Microsoft IT : Challenges et Réalités
Similarities to other IT
Support desktop, integrated communications, network, data centers, application development for a global businessManage customer information on a massive scale (2B ‘personas’, 130M organizations)Support a rapidly changing business climate, new business models (Cloud, Online Services, Mobile)We have to balance investment in new applications with supporting legacy applications and infrastructureWe support multiple business units on a common infrastructure
We are like other large companies IT departments
Places Where We Differ…
MSIT is expected to be a world class showcaseMSIT is expected to utilize full range of MS productsMSIT personnel are in high demand as experts; EBCs, keynotes, 1:1 drill down, executive sponsorshipsCustomer expect MSIT to understand how MS products integrate with non-MS products
External Expectations
Historical lack of long-term focus on system and enterprise architecture 30+ years of silo’d business systems and architectureStill consolidating ITGenerally a focus on immediate requirement and not on long term implications; support, maintenance and enhancement costs Duplication of data and function across silos Little consistency of implementation leading to high cost of operations
Long-term Enterprise Architecture
44
Efficacité des processus
Databases multiples
Applications multiples
Applications non valorisées
Données mal exploitées
Proliferation des serveurs
Gestion du poste de travail
Dépense d’énergie
Optimisation des processus
Consolidation Databases
Portfolio standard d’applications
Déploiement & Adoption effectifs
Qualité et pertinences des Données
Consolidation/Virtualisation des serveurs Standardisation/Virtualisation du Poste de travail Réduction empreinte carbone
Coûts Opportunités
Les différents axes de travail
55
MS IT et contexte MicrosoftEvolution de l’Organisation
Managing Growth
Enterprise Credibility
IT Optimization
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
OnlineServices
MIS Org. Est.
Centralized
Global Network
SAP Deployment
Exchange DC
Consolidation
Admin IT De-
Centralized
1St Formal
F&B Program W2K
1st Enterprise Wide Dogfood Exchange 2000
Founded MACS
1 CIO Apps and
Infra.
Combine Field
IT
Est. WW
IT Ops
BOSG and
Azure F&B
Total Employés
2,376x
x3,057
3,839xx4,355 4,450x
BUIT’s Consolidat
ed2 – CIO’s
BUITs Decentraliz
ed
Data Center Consolidatio
n
5
66
Servers / Devices770K devices / 340K Computers6 production data centers supporting MSIT6 forests16 domainsCorp Forest
9 domains1 M objects - 11 Gb
Messaging20.9M internet emails received /day1.2M internet e-mails delivered /day
Sharepoints200K Sharepoint sites18,1 TB
Users / Sites170K end users700 buildings106 countries13 actively Used language (5 standard)Various Profile
Office dweller (40%)Campus Nomad (40%)Remote users (20%)Other (100,000+ partners) Remote Connectivity
11M remote connections/month906K VPN connections/month37.8M OWA connections/month
Microsoft Confidential
Online Environment350M active Hotmail accounts worldwide550M unique visitors to Microsoft sites/month worldwide2B Live Search queries/month worldwide
Contexte Microsoft & MS ITQuelques chiffres …
77
Contexte Microsoft & MS ITRéduire les coûts tout en absorbant une croissance significative de la demande
Dec 2008 YOY% Dec 2008 YOY%
Internal Users 170K +15% Support tickets/month 175K +15%
Trading Partners 82K +10% SharePoint sites 200K +15%
Buildings 700 +21% Invoices/month 345K +2%
OS Instances 800K +25% Application releases/month 350 +50%
Network devices 8,873 +16% Sites exceeding network SLA 13% +110%
Instant messages/month 80M +266% Internet E-mails/day 1,2M +15%
Spam filtered/day 20M +15% Storage 7PB +100%
Average mailbox size 600MB +55% Downloads/Month 1.2M +9%
UC minutes/month 1.4M +450% Batch job runs / month 5.5M NA
Conferencing min/month 38M +23% Remote Connections/month 1.4M +15%
88
Contexte Microsoft & MS IT
Metrics To Improve FY08 MYR FY09 MYR FY10 MYR FY11 Plan
Critical Application Availability 96.6% 99.5% 99.7% >99.9%
Major Service Outages / month >80 40 25 <10
Average Duration of Outages >7 hours >5 hours 5 hours <3 hours
Proactive Monitoring 40% 50% 55% 80%
Apps w/Tested DR Plans 2.6% 5.9% 14.9% 70% tested
Application User NSAT 113 124 127 135
Production Changes / month >6,000 >6,000 4,000 <2,000
Major Incidents from Change >50% <33% <25% <10%
#of Applications supported 2,325 1,641 1,185 <1,000
Physical Servers (production) 12,540 11,738 8,900 <7,000
Virtualized Servers 12% 24% 36% >50%
Storage Utilization 58% 67% 74% 80%
Progress made and goals using ITIL/MOF model"People, Process & Technology"
99
Increase server utilization for higher efficiency, reliability, and agility
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV -
5,000
10,000
15,000
20,000
0%
5%
10%
15%
20%
25%
1,091 1,274 1,419 1,596 1,856 2,247 2,400 2,604 2,823 3,054 3,101 3,110 3,452 3,552 3,618
10,563 10,863 11,171 11,259 12,060 12,126 11,977 11,900 11,907 11,945 11,970 11,992 11,994 11,765 11,738
9% 10% 11% 12% 13%16%
17% 18% 19% 20% 21% 21%22% 23% 24%
Server Footprint Trend Compared to VM%
# of VMs # of PHY Servers %VM
trend trend
Optimisation de l’InfrastructureVirtualisation
2008
1010
Optimisation de l’InfrastructureVirtualisation
Server Optimization15602
869
531125%
552127%
1323
820836%
2052
1057243%
2643
1293649%
3234
14589 1446113891
Original Forecast : 14042 / 10%Actual Trend Jul-Nov : 13891 / 15%
Phys Servers *
VM Count
Total VM Hosts
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Baseline
Actual Forecast2009 2010
1111
Optimisation de l’InfrastructureVirtualisation
Increase server utilization for higher efficiency, reliability, and agility
Impact: • 100% des nouveaux serveurs physiques installés pour virtualization
depuis juin 2008 : coûts d’hébergement diminués de $4.3M la première année (Jan 2009)
• Cible 50% de virtualisation fin Juin’10 pour économie de $4.1M ($5.5M sur 2010)
Impact Environemental : Economie d’énergie électrique de 20, réduction d’émission CO²Agilité :
Mise à disposition d’un serveur passée de maximum 36 semaines à 4 semainesDéploiement agile de services techniques (Branch Cache)
PRA (disaster recovery) en cours de généralisationJustification business exigée si demande d’un serveur physique vs coûts d’hébergement et de support faiblesAvec le déploiement d’Hyper-V, 90% des nouveaux serveurs demandés seront déployés sous forme de machine virtuelle
1212
Pre-Release Deployment Projects Windows 2008 R2
AccessAnywhere
• BranchCache (Broadcast)• DirectAccess; VPN Reconnect; NAP-VPN
InfrastructureManagement
•PowerShell; AD Recycle Bin; RO-DC; MSA•Migration Manifests; BPA
DatacenterAutomation
•Role Migration/remote administration
Enterprise ClassPlatform
•Server core•64 bit architecture
Virtualization andConsolidation
•Hyper-V v2; CSV; Live Migration•Virtual Desktop Infrastructure (VDI)
ServerReliability /
Performance•Parity with Windows Server 2008
1313
Windows 2008 R2 sur WWW.MICROSOFT.COM
MSCOM provides a unique workload to the Windows PG: a high traffic, highly available internet facing corporate web presence.
• High traffic• Average 20K requests/sec• 550K concurrent connections• 1.6 billion hits/day (which roughly equates to 200K page views/day) from 57million+ unique
IP addresses • 2GB+/sec website traffic• 100-300GB+/sec download traffic
• High availability• MSCOM Platform availability YTD 99.95% as measured
1414
Déploiement Windows 7Nos Objectifs
Déploiement autonome « no touch »Réduction impact changement Support de scenarii de migration à la carteRéduction des appels au support
Nos Constats165K postes déployés en RTM (97% France)Des utilisateurs libres de choisir quand / commentFaible niveau d'incidentChange management légerTaux de satisfaction élevé
Nos ChoixInfrastructure de distribution (WDS) avec 30+ serveurs W2008 R2USMTFonctionnalité Peer-to-peer Images simplifiéesWindows Update
1515
RC
Beta
Pre
Beta
RTM
Oct (M3) Nov (M3) Dec (M3) Jan (Beta) Feb (Beta) Mar (Beta) Apr (Beta) May (RC) Jun (RC) Jul (RC) RTM
0 0 0
0.2059 0.2059 0.2059 0.2059
0.1772 0.1772 0.1772
0.251
15.57% 15.17% 14.26%
9.79%
12.59% 11.57%
14.87%
8.43%10.26% 9.77%
5.29%
15% 15% 15% 15% 15% 15% 15%12% 12% 12%
10%
Incident Rate TrendVista Dogfood Windows 7 Dogfood Windows 7 Goal
15
Résultats
Issue Classification % Vol. Comments
Setup - Help 49.7% Help with Install/ RIS/ DVD
Display Driver issues 10.9% Display drivers/ Video drivers require updates
Configure: Help Personalize PC - Settings 5.9% Personalize PC/ remove
windows .oldOSD Install Failure 3.1% OSD PUSH/OSD fail at checker toolDomain User Not Admin. 3.0% Need Admin RightsWindows fail to boot up correctly 3.0% windows fail to boot up correctly/
unable to boot upActivation (Error/Key needed) 2.3% Activation key needed for Ultimate
editionsDomain Join/ Trust Relation 2.1% Domain Join
Information Requests 2.0% generic information requestsNetwork Printer 1.7% Printer setup / driver
Summary 83.7%
Top Customer Pain Points
1616
Ce que nous avons retenu …Créer une expérience de migration avec l'utilisateur au centre du besoin
Smooth setup, sans pop-ups inattendus ou messages d’erreur “opaques”
Utilisation des fonctionnalités Windows Deployment Services (WDS) et de Operating Deployment Services (ODS) de System Center Configuration Manager (SCCM) 2008 R2Utiliser USMT pour la migration des donnéesAutomatisation et installation autonome pour un meilleur cout opérationnel Réduction du nombre d’images, étape 1 OK Allègement de l’image en se concentrant sur le plus petit dénominateur commun en terme d’applications requisesUtilisation de Windows Update pour dernières versions de driversBranchCache pour réduire les besoins en bande passanteInvestir dans l'accompagnement en amontLe timing et une communication ciblée sont les clés du succèsUtiliser la standardisation des HW et drivers
1717
Poste de travail : Gestion de l’énergie
• SCCM R3• Solution de Gestion
d'Energie principale• Déploiement en Janvier• Utilisation de
l'infrastructure actuelle• Simplification du
modèle de support• GPO pour le temps de
mise en veille des écrans.
Microsoft IT > NotificationClient Power Management
Announcement GPO Monitor Timeouts
During October 2009, the MSIT Client Power Management Team will deploy power saving monitor timeouts across the company via Group Policy Objects (GPO). These monitor timeouts are a key part of the overall Client Power Management initiative to save Microsoft approximately 23,000,000 kWh in energy consumption per year. This equates to about 10,000 tons of CO2 and $1.8 million (US) in savings.
1818
Déploiements en cours
Exchange 2010 : terminéMigration d’une partie des boîtes aux lettres vers Exchange OnlineDisponibilité de 99,99%
Office 2010 : 60K utilisateurs sur version Béta/RCSharepoint 2010 : Migration en cours (>60%)Direct Access : Pilote de 12K utilisateursNAP déployé sur 340K devices en mode reporting
Mode « remediation » sur les US (100K devices)
BitLocker : Par fonction & rôleForefront Identity Management : déploiement en coursAPP-V : Pilotes finalisés, démarrage déploiementGénéralisation de Dynamics CRM pour les fonctions de ventes et support
1919
$128MILLION
ANNUALLY
$38MILLION
$13MILLION
$0MILLION
2009 2010
PROJECTCOSTS
So Far …• 8000+ Users• 89 Countries• 175 NSAT• 90% Adoption• In 30 Days!
BREAKEVEN
237% ROI
Migration MS CRMPRODUCTIVITYSAVINGS
2020
OCS R2 / Communications unifiées Photo de Microsoft aujourd'hui
Déploiement graduel d’OCS par étape : Messagerie unifiées (messages vocaux dans Exchange) Notion de présence, messagerie instantanée Communicator et conférences Video conferencing & Roundtables Live Meeting OCS R2
160K comptes provisionnés & 133K actifs sur Office Communicator 2007 R2
66K utilisateurs sur 'Enterprise Voice‘ Plus de 2,2K Microsoft RoundTables/Polycom CX7000
déployés (120 en France) 34K Organisateurs de e-conferences sur Live Meeting (OCS
et Live Meeting Service).
2121
OCS/R2 : Quelques Chiffres (Décembre 2009)
IM & Présence• 130K Utilisateurs Uniques actifs• 12,7M sessions/mois (134 en moyenne par utilisateur)• 79M messages/mois• 64K transferts de fichiers/mois• 190K partages applications/mois (15 minutes en moyenne)
Peer-to-peer • Video : 41K sessions avec une moyenne de 16 minutes• Audio : 6.8M sessions avec une moyenne de 7 minutes
Enterprise Voice• 4.1M appels téléphoniques en TOIP (7,5 minutes en moyenne)
OCS Web Conferencing (Live Meeting)• 117K conférences/mois
RoundTable• 13K conférences (PSTN and/or PC audio)
Volume x2 sur Microsoft France en 6 mois
2222
Bénéfices OCS 2007
Plus besoin de fournisseur externe pour les ponts de conférence (Coût de $8.8M de Juillet 2008 à Juin 2009)
Centralisation de la création de téléphoneProcess unique et simplifié de la création IM /
Téléphone / e-Conference.Gain moyen en productivité utilisateur de 68 minutes
par semaine grâce à CommunicatorFlexibilité pour les travailleurs nomades ou distantsRéduction des voyagesSuppression des PABX avec version 14
2323
Retour d’expérience Exemple Microsoft : La “Mid Year Review”
Moving Microsoft’s most critical business meeting of the year in WE from Paris/CDG to LiveMeetingLine US $ Comments
Air Travel/ Taxis 262.400 Cost 350 attendees who travelled within Europe
Hotel Rooms 111.666 300 attendees from Subs and 50 from HQ. Room rate Euro 150/night
Security 70.000 For reception services, security personnel etc
Food & Meeting Rooms 259.000 Hotel Euro 177K, for lunch, dinner, andmeeting rooms
Total Saving $703.066
2424
Aligning our adoption plan with the Windows Azure platform roadmap
24
Application Segmentation1 Adoption Planning3
Platform Capabilities Roadmap2
Basic Intermediate AdvancedNon-mission criticalLimited regulatory exposureLBI info
Non-mission criticalMedium regulatory exposureMBI info
Mission criticalHigh regulatory exposureHBI info
No cross-premiseLow monitoring needsSource code accessible< 10GB SQL DB storage
Medium cross-premiseMedium monitoring needsSource code accessible< 50GB SQL DB storage
High cross-premiseHigh monitoring needsPackaged app integration> 50GB SQL DB storage
BusinessFactors
TechnicalFactors
CY 2012*CY 2011*CY 2010
New Applications
Evaluate all new apps for Cloud Fit: Does the application lend itself to be built and optimized for the cloud?Classification: Will the new application be classified as Basic, Intermediate, or Advanced? And does the Azure Capabilities timeline match the business timing needs?
New applications will be designed to leverage cloud capabilities as
appropriate, with the timing based on platform readiness.
Selection
Upgrade Plan: Are there plans to upgrade the hardware or code for the application? Cloud Fit: Does the application lend itself to be ported to the cloud?ROI / TCO: Does the incremental benefit justify the migration costs?
Existing Applications
37%
31%32%
Each existing application is evaluated for cloud migration and accepted if there is a technical fit and incremental business benefits
that justify migration costs.
Eligibility for Cloud Migration
MSIT ApplicationSegmentation
Different approaches will be taken for new and existing applications. Enterprise applications can be classified into three categories based on their business and technical characteristics
As early adopters we are partnering with the Azure product team to leverage their offerings and capabilities.
Eligibility for Cloud Adoption
* Expected features based on analysis - not yet on official roadmap
1-8 cores; 1.7-14 GB RAM250-2000GB/VM (‘Infinite’ VMs)100Mbps minimum per VMGlobal Data Centers Geo-replication
Managed/Raw VMsVirtual Network Overlay (VNO)More Global Data Centers
Hardware performance increases & further platform refinements based on usage experience
50GB Cloud StorageSQL Fault ToleranceRDBMS SynchronizationSQL Clone
SQL Backup & RestoreSQL Reporting & BIGeo-replicationRemoval of 50GB Limit
Continued improvements to SQL Azure platform
AppFabric Service Bus & Access ControlAuth. Store & Claims Transformation
Durable Message Store & Delivery Guarantee
Continued improvements to AppFabric
PowerShell supportMonitoring & Logging APIsDeployment Portal/APIs99.9% SLAs
Managed/Raw VMsRemote Desktop Admin Role Access
System Center for Cloud
SQL IP FilteringCertificate Store AccessGFS allows MBI on AzureSingle LiveID / Corp ID Authentication
Enhanced Security via Remote Desktop / AdminSegmented Roles
HBI Support and Regulatory Compliance
2010
2011
2012
2013
Basic Apps
Advanced Apps
Intermediate Apps