December 19, 2016 Ms. Elizabeth Lord, Land Use Attorney Agency of Natural Resources ANR Legal Division One National Life Drive, Davis Building Montpelier, VT 05620-3522 RE: South Face Village at Okemo Development Company, LLC – Ludlow, Vermont Non-Native and Invasive Plant Species 2016 Monitoring-Year 1 (Baseline) State of Vermont Land Use Permit #2S1198-5 US Army Corps of Engineers 404 Permit (#NAE-2010-1452) Dear Elizabeth: This letter is to inform you that VHB performed the first annual survey for invasive plant species, as required by Condition #33 of the State of Vermont Land Use Permit (“LUP”) #2S1198-5, and by Special Conditions #4 and #10 of the United States Army Corps of Engineers (“USACE”) 404 Permit (#NAE-2010-1452), on August 10, 2016. The invasive species monitoring for 2016 represents the baseline survey for this project. On behalf of South Face Village at Okemo Development Company, environmental scientists from VHB conducted the invasive species survey within the permitted forest management Patch Cut areas. VHB monitored for the target invasive species that are specified in the USACE 404 Permit and the LUP. No occurrences of non-native or invasive species were found within or adjacent to the study area. A summary memorandum, which includes a Non-Native and Invasive Plant Species Monitoring Map and representative photographs, is enclosed to provide documentation of the monitoring. Follow-up monitoring should occur in approximately ten years, at the time of the next patch cutting maintenance cycle, as specified by the permits, and the results of the future monitoring would be reported to your office and the Army Corps of Engineers approximately ten years from now. Additionally, the USACE 404 Permit requires annual monitoring for five years once Project construction is completed (construction completion is expected in approximately ten years). Please feel free to call if you have any comments or questions. Sincerely, Owen McEnroe Environmental Scientist cc Andy Becker, South Face Village at Okemo Michael Adams, US Army Corps of Engineers OWM/jkw Enclosure \\VTSBDATA\projects\57174.33 South Face EV Comp 2016\docs\memos\NNIS_2016\South_Face_NNIS Mon_Cover Letter_2016.doc

Upload: others

Post on 21-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 9, 2016 Agency of Natural Resources State of Vermont Land ... · Suite 200 South Burlington, Vermont 05403 To: South Face Village at Okemo ... Representative NNIS Baseline Assessment

December 19, 2016

Ms. Elizabeth Lord, Land Use Attorney Agency of Natural Resources ANR Legal Division One National Life Drive, Davis Building Montpelier, VT 05620-3522

RE: South Face Village at Okemo Development Company, LLC – Ludlow, Vermont Non-Native and Invasive Plant Species 2016 Monitoring-Year 1 (Baseline) State of Vermont Land Use Permit #2S1198-5 US Army Corps of Engineers 404 Permit (#NAE-2010-1452)

Dear Elizabeth:

This letter is to inform you that VHB performed the first annual survey for invasive plant species, as required by Condition #33 of the State of Vermont Land Use Permit (“LUP”) #2S1198-5, and by Special Conditions #4 and #10 of the United States Army Corps of Engineers (“USACE”) 404 Permit (#NAE-2010-1452), on August 10, 2016. The invasive species monitoring for 2016 represents the baseline survey for this project.

On behalf of South Face Village at Okemo Development Company, environmental scientists from VHB conducted the invasive species survey within the permitted forest management Patch Cut areas. VHB monitored for the target invasive species that are specified in the USACE 404 Permit and the LUP. No occurrences of non-native or invasive species were found within or adjacent to the study area. A summary memorandum, which includes a Non-Native and Invasive Plant Species Monitoring Map and representative photographs, is enclosed to provide documentation of the monitoring.

Follow-up monitoring should occur in approximately ten years, at the time of the next patch cutting maintenance cycle, as specified by the permits, and the results of the future monitoring would be reported to your office and the Army Corps of Engineers approximately ten years from now. Additionally, the USACE 404 Permit requires annual monitoring for five years once Project construction is completed (construction completion is expected in approximately ten years).

Please feel free to call if you have any comments or questions.

Sincerely,

Owen McEnroe Environmental Scientist

cc Andy Becker, South Face Village at Okemo Michael Adams, US Army Corps of Engineers

OWM/jkw Enclosure

\\VTSBDATA\projects\57174.33 South Face EV Comp 2016\docs\memos\NNIS_2016\South_Face_NNIS Mon_Cover Letter_2016.doc

Page 2: 9, 2016 Agency of Natural Resources State of Vermont Land ... · Suite 200 South Burlington, Vermont 05403 To: South Face Village at Okemo ... Representative NNIS Baseline Assessment

40 IDX Drive, Building 100

Suite 200

South Burlington, Vermont 05403

To: South Face Village at Okemo

Project File

Date: December 19, 2016

Project #: 57174.33

From: Owen McEnroe,

Environmental Scientist Re:

South Face Village at Okemo – 2016 Non-Native and

Invasive Species Survey (Baseline Year Monitoring)

INTRODUCTION

On behalf of South Face Village at Okemo Development Company, LLC (“Client”), and in support of the South Face

Village at Okemo project located in Ludlow, Vermont (“Project”), VHB has prepared this memorandum to

summarize the results of the non-native and invasive plant species (“NNIS”) identification survey conducted by VHB

on August 10, 2016. Specifically, this memorandum presents baseline NNIS data collected by VHB as required by

Condition #33 of the State of Vermont Land Use Permit (“LUP”) #2S1198-51, by Special Conditions #4 and #10 of

the United States Army Corps of Engineers (“USACE”) 404 Permit (#NAE-2010-1452)2, and as outlined in the Timber

Creek at Okemo Number II Forest and Wildlife Habitat Management Plan Narrative (“Plan”)3. The following sections

describe the NNIS investigation methods and present the NNIS investigation results.

METHODS

Qualified VHB environmental scientists conducted the baseline NNIS monitoring in accordance with the methods

described in the Plan, within and immediately adjacent to four Wildlife Enhancement Patch Cut areas (“Study Area”) to

be disturbed during the Project’s required forest management activities. Management cutting in the four Patch Cut

areas is planned to occur during the 2016-2017 winter, in accordance with the Plan and the Permits. The Study Areas

and the overall Project Area are shown on the NNIS Monitoring Map in Attachment 1. The four Study Areas total

approximately 8.1 acres and include mainly forested lands, with smaller portions of revegetating former

logging/access roads. Representative photographic documentation of the NNIS survey is located in Attachment 2.

As specified in the Plan, the target NNIS plant species are those listed in the Vermont Agency of Agriculture, Food &

Markets (“AAFM”) Quarantine #34, which include Class A or B noxious weeds in Vermont, species listed on the Invasive

Species Watch List for Vermont (“WL”)5, species listed in Appendix D of the USACE New England District

Compensatory Mitigation Guidance, and species required by Special Condition #10 of the USACE Permit, which

include Common reed (Phragmites australis), Purple loosestrife (Lythrum salicaria), Glossy Buckthorn (Frangula alnus),

Common buckthorn (Rhamnus cathartica), Russian olive (Eiaeagnus angustifolia), Autumn olive (Eiaeagnus umbellata),

and Multiflora rose (Rosa multiflora).

1 State of Vermont Land Use Permit #2S1198-5. Signed date: September 13, 2013 2 United States Army Corps of Engineers 404 Permit #NAE-2010-1452. Signed date: December 13, 2013 3 Holleran, Robbo, Forester. Revised May 21, 2013. Timber Creek at Okemo Number II Forest and Wildlife Habitat Management Plan

Narrative. 4 Vermont Agency of Agriculture. Quarantine #3 – Noxious Weeds. 2012. Available online at:

http://www.vermontagriculture.com/ARMES/plantindustry/plantPathology/ weeds/documents/NoxiousWeedsQuarantine.pdf 5 Invasive Species Watch List for Vermont. 2005. Available online at:

http://www.vtfishandwildlife.com/common/pages/DisplayFile.aspx?itemId=111481

Page 3: 9, 2016 Agency of Natural Resources State of Vermont Land ... · Suite 200 South Burlington, Vermont 05403 To: South Face Village at Okemo ... Representative NNIS Baseline Assessment

South Face Village at Okemo – 2016 Non-Native and Invasive Species

Survey

Ref: 57174.33

December 19, 2016

Page 2 of 2

RESULTS

Based on the baseline assessment, there are no occurrences of any of the aforementioned NNIS identified within the

Study Areas. Additionally, VHB identified no NNIS occurrences adjacent to the Study Areas.

SUMMARY AND RECOMMENDATIONS

On behalf of the Client, VHB conducted the NNIS baseline survey as required by the permits on August 10, 2016, prior

to the initial cutting of the four required wildlife Patch Cut Areas. No occurrences of NNIS were found within or

adjacent to any portion of the Study Areas.

2016 represents the baseline monitoring year. The first round of follow-up monitoring is scheduled to occur in

approximately ten years, when the next maintenance patch cutting is performed as specified in the Plan. Additionally,

Special Condition #10 of the USACE Permit requires annual monitoring for five years once Project construction is

completed (construction completion is expected in approximately ten years). In the forthcoming years of NNIS

monitoring, VHB recommends carefully assessing the Study Areas to determine the presence or absence of target

NNIS, and to remove each occurrence, if any are found, as described in Special Condition #10 of the USACE Permit. As

described in Special Condition #10, hand pulling is preferred, however, in the event that hand-pulling is not effective,

alternate methods (i.e., herbicide) will need to be coordinated with both the Vermont Agency of Natural Resources

(“ANR”) and the USACE.

ATTACHMENTS

1. Non-Native Invasive Species Monitoring Map

2. Representative NNIS Baseline Assessment Photographs

\\VTSBDATA\projects\57174.33 South Face EV Comp 2016\docs\memos\NNIS_2016\South Face NNIS Memo_Final.docx

Page 4: 9, 2016 Agency of Natural Resources State of Vermont Land ... · Suite 200 South Burlington, Vermont 05403 To: South Face Village at Okemo ... Representative NNIS Baseline Assessment

ATTACHMENT 1 

Page 5: 9, 2016 Agency of Natural Resources State of Vermont Land ... · Suite 200 South Burlington, Vermont 05403 To: South Face Village at Okemo ... Representative NNIS Baseline Assessment

PatchCut 1

PatchCut 2

PatchCut 3

PatchCut 4

T O W N O FL U D L O W

2010-SC-32007-SC-03B

2007-SC-09

2007-TB-25

2010-SC-2

2007-SC-26

2007-TB-16

2007-SC-04

2007-SC-16

2007-SC-20

2010-SC-1

2007/2008-SC-15

2008-SC-6

2007-SC-18

2007-SC-21

2007-SC-06

2007-SC-05

2007-SC-12

2007-S

C-10

2007-SC-14

2007-SC-22

2008-SC-1

2007-SC-12A

2007-SC-19

2007-SC-13

2007-SC-16A

2007/2008-SC-15

2007-TB-03

2008-SC-52007-SC-02

2011-TB-C1

2007-TB-24

2010-TB-SB

2007-TB-07

2007-TB-17

Sanders Brook

2008-2

2008-3

2008-1

2010-1

2007-04

2007-05

2007-032007-06

2007-07

2007-09

2007-08

2007-132007-12

2007-112007-10

2007-192007-20

2007-21

2007-222007-17

2007-18

2007-16A

2007-15 2007-14

2007-232007-24

2007-02

2007-01

1820

1980

1580

2440

168023

401700

1600

2460

2420

2060

1780

1980

2000

2100 20802040

2020

1920

2120

1800

1960

1720

1760

1660

1860

18201840

1880

1940

1740

1900

2140

1680

1700

2160

2400

2200

2380

22202180

23602340

23002320

22602280

2240

2320

1600

170023

0022

8022

60

1620

2240

2220

2200

2180

2160

1640

2140

2120

2100

2080

20602040

2020

Overview Dr

Trailside

Edelw

eissRd

VCGI

logos

South Face Village at Okemo Development Company, LLC Ludlow, VTNon-Native Invasive Species Monitoring MapSources:VCGI (Vermont Center for Geographic Information - Various Dates)VHD (Vermont Hydrology Dataset maintained by VCGI - 2015)VT ANR (Vermont Agency of Natural Resources - Various Dates)VTrans (Vermont Department of Transportation - 2015)Study Areas , Project Area, and Resort Roads Digitized by VHB (2016); Background Imagery by VCGI (2016)

i

November 10, 2016\\v

tsbda

ta\pro

jects\

5717

4.01\G

IS\pro

ject\N

NIS\N

NIS_M

onito

ring_

Map_

2016

.mxd

Copyright:© 2013 NationalGeographic Society, i-cubed

400 0 400200 Feet

VHB NNIS Study Areas

LegendStudy Area (VHB)Project Area (VHB)Resort Road

Delineated Stream (VHB)Perennial Stream Intermittent Ephemeral

Recon Stream (VHB)Delineated Wetland (VHB)

Class II WetlandClass III Wetland Recon WetlandStream (VHD)

VV

SWIV

VSWI

VV

SWIV

VSWIVSWI Wetland (VT ANR)

Waterbody (VHD)20 ft. Contour (VCGI)Parcel BoundaryCounty BoundaryTown BoundaryRoads (VCGI)

Page 6: 9, 2016 Agency of Natural Resources State of Vermont Land ... · Suite 200 South Burlington, Vermont 05403 To: South Face Village at Okemo ... Representative NNIS Baseline Assessment

ATTACHMENT 2

Page 7: 9, 2016 Agency of Natural Resources State of Vermont Land ... · Suite 200 South Burlington, Vermont 05403 To: South Face Village at Okemo ... Representative NNIS Baseline Assessment

South Face Village at Okemo Development Company, LLC Non-Native and Invasive Species - Baseline Survey - Representative Photographs

Ludlow, Vermont

Photographs taken by VHB Environmental Scientist O. McEnroe on August 10, 2016 Page 1 of 1

\\vtsbdata\projects\57174.33 south face ev comp 2016\sitephotos\08102016\owm\nnis_southface_photodoc_2016.docx

Photograph 1. Representative view of forested area within Patch Cut-1

Photograph 2. Representative view of a former access road within Patch Cut- 2

Photograph 3. Representative view of a former access road and forested area within Patch Cut-2,

Photograph 4. Representative view of a forested portion of Patch Cut-3

Photograph 5. Representative view of a former access road within Patch Cut-3

Photograph 6. Representative view of forested area within Patch Cut-4