a g e n d a public comment presentation: five-year

114
Agenda 6/25/19 Page 1 FINAL A G E N D A REGULAR MEETING ON JUNE 25, 2019 3:00 P.M. AT CORAM, NEW YORK PUBLIC COMMENT PRESENTATION : FIVE-YEAR ENGINEERING REPORT BY TIM KILCOMMONS, CHIEF ENGINEER AND DIRECTOR OF RESEARCH AND DEVELOPMENT AND MICHAEL WEBER AND JOHN COLLINS OF H2M PRESENTATION : SCWA TOTAL COLIFORM MONITORING BY KEVIN DURK, DIRECTOR OF WATER QUALITY & LABORATORY SERVICES MINUTES FOR APPROVAL 1. Regular Meeting May 21, 2019 RESOLUTION AMENDMENT 2a. Amend Resolution 323-10-2017 which authorizes entering into an agreement with the Greenlawn Water District to convey approximately a 700 foot section of 10-inch water main on 25A in Centerport to the Authority in exchange for an emergency interconnection between the Authority’s system and the Greenlawn Water District’s system, to include the payment of $1000 by the Authority to Greenlawn Water District to compensate Greenlawn Water District for a hydrant that had been installed on the main. 3a. Amend Resolution 344-11-2018 accepting Contract 7565 for replacement of concrete and bituminous patches, concrete curb and concrete sidewalk restoration on State, County, Town and Village highways during the one-year period beginning April 1, 2019, submitted by LLL Industries Inc. of Brookhaven, New York, totaling an estimated amount of $1,413,531, to reflect an increase to an estimated amount of $4,000,000 per year for Group I; and to reflect an increase in the estimated amount of $1,428,250 for Group II submitted by New York Paving Inc. of Old Bethpage, New York, to an estimated amount of $2,400,000 per year.

Upload: others

Post on 28-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR

Agenda –6/25/19 – Page 1 FINAL

A G E N D A

REGULAR MEETING ON JUNE 25, 2019

3:00 P.M. AT CORAM, NEW YORK

PUBLIC COMMENT PRESENTATION: FIVE-YEAR ENGINEERING REPORT BY TIM KILCOMMONS, CHIEF ENGINEER AND DIRECTOR OF RESEARCH AND DEVELOPMENT AND MICHAEL WEBER AND JOHN COLLINS OF H2M PRESENTATION: SCWA TOTAL COLIFORM MONITORING BY KEVIN DURK, DIRECTOR OF WATER QUALITY & LABORATORY SERVICES MINUTES FOR APPROVAL

1. Regular Meeting – May 21, 2019

RESOLUTION – AMENDMENT 2a. Amend Resolution 323-10-2017 which authorizes entering into an agreement

with the Greenlawn Water District to convey approximately a 700 foot section of 10-inch water main on 25A in Centerport to the Authority in exchange for an emergency interconnection between the Authority’s system and the Greenlawn Water District’s system, to include the payment of $1000 by the Authority to Greenlawn Water District to compensate Greenlawn Water District for a hydrant that had been installed on the main.

3a. Amend Resolution 344-11-2018 accepting Contract 7565 for replacement of

concrete and bituminous patches, concrete curb and concrete sidewalk restoration on State, County, Town and Village highways during the one-year period beginning April 1, 2019, submitted by LLL Industries Inc. of Brookhaven, New York, totaling an estimated amount of $1,413,531, to reflect an increase to an estimated amount of $4,000,000 per year for Group I; and to reflect an increase in the estimated amount of $1,428,250 for Group II submitted by New York Paving Inc. of Old Bethpage, New York, to an estimated amount of $2,400,000 per year.

Page 2: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR

Agenda –6/25/19 – Page 2 FINAL

CONTRACTS – RESCIND

4a. Rescind award to Romeo Enterprises Inc. of Holbrook, New York, for Groups B, C & F (on road use/emergency) stations under Contract 7610, under Resolution 154-05-2019, for furnishing and delivery of ultra low sulfur diesel fuel to various pumping stations and office buildings, due to contractor’s inability to execute the agreement and collect the 5% bond as liquidated damages; contract will be rebid.

CONTRACTS – EXTEND

5a. Contract 7370 - for furnishing and delivery of Programmable Logic Controller (PLC) and various electrical control equipment during the one-year period beginning September 1, 2019 – extend with Graybar Electric Co., Inc. of Teterboro, New Jersey (Items 2, 23 and 24); extend with Eagle Control Corp. of Yaphank, New York (Items 3-5); extend with Aetna Electric LLC of New Hyde Park, New York (Items 1, 6, 7, 29, 30 and 36).

5b. Contract 7453 – for transmission replacement for cars and light duty trucks

during the one-year period beginning September 1, 2019 – extend with T&T Baldwin Automotive, Inc. of East Patchogue, New York.

5c. Contract 7459 – for drilling of wells and test borings – Zone A (West of

William Floyd Parkway) during the one-year period beginning October 1, 2019 – extend with Delta Well and Pump Co., Inc. of Ronkonkoma, New York.

5d. Contract 7470 – for furnishing and delivery of propane at various pump

stations located on Fire Island during the two-year period beginning October 1, 2019 – extend with Beach Propane Inc. of Ocean Beach, New York.

5e. Contract 7531 – for furnishing and delivery of replacement parts for Boss

compressor, auto crane, Volvo construction equipment and Western snowplow during the one-year period beginning August 1, 2019 – extend with Dejana Truck & Utility Equipment of Kings Park, New York.

5f. Contract 7538 – for furnishing and installing team insert valves 4” to 12”

during the one-year period beginning October 1, 2019 - extend with ZC Utility Services LLC d/b/a Carner Brothers of Roseland, New Jersey.

5g. Contract 7539 – for furnishing and delivery of wide range couplings and

flange adapters during the one-year period beginning October 1, 2019 – extend with Smith-Blair Inc. of Texarkana, Arkansas.

Page 3: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR

Agenda –6/25/19 – Page 3 FINAL 5h. Contract 7550 – for drilling of wells and test borings; Zone B (East of William

Floyd Parkway) during the one-year period beginning October 1, 2019 – extend with Peconic Well & Pump Inc. of Hampton Bays, New York.

CONTRACTS – AWARD/REJECT 6a. Contract 7567 – for painting and vinyl wall covering at various Authority sites. 6b. Contract 7617 – for inspection of fire hydrants during the one-year period

beginning August 1, 2019. 6c. Contract 7618 – for furnishing and delivery of valve boxes during the two-

year period beginning July 1, 2019. 6d. Contract 7620 – for furnishing and delivery of pH measuring equipment and

pressure transmitters during the one-year period beginning July 1, 2019. 6e. Contract 7621 – for furnishing and delivery of waterworks supplies, tools and

equipment during the one-year period beginning July 1, 2019. 6f. Contract 7622 – for instrumentation, electrical control products and

communications equipment during the period June 1, 2019 through March 31, 2020.

6g. Contract 7623 – for furnishing and delivery of combined drills and taps and

tapping machine parts during the one-year period beginning July 1, 2019. 6h. Contract 7624 - for replacement of automotive glass – mobile service during

the one-year period beginning July 1, 2019. 6i. Contract 7625 – for miscellaneous minor construction and/or repairs at

various Authority structures during the one-year period beginning August 1, 2019.

6j. Contract 7626 – for furnishing of courier services during the one-year period

beginning September 1, 2019. 6k. Contract 7627 – for materials, labor and equipment required for the

maintenance of point of use household drinking water treatment systems at browns Hill Estates, Orient Point, during the one-year period beginning August 1, 2019.

6l. Contract 7628 – for furnishing and delivery of automatic blowoff control

panels during the one-year period beginning August 1, 2019. 6m. Water Main Installation Contract for East Quogue Authorize the Chief Executive Officer, Jeffrey Szabo, to award the contract to

Page 4: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR

Agenda –6/25/19 – Page 4 FINAL

install new water mains in the East Quogue area to the lowest, responsive, responsible bidder prior to the July 2019 Board meeting, with advisement to the Board of the results of the bid prior to the award.

GENERAL

7. Special Services

a) RFP 1539 – Sexual Harassment and Retaliation Prevention Training in Accordance with New York State Law for Management, Staff and Board Members

Accept proposal received of Jackson Lewis PC of Melville, New York, for Sexual Harassment and Retaliation Prevention Training in accordance with New York State Law for management, staff and board members at an estimated cost of $1,750 for one session and $1,750 for policy review, if necessary.

b) RFP 1540 – Flame Retardant Clothing Thru Electronic Ordering System

Accept proposal received of Tyndale Company Inc. of Pipersville, Pennsylvania, for furnishing and delivering of flame retardant clothing thru an electronic ordering system during the three-year period beginning August 1, 2019, in the aggregate estimated amount of $23,631.45.

c) Intellectual Property Counsel

Ratify expenditures paid to Heslin Rothenberg Farley & Mesiti, P.C. in the amount of $32,631.74 for their services and authorize their continued representation of the Authority on a new patent matter and a copyright issue.

8. Main Extensions

a) Northview Drive, Town of Southampton Authorize the acceptance of $50,000 from the Town of Southampton to

apply to the Noyac 2018 Surcharge area, which would reduce the surcharge from $5,638 per home to $4,249 per home; waive the 40% participation rule and extend water main up to house #31 Northview Drive.

9. Government

a) Five-Year Engineering Report Approve Five-Year Engineering Report as prepared by H2M Architects

and Engineers for the period January 1, 2014 through December 31, 2018 under RFP 1525.

10. Equipment a) Steel Shelving – Westhampton Warehouse Accept the quote received of Abaco Steel Products of Bohemia, New

York, to furnish and install steel shelving at the Authority’s Westhampton Warehouse in the amount of $5,544.

Page 5: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR

Agenda –6/25/19 – Page 5 FINAL b) Exact Pipe Cut Air 360 Pipe Saw Authorize the purchase of three (3) Exact Pipe Cut Air 360 Pipe Saws

and blades from F.W. Webb Company of Riverhead, NY, for the Construction Maintenance Department in the total amount of $20,250.

11. Meetings, Seminars, Training, Conferences

a) WaterISAC Membership Authorize membership in WaterISAC for a one-year period in the amount

of $5,249. b) AWWA and Water Environment Foundation (WEF)– Transformative

Issues Symposium On Workforce Authorize the attendance of Donna Mancuso, Chief Human Resources

Officer, at the AWWA/WEF Transformative Issues Symposium on Workforce in Washington, D.C. from August 7-9, 2019, at an approximate cost of $1,000.

c) Water Hammer in Transmission and Distribution Systems Authorize the attendance of James R. Wilson, Distribution Engineering

Supervisor to attend the ASCE “Water Hammer In Transmission and Distribution Systems” seminar in Henderson, Nevada from September 26- 27, 2019, at an approximate cost of $2,825.

INVOICES - To be paid from the Operating Fund:

12a. Dvirka & Bartilucci (tank engineers) $15,768.75 12b. Goldberg Segalla $1,630.13 12c. H2M Architects & Engineers $43,187.00 12d. Heslin Rothenberg Farley & Mesiti P.C. $16.57 12e. LaSalle, LaSalle & Dwyer PC $12,052.67 12f. McCabe, Collins, McGeough, Fowler, Levine & Nogan, LLP $2,147.92 12g. O’Connor, O’Connor, Hintz & Deveney, LLP $4,125.00 12h. Putney, Twombly, Hall & Hirson LLP (Labor Counsel) $3,534.00 12i. Pyramid Title Agency $325.00 12j. The Bank of New York Mellon $105,000.00

NEXT MEETING – Scheduled for July 30, 2019, at 3:00 p.m. at the Administration Building, Oakdale.

NEW BUSINESS & PUBLIC COMMENT EXECUTIVE SESSION

Page 6: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR

Agenda –6/25/19 – Page 6 DRAFT EXECUTIVE SESSION

Page 7: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 8: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 9: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 10: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 11: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 12: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 13: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 14: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 15: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 16: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 17: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 18: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 19: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 20: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 21: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 22: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 23: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 24: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 25: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 26: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 27: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 28: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 29: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 30: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 31: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 32: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 33: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 34: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 35: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 36: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 37: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 38: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 39: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 40: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 41: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 42: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 43: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 44: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 45: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 46: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 47: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 48: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 49: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 50: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 51: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 52: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 53: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 54: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 55: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 56: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 57: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 58: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 59: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 60: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 61: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 62: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 63: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 64: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 65: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 66: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 67: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 68: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 69: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 70: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 71: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 72: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 73: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 74: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 75: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 76: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 77: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 78: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 79: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 80: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 81: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 82: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 83: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 84: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 85: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 86: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 87: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 88: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 89: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 90: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 91: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 92: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 93: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 94: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 95: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 96: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 97: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 98: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 99: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 100: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 101: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 102: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 103: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 104: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 105: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 106: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 107: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 108: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 109: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 110: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 111: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 112: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 113: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR
Page 114: A G E N D A PUBLIC COMMENT PRESENTATION: FIVE-YEAR