7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 1/118 Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane Project “VISION” Document END USER MANUAL Version 1 Module Production Planning (PP) Page 1 of 118 END USER MANUAL SAP, PRODUCTION PLANNING (PP) MODULE PROJECT “VISION” SUJAN BARRE THOMAS ANTIVIBRATION SYSTEMS PVT. LTD., Thane Prepared By, HARRIS PANCHAL SAP Consultant, PP Mahindra IT Consulting Pvt. Ltd., Mumbai

Upload: mpsinghrathour

Post on 14-Apr-2018

314 views

Category:

Documents


18 download

TRANSCRIPT

Page 1: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 1/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 1 of 118

END USER MANUAL

SAP, PRODUCTION PLANNING (PP) MODULE

PROJECT

“ V I S I O N ”

SUJAN BARRE THOMAS ANTIVIBRATION SYSTEMS PVT. LTD.,

Thane

Prepared By,

HARRIS PANCHAL

SAP Consultant, PP

Mahindra IT Consulting Pvt. Ltd., Mumbai

Page 2: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 2/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 2 of 118

DOCUMENT CONTROL

Sr. No. RevisionDate of 

Creation

Date of 

ModificationRemarks

1 1.0 07-February-09 07-February-09 ---

Security Classification: COMPANY CONFIDENTIAL

Page 3: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 3/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 3 of 118

Contents

1. CHECK SCHEDULING AGREEMENT – MD04....................................................................................4

2. CHECK STOCK OF MATERIAL - MMBE.............................................................................................6

3. EXPLODED BOM VIEW – CS11 ..........................................................................................................9

4. RESERVATION CREATION ...............................................................................................................11

4.1a BY MANUAL CREATION THROUGH – MB21...................................................................11

4.1b RESERVATION DISPLAY – PRINT FOR INTIMATION – MB25.......................................14

4.1c STOCK TRANSFER POSTING – MB26 ............................................ ................................18

4.2 BY MANUAL CREATION THROUGH – MB1B ............................................ ........................19

5. CHECK BILL OF MATERIAL – CS03 ................................................................................................21

5.1 CHECKING STANDARD BOM.............................................................................................21

5.2 ADDING AN ALTERNATIVE BOM....... ................................................... .............................23

6. CHECK ROUTING – CA03 .................................................................................................................256.1 CHECKING STANDARD ROUTING ........................................... .........................................25

6.2 ADDING AN ALTERNATIVE ROUTING .......................................... ....................................28

7. PRODUCTION ORDER CREATION – MANUAL – CO01 ..................................................................30

8. SHOP FLOOR PRINTING – PRODUCTION ORDER – CO04 ...........................................................35

9. PRODUCTION ORDER CONFIRMATION – CO11n ..........................................................................39

10. QUALITY INSPECTION – QA32.......................................................................................................43

11. PRODUCTION ORDER SETTLEMENT – KO88 ..............................................................................51

12. PRODUCTION ORDER TECO – (Technically Complete) – CO02 ................................................53

13. CHECK PRODUCTION ORDER REPORTS ....................................................................................55

13.1 PRODUCTION ORDER INFORMATION SYSTEM - COOIS ........................................... .56

13.2 CAPACITY PLANNING - STANDARD OVERVIEW – CM01 ........................................... .6113.3 CAPACITY PLANNING - CAPACITY EVALUATION – CM50 .......................................... 63

13.4 ORDER PROGRESS REPORT – CO46............................................................................66

13.5 DISPLAYING PRODUCTION ORDER CONFIRMATION – CO14 .................................... 68

13.6 CHECK PRODUCTION ORDER DELIVERY – MB51........................................................69

13.7 CHECK RAW MATERIAL ISSUE – MB51 ....................................... ..................................71

13.8 CHECK RAW MATERIAL RECEIPT – MB51.....................................................................73

13.9 MATERIAL USAGE ANALYSIS - MCRE............................................................................75

13.10 ANALYZE PRODUCTION ORDER – KKBC_ORD ............................................ ..............77

13.11 CHECKING FAILED GOODS MOVEMENT - COGI .......................................... ..............79

14. PRODUCTION ORDER – THROUGH DEMAND MANAGEMENT ..................................................80

14.1 CREATE PLANNED INDEPENDENT REQUIREMENT – MD61.......................................80

14.2 MRP – AT PLANT LEVEL – MD01.....................................................................................83

14.3 MRP – AT MATERIAL LEVEL – MD02 .......................................... ....................................85

14.4 PRODUCTION ORDER CONFN. WITH REWORK – CO11n............................................93

14.5 PRODUCTION ORDER CREATION – REWORK – CO07 .......................................... ......97

14.6 REWORK PRODUCTION ORDER CONFIRMATION – CO11n......................................101

14.7 GOODS RECEIPT OF REWORK ORDER – MB31....................................... ..................104

15. MRP – FOR PLANNED ORDER + PURCHASE REQUISITION ....................................................107

16. CO-PRODUCT SCENARIO ............................................................................................................114

Page 4: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 4/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 4 of 118

1. CHECK SCHEDULING AGREEMENT – MD04

Sales & Distribution (SD) Module would be inputting Scheduling Agreement in the SD Module which

would be visible in the Stock Requirement List (Dynamic Listing).

SAP ECC menu Logistics → Production → MRP → Planning → Evaluations

→ Stock/Requirements List 

Transaction code MD04

Here enter the Material and the Plant who’s Requirements are to be checked.

Page 5: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 5/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 5 of 118

Here you can see the Scheduling Agreement inputted by SD.

Page 6: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 6/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 6 of 118

2. CHECK STOCK OF MATERIAL - MMBE

The Stock of the Raw Material is checked against the Selection criteria.

SAP ECC menu Logistics → Material Management → Inventory 

Management → Environment  → Stock → Stock Overview 

Transaction code MMBE

Double click on the Transaction code and give the selection condition as per your requirement.

Page 7: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 7/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 7 of 118

Click on Execute

The System will Show you the Stock as of that particular Item. The system will show you the Actual

stock lying at different areas such as Unrestricted, Quality Inspection, Reserved and Blocked Stock etc.

Page 8: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 8/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 8 of 118

If the stock is not available at IS01 (Issuing In-Between Storage Location), then, In-House Stock

transfer of components has to be done, i.e. ST01 to IS01. Production Order will be consuming the

Stock from ST01 (General Storage Location) to IS01 (In-between / WIP Storage Location).

 Also if the production department has determined the total quantity required for a particular material,

say ROH, then they can check the same by exploding the total BOM Quantity.

Page 9: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 9/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 9 of 118

3. EXPLODED BOM VIEW – CS11

To check the Total Raw Material requirement by means of Exploding the Total BOM of a particular 

Material.

SAP ECC menu Logistics → Production → Master Data → Bills of Material 

→ Reporting → BOM Explosion→ Material BOM 

Transaction code CS11

Enter Material / Plant / Required Qty. / BOM Application and click on Execute icon.

Page 10: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 10/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 10 of 118

 After the execution, it will show the Total Requirement for that Finish Product in terms of Raw Material

requirement.

Page 11: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 11/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 11 of 118

4. RESERVATION CREATION

4.1a BY MANUAL CREATION THROUGH – MB21

Now known the total quantity the Reservation needs to be created for the total requirement which was

being put at the time of exploding the BOM.

SAP ECC menu Logistics → Material Management → Inventory 

Management → Reservation → Create

Transaction code MB21

Enter Movement No.: 311 for Plant 1000.

Page 12: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 12/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 12 of 118

Enter Material, its Quantity, Unit oF Measure, the Receving Storage Location (IS01) and StorageLocation (ST01)

 And Click on SAVE. Reservation is created and it will be shown with a Green Tick and a Reservation

No. being created.

Page 13: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 13/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 13 of 118

Note the Reservation No. shown in the System Status bar.

Page 14: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 14/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 14 of 118

4.1b RESERVATION DISPLAY – PRINT FOR INTIMATION – MB25

SAP ECC menu Logistics → Material Management → Inventory 

Management → Reservation → Reservation List 

Transaction code MB25

Enter Material & Plant 1000.

Page 15: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 15/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 15 of 118

Click on Execute

Reservation List Display will be seen.

Select the Reservation Line and Click on Change Layout From Drop Down menu

Page 16: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 16/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 16 of 118

Select Choose to select the saved Layout.

Page 17: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 17/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 17 of 118

Now you can see the details as per the selected Layout.

Select this line and Click on Print Option. Once the Spool is created, go to Spool Management to select

the print to be printed as a Hard Copy which then can be given to the Stores for issuing the material

from ST01 to IS01.

Page 18: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 18/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 18 of 118

4.1c STOCK TRANSFER POSTING – MB26

SAP ECC menu Logistics → Material Management → Inventory 

Management → Reservation → Picking

Transaction code MB26

You can enter here the Material / Reservation No. / Order No. / Plant as per your filtering requirement.

 After entering you can simply select the One Reservation which you want to post, multiple selection is

also possible. If only 1 is to be posted then you need to delete the other postings and then Post the one

which was kept.

Goods movement would take place, which would mention it by Displaying a Green Tick mark in the

status bar.

Now the required material is available at IS01.

Page 19: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 19/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 19 of 118

4.2 BY MANUAL CREATION THROUGH – MB1B

SAP ECC menu Logistics → Logistics Execution → Internal Whse

Processes → Posting Change → Inventory 

Management → Enter Posting Change

Transaction code MB1B

Here with this TCode you can directly post the required stock within plant.

Page 20: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 20/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 20 of 118

Enter the following details on the main Screen viz.

1. Movement Type: 311

2. Plant: 10003. Storage Location (Where the goods exists, Transfer from location): ST01

On the next screen Enter the following:

1. Rcvg SLoc (Where the material is needed to consume): IS01

2. Enter the Material details and Storage Location

 And SAVE to post the material to the required Storage locat ion.

Page 21: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 21/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 21 of 118

5. CHECK BILL OF MATERIAL – CS03

5.1 CHECKING STANDARD BOM

Now enter the Material number of which you BOM you want to see and execute.

SAP ECC menu Logistics → Production → Master Data → Bills OF Material  

→ Material BOM → Display 

Transaction code CS03

Page 22: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 22/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 22 of 118

System will show you the Bill Of Material with details like material included in bill of material, description

of the component, quantity required with unit of measure.

Page 23: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 23/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 23 of 118

5.2 ADDING AN ALTERNATIVE BOM

 At times there are chances that an Alternative Material is available to produce a particular component.

In that case an Alternative BOM for the same FERT would be required.

To do so, CS01 can be used to create an Alternate over an Existing BOM.

It would highlight that an Alternative 2 added to BOM and a New Page for entering the BOM

components would come where you can enter the new / alternate components.

SAP ECC menu Logistics → Production → Master Data → Bills OF Material  

→ Material BOM → Create

Transaction code CS01

Page 24: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 24/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 24 of 118

Other relevant details such as Storage Location and SAVE the BOM.

Once you have created it and when you open the BOM in change mode it would show you 2

alternatives and you can select which one you want to view / modify.

Page 25: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 25/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 25 of 118

6. CHECK ROUTING – CA03

6.1 CHECKING STANDARD ROUTING

SAP ECC menu Logistics → Production→ Master Data → Routings →

Standard Routings → Display 

Transaction code CA03

Enter the Material Number & Plant to display the Routing.

Page 26: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 26/118

Page 27: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 27/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 27 of 118

CONTROL KEY:

You maintain the control key for operations in Customizing for Shop Floor Control. This is customizing

operation.

For SBT Scenario we are using 3 Control Keys viz.

1. PP01 - Routing/Ref. op. set - internal proc.

2. PP03 - Routing - in-house prod. auto. goods rct

3. PP07 - For Rework

PP01

Is used for all Operations other than the Last Operation as it has a Auto GR Tick which will allow the

components to be Goods received after the Final confirmation.

PP03

Is used for the Last operation or where Goods Receipt is to take place.

NOTE: Auto Goods Receipt can take place in 1 Operation only in the whole Routing sequence.

PP07

This is specifically used for to be used in Rework Order operations. Manual GR is mandatory for 

Rework Orders.

Page 28: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 28/118

Page 29: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 29/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 29 of 118

Here you can see the Counter as 2.

Enter the Usage as 1 and Status 4 and click on Operations.

Now you can enter the new sequence of operation that you want and give Enter.

Enter the Setup Time, Machine Time and Labour Time and SAVE.

Page 30: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 30/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 30 of 118

7. PRODUCTION ORDER CREATION – MANUAL – CO01

Enter the following:

1. Material Number: XXXXXXXX

2. Production Plant: 1000

3. Order Type ZS01

SAP ECC menu Logistics → Production → Shop Floor Control → Order   →

Create → With Material 

Transaction code CO01

Page 31: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 31/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 31 of 118

Enter the following:

1. Quantity of Production

2. Basic Dates (As per the Scheduling Type)

Page 32: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 32/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 32 of 118

 As we have an Alternative Routing for the FERT, you need to select the Icon Production Version

in the top frame.

It would then prompt you for the Routing which needs to be selected for the FERT as per the machine

availability.

Select the required sequence and then you can continue as per the regular Production Order 

execution.

PRE-REQUISITE FOR PRODUCTION VERSION:

Production version needs to be maintained in Work Scheduling View or MRP4 View of the

Material Master for the FERT’s who have more than 1 combination of BOM and/or Routings.

Now, Click on the following:

1. Material Availability Check

It would show that the Material is available or not, if not it would mention that the material is shortage

and material need to be made available at the required storage location.

Page 33: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 33/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 33 of 118

Click on the following:

1. Capacity Check

It would show whether the Capacity is Available or not.

Page 34: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 34/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 34 of 118

Click on the Calculator on the Top Frame, to calculate the costs. Thereafter the system should

message as shown below.

Click on the Green Flag to RELEASE the Order.

System would show that the Order has been released.

Now you can SAVE the production order and note the Production Order No.

Page 35: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 35/118

Page 36: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 36/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 36 of 118

Select the Order description line and Press F8 (Execute).

Page 37: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 37/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 37 of 118

Select OWN SPOOL REQUESTS from the Pull Down Menu and select the latest Spool and select theprinter to Print the Shop Floor Paper.

Page 38: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 38/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 38 of 118

The Production Order print can now be taken by the Production Supervisor and can move the same

along with the Material being provided from IS01.

Once the Production Order is printed the same cannot be printed as a New Print, it has to be printer as

a RE-PRINT and the Heading would show DUPLICATE for the Shop Floor personnel’s to understand

that it is a Duplicate Print of the prodcution Order.

Page 39: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 39/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 39 of 118

9. PRODUCTION ORDER CONFIRMATION – CO11n

SAP ECC menu Logistics → Production → Shop Floor Control →

Confirmation  → Enter → For Operation

Transaction code CO11N

Page 40: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 40/118

Page 41: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 41/118

Page 42: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 42/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 42 of 118

 Also you can click on Goods Movement to enter the Actual material usage for 

the Qty entered on the main confirmation screen.

Here you can see 2 Goods Movement i.e. Goods Issue and Goods Receipt to be happening in a Single

Confirmation command.

Thereafter click on SAVE.

Check for any System Messages which appear in the Status Bar.

Now the material has been posted to QA for Quality Inspection. The same can be checked in the Stock

Overview List of the FERT material.

Material qty. can be seen in Quality Inspection Stage.

Page 43: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 43/118

Page 44: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 44/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 44 of 118

First check the Stock Overview MD04 for the FERT material.

You can check the QM Lot being created.

The inspection of the components would be done in the QA Department and thereafter you can type in

the TCode QA32 for viewing the Inspection Lot which has been created in the QA.

In the Inspection Lot Enter Plant & Material who’s Inspection Lot is to be checked.

Page 45: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 45/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 45 of 118

Select the Inspection Lot which is to be confirmed after Inspection and click on Usage Decision Box at

the top .

Page 46: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 46/118

Page 47: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 47/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 47 of 118

 As the Scrap would be posted against a Pre-Defined Scrap material, say TEST-SCRAP, the Material

has to be selected against “To New Material”.

Page 48: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 48/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 48 of 118

Page 49: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 49/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 49 of 118

 After the Usage Decision is Saved, selected Inspection Lot appears with a TICK mark on its left side

and a Lot No. is created which can be seen at the System Status bar.

Click on REFRESH button to see the QM Lot being cleared (not appearing anymore in the list).

Page 50: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 50/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 50 of 118

You can also check the Stock Overview for this FERT component whose inspection has been done.

The same can be done through Transaction Code MMBE.

 Also you can see that the Qty has been reduced from Quality Inspection Stock and Qty. 3 nos. has

been moved to Un-Restricted Use and 1 Nos. in Blocked Storage.

Page 51: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 51/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 51 of 118

11. PRODUCTION ORDER SETTLEMENT – KO88

SAP ECC menu Logistics  Production->Shop Floor Control->Period End 

Closing ->Settlement-> Individual Processing

Transaction code KO88

Page 52: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 52/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 52 of 118

On the: Initial Screen, make the following entries:

Field name User action and values Comment

Order  1000128 Example

Settlement period  10 Example

Fiscal year  2008 Example

Processing type  Automatic Example

Deselect Test run & Select Check trans. Data. Click on Execute Button

Variance amount has been settled to the Price Difference account

Page 53: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 53/118

Page 54: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 54/118

Page 55: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 55/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 55 of 118

13. CHECK PRODUCTION ORDER REPORTS

 All the necessary reports for PRODUCTION PLANNING Module can be get from the above menu.

SAP ECC menu Information systems   General Report Selection  

Production Planning  Production Control 

Page 56: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 56/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 56 of 118

13.1 PRODUCTION ORDER INFORMATION SYSTEM - COOIS

The order information system is a tool for shop floor control and process industries with reporting

functions for production orders, planned orders and process orders. Evaluations take place - as with the

IOC logical database, via the original order tables.

On the Production Order Information System screen, make the necessary entries to run the report as

desired.

SAP ECC menu Information systems   General Report Selection  

Production Planning  Production Control   Order 

Information System

Transaction code COOIS

Page 57: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 57/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 57 of 118

You can view all the orders in the system, including the orders with deletion flags or deletion indicators.

 Archived orders are not taken into account.

The order information system has the following display options:

In an individual object list, a list is generated for the selected object (for instance, order header,

operation, and component). You can define the structure and appearance of the individual

object list with a layout

On the object overview the individual orders are displayed with their subordinate objects in a

hierarchical structure. With an overall profile, you can define which fields are displayed and

which objects (order headers, items, sequences, and so on) are read or displayed. In addition,

you can define which fields are displayed for the individual objects

Page 58: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 58/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 58 of 118

Reports regarding SCRAP / REJECTION can also be seen through this report where in you need to

select CONFIRMATION as the header of the report.

Page 59: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 59/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 59 of 118

HEADER - ORDER WISE

HEADER - ITEMWISE

HEADER - DOCUMENTED GOODS MOVEMENT

HEADER - OPERATION WISE

Page 60: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 60/118

Page 61: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 61/118

Page 62: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 62/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 62 of 118

In the capacity evaluation you can display the planned capacity requirements and the remaining

capacity requirements

Page 63: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 63/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 63 of 118

13.3 CAPACITY PLANNING - CAPACITY EVALUATION – CM50

To Check all the Capacity Available for more than 1 Work Center.

SAP ECC menu Logistics   Production   Shop Floor Control   Information

System   Capacity Evaluation   Extended Evaluation 

Work Center View 

Transaction code CM50

Page 64: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 64/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 64 of 118

On the Capacity Evaluation : Selection screen, make the necessary entries to run the report as desired.Here you can get a complete capacity evaluation for more than 1 Work Center, i.e. a Range of WorkCenters can be inputted here.

Page 65: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 65/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 65 of 118

Likewise, all the selected range of work centers can be seen here.

Page 66: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 66/118

Page 67: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 67/118

Page 68: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 68/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 68 of 118

13.5 DISPLAYING PRODUCTION ORDER CONFIRMATION – CO14

You use this to display the confirmations of production orders.

SAP ECC menu Logistics   Production   Shop Floor Control  

Confirmation   Display 

Transaction code CO14

On the Display Production Order Confirmation: Initial  screen, make the necessary entries to run the

report as desired.

If several confirmations exist, the system branches to an operation overview containing the

confirmations. Choose one or more confirmations. If you choose more than one confirmation then you

can switch between confirmations in the detail display. You can print the operation overview and define

a user-specific layout for it (column selection and sorting).

If only one confirmation exists, the system branches directly to the detail screen for the confirmation.

Page 69: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 69/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 69 of 118

13.6 CHECK PRODUCTION ORDER DELIVERY – MB51

SAP ECC menu Logistics → Material Management → Inventory 

Management → Environment → List Displays → Material 

Documents

Transaction code MB51

Page 70: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 70/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 70 of 118

 After selecting MB51 Enter filtering criteria’s such as Material, Plant, Movement Type, etc.

Click on Execute.

2 highlighted in the Boxes displays the GR done 1st

by Original Production Order and later through

Rework Production Order.

Page 71: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 71/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 71 of 118

13.7 CHECK RAW MATERIAL ISSUE – MB51

Enter and Input the Filtering criteria’s. Here we input 261 and 262 Goods Movement for Issuing of Raw

material.

SAP ECC menu Logistics → Material Management → Inventory 

Management → Environment → List Displays → Material 

Documents

Transaction code MB51

Page 72: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 72/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 72 of 118

Page 73: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 73/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 73 of 118

13.8 CHECK RAW MATERIAL RECEIPT – MB51

Enter and Input the Filtering criteria’s. Here we input 101 and 102 Goods Movement for Issuing of Raw

material.

SAP ECC menu Logistics → Material Management → Inventory 

Management → Environment → List Displays → Material 

Documents

Transaction code MB51

Page 74: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 74/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 74 of 118

This report would display the Total Receipt of Raw Material in the plant i.e. the Qty. which is being

procurred externally.

Note: Attached herewith is an Non-SBT example (as no live data is available at present in the System).

Page 75: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 75/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 75 of 118

13.9 MATERIAL USAGE ANALYSIS - MCRE

SAP ECC menu Information Systems → Logistics → Production →

Material → Material Consumption

Transaction code MCRE

Page 76: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 76/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 76 of 118

Enter the Plant and Production Order whose Material Consumption Analysis is to be done and click on

Execute.

Click on Sujan Barre Thomas and click on Switch Drill Down and select the Level at which you want to

analyze. Say you want to analyze at the Order Level, so select Order.

Here you can see the Total Requirement Qty (Planned Qty.) vs Withdrawal Qty. (Actual Consumption).

Page 77: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 77/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 77 of 118

13.10 ANALYZE PRODUCTION ORDER – KKBC_ORD

This will report based on Production as well as Accounting for a particular order.

Enter the Order No. which is to be analyzed.

You can also select Layouts to select which type of Report you would like to see for that particular 

order.

Transaction code KKBC_ORD

Page 78: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 78/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 78 of 118

Say you select the first layout, Target/Actual – Comparison, now click on Execute.

Select on to select the required fields.

Page 79: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 79/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 79 of 118

13.11 CHECKING FAILED GOODS MOVEMENT - COGI

You can check Errors in Goods Movement through COGI Transaction code.

SAP ECC menu Logistics → Production-Process → Process Order →

Environment → Material Movement → Failed Goods

Movement 

Transaction code COGI

Page 80: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 80/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 80 of 118

14. PRODUCTION ORDER – THROUGH DEMAND MANAGEMENT

14.1 CREATE PLANNED INDEPENDENT REQUIREMENT – MD61

 As part of material requirements planning using the net change method, the planned independent

requirements are exploded across the entire BOM structure. As a result, the system also determines

dependent requirements for purchased parts and raw materials.

SAP ECC menu Logistics → Production → Production Planning → Demand 

Management   → Planned Independent Requirement →

CreateTransaction code MD61

Page 81: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 81/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 81 of 118

On the Create Planned Independent Requirement: Initial Screen, enter the

following data:

Field name Description Comment

Planned Independent Requirements for 

Material  Enter Material Code. Finished Good MTS

(You have to select the

radio button)

Plant  Enter Plant Code. Always Enter Production

Plant.

Selection parameters

VersionSelect Verson

Number.

Always select Active

Version

Planning horizon

From From Date

To To Date

Change system default

if necessary.

Planning period Select the appropriate

Planning Period

The default planning

period is M (month).

You can change the

default value for this

field by changing the

user settings.

Page 82: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 82/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 82 of 118

Check the Stock Requirement List for the same through MD04.

The Independent Requirement which is generated can be seen here in the RED box being highlighted.

Page 83: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 83/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 83 of 118

14.2 MRP – AT PLANT LEVEL – MD01

MD01 is used for running the MRP for specific plant or number of plants to maintain the scope of 

planning. In the scope of planning you can maintain number of plants and can use the scope to run

MRP for maintained plants.

Usually this is followed when the First MRP is run at the time of first Run in Production Environment.

Thereafter MRP is run at Material Level i.e. MD02. So if you want to run MRP for all plant and material

in that case we use MD01

SAP ECC menu Logistics → Production → MRP → Planning  → Total 

Planning→ Online

Transaction code MD01

Page 84: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 84/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 84 of 118

Page 85: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 85/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 85 of 118

14.3 MRP – AT MATERIAL LEVEL – MD02

MD02 is used to run MRP for a particular Material. This run would be for just one material , single item ,

multi level ( will explode whole BOM for particular material )

SAP ECC menu Logistics → Production → MRP → Planning  → Total 

Planning→ Single Item, Multi Level 

Transaction code MD02

Page 86: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 86/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 86 of 118

Enter the following details:

1. Enter Material Name

2. Enter Plant

3. Select Processing Key

Specifies the type of MRP run. The following types are possible:

net change planning: NETCH

net change planning in the planning horizon : NETPL

online regenerative planning : NEUPL

4. Create Planned Order / Purchase Requisitions (In case of BOP)

5. Delivery Schedules: Whether To Create or No

6. Create MRP List

7. Planning Mode & Scheduling

 Above details are shown in the image above. ENTER to run the MRP.

 An MRP List will be generated.

Page 87: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 87/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 87 of 118

Now the Planned Orders will be generated for this PIR.

Through MD04 you can select this Planned Order. Shown below.

Page 88: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 88/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 88 of 118

Select the Row of Planned Order, and Click on CONVERT TO PRODUCTION ORDER through this

Icon .

Page 89: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 89/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 89 of 118

Clicking on this, will take you to the Production Order Screen.

Enter the following:3. Quantity of Production

4. Basic Dates (As per the Scheduling Type)

Click on the following:

1. Material Availability Check

It would show that the Material is available or not, if not it would mention that the material is shortage

and material need to be made available at the required storage location.

Page 90: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 90/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 90 of 118

Click on the following:

2. Capacity Check

It would show whether the Capacity is Available or not.

Click on the Calculator on the Top Frame, to calculate the costs. Thereafter the system should

message as shown below.

Click on the Green Flag to RELEASE the Order.

Page 91: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 91/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 91 of 118

System would show that the Order has been released.

Now you can SAVE the production order and note the Production Order No.

Page 92: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 92/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 92 of 118

Refresh the Stock Requirement List (MD04) to see the Planned Order being now converted to status

Production Order (Shown in red box below).

Shop Floor Printing can be performed thereafter through Transaction Code: CO04N.

SAP ECC menu Logistics → Production → Shop Floor Control → Control  

→ Print 

Transaction code CO04N

Page 93: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 93/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 93 of 118

14.4 PRODUCTION ORDER CONFN. WITH REWORK – CO11n

SAP ECC menu Logistics → Production → Shop Floor Control →

Confirmation  → Enter → For Operation

Transaction code CO11N

Page 94: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 94/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 94 of 118

 As we would be Confirming the Order Operation Wise we can go for Time-Ticket Confirmation.

Enter the Order No. and the Operation which you want to confirm and Click on ACTUAL. DATA

to get the Existing Data which has come along with the Production Order. Here you

can now enter the ACTUAL Data which you have got through Production to be seen as the Variance

during the Production Order reporting.

 As we would be doing REWORK activity in this Production Order, we can first check the Stock for the

part across the plant through T Code MMBE.

Page 95: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 95/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 95 of 118

On confirmation screen let us consider 200 as Yield Qty. and 100 as Qty. which is to be REWORKED.

Save the Confirmation

Check for any System Messages which appear in the Status Bar.

Now the material Qty. 200 has been posted to QA for Quality Inspection. The same can be checked in

the Stock Overview List of the FERT material.

Page 96: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 96/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 96 of 118

You can go back to CO02 for Production Order No. 100123 to see the status of the Qty.

Here you can see that out of the Total Qty. Delvrd is 200 and 100 is reworked which can be seen

through Operation Overview at the extreme Right End.

Page 97: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 97/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 97 of 118

14.5 PRODUCTION ORDER CREATION – REWORK – CO07

PRE-REQUISITIES:

For Rework Order Following Pre-Requisites have to be followed.

1. A separate Rework Order has to be Created without Reference to any Material.

2. Goods Receipt for a Rework Order has to be done manually.

SAP ECC menu Logistics → Production → Shop Floor Control → Order   →

Create → Without Material 

Transaction code CO07

Page 98: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 98/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 98 of 118

Production Order Initial Screen will appear. Here enter Production Plant & Order Type for that Rework

Order.

GENERAL TAB

Thereafter on the Header Screen, Enter the following:

1. Material Description

2. Total Qty. to be reworked and Its Unit of Measurement

3. Basic Dates

Page 99: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 99/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 99 of 118

 After giving ENTER it would give a Dialogue Box.

Here select on GENERATE OPERATION.

On the next Screen, i.e. Main Settlement Rule: Overview enter the following:

1. Category: ORD (i.e. to be settled against a Production Order)

2. Settlement Receiver: Production Order No. (In this case it is 1000123) & give ENTER.

Here it will now show the relevant details.

Go Back now.

Page 100: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 100/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 100 of 118

ASSIGNMENT TAB

Enter MRP Controller 

Enter Profit Center 

GOODS RECEIPT

Control Data: Stock Type ; X – Quality Inspection

Thereafter Click on Operation Overview Icon

Select the following:

Work Center on which the rework is taking place

Control Key: PP07 (For Rework Production)

Can also enter the Operation Description and give ENTER.

Thereafter Click on Component Overview to enter the components to be processed.

Enter the Component to be reworked.

Enter the Quantity (can be calculated through CS11 for total requirement as per the rework 

quantity ).

 After entering the details and giving ENTER it would ask for the Operation Assignment, i.e. the

component is to be assigned to which Operation. Select the operation and give Enter. Also

check for the Storage Location i.e. from where the Material will be issued, which should be

IS01 in our case.

Go back now.

Like a Normal Production, Check for Material Availability, Capacity Availability, Pre-Cost it and then

Release the Rework (Production) Order and Save it and note the Rework Production Order No.

Page 101: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 101/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 101 of 118

14.6 REWORK PRODUCTION ORDER CONFIRMATION – CO11n

SAP ECC menu Logistics → Production → Shop Floor Control →

Confirmation  → Enter → For Operation

Transaction code CO11N

Page 102: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 102/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 102 of 118

 As we would be Confirming the Order Operation Wise we can go for Time-Ticket Confirmation.

Enter the Order No. and the Operation which you want to confirm and Click on ACTUAL. DATA

to get the Existing Data which has come along with the Production Order. Here you

need to enter the ACTUAL Data which you have got through Production as the same will not be copied.

Page 103: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 103/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 103 of 118

Check for any System Messages which appear in the Status Bar.

Now the material has been posted to QA for Quality Inspection. GR for the order needs to be done

manually.

Page 104: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 104/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 104 of 118

14.7 GOODS RECEIPT OF REWORK ORDER – MB31

NOTE: Goods Receipt for a REWORK Order has to be done manually. Auto GR is not possible.

Now, here enter the following:

Movement Type: 101

Order No. would be the parent Production Order , 1000123

Plant : 100

Storage Location : FG01

SAP ECC menu Logistics → Production → Shop Floor Control → Goods

Movement   → Goods Receipt 

Transaction code MB31

Page 105: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 105/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 105 of 118

 After entering select the item No.1

Click on

 And SAVE. You can see the Document No.

Page 106: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 106/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 106 of 118

You can go back to the Order 1000123 and see that all the 300 Nos. have been delivered.

Components are now posted to QA, which can be checked through MMBE

Hereafter the QA Cycle can be followed Index Point No. 11 to clear the Production Order.

Page 107: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 107/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 107 of 118

15. MRP – FOR PLANNED ORDER + PURCHASE REQUISITION

So far we have seen MRP being run to generate PLANNED ORDER further to generate Production

Order to be run in Production environment. Now here we would see the MRP to be run to generate

Planned order as well as Purchase Requisition by a Single MRP Run through MD02.

MD02 is used to run MRP for a particular Material. This run would be for just one material , single item ,

multi level ( will explode whole BOM for particular material ).

SAP ECC menu Logistics → Production → MRP → Planning  → Total 

Planning→ Single Item, Multi Level 

Transaction code MD02

Page 108: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 108/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 108 of 118

Here we take another Material as an Example.

FERT Material: TEST-FG12

Requirement in MD61 : 35 Qty.

First we check the existing Stock for TEST-FG12 through MD04.

Page 109: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 109/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 109 of 118

Enter the following details:

1. Enter Material Name

2. Enter Plant

3. Select Processing Key

Specifies the type of MRP run. The following types are possible:

net change planning: NETCH

net change planning in the planning horizon : NETPL

online regenerative planning : NEUPL

4. Create Planned Order / Purchase Requisitions (In case of BOP)

5. Delivery Schedules: Whether To Create or No

6. Create MRP List

7. Planning Mode & Scheduling

 Above details are shown in the image above. ENTER to run the MRP.

 An MRP List will be now generated.

Page 110: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 110/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 110 of 118

Now we go back to MD04 to check the Stock.

We can see that NO STOCK is available to Manufacture the FERT, shown as “0” in Available Qty. in

BLUE colour.

Click on the Eye Glass to get the new Dialogue Box.

Now click on to see the Order Report.

Page 111: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 111/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 111 of 118

Here you can see the Components which are contained in that FERT. And can Browse through, by

Double Clicking on the components to check the availability and the List below will show the latest

Stock position for that particular component.

Say we Click on IT-ROH03 (ROH material, whose Purchase Requisition is to be created).

Page 112: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 112/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 112 of 118

Here the one shown in RED Box, is the Planned Order which can be converted to Purchase

Requisition.

Click on Eye Glass.

Click on PUR. REQ. in the new dialogue Box. It will take you to Convert Planned order to Purchase

Requisition : Details Screen.

Here you can related information details such as, Storage Location (say ST01) and SAVE it. You will

get a Confirmation Message.

Page 113: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 113/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 113 of 118

REFRESH the list. Now you can see the List has been updated as shown in the RED BOXES below.

Further more, a PURCHASE ORDER can be created through PURCHASE REQUISITION. If release

Strategy has been set for Purchase Requisitions, the PR needs to be released before it is converted to

Purchase Order. This activity would be done by Purchase Dept. personnel.

Page 114: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 114/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 114 of 118

16. CO-PRODUCT SCENARIO

Products that are usually manufactured together can be produced using one production order.

The main product is the primary reason for the production process. It is displayed in the production

order header. The system also creates a separate order item for the main product.

 A co-product is a product that is produced in conjunction with other products. The system creates a

separate order item in the production order for each co-product. As a result, it is possible to display

actual costs at co-product level.

Creating a production order to manufacture co-products has the following advantages:

Main product and co-product(s) are settled to different receivers

Goods movements can be posted simultaneously for all products manufactured in the order.

Pre-Requisities

The following prerequisites must be fulfilled if you want to create a production order with co-products or 

by-products.

Prerequisite for the main product:

The indicator Co-product must be activated in the material master of the main product (MRP area)

Prerequisites for a co-product:

The indicator Co-product must be activated in the material master of the co-product (MRP area)

The co-product must be listed as an item in the bill of material of the main product with a

negative value.

On the Basic data tab page of the BOM item, the indicator Co-product must be activated in the

field group General data.

Example:

Say we have a Family Mould with 2 Family Components viz

1. TEST-COP01

2. TEST-COP02

Now say we want to take the Production of these 2 Family FERT’s.

Page 115: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 115/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 115 of 118

Say we consider the Header / Main Product is TEST-COP01 we create a Production Order for this

Header Material.

BOM For TEST-COP01 would be as seen below.

Highlighted in Red is the Famiyl Component with –ve (negative) Quantity.

When we check the Production Order it would show it as follows.

NOTE: GR for such an Order for a Co-Product scenario has to be done MANUALLY by MB31.

 Also, whatever the Rejection / Scrap which is going to get posted will be of the Main Product whose

Production Order is being made.

Page 116: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 116/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 116 of 118

To Summarize:

1. A co-product is a product that is produced in conjunction with other products. The systemcreates a separate order item in the production order for each co-product. As a result, it is

possible to display actual costs at co-product level.

2. The main product is the primary reason for the production process. It is displayed in the

production order header. The system also creates a separate order item for the main product.

3. The indicator Co-product must be activated in the material master of the main product (MRP 2)

as well as the Co-Product.

4. The co-product must be listed as an item in the bill of material of the main product with negative

Qty.

5. On the Basic data tab page of the BOM item, the indicator Co-product must be activated in the

field group General data.

6. Production Order would be of the Main Product, hence also the Confirmation and scrapping

would be of the Main Product Only.

7. Production Qty mentioned in the Production Order, say Qty. 10 means 10 Qty. of Co-Product 1,

and 10 Qty. of Co-Product 2.

8. Raw Material qty. to be issued would be the qty. required to product both the co-products.

9. In Production Order you need to maintain the settlement Rule in pull down menu i.e. Header ->

Settlement Rule

10. You cannot post Auto-GR for Co-Products. You have to follow Manual GR by MB31 101 Movt.

11. If you want to scrap co-product do the following steps.

Confirm all the qty as yield qty in . ( ok + scrap)

Do goods receipt for main product & co-product (total qty).

Physically you know the how much rejected qty. Move that qty from accepted str 

location to rejection str location by using MB1B 311 mvt.

Now yield qty will reduce.

Check in MB51 with mvt type 311 with corresponding period, you came to know how

much quantities are rejected.

By 551 mvt materials scrap that rejected qty.

12. But if you want the Sell the scrap, then follow the following steps:

a. Confirm all the qty as yield qty ( ok + scrap)

b. Do goods receipt for main product & co-product (total qty).

c. Scrap the Material to a Scrap material, say SCRAP-MATERIAL through QA32 (QM).

Page 117: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 117/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

Page 117 of 118

Suppose you have a Co-Product scenario for LH & RH of a particular FERT.

In this case you want to run only a few nos. of Cavity of RH keeping the nos. of cavities of LH runningas it is. In that case follow the below mentioned procedure.

Most important of all you need to maintain the Base Qty. relation of the 2 co-products.

Say for 4 Components of LH you want only 2 Components of RH. Here you need to maintain in BOM of 

LH the following:

Select the Co-product with negative value (i.e. RH) and double click on Item No. to enter detail

information

Page 118: 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

7/30/2019 78626741-Ste-by-Step-Sap-Pp-User-Manual 1.pdf

http://slidepdf.com/reader/full/78626741-ste-by-step-sap-pp-user-manual-1pdf 118/118

Organization Sujan Barre Thomas Anti-Vibration Systems Pvt. Ltd., Thane

Project “VISION”

Document END USER MANUAL Version 1

Module Production Planning (PP)

 After entering, on the Basic Data Screen, maintain the negative Qty. as 0.50 –

Now you can go ahead and create the production order.