#30 11-21 15 15 15 15 15 15 14 14 14 14#50 7-15 11 11 11 11 11 11 10 10 10 10

#100 4-12 8 7 7 7 7 7 7 7 7 7#200 3.7-7.7 5.1 5.0 5.0 4.9 4.9 4.9 4.8 4.7 4.6 4.6

% Oil Content 5.0-5.8 5.32 5.34 5.37 5.38 5.39 5.37 5.33 5.28 5.27 5.30Bulk GmbRice Gmm

Va 3-5 4.28 4.13 4.20 3.98 4.30 4.30 4.23 4.65 4.55 4.35VMA 13 min 15.78 15.85 15.93 15.68 15.85 15.73 15.58 15.85 15.88 15.78VFA 65-75 73.08 74.15 73.80 74.73 72.85 72.58 72.78 70.65 71.35 72.55D/A 0 6-1 2 1 08 1 03 1 03 1 03 1 03 1 03 1 03 1 00 0 98 0 98D/A 0.6 1.2 1.08 1.03 1.03 1.03 1.03 1.03 1.03 1.00 0.98 0.98

Paving Dates 6/15/07 6/16/07 6/16/07 6/16/07 6/18/07 6/18/07 6/22/07 6/25/07 7/2/07 7/2/07Sample No. Tolerance 14 15 16 17 18 19 20 21 22 23 24 25 26

1" 94-100 100 100 100 100 100 100 100 100 100 100 100 100 1003/4" 92-100 97 97 97 98 99 99 99 99 99 99 99 99 981/2" 76-88 80 79 80 80 82 84 84 85 84 84 84 83 823/8" 65-77 69 69 70 70 71 73 72 72 72 71 71 72 71#4 44 56 47 47 48 48 48 49 48 48 49 50 51 53 53#4 44-56 47 47 48 48 48 49 48 48 49 50 51 53 53#8 28-38 31 31 31 31 31 32 31 31 33 34 34 36 35#16 18-28 20 20 21 21 21 21 21 21 22 22 22 23 22#30 11-21 15 15 15 15 15 15 15 15 16 16 16 17 16#50 7-15 11 11 11 11 11 11 11 11 11 12 12 12 12

#100 4-12 7 7 7 7 7 7 7 7 7 8 8 8 8#200 3.7-7.7 4.8 4.9 5.0 5.0 5.0 5.0 4.9 5.0 5.2 5.3 5.4 5.5 5.4

% Oil Content 5.0-5.8 5.41 5.39 5.42 5.36 5.24 5.25 5.16 5.23 5.28 5.31 5.37 5.33 5.34Bulk GmbRice Gmm

Va 3-5 3.85 3.30 3.53 3.80 4.15 4.45 4.35 4.33 4.43 4.75 5.07 5.55 6.30VMA 13 min 15.58 15.18 15.40 15.75 16.03 16.18 15.95 15.83 16.03 16.75 17.13 17.75 18.60VFA 65-75 75.48 78.25 77.13 75.85 73.98 72.35 72.68 72.75 72.63 72.08 70.83 69.00 66.10D/A 0.6-1.2 0.98 0.98 1.00 1.00 1.00 1.03 1.03 1.03 1.05 1.03 1.03 1.05 1.00

Production Test DataKey No Project No Item Description Job Name

Out of spec = shaded area

Key No. Project No. Item Description Job Name9101 ST-4170 (625) SuperPave Plant Mix Bear Ridge Grade

ALLWEST MOVING AVERAGE (as per 4 most recent tests)

Paving Dates 6/22/07 6/22/07 6/22/07 6/23/07 6/23/07 6/25/07 6/25/07 6/25/07 6/27/07 6/27/07 6/27/07Sample No. Tolerance 1 2 3 4 5 6 7 8 9 10 11 12 13

1" 94-100 100 100 100 100 100 100 100 100 100 1003/4" 92-100 98 98 99 99 99 98 98 99 99 1001/2" 76 88 81 81 81 82 82 82 83 85 85 881/2" 76-88 81 81 81 82 82 82 83 85 85 883/8" 65-77 69 68 69 68 68 68 70 69 70 72#4 44-56 46 46 46 45 47 46 48 48 47 50#8 28-38 31 31 31 30 31 31 32 32 31 32

#16 18-28 21 20 20 20 20 20 21 21 20 21#30 11-21 15 15 14 14 15 15 15 15 15 16#50 7-15 9 8 8 10 11 11 11 11 11 11#100 4-12 7 7 7 7 7 7 7 7 7 7#200 3 7 7 7 4 9 4 9 4 9 4 8 4 9 4 8 4 8 4 8 4 8 5 0#200 3.7-7.7 4.9 4.9 4.9 4.8 4.9 4.8 4.8 4.8 4.8 5.0

% Oil Content 5.0-5.8 5.18 5.21 5.22 5.24 5.30 5.29 5.39 5.35 5.35 5.43Bulk GmbRice Gmm

Va 3-5 4.15 4.33 4.60 4.90 4.28 3.85 3.60 3.55 3.70 3.95VMA 13 min 15.45 15.43 15.70 16.00 15.60 15.75 15.75 15.63 15.87 15.80VFA 65-75 73.28 72.00 70.73 69.30 72.65 75.70 77.40 77.35 76.70 75.00D/A 0.6-1.2 1.03 1.05 1.05 1.03 1.03 0.95 0.95 0.95 0.93 1.00

Paving DatesSample No. Tolerance 14

1" 94-100 1003/4" 92-100 1001/2" 76-88 923/8" 65-77 68#4 44-56 46#8 28 38 30#8 28-38 30

#16 18-28 20#30 11-21 15#50 7-15 11#100 4-12 7#200 3.7-7.7 5.0

% Oil Content 5.0-5.8 5.28Bulk GmbRice GmmRice Gmm

Va 3-5 4.10VMA 13 min 15.60VFA 65-75 73.50D/A 0.6-1.2 1.00

Page 8: A Tale of Three Projects - University of Idaho...A Tale of Three Projects 47th Annual Asphalt Conference Joe Schacher, P.E. Lapwai To Spalding M.P. 304.090 • US-95, MP 300.09 to

Production Test DataKey No. Project No. Item Description Job Name

Out of spec = shaded area

10515 A0410 (515) SuperPave Plant Mix Lauer Rd to West Lake RdALLWEST MOVING AVERAGE (as per 4 most recent tests)

Paving Dates 7/6/07 7/9/07 7/9/07 7/9/07 7/10/07 7/10/07 7/10/07 7/11/07 7/11/07 7/11/07 7/12/07 7/12/07 7/12/07Sample No. Tolerance 1 2 3 4 5 6 7 8 9 10 11 12 13

1" 94-100 100 100 100 100 100 100 100 100 100 1003/4" 92-100 99 98 98 98 98 99 99 100 100 1001/2" 76-88 84 85 85 85 83 82 80 81 82 821/2 76-88 84 85 85 85 83 82 80 81 82 823/8" 65-77 72 72 72 72 70 69 67 67 68 68#4 44-56 51 50 50 50 49 48 46 46 46 46#8 28-38 33 33 33 33 32 32 31 31 31 31#16 18-28 22 22 22 22 21 21 21 21 21 21#30 11-21 16 16 16 16 15 15 15 15 15 15#50 7-15 11 12 11 11 10 10 10 11 11 11

#100 4-12 8 8 8 7 7 7 7 7 7 7#200 3 7 7 7 5 3 5 3 5 2 5 2 4 9 4 9 4 8 4 9 5 0 4 8#200 3.7-7.7 5.3 5.3 5.2 5.2 4.9 4.9 4.8 4.9 5.0 4.8

% Oil Content 5.0-5.8 5.38 5.38 5.28 5.29 5.24 5.17 5.16 5.18 5.18 5.22Bulk GmbRice Gmm

Va 3-5 4.00 3.80 4.18 3.93 4.08 3.98 3.98 4.05 4.00 4.20VMA 13 min 15.73 15.60 15.90 15.85 15.93 15.70 15.50 15.43 15.33 15.55VFA 65-75 74.75 75.73 73.73 75.23 74.43 74.75 74.40 73.85 74.00 73.10D/A 0.6-1.2 1.08 1.08 1.05 1.03 1.00 1.00 1.00 1.03 1.05 1.03

Paving DatesSample No. Tolerance 14 15 16

1" 94-100 100 100 1003/4" 92-100 100 100 991/2" 76-88 83 83 843/8" 65-77 70 70 71#4 44-56 47 47 47#8 28-38 31 31 31#16 18-28 21 21 20#30 11-21 15 15 15#50 7-15 11 11 10

#100 4-12 7 7 7#200 3.7-7.7 4.8 4.9 4.7

% Oil Content 5.0-5.8 5.25 5.24 5.33Bulk GmbRice Gmm

Va 3-5 4.20 4.15 4.40VMA 13 min 15.57 15.50 15.90VFA 65-75 73.17 73.40 72.60D/A 0.6-1.2 1.03 1.05 1.00

Plotted Variability

Statewide Super Pave ProjectsDist Key Project Name Hveem SuperPave Quantity TotalCost HveemYear Paved Tons to Date SP Year Paved Tons to Date

1 8479 Prairie Ave $38.45 29,977 $1,152,615.65 2006 29,9771 8484 Fairfield Rd $44.00 24,975 $1,098,904.40 2007 24,9751 8918 Pinehurt-Osburn $44.95 48,840 $2,195,358.00 paving not started1 9405 Meadow Ck $53.28 6,207 $330,725.48 2006 6,2071 9445 Wallace-IC68 $44.95 34,855 $1,566,752.93 2007 31,7921 9460 StLine-Sherman $55.13 35,757 $1,971,274.04 2007 23,8971 10914 Worley North $32.65 104,904 $3,425,115.60 paving not started2 7366 $52 00 18 283 $950 713 92 2006 18 2832 7366 Chainup-Grangeville $52.00 18,283 $950,713.92 2006 18,2832 8350 Top Lewiston Hill $42.10 115,918 $4,880,134.75 2006 & 2007 109,2442 8353 Lawai-Spalding $69.80 15,040 $1,049,761.29 2007 15,0402 8354 Skookumchuck $70.00 12,586 $880,989.20 2007 12,5852 8883 SH-6, WA-Jct 95 $75.00 16,717 $1,253,775.00 paving not started2 8889 Lawyers Ck-Lauer $55.50 10,738 $595,942.91 2007 10,7382 9101 Bear Ridge Grade $69.62 8,268 $575,585.44 2007 8,0702 10515 Lauer WestLake $64 27 8 268 $531 354 15 2007 8 2682 10515 Lauer-WestLake $64.27 8,268 $531,354.15 2007 8,2683 88 Marsing-SunnySl $57.00 30,496 $1,738,287.96 2006 & 2007 30,4963 3214 Karcher IC $42.70 52,709 $2,250,674.30 CO80 2007 11,7963 8956 Gowen-Eisenman $60.60 21,700 $1,315,020.00 paving not started3 8957 Gowen-Eisenman $60.60 66,800 $4,048,080.00 paving not started3 8959 Gowen-Eisenman $60.60 25,479 $1,544,027.40 paving not started3 9106 US-20 $69.31 41,495 $2,875,991.42 2007 41,4943 9980 Eagle Rd Ramp $100 00 2 736 $273 630 00 2007 2 7363 9980 Eagle Rd Ramp $100.00 2,736 $273,630.00 2007 2,7364 7833 J Canal Br $57.15 4,415 $252,340.68 2006 4,1994 8256 US-26/ SH46 $80.05 13,019 $1,042,188.56 2007 13,2594 8896 Jerome-US-93 $55.17 109,373 $6,034,108.41 2007 49,2545 9366 Ferry Butte $90.00 3,726 $335,322.00 2007 3,7505 9878 Aberdeen-Sterling $42.43 21,092 $894,940.35 2007 19,6885 9890 Hiway-Reservation $50.14 15,660 $785,178.36 2006 14,3955 10455 Topaz-Lava $25.00 14,681 $367,025.00 2007 9,9105 10455 Topaz-Lava $28.00 54,779 $1,533,812.00 paving not started6 7843 South Rexburg $51.76 8,894 $460,353.44 n/a6 8634 Chester-Twin Gr $59.36 13,490 $800,752.75 2007 12,1066 9561 Leadore East $84.97 7,106 $603,787.47 2007 6,2456 9563 Ririe to Clark Hill $48.01 54,325 $2,608,148.53 2007 46,9926 9567 Henry's Fork-Rexbg $48.71 56,662 $2,760,008.46 2007 51,6776 10007 IF-Rigby, SBL $54.39 22,294 $1,212,588.06 2006 20,3116 10011 Shelley $47.00 4,681 $220,011.23 2007 4,270

average bid price $51.34 $63.67TotalCost $56,415,279.13 Average Superpave bid price isTotal Hveem $33,755,409.12 60% 24.02TotalSuperPave $22,659,870.01 40% percent more than Hveem bid price.