Phoenix MEA better way to do business

ProfileEstablished in 1931 Phoenix is based in central London.

We specialise in the complete installation of Mechanical & Electrical to all work sectors including quality office developments, commercial and public buildings, data centers, retail, health, education, leisure,

hotels, residential and pharmaceuticals.

The company has an extensive client base including financial institutions, insurance companies, the legal and accountancy sectors and major pharmaceutical companies. Our clients include prominent

main and management contractors.

Our experience ranges from projects with a value in excess of £50M to £1M. Our special Phoenix Direct division undertakes projects up to

the value of £1M.

Phoenix Mechanical was introduced in 2008 to form a stronger team and provide a fully coordinated and integrated service solution.We offer an M&E design & build management facility along with

design and development, installation of MV / LV distribution systems, shell & core, CAT A & B fit-out, HV cabling and switchgear, lighting control, BMS, Public Health, water treatment and commissioning,

At Phoenix we believe that the way to promote our business is through the development of good working relationships with our

clients. We aim to provide a high quality installation in an efficient, friendly manner on time and to budget.

Phoenix ME A better way to do business

Management Staff phoenix me a better way to do business

Lee ComptonCEO

Head of financeDuncan McArthur

DirectorStewart Crane

Operations DirectorTerry Perkins

Operations DirectorDerek Joiner

Operations DirectorMike Viney

Project Director Sean O’Connor

QHSE ManagerRichard Veroft

DirectorColin Mint

Operations DirectorSimon Collingbourne

Procurement Manager

Claire Walker

Estimating ManagerRichard Carey

CAD ManagerTony Deacon

Customer RelationsDanielle Browne

Managing DirectorAlan Tarrant

Project Director Andrew Lessiter

Contracts Services Manager

Brett Cowlbeck

Phoenix Direct

Project DirectorPaul Carless

Operations DirectorAdam Cecil

Phoenix ME A better way to do business

Staff Number

Directors 4

Operations Directors 5

Project Directors 3

Project Managers 35

Financial Managers 14

CAD Engineers 14

Head office and site support 25

Testing & Commissioning 17

Electricians 96

Apprentices 14

Labourers 5

Staff Breakdown

Turnover

Phoenix ME A better way to do business

2012 - £52M

2013 - £62M

2014 - £77.3M

2015 Forecast - £85M

Project Profiles

Phoenix ME A better way to do business

Confidential Financial client

Phoenix ME A better way to do business

E C Harris was appointed to project manage a complete

refurbishment in Burgess Hill, Surrey.

The professional team who have carried out the design consists

of architects Pringle Brandon Perkins + Will and Building Service

Consultants Maleon.

Wates Interiors are the principal contractor and Phoenix have

been appointed to partner them to carry out the full M&E Cat

A&B refurbishment.

An office development of 6 No. floors (lower ground, ground, 1st

to 3rd floors and roof) and was originally constructed in 1970’s.

Includes open plan office areas, on Ground, First & Second

Floors totalling approximately 11,000m2 with the Third floor

containing Café, Restaurant, Kitchen, Meeting Rooms and

Plantrooms. There are new toilet facilities at Ground, First,

Second & Third floor with new shower & toilet facilities at Lower

Ground Floor. The ground floor comprises the main entrance,

reception, offices and circulation spaces. A large atrium rises

from ground floor to roof level and provides natural light to the

office floors and the reception. At lower ground floor level there

is also a Wellness Centre, the DPC, Plantrooms, stores and

engineers workshop.

Phoenix were responsible for the full coordination of the services

with the architectural design intent, and drawings were produced

on site with support from our head office. These were issued to

the professional team for approval and reviewed during

workshops both on site and at Maleon’s offices.

Client – Confidential Financial clientMain Contractor – Wates

Architect – Pringle Brandon + Will Consultant – Maleon

Programme Duration – Aug 14 – Jul 15Value – £8.3M

Area – 11,000M2

Phoenix undertook the complete fit out from shell

and core to of the 17 floors and 428,000 square

foot of office space for at The Place (Mini shard)

London bridge.

The works included install of some 10,000 light

fittings complete with dedicated lighting control

system, low level busbar system to all floor levels

for LV power distribution. Install of modular wiring

for both lighting and small power system. UPS

system with riser distribution and full fit out of IT

rooms to each levels.

Specialist lighting to level 14 and 17 for the news

canteen and function spaces and fit out of the

television studios to level 2.

The fit out was completed as staged handovers of

floors but the project in it entirety was completed

within an 8 month period with all floors running

concurrently.

phoenix me a better way to do business

Mini Shard

Client – Confidential Main Contractor – ISG

Architect – Pringle Brandon Consultant – TB&A

Programme Duration –Dec 13 – Nov 14

Value – £13MArea – 39,000M2

phoenix me a better way to do business

Phoenix have been appointed to carry out the Cat B Fit-Out

for Amazon’s new London head office. Works consisted of the

electrical, mechanical and public health services over 11 floors,

with additional plant space on the roof and basement levels.

All co-ordination drawings were produced on site and approval

given via workshops with the professional team.

Services consisted of extension to the LV system, new dedicated

UPS system and CRAC units serving MDF & IDF rooms, high and

low level power track installation serving fan coils with LTHW heater

batteries, fully addressable Simmtronic lighting control system and

specialist feature lighting.

Installation of new Advanced Air fan coil units served by new chilled

water installation, and the relocation of existing FCU’s, new supply

air and extract air system. Installation of public health tea points on

all levels west and east sides.

Flushing and commissioning was via a temporary floor mounted

pumps. All electrical testing and commissioning was

undertaken by Phoenix JIB approved operatives.

Tribble

Client – AmazonMain Contractor – BW Interiors

Architect – AI ArchitectsConsultant – YES Engineering

Quantity Surveyor – Cushman & WakefieldProgramme Duration –

2013 – PresentValue – £7M

Area – 3700M²

60 Holborn Viaduct, EC1

phoenix me a better way to do business

Phoenix have been appointed to carry out the Cat A&B Fit-Out

for Jardine Lloyd Thompson’s new London head office. Works

consisted of the electrical, mechanical and public health

services over 10 floors, with additional plant space on the roof

and basement levels.

All co-ordination drawings were produced on site and approval

given via workshops with the professional team.

Services consisted of extension to the LV system, new

dedicated UPS systems serving SER & MER rooms, high and

low level power track installation serving fan coils with electric

heater batteries, fully addressable DALI lighting control system

and specialist feature lighting.

Installation of 602 ability Matrix fan coil units served by new

chilled water installation, new supply and extract system.

Installation of public health showers, tea points and a fully

workable kitchens on various levels

Flushing and commissioning was via a temporary floor. Mounted

pumps over seen by Chesterfield prior to installation. All

electrical testing and commissioning was undertaken by

Phoenix JIB approved operatives.

JLT St Botolphs

Client – JLTMain Contractor – ISG

Architect – M Moser AssociatesConsultant – Grontmij

Quantity Surveyor – Capita SymondsProgramme Duration - 36 Weeks

(November 2012 – July 2013)

Value – £10MArea – 27,000M2

Phoenix were appointed by ISG to carry out the Mechanical,

Electrical and Public Health Cat ‘A’ installation on levels Grd, 1,

2, 3, 5, 7, 8 & 9 and Cat ‘B’ fit out works on levels Grd, 1, 7, 9

and basement levels within the Walbrook.

The Cat ‘A’ works comprised off fully co-ordinated services

installation comprising off approx. 200 Diffusion FCUs a floor

with associated BMS controls and power supplying conditioned

air to the office space. FCUs were fed via a dedicated CHW

system that was integrated to the landlord system. Installation of

new DBs and associated tap off, h/l modular wiring power and

Simmtronic lighting control system

The Cat ‘B’ works comprised off installation off a dedicated AC

system to the on floor SERs, post room , and executive shower

room. Modifications to the Cat ‘A’ service to accommodate the

new meeting rooms, executive meeting rooms, executive offices,

tea points, WCs and pantry. A new kitchen ventilation system

providing conditioned air to the kitchen located on level 7 via an

AHU located within the ceiling void and extract fan at roof level.

Electrical installation comprising of fully co-ordinated under

power track installation, power supplies to SERs, desk top fit out,

specialist lighting to all executive areas and main receptions

New WCs, tea points, pantry and kitchen were provided

throughout consisting of all new DWS & PH and dedicated

extract ventilation system

phoenix me a better way to do business

Walbrook

Fit-Out

ClientMinerva & AJG Gallagher's

Main Contractor - ISGArchitect

Fosters & partnersScott Brownrigg

Morey SmithConsultant

Cat A GronmijCat B HPF

Programme DurationOct 2012 – Dec 14

Value – £4.2M

phoenix me a better way to do business

Phoenix were appointed as the principal contractor,

responsible for the full Design and Build and the Construction

of a 7 storey building which was located between two existing

buildings. The new building housed new Generators, MV and

LV switch panels and associated services. New Chillers were

added to the roof on one of the existing buildings which

required full structural strengthening.

Two floors in the existing building were stripped out and fully

fitted out as Data Halls.

The other ten floors in the building were occupied and all

existing services were maintained throughout the project. A

new incoming MV supply substation

was built under the DLR and new bulk fuel tanks were

housed in an external compound.

Within the data halls we installed new PDU’s, Cooling

CRACs, fire protection, water mist, new UPS system

were installed in new rooms and ventilation and

humidification systems were added in addition to the new

power and lighting systems. A full BMS/PMS and EMS

were installed to control the Generators and Power

management.

Harbour Exchange Data Centre

Client – ConfidentialMain Contractor – Phoenix

Architect – NWAConsultant – Houseman HendersonProgramme Duration - 44 Weeks

(January 2012 – November 2012)

Value – £18MArea – 8000M²

phoenix me a better way to do business

BP4 Canary Wharf

Client – Canary Wharf GroupMain Contractor – Canary Wharf Group

Architect – K.P.FConsultant – Hilson Moran

Programme Duration - May 12 – Dec 13Value – £11.8M

Phoenix was appointed to carry out the

Shell and Core Installation to BP4, 25

Churchill Place. The project is a 530,000

square feet, high quality commercial office

block, located towards the East end of

Canary Wharf.

The development is a 23 storey tower

consisting of one basement level, one

promenade level, a double height entrance,

mid-level plantrooms at level 12 and

plantrooms on level 21, 22 and 23. The

building consists of 20 office floors.

Our scope consists of MV & LV Switchgear,

risings busbar, lighting & small power, dial

controlled lighting system and photovoltaic

system.

Phoenix ME A better way to do business

Endorsements

Quadrant 3Peter Devenish

Technical Services Manager Sir Robert McAlpine

“100% well lead from the Project Director, Project Manager and all site staff”

“Attitude excellent from the project manager through to all the team”

“Project completed early and within budget / costs allocated”

BMW

Phil PowerProject Manager

Paragon

“This being our 1st project with Phoenix we are receiving the

level of service that you would expect from a leading contractor.

We are ensured a friendly yet professional service lead by great management”

Double Negative

Project Director BW Interiors

“Bought competitively & quick.Final account good”

“Director always keen to come to site and assist. Honest approach from the Project

Manager and all the Phoenix team”

Skype

Andrew HargraveConstruction Director

ISG

“Phoenix consistently delivered an excellent product on time /on budget and to the highest

quality”

Salford Police Station

David RogersonProject Manager

Mace

“Pro-active attitude throughout”

“Good overall performance from the Phoenix Team and I look forward to

working with Phoenix again”

Phoenix ME A better way to do business