    1.- NOMBRE DEL PROYECTO SANEAMIENTO BASICO GORAMARCA 2.- SECTOR SISTEMA PRINCIPAL3.- DISTRITO SANTA MARIA DEL VALLE4.- PROVINCIA HU NUCO

    A .- POBLACION ACTUAL 98.00 FAM 321 Hab.B .- TASA DE CRECIMIENTO (%) 1.70 %C.- PERIODO DE DISE O (A OS) 20 AosD.- POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 430.14 Hab.E.- DOTACION (LT/HAB/DIA) 80 Lt/Hab/DiaF.- CONSUMO PROMEDIO ANUAL (LT/SEG) Qp= Pob. x Dot./86,400 0.398 Lt/SegG.- CONSUMO MAXIMO DIARIO LT/SEG Qm d= 1.30 x Q 0.518 Lt/SegH.- CAUDAL DE LA FUENTE (LT/SEG) 1.100 Lt/Seg TIPO DE FUENTE TIPO DE MANANTE NUMERO DE MANANTESI.- VOLUMEN DEL RESERVORIO (M3) V= 0.25 x Qp x 86400/1000 8.60 m3

    A UTILIZAR : 16.00 m3J.- CONSUMO MAXIMO HORARIO (LT/SEG) Qmh= 2 x Qp 0.797 Lt/Seg

    TIERRA COMPACTA = TC TIERRA COMPA CTA ROCA SUEL TA = TC-RS ROCA SUELTA = RS TIERRA COMPA CTA ROCA FIJ A = TC-RF ROCA FIJA = RF ROCA SUEL TA -ROCA FIJ A = RS-RF

    LINEA DE CONDUCCION

    ELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTADINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDA

    CAPT1 2,996.00 2,996.00 2,996.00CAPT CDC 2,962.00 0.145 0.518 TC 234.48 0.74 1 1/2 0.45 1.10 2,994.90 32.90 2,994.90CAPT CDC 2,962.00 2,962.00 2,962.00

    0.145 KmsK.- CAUDA L UNITARIO(LT/SEG) Nro. Familias 131.14

    Qu(Lts/Seg): 0.0061

    CALCULOS PARA REDES DE AGUA POTABLE

    MANANTELADERA

    2.00

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    3/19

    1.- NOMBRE DEL PROYECTO SANEAMIENTO BASICO GORAMARCA 2.- SECTOR SISTEMA PRINCIPAL A3.- DISTRITO SANTA MARIA DEL VALLE4.- PROVINCIA HU NUCO

    A .- POBLACION ACTUAL 60.00 FAM 197 Hab.B .- TASA DE CRECIMIENTO (%) 1.70 %C.- PERIODO DE DISE O (A OS) 20 AosD.- POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 263.71 Hab.E.- DOTACION (LT/HAB/DIA) 80 Lt/Hab/DiaF.- CONSUMO PROMEDIO ANUAL (LT/SEG) Qp = Pob. x Dot./86,400 0.244 Lt/SegG.- CONSUMO MAXIMO DIARIO LT/SEG Q m d = 1.30 x Q 0.317 Lt/SegH.- CAUDAL DE LA FUENTE (LT/SEG) 1.100 Lt/Seg TIPO DE FUENTE TIPO DE MANANTE NUMERO DE MANANTESI.- VOLUMEN DEL RESERVORIO (M3) V= 0.25 x Qp x 86400/1000 5.27 m3

    A UTILIZAR : 9.00 m3J.- CONSUMO MAXIMO HORARIO (LT/SEG) Qm h= 2 x Qp 0.488 Lt/Seg

    TIERRA COMPACTA = TC TIERRA COMPA CTA ROCA SUEL TA = TC-RS ROCA SUELTA = RS TIERRA COMPA CTA ROCA FIJ A = TC-RF ROCA FIJA = RF ROCA SUEL TA -ROCA FIJ A = RS-RF

    LINEA DE CONDUCCION

    ELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTADINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDA

    CAPT1 2,996.00 2,996.00 2,996.00CAPT CDC 2,962.00 0.145 0.317 TC 234.48 0.62 1 1/2 0.28 0.44 2,995.56 33.56 2,995.56CAPT CDC 2,962.00 2,962.00 2,962.00CDC 1 2,930.00 0.190 0.317 TC 168.42 0.66 1 1/2 0.28 0.58 2,961.42 31.42 2,961.42CDC 1 2,930.00 2,930.00 2,930.00

    0.335 KmsK.- CAUDAL UNITARIO(LT/SEG) Nro. Familias 52.74

    Qu(Lts/Seg): 0.0093

    CALCULOS PARA REDES DE AGUA POTAB LE

    MANANTELADERA

    2.00

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    4/19

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    5/19

    1.- NOMBRE DEL PROYECTO SANEAMIENTO BASICO GORAMARCA 2.- SECTOR SISTEMA RESERVORIO 23.- DISTRITO SANTA MARIA DEL VALLE4.- PROVINCIA HU NUCO

    A .- POBLACION ACTUAL 10.00 FAM 33 Hab.B .- TASA DE CRECIMIENTO (%) 1.70 %C. - PERIODO DE DISEO (AOS) 20 AosD. - POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 43.95 Hab.E. - DOTACION (LT/HAB/DIA) 80 Lt/Hab/DiaF. - CONSUMO PROMEDIO ANUAL (LT/SEG) Qp = Pob. x Dot./86,400 0.041 Lt/SegG.- CONSUMO MAXIMO DIARIO (LT/SEG) Q m d = 1.30 x Qp 0.053 Lt/SegH. - CAUDAL DE LA FUENTE (LT/SEG) 1.100 Lt/Seg TIPO DE FUENTE TIPO DE MANANTE NUMERO DE MANANTESI.- VOLUMEN DEL RESERVORIO (M3) V= 0.25 x Qp x 86400/1000 0.88 m3

    A UTILIZAR : 2.00 m3J.- CONSUMO MAXIMO HORARIO (LT/SEG) Q mh = 2 x Qp 0.081 Lt/Seg

    TIERRA COMPA CTA = TC TIERRA COMPA CTA ROCA SUEL TA = TC-RS ROCA SUELTA = RS TIERRA COMPA CTA ROCA FIJ A = TC-RF ROCA FIJA = RF ROCA SUELTA -ROCA FIJ A = RS-RF

    LINEA DE CONDUCCION

    ELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTADINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDA

    CAPT1 2,996.00 2,996.00 2,996.00CAPT CDC 2,962.00 0.145 0.053 TC 234.48 0.31 1 1/2 0.05 0.02 2,995.98 33.98 2,995.98CAPT CDC 2,962.00 2,962.00 2,962.00CDC 1 2,930.00 0.190 0.053 TC 168.42 0.33 1 1/2 0.05 0.02 2,961.98 31.98 2,961.98CDC 1 2,930.00 2,930.00 2,930.00

    CDC 2 2,870.00 0.215 0.053 TC 279.07 0.30 1 0.10 0.17 2,929.83 59.83 2,929.83CDC 2 2,870.00 2,870.00 2,870.00Reserv. 2 2,828.00 0.107 0.053 TC 953.27 0.23 1 0.10 0.09 2,869.91 41.91 2,869.91Reserv. 2 2,828.00 2,828.00 2,828.00

    0.657 KmsK.- CAUDAL UNITARIO(LT/SEG) Nro. Familias 13.40

    Qu(Lts/Seg): 0.0061

    RED DE DISTRIBUCIONELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTA

    DINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDAReserv. 2 2,828.00 2,828.00 2,828.00B 2,823.00 0.029 0.061 TC 172.41 0.35 1 0.12 0.03 2,827.97 4.97 2,827.97Viv. 19 2,818.00 0.060 0.006 TC 166.17 0.15 1/2 0.05 0.03 2,827.94 9.94 2,827.97C 2,811.00 0.065 0.055 TC 261.08 0.31 1 0.11 0.06 2,827.91 16.91 2,827.91Viv. 17 2,812.00 0.100 0.024 TC 159.15 0.25 3/4 0.09 0.08 2,827.84 15.84 2,827.84Viv. 16 2,805.00 0.046 0.012 TC 496.47 0.15 1/2 0.10 0.07 2,827.77 22.77 2,827.91Viv. 11 2,798.00 0.135 0.018 TC 221.59 0.21 3/4 0.06 0.06 2,827.85 29.85 2,827.85Viv. 9 2,786.00 0.082 0.012 TC 510.41 0.15 1/2 0.10 0.13 2,827.73 41.73 2,827.73Viv. 15 2,776.00 0.027 0.006 TC 1,915.83 0.09 1/2 0.05 0.01 2,827.72 51.72 2,827.72

    CALCULOS PARA REDES DE AGUA POTABL E

    MANANTELADERA

    2.00

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    6/19

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    7/19

    1.- NOMB RE DEL PROYECTO SANEAMIENTO BASICO GORAMARCA 2.- SECTOR SISTEMA RESERVORIO 43.- DISTRITO SANTA MARIA DEL VALLE4.- PROVINCIA HU NUCO

    A .- POBLACION ACTUAL 21.00 FAM 69 Hab.B .- TASA DE CRECIMIENTO % 1.70 %C. - PERIODO DE DISEO (AOS) 20 AosD. - POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 92.30 Hab.E. - DOTACION (LT/HAB/DIA) 80 Lt/Hab/DiaF. - CONSUMO PROMEDIO ANUAL (LT/SEG) Qp = Pob. x Dot./86,400 0.085 Lt/SegG. - CONSUMO MAXIMO DIARIO (LT/SEG) Q m d = 1.30 x Qp 0.111 Lt/SegH. - CAUDAL DE LA FUENTE (LT/SEG) 1.100 Lt/Seg TIPO DE FUENTE TIPO DE MANANTE NUMERO DE MANANTESI.- VOLUMEN DEL RESERVORIO (M3) V= 0.25 x Qp x 86400/1000 1.85 m3

    A UTILIZAR : 3.00 m3J.- CONSUMO MAXIMO HORARIO (LT/SEG) Q mh = 2 x Qp 0.171 Lt/Seg

    TIERRA COMPA CTA = TC TIERRA COMPA CTA ROCA SUEL TA = TC-RS ROCA SUELTA = RS TIERRA COMPA CTA ROCA FIJ A = TC-RF ROCA FIJA = RF ROCA SUEL TA -ROCA FIJ A = RS-RF

    LINEA DE CONDUCCION

    ELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTADINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDA

    CAPT1 2,996.00 2,996.00 2,996.00CAPT CDC 2,962.00 0.145 0.111 TC 234.48 0.41 1 1/2 0.10 0.06 2,995.94 33.94 2,995.94CAPT CDC 2,962.00 2,962.00 2,962.00CDC 1 2,930.00 0.190 0.111 TC 168.42 0.44 1 1/2 0.10 0.08 2,961.92 31.92 2,961.92CDC 1 2,930.00 2,930.00 2,930.00

    CDC 3 2,874.00 0.350 0.111 TC 160.00 0.45 1 0.22 1.11 2,928.89 54.89 2,928.89CDC 3 2,874.00 2,874.00 2,874.00Reserv. 4 2,807.00 0.015 0.111 TC 4,466.67 0.23 1 0.22 0.05 2,873.95 66.95 2,873.95Reserv. 4 2,807.00 2,807.00 2,807.00

    0.700 KmsK.- CAUDAL UNITARIO(LT/SEG) Nro. Familias 28.14

    Qu(Lts/Seg): 0.0061

    RED DE DISTRIBUCIONELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTA

    DINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDAReserv. 4 2,870.00 2,870.00 2,870.00

    Viv. 31 2,857.00 0.045 0.128 TC 288.89 0.42 1 0.25 0.18 2,869.82 12.82 2,869.82Viv. 30 2,850.00 0.030 0.012 TC 660.55 0.14 1/2 0.10 0.05 2,869.77 19.77 2,869.82Viv. 90 2,850.00 0.040 0.043 TC 495.41 0.25 1 0.08 0.02 2,869.79 19.79 2,869.79Viv. 68 2,822.00 0.160 0.012 TC 298.72 0.17 1/2 0.10 0.25 2,869.55 47.55 2,869.79Viv. 59 2,842.00 0.025 0.012 TC 1,111.80 0.13 1/2 0.10 0.04 2,869.76 27.76 2,869.82Viv. 28 2,854.00 0.050 0.061 TC 316.33 0.31 1 0.12 0.05 2,869.76 15.76 2,869.76Viv. 27 2,836.00 0.050 0.006 TC 675.29 0.11 1/2 0.05 0.02 2,869.74 33.74 2,869.76Viv. 12 2,840.00 0.150 0.049 TC 198.43 0.31 1 0.10 0.10 2,869.66 29.66 2,869.66Pase 2,830.00 0.027 0.030 TC 1,468.96 0.17 3/4 0.11 0.03 2,869.63 39.63 2,869.63Viv. 14 2,830.00 0.055 0.012 TC 720.56 0.14 1/2 0.10 0.08 2,869.55 39.55 2,869.63Viv. 25 2,830.00 0.025 0.012 TC 1,585.22 0.12 1/2 0.10 0.04 2,869.59 39.59 2,869.59

    CALCULOS PARA REDES DE AGUA POTABLE

    MANANTELADERA

    2.00

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    8/19

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    9/19

    1.- NOMBRE DEL PROYECTO SANEAMIENTO BASICO GORAMARCA 2.- SECTOR SISTEMA PRINCIPAL B3.- DISTRITO SANTA MARIA DEL VALLE4.- PRO VINCIA HU NUCO

    A.- POBLACION ACTUAL 38.00 FAM 125 Hab.B.- TASA DE CRECIMIENTO (%) 1.70 %C.- PERIODO DE DISE O (A OS) 20 AosD.- POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 167.02 Hab.E.- DOTACION (LT/HAB/DIA) 80 Lt/Hab/DiaF.- CONSUMO PROMEDIO ANUAL (LT/SEG) Qp = Pob. x Dot./86,400 0.155 Lt/SegG.- CONSUMO MAXIMO DIARIO (LT/SEG) Qm d= 1.30 x Qp 0.201 Lt/SegH.- CAUDAL DE LA FUENTE (LT/SEG) 1.100 Lt/Seg TIPO DE FUENTE TIPO DE MANANTE NUMERO DE MANANTESI.- VOLUMEN DEL RESERVORIO (M3) V= 0.25 x Qp x 86400/1000 3.34 m3

    A UTILIZAR : 7.00 m3J.- CONSUMO MAXIMO HORARIO (LT/SEG) Qmh= 2 x Qp 0.309 Lt/Seg

    TIERRA COMPACTA = TC TIERRA COMPA CTA ROCA SUEL TA = TC-RS ROCA SUELTA = RS TIERRA COMPA CTA ROCA FIJ A = TC-RF ROCA FIJA = RF ROCA SUEL TA -ROCA FIJ A = RS-RF

    LINEA DE CONDUCCION

    ELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTADINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDA

    CAPT1 2,996.00 2,996.00 2,996.00CAPT CDC 2,962.00 0.145 0.201 TC 234.48 0.52 1 1/2 0.18 0.19 2,995.81 33.81 2,995.81CAPT CDC 2,962.00 2,962.00 2,962.00CDC 4 2,932.00 0.700 0.201 TC 42.86 0.73 1 0.40 6.63 2,955.37 23.37 2,955.37CDC 4 2,932.00 2,932.00 2,932.00

    0.845 KmsK.- CAUDAL UNITARIO(LT/SEG) Nro. Familias 50.92

    Qu(Lts/Seg): 0.0061

    CALCULOS PARA REDES DE AGUA POTAB LE

    MANANTELADERA

    2.00

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    10/19

    1.- NOMBRE DEL PROYECTO SANEAMIENTO BASICO GORAMARCA 2.- SECTOR SISTEMA RESERVORIO 63.- DISTRITO SANTA MARIA DEL VALLE4.- PROVINCIA HU NUCO

    A .- POBLACION ACTUAL 16.00 FAM 52 Hab.B .- TASA DE CRECIMIENTO (%) 1.70 %C. - PERIODO DE DISE O (A OS) 20 AosD. - POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 70.32 Hab.E. - DOTACION (LT/HAB/DIA) 80 Lt/Hab/DiaF. - CONSUMO PROMEDIO ANUAL (LT/SEG) Qp = Pob. x Dot./86,400 0.065 Lt/SegG. - CONSUMO MAXIMO DIARIO (LT/SEG) Q md = 1.30 x Qp 0.085 Lt/SegH. - CAUDAL DE LA FUENTE (LT/SEG) 1.100 Lt/Seg TIPO DE FUENTE TIPO DE MANANTE NUMERO DE MANANTESI.- VOLUMEN DEL RESERVORIO (M3) V= 0.25 x Qp x 86400/1000 1.41 m3

    A UTILIZAR : 3.00 m3J.- CONSUMO MAXIMO HORARIO (LT/SEG) Qmh= 2 x Qp 0.130 Lt/Seg

    TIERRA COMPA CTA = TC TIERRA COMPA CTA ROCA SUEL TA = TC-RS ROCA SUELTA = RS TIERRA COMPA CTA ROCA FIJ A = TC-RF ROCA FIJA = RF ROCA SUELTA -ROCA FIJ A = RS-RF

    LINEA DE CONDUCCION

    ELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTADINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDA

    CAPT1 2,996.00 2,996.00 2,996.00CAPT CDC 2,962.00 0.145 0.085 TC 234.48 0.37 1 1/2 0.07 0.04 2,995.96 33.96 2,995.96CAPT CDC 2,962.00 2,962.00 2,962.00CDC 4 2,932.00 0.700 0.085 TC 42.86 0.53 1 0.17 1.34 2,960.66 28.66 2,960.66CDC 4 2,932.00 2,932.00 2,932.00

    Reserv. 6 2,930.00 0.090 0.085 TC 22.22 0.60 1 0.17 0.17 2,931.83 1.83 2,931.83Reserv. 6 2,930.00 2,930.00 2,930.00

    0.935 KmsK.- CAUDA L UNITARIO(LT/SEG) Nro. Familias 21.44

    Qu(Lts/Seg): 0.0061

    RED DE DISTRIBUCIONELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTA

    DINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDAReserv. 6 2,930.00 2,930.00 2,930.00Viv. 37 2,920.00 0.033 0.097 TC 303.03 0.37 1 0.19 0.08 2,929.92 9.92 2,929.92Pase 2,873.00 0.090 0.030 TC 632.43 0.21 1 0.06 0.03 2,929.89 56.89 2,929.89Viv. 35 2,872.00 0.080 0.018 TC 723.66 0.16 3/4 0.06 0.04 2,929.86 57.86 2,929.86Viv. 34 2,868.00 0.106 0.012 TC 583.55 0.15 1/2 0.10 0.16 2,929.69 61.69 2,929.92Pase 2,904.00 0.170 0.061 TC 152.46 0.36 1 0.12 0.18 2,929.74 25.74 2,929.74Viv. 97 2,910.00 0.040 0.036 TC 493.57 0.23 1 0.07 0.02 2,929.73 19.73 2,929.74Viv. 40 2,862.00 0.200 0.018 TC 338.71 0.19 3/4 0.06 0.09 2,929.65 67.65 2,929.65Viv. 43 2,860.00 0.110 0.012 TC 633.20 0.15 1/2 0.10 0.17 2,929.48 69.48 2,929.48

    CALCULOS PARA REDES DE AGUA POTABLE

    MANANTELADERA

    2.00

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    11/19

    1.- NOMB RE DEL PROYECTO SANEAMIENTO BASICO GORAMARCA 2.- SECTOR SISTEMA RESERVORIO 73.- DISTRITO SANTA MARIA DEL VALLE4.- PROVINCIA HU NUCO

    A .- POBLACION ACTUAL 11.00 FAM 36 Hab.B .- TASA DE CRECIMIENTO (%) 1.70 %C. - PERIODO DE DISEO (AOS) 20 AosD. - POBLACION FUTURA Pf = Po 1+ r x t/100 48.35 Hab.E. - DOTACION (LT/HAB/DIA) 80 Lt/Hab/DiaF. - CONSUMO PROMEDIO ANUAL (LT/SEG) Qp = Pob. x Dot./86,400 0.045 Lt/SegG.- CONSUMO MAXIMO DIARIO (LT/SEG) Q m d = 1.30 x Qp 0.058 Lt/SegH. - CAUDAL DE LA FUENTE (LT/SEG) 1.100 Lt/Seg TIPO DE FUENTE TIPO DE MANANTE NUMERO DE MANANTESI.- VOLUMEN DEL RESERVORIO (M3) V= 0.25 x Qp x 86400/1000 0.97 m3

    A UTILIZAR : 2.00 m3J.- CONSUMO MAXIMO HORARIO (LT/SEG) Q mh = 2 x Qp 0.090 Lt/Seg

    TIERRA COMPACTA = TC TIERRA COMPA CTA ROCA SUELTA = TC-RS ROCA SUELTA = RS TIERRA COMPA CTA ROCA FIJ A = TC-RF ROCA FIJA = RF ROCA SUELTA -ROCA FIJA = RS-RF

    LINEA DE CONDUCCION

    ELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTADINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDA

    CAPT1 2,996.00 2,996.00 2,996.00CAPT CDC 2,962.00 0.145 0.058 TC 234.48 0.32 1 1/2 0.05 0.02 2,995.98 33.98 2,995.98CAPT CDC 2,962.00 2,962.00 2,962.00CDC 4 2,932.00 0.700 0.058 TC 42.86 0.46 1 0.11 0.67 2,961.33 29.33 2,961.33CDC 4 2,932.00 2,932.00 2,932.00CDC 5 2,870.00 0.460 0.058 TC 134.78 0.36 1 0.11 0.44 2,931.56 61.56 2,931.56CDC 5 2,870.00 2,870.00 2,870.00Reserv. 7 2,848.00 0.115 0.058 TC 191.30 0.34 1 0.11 0.11 2,869.89 21.89 2,869.89Reserv. 7 2,848.00 2,848.00 2,848.00

    1.420 KmsK.- CAUDAL UNITARIO(LT/SEG) Nro. Familias 14.74

    Qu(Lts/Seg): 0.0061

    RED DE DISTRIBUCIONELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTA

    DINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDAReserv. 7 2,848.00 2,848.00 2,848.00

    Viv. 52 2,836.00 0.075 0.067 TC 160.00 0.37 1 0.13 0.09 2,847.91 11.91 2,847.91Viv. 39 2,816.00 0.095 0.018 TC 335.87 0.19 1/2 0.14 0.31 2,847.60 31.60 2,847.60Viv. 49 2,790.00 0.175 0.006 TC 329.13 0.13 1/2 0.05 0.07 2,847.52 57.52 2,847.91Viv. 53 2,836.00 0.090 0.006 TC 132.31 0.15 1/2 0.05 0.04 2,847.87 11.87 2,847.91Viv. 51 2,804.00 0.127 0.055 TC 345.73 0.29 1 0.11 0.11 2,847.80 43.80 2,847.80Viv. 42 2,790.00 0.172 0.012 TC 336.04 0.17 1/2 0.10 0.26 2,847.53 57.53 2,847.53Viv. 56 2,767.00 0.123 0.006 TC 654.75 0.11 1/2 0.05 0.05 2,847.48 80.48 2,847.80Viv. 50 2,798.00 0.050 0.030 TC 995.99 0.19 1 0.06 0.01 2,847.79 49.79 2,847.79Viv. 50 ramal 2,794.00 0.020 0.006 TC 2,689.25 0.08 1/2 0.05 0.01 2,847.78 53.78 2,847.79Viv. 63 2,774.00 0.030 0.018 TC 2,459.50 0.13 1/2 0.14 0.10 2,847.69 73.69 2,847.69Viv. 81 2,780.00 0.056 0.012 TC 1,208.70 0.13 1/2 0.10 0.09 2,847.60 67.60 2,847.69Viv. 65 2,774.00 0.025 0.006 TC 2,947.49 0.08 1/2 0.05 0.01 2,847.68 73.68 2,847.68

    CALCULOS PARA REDES DE AGUA POTABL E

    MANANTELADERA

    2.00

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    12/19

    1.- NOMBRE DEL PROYECTO SANEAMIENTO BASICO GORAMARCA 2.- SECTOR SISTEMA RESERVORIO 83.- DISTRITO SANTA MARIA DEL VALLE4.- PROVINCIA HU NUCO

    A .- POBLACION ACTUAL 10.00 FAM 33 Hab.B .- TASA DE CRECIMIENTO (%) 1.70 %C. - PERIODO DE DISE O (A OS) 20 AosD. - POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 43.95 Hab.E. - DOTACION (LT/HAB/DIA) 80 Lt/Hab/DiaF. - CONSUMO PROMEDIO ANUAL (LT/SEG) Qp = Pob. x Dot./86,400 0.041 Lt/SegG.- CONSUMO MAXIMO DIARIO (LT/SEG) Q m d = 1.30 x Qp 0.053 Lt/SegH. - CAUDAL DE LA FUENTE (LT/SEG) 1.100 Lt/Seg TIPO DE FUENTE TIPO DE MANANTE NUMERO DE MANANTESI.- VOLUMEN DEL RESERVORIO (M3) V= 0.25 x Qp x 86400/1000 0.88 m3

    A UTILIZAR : 2.00 m3J.- CONSUMO MAXIMO HORARIO (LT/SEG) Q mh = 2 x Qp 0.081 Lt/Seg

    TIERRA COMPACTA = TC TIERRA COMPA CTA ROCA SUEL TA = TC-RS ROCA SUELTA = RS TIERRA COMPA CTA ROCA FIJ A = TC-RF ROCA FIJA = RF ROCA SUELTA -ROCA FIJ A = RS-RF

    LINEA DE CONDUCCION

    ELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTADINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDA

    CAPT1 2,996.00 2,996.00 2,996.00CAPT CDC 2,962.00 0.145 0.053 TC 234.48 0.31 1 1/2 0.05 0.02 2,995.98 33.98 2,995.98CAPT CDC 2,962.00 2,962.00 2,962.00CDC 4 2,932.00 0.700 0.053 TC 42.86 0.44 1 0.10 0.56 2,961.44 29.44 2,961.44CDC 4 2,932.00 2,932.00 2,932.00

    CDC 5 2,870.00 0.460 0.053 TC 134.78 0.35 1 0.10 0.37 2,931.63 61.63 2,931.63CDC 5 2,870.00 2,870.00 2,870.00CRP 6 (2) 2,820.00 0.270 0.053 TC 185.19 0.33 1 0.10 0.22 2,869.78 49.78 2,869.78CRP 6 (2) 2,820.00 2,820.00 2,820.00Reserv. 8 2,758.00 0.310 0.053 TC 200.00 0.32 1 0.10 0.25 2,819.75 61.75 2,819.75Reserv. 8 2,758.00 2,758.00 2,758.00

    1.575 KmsK.- CAUDAL UNITARIO(LT/SEG) Nro. Familias 13.40

    Qu(Lts/Seg): 0.0061

    RED DE DISTRIBUCIONELEMENTO NIVEL LONGITUD Q DEL TIPO PENDIENTES DIAMETRO DIAMETRO VELOC. Hf ALTURA PRESION COTA

    DINAMICO (KM) TRAMO SUELO (PULG.) COMERCIAL FLUJO PIEZOMET. PIEZO.SALIDAReserv. 8 2,758.00 2,758.00 2,758.00E 2,754.00 0.020 0.061 TC 200.00 0.34 1 0.12 0.02 2,757.98 3.98 2,757.98E1 2,751.00 0.098 0.043 TC 71.22 0.37 1 0.08 0.05 2,757.93 6.93 2,757.93Viv. 58 2,750.00 0.160 0.012 TC 49.54 0.24 1/2 0.10 0.25 2,757.68 7.68 2,757.93Viv. 74 2,726.00 0.077 0.024 TC 414.64 0.21 3/4 0.09 0.06 2,757.87 31.87 2,757.87Viv. 75 2,686.00 0.163 0.012 TC 440.91 0.16 1/2 0.10 0.25 2,757.62 71.62 2,757.87Viv. 73 2,726.00 0.080 0.018 TC 398.34 0.19 1/2 0.14 0.26 2,757.61 31.61 2,757.61Viv. 80 2,710.00 0.131 0.012 TC 363.41 0.16 1/2 0.10 0.20 2,757.40 47.40 2,757.98Viv. 76 2,716.00 0.160 0.006 TC 262.37 0.13 1/2 0.05 0.07 2,757.91 41.91 2,757.91

    CALCULOS PARA REDES DE AGUA POTABLE

    MANANTELADERA

    2.00

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    13/19

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    14/19

    Item Descripcin Und. Metrado Precio S/. Parcial S/.

    01 PRE INVERSION

    01.01 COSTO ELABORACION DE PERFIL TECNICO und 500.00 0.00

    01.02 COSTO ELABORACION DE EXPEDIENTE TECNICO ( 80 fam) und 2,500.00 0.00

    02 CAPTACION

    02.01 CAPTACION CIEGA LC=1/2" (Q

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    15/19

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    16/19

    04.05 RESERVORIO FERROCEMENTO DE 1.50 M3 LC=1 1/2"-1" (INCLUYE CAMARA DE VALVULAS) und 1,269.07 0.00

    04.06 RESERVORIO FERROCEMENTO DE 1.5 M3 LC=1"-1" (INCLUYE CMARA DE VLVULAS) und 1,191.72 0.00

    04.07 RESERVORIO FERROCEMENTO DE 1.50 M3 LC=1"-3/4" (INCLUYE CAMARA DE VALVULAS) und 1,182.02 0.00

    04.08 RESERVORIO FERROCEMENTO DE 1.50 M3 LC=3/4"-3/4" (INCLUYE CAMARA DE VALVULAS) und 1,307.55 0.00

    04.09 RESERVORIO FERROCEMENTO DE 2.50 M3 (NO INCLUYE CAMARA DE VALVULAS) und 1,391.89 0.00

    04.10 RESERVORIO FERROCEMENTO DE 3.00 M3 (NO INCLUYE CAMARA DE VALVULAS) und 1,449.48 0.00

    04.11 RESERVORIO FERROCEMENTO DE 5.00 M3 (NO INCLUYE CAMARA DE VALVULAS) und 1,788.84 0.00

    04.12 RESERVORIO FERROCEMENTO DE 7.50 M3 (NO INCLUYE CAMARA DE VALVULAS) und 2,262.35 0.00

    04.13 RESERVORIO FERROCEMENTO DE 10.00 M3 (NO INCLUYE CAMARA DE VALVULAS) und 3,022.72 0.00

    04.14 RESERVORIO FERROCEMENTO DE 15.00 M3 (NO INCLUYE CAMARA DE VALVULAS) und 4,297.81 0.00

    04.15 CAMARA DE VALVULAS FERROCEMENTO 1 1/2" - 2" und 1,130.11 0.00

    04.16 CAMARA DE VALVULAS FERROCEMENTO 1 1/2"-1 1/2" und 1,013.71 0.00

    04.17 CAMARA DE VALVULAS FERROCEMENTO 1 1/2"-1" und 983.81 0.00

    04.18 CAMARA DE VALVULAS FERROCEMENTO 1"-1" und 811.76 0.0004.19 CAMARA DE VALVULAS FERROCEMENTO 1"-3/4" und 712.06 0.00

    04.20 CAMARA DE VALVULAS FERROCEMENTO 3/4"-3/4" und 592.42 0.00

    04.21 EQUIPO HIPOCLORADOR : SUMINISTRO E INSTALACION und 83.25 0.00

    04.22 EQUIPO FLOTADOR PARA RESERVORIO LC=3/4" und 191.48 0.00

    04.23 EQUIPO FLOTADOR PARA RESERVORIO LC=1" und 192.98 0.00

    04.24 EQUIPO FLOTADOR PARA RESERVORIO LC=1 1/2" und 210.28 0.00

    05 LINEA DE DISTRIBUCION

    05.01 TRAZO-REPLANT,EXCAV.TIERRA,RELLENO-COMPACT,ELIM.MAT.EXCEDENT ML 1.93 0.00

    05.02 TRAZO-REPLANT,EXCAV.ROCA SUELTA,RELLENO-COMPACT,ELIM.MATERIA ML 9.19 0.00

    05.03 RED DIST.: SUMINISTRO E INSTALACION TUB. PVC-SAP C=7.5 2" ML 5.85 0.00

    05.04 RED DIST.:SUMINISTRO E INSTALACION TUB. PVC-SAP C=7.5 1 1/2" ML 4.09 0.00

    05.05 RED DIST.:SUMINISTRO E INSTALACION TUB. PVC-SAP C=10 1 1/2" ML 4.77 0.00

    05.06 RED DIST.:SUMINISTRO E INSTALACION TUB. PVC-SAP C=10 1" ML 2.97 0.00

    05.07 RED DIST.:SUMINISTRO E INSTALACION TUB. PVC-SAP C=10 3/4" ML 2.46 0.00

    05.08 RED DIST.:SUMINISTRO E INSTALACION TUB. PVC-SAP C=10 1/2" ML 2.02 0.00

    05.09 RED DIST.:SUMINISTRO E INSTALACION TUB. F.G. 2" ML 31.63 0.00

    05.10 RED DIST.:SUMINISTRO E INSTALACION TUB. F.G. 1 1/2" ML 21.75 0.00

    05.11 RED DIST.:SUMINISTRO E INSTALACION TUB. F.G. 1" ML 14.63 0.00

    05.12 RED DIST.:SUMINISTRO E INSTALACION TUB. F.G. 3/4" ML 10.45 0.00

    05.13 RED DIST.:SUMINISTRO E INSTALACION TUB. F.G. 1/2" ML 8.24 0.00

    05.14 PASE AEREO : TUBERIA F.G. 1/2" CON DADOS L

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    17/19

    05.26 PASE AEREO TUBERIA F.G. 1" CON COLUMNAS Y CABLE L=15-25 ml (Plano 5B) ML 107.09 0.00

    05.27 PASE AEREO TUBERIA F.G. 1 1/2" CON COLUMNAS Y CABLE L=25-35 ml (Plano 5B) ML 93.38 0.00

    05.28 PASE AEREO TUBERIA F.G. 1 " CON COLUMNAS Y CABLE L=25-35 ml (Plano 5B) ML 85.25 0.00

    05.29 PASE AEREO TUBERIA F.G. 1 " CON COLUMNAS Y CABLE L=35-45 ml (Plano 5B) ML 69.76 0.00

    05.30 PASE AEREO TUBERIA F.G. 3/4 " CON COLUMNAS Y CABLE L=15-25 ml (Plano 5B) ML 103.27 0.00

    05.31 PASE AEREO TUBERIA F.G. 3/4 " CON COLUMNAS Y CABLE L=25-35 ml (Plano 5B) ML 81.77 0.00

    05.32 PASE AEREO TUBERIA F.G. 3/4 " CON COLUMNAS Y CABLE L=35-45 ml (Plano 5B) ML 71.34 0.00

    05.33 PASE AEREO TUBERIA F.G. 1/2 " CON COLUMNAS Y CABLE L=15-25 ml (Plano 5B) ML 100.53 0.00

    05.34 PASE AEREO TUBERIA F.G. 1/2 " CON COLUMNAS Y CABLE L=25-35 ml (Plano 5B) ML 79.21 0.00

    05.35 PASE AEREO TUBERIA F.G. 1/2 " CON COLUMNAS Y CABLE L=35-45 ml (Plano 5B) ML 75.25 0.00

    05.36 VALVULA DE PASO 2" (INC.CAMARA DE CONCRETO Y TAPA METAL) und 329.23 0.00

    05.37 VALVULA DE PASO 1 1/2"(INC.CAMARA DE CONCRETO Y TAPA METAL) und 270.84 0.00

    05.38 VALVULA DE PASO 1" (INC.CAMARA DE CONCRETO Y TAPA METAL) und 208.23 0.00

    05.39 VALVULA DE PASO 3/4" (INC.CAMARA DE CONCRETO Y TAPA MET.) und 198.29 0.0005.40 VALVULA DE PURGA + ACCESORIOS 1 1/2"(INC.SUMIN. E INSTALAC.) jgo 290.04 0.00

    05.41 VALVULA DE PURGA + ACCESORIOS 1" (INC.SUMIN. E INSTALAC.) jgo 227.84 0.00

    05.42 VALVULA DE PURGA + ACCESORIOS 3/4" (INC.SUMIN. E INSTALAC.) jgo 217.90 0.00

    05.43 VALVULA DE PURGA + ACCESORIOS 1/2" (INC.CAMARA DE CONCRETO Y TAPA MET.) und 169.46 0.00

    05.44 REDUCCION SP PVC-SAP 2" A 1 1/2" (INC.SUMIN.E INSTALAC.) und 7.64 0.00

    05.45 REDUCCION SP PVC-SAP 1 1/2" A 1" (INC.SUMIN.E INSTALAC.) und 6.04 0.00

    05.46 REDUCCION SP PVC-SAP 1" A 3/4" (INC.SUMIN.E INSTALAC.) und 4.64 0.00

    05.47 REDUCCION SP PVC-SAP 3/4" A 1/2" (INC.SUMIN.E INSTALAC.) und 4.90 0.00

    05.48 REDUCCION SP PVC-SAP 1 1/2" A 1/2" (INC.SUMIN.E INSTALAC.) und 6.04 0.00

    05.49 REDUCCION SP PVC-SAP 1 1/2" A 3/4" (INC.SUMIN.E INSTALAC.) und 6.04 0.00

    05.50 REDUCCION SP PVC-SAP 1" A 1/2"(INC.SUMIN.E INSTALAC.) und 4.90 0.00

    05.51 TEE SP PVC-SAP 2" (INC.SUMIN.E INSTALAC.) und 11.64 0.00

    05.52 TEE SP PVC-SAP 1 1/2" (INC.SUMIN.E INSTALAC.) und 8.14 0.00

    05.53 TEE SP PVC-SAP 1" (INC.SUMIN.E INSTALAC.) und 6.24 0.00

    05.54 TEE SP PVC-SAP 3/4" (INC.SUMIN.E INSTALAC.) und 5.50 0.00

    05.55 TEE SP PVC-SAP 1/2" (INC.SUMIN.E INSTALAC.) und 4.64 0.00

    05.56 CODO SP PVC-SAP 2"X90 (INC.SUMIN.E INSTALAC.) und 9.04 0.00

    05.57 CODO SP PVC-SAP 2"X45 (INC.SUMIN.E INSTALAC.) und 8.14 0.00

    05.58 CODO SP PVC-SAP 1 1/2"X90 (INC.SUMIN.E INSTALAC.) und 7.44 0.00

    05.59 CODO SP PVC-SAP 1 1/2"X45 (INC.SUMIN.E INSTALAC.) und 6.64 0.00

    05.60 CODO SP PVC-SAP 1"X90 (INC.SUMIN.E INSTALAC.) und 5.31 0.00

    05.61 CODO SP PVC-SAP 1"X45 (INC.SUMIN.E INSTALAC.) und 5.44 0.00

    05.62 CODO SP PVC-SAP 3/4"X45 (INC.SUMIN.E INSTALAC.) und 5.30 0.00

    05.63 CODO SP PVC-SAP 3/4"X90 (INC.SUMIN.E INSTALAC.) und 4.76 0.00

    05.64 CODO SP PVC-SAP 1/2"X45 (INC.SUMIN.E INSTALAC.) und 4.70 0.00

    05.65 CODO SP PVC-SAP 1/2"X90 (INC.SUMIN.E INSTALAC.) und 4.65 0.00

    05.66 TAPON SP HEMBRA PVC-SAP 2"(INC.SUMIN.E INSTALAC.) und 7.54 0.00

    05.67 TAPON SP HEMBRA PVC-SAP 1 1/2"(INC.SUMIN.E INSTALAC.) und 6.64 0.00

    05.68 TAPON SP HEMBRA PVC-SAP 1"(INC.SUMIN.E INSTALAC.) und 4.84 0.00

    05.69 TAPON SP HEMBRA PVC-SAP 3/4"(INC.SUMIN.E INSTALAC.) und 4.54 0.00

    05.70 TAPON SP HEMBRA PVC-SAP 1/2"(INC.SUMIN.E INSTALAC.) und 4.24 0.00

    06 CONEXION DOMICILIARIA

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    18/19

  • 8/12/2019 6.- Calculo Agua Potable Goramarca

    19/19

    1.- NOMBRE DEL PROYECTO: SANEAMIENTO BSICO RAC CHICANCHA Y GORAMARCA

    2.- SECTOR: RACC HICANCHA Y GORAMARCA

    3.- DISTRITO: SANTA MA RA DEL VAL LE

    4.- PROVINCIA: HUNUCO

    Item Descripcin Und. Metrado01 PRE INVERSION01.01 COSTO ELABORACION DE EXPEDIENTE TECNICO und 1.0002 CAPTACION02.01 CAPTACION LADERA L.C.=1" c/v (Q=-0.25 - 1.2 LTS) und 2.0002.02 DEMOLICIN DE CAPTACION LADERA L.C.=1" und 1.0002.03 CAPTACION LADERA L.C.=1" Con CDC SALIDA 1" Y 1 1/2" c/v (Q=-0.25 - 1.2 LTS) und 1.0002.04 PROTECCIN DE MANANTES (ALAMBRE CON PUAS) ML 60.0003 LINEA DE CONDUCCION03.01 TRAZO Y REPLANTEO, EXCAV. EN TIERRA, RELLENO Y COMPACTACION ML 4119.0003.02 LIN.CONDUCCION: SUM. E INST. DE TUB. PVC-SAP C=7.5 1 1/2" ML 575.0003.03 LIN.CONDUCCION: SUM. E INST. DE TUB. PVC-SAP C=10 1" ML 2619.0003.04 LIN.CONDUCCION: SUM. E INST. DE TUB. PVC-SAP C=10 3/4" ML 57.00

    03.05 LIN.CONDUCCION: SUM. E INST. DE TUB. PVC-SAP C=10 1/2" ML 770.0003.06 LIN.CONDUCCION: SUM. E INST. DE TUB. FG 1/2" ML 25.0003.07 PASE AEREO DE 1" con cable ML 25.0003.07 PASE CARRETERA FG 1" ML 48.0003.08 VALVULA DE AIRE 1" UND 1.0003.08 VALVULA DE PASO Y ACCESORIOS DE 1/2" UND 1.0005.16 CODO SP PVC-SAP 1 1/2"X45 (INC.SUMIN.E INSTALAC.) und 4.0005.16 CODO SP PVC-SAP 1"X45 (INC.SUMIN.E INSTALAC.) und 38.0005.16 CODO SP PVC-SAP 1"X90 (INC.SUMIN.E INSTALAC.) und 3.0003.09 CAM.ROMPEPRESIONES EN LINEA DE CONDUCCION L.C.=1 "(PLANO 3A) und 3.0003.10 CAMARA DIST. DE CAUDALES (PLANO 04A) LC=1 1/2" Salida 1", 1" y 1" und 1.0003.10 CAMARA DIST. DE CAUDALES (PLANO 04A) LC=1 1/2" Salida 3/4" y 1" und 1.00

    03.10 CAMARA DIST. DE CAUDALES (PLANO 04A) LC=1" Salida 1" y 1" und 4.0004 RESERVORIO04.01 RESERVORIO CONCRETO ARMADO DE 1.00 M3 Ing y Sal 1" (CAMARA DE VALVUL und 2.0004.03 RESERVORIO CONCRETO ARMADO DE 1.00 M3 Ing y Sal 3/4" (CAMARA DE VALV und 1.0004.03 RESERVORIO CONCRETO ARMADO DE 2.00 M3 Ing y Sal 1" (CAMARA DE VALVUL und 4.0004.03 RESERVORIO CONCRETO ARMADO DE 3.00 M3 Ing y Sal 1" (NO INC CAM VALV) und 2.0004.02 RESERVORIO CONCRETO ARMADO DE 5.00 M3 (NO INCLUYE CAMARA DE VALV und 1.0004.04 CAMARA DE VALVULAS 1"-1" und 3.0004.05 EQUIPO HIPOCLORADOR : SUMINISTRO E INSTALACION und 10.0002.02 PROTECCIN DE RESERVORIO (ALAMBRE CON PUAS) ML 160.0005 LINEA DE DISTRIBUCION05.01 TRAZO-REPLANT,EXCAV.TIERRA,RELLENO-COMPACT,ELIM.MAT.EXCEDENT ML 7740.00

    05.02 RED DIST.:SUMINISTRO E INSTALACION TUB. PVC-SAP C=10 1" ML 1867.0005.03 RED DIST.:SUMINISTRO E INSTALACION TUB. PVC-SAP C=10 3/4" ML 1856.0005.04 RED DIST.:SUMINISTRO E INSTALACION TUB. PVC-SAP C=10 1/2" ML 4017.0005.05 PASE EN CARRETERA DE FOGO 1" CON DADOS DE CONCRETO ML 36.0005.05 PASE EN CARRETERA DE FOGO 3/4" CON DADOS DE CONCRETO ML 18.0005.06 PASE EN CARRETERA DE FOGO 1/2" CON DADOS DE CONCRETO ML 55.0005.07 PASE AREO DE FOGO 3/4" ML 12.0005.08 VALVULA DE PASO 1" (INC.CAMARA DE CONCRETO Y TAPA METAL) und 5.0005.09 VALVULA DE PASO 3/4" (INC.CAMARA DE CONCRETO Y TAPA METAL) und 11.0005.10 VALVULA DE PASO 1/2" (INC.CAMARA DE CONCRETO Y TAPA METAL) und 2.0005.11 REDUCCION SP PVC-SAP 1" A 3/4" (INC.SUMIN.E INSTALAC.) und 8.0005.12 REDUCCION SP PVC-SAP 3/4" A 1/2" (INC.SUMIN.E INSTALAC.) und 4.00

    05.13 REDUCCION SP PVC-SAP 1" A 1/2"(INC.SUMIN.E INSTALAC.) und 3.0005.14 TEE SP PVC-SAP 1" (INC.SUMIN.E INSTALAC.) und 12.0005.15 TEE SP PVC-SAP 3/4" (INC.SUMIN.E INSTALAC.) und 3.0005.16 CODO SP PVC-SAP 1"X45 (INC.SUMIN.E INSTALAC.) und 14.0005.17 CODO SP PVC-SAP 1"X90 (INC.SUMIN.E INSTALAC.) und 8.0005.18 CODO SP PVC-SAP 3/4"X45 (INC.SUMIN.E INSTALAC.) und 24.0005.19 CODO SP PVC-SAP 1/2"X45 (INC.SUMIN.E INSTALAC.) und 19.0006 CONEXION DOMICILIARIA06.01 CONEX.DOMICIL.: VALVULA ESFERICA 1/2"(TUB.MATRIZ 1") PLANO 9F pto 54.0006.02 CONEX.DOMICIL.: VALVULA ESFERICA 1/2"(TUB.MATRIZ 3/4") PLANO 9F pto 24.0006.03 CONEX. DOMICIL.: VALVULA ESFERICA 1/2''(MATRIZ 1/2'') PLANO 9F pto 48.0007 PILETAS Y LETRINAS

    07.01 PILETA DOMICILIARIA TIPO 1 (PLANO 9A) und 126.0007.02 BAO CON ARRASTRE HIDRULICO (LOSA TURCA) und 126.0008 TRANSPORTE08.01 TRANSPORTE MATERIAL INDUSTRIALIZADO HUANUCO - OBRA GLB 1.0008.02 TRANSPORTE MATERIAL PETREO DESDE CANTERAS A OBRA GLB 1.0009 CARTEL PLACA HERRAMIENTAS Y EQUIPO09.01 CARTEL DE OBRA und 2.0009.02 PLACA INAUGURACION und 2.0009.03 EQUIPO TOPOGRAFICO OBR 2.0009.04 PAQUETE DE HERRAMIENTAS jgo 2.0010.00 MITIGACIN IMPACTO AMBIENTAL10.01 MITIGACIN IMPACTOS AMBIENTALES und 2.00

    METRADO CONSOLIDADO