5s and safety - acid loop - work place imporvements... · 3 roadmap## master!plan!for! 5s...

54
1 5S – for workplace improvement Outline Understanding 5S Benefits of adop<ng 5S How to adopt 5S at our company Check lists and audits Preparing a master plan Safety

Upload: ngocong

Post on 16-May-2018

227 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

1

5S  –  for  workplace  improvement  

Outline  n  Understanding  5S  n  Benefits  of  adop<ng  5S  n  How  to  adopt  5S  at  our  company  n  Check  lists  and  audits  n  Preparing  a  master  plan  n  Safety  

Page 2: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

2

What  is  5S  n  A  systema<zed  approach  to  organized  workplace,  keeping  rules  and  standards,  and  maintaining  the  discipline  needed  for  an  excellent  opera<on  

n  5S  is  a  methodology  developed  by  the  Japanese  for  achieving  a  visual,  safe,  pleasant,  and  produc<ve  workplace  

n  Each  “S”  represents  a  Japanese  word  that  describes  the  basic  but  very  important  aspects  of  this  universal  approach  –  the  five  pillars  

n  These  5  pillars  “carry”  the  improvement  ac<vi<es  forward  

What  is  5S?  1S-SEIRI 2S-SEITON

3S-SEISO 4S-SEIKETSU

5S-SHITSHUKE

Sorting out

Self Discipline

A place for everything and every thing in its place

Standardized Cleanliness

Page 3: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

3

Roadmap    

Master  plan  for  5S  1S:  Elimina4ng  Unnecessary  Items  2S:  Fixing  Storage  Places  

3S:  Consolida4ng  Cleaning  Procedures  4S:  Maintaining  A  Spotless  Workplace  5S:  Visual  Control  in  the  Workplace  

Understanding  5S,  management  commitment,  5S  Pilot  Area  Selec4on  

Objec<ves  of  5S  

VISUAL WORKPLACE

SAFE WORKPLACE

PRODUCTIVE WORKPLACE

STANDARDIZED WORKPLACE

A PLEASANT WORKPLACE

Page 4: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

4

Pleasant  workplace?  

What  appears  to  be  the  problem?  

“Normal”  behaviour  People  leave  trash  People  tolerate  it  No  one  stops  to  pick  it  up  

Page 5: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

5

“Normal”  behaviour  People  leave  trash  Some  do  not  tolerate  it  ,  pick  it  up  

Desirable  behaviour  People  do  not  leave  trash  People  do  not  tolerate  it  Everyone  picks  it  up  

Page 6: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

6

Common  workplace  issues  

Unorganized workplace

Dirty / Unsafe areas

Crowded work areas

A  general  factory  

Page 7: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

7

The  approach  (overview)  n  Step by step! n  Overview of the plant

¨ In large or medium companies – select pilot area ¨ Focus on the critical areas ¨ Take photos (Before and After album)

n  Create in house team – few motivated persons n  Define areas and responsible persons n  Run specific campaigns and monitor results n  Show case success, motivate the remaining persons

Key  1:    Seiri  (Sor<ng  out)  

Dis<nguishing  between  what  is  needed    and  what  is  not  needed  

 Eliminate  what  is  not  needed  

 

Page 8: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

8

Movie  clip  

But  how  to  do  Seiri?  

Use   Throw  

When in doubt – throw it out!

Page 9: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

9

n Differen<ate  the  necessary  and  the  unnecessary  ¨  Mark  the  unnecessary  items  with  a  “red  tag”    

n  Ask  4  ques<ons  ¨  Is  this  item  needed  for  our  current  work/produc<on  ?  ¨  In  what  quan<ty  ?  (we  do  not  need  too  many)  

¨ Where  should  it  be  located  ?  (if  seldom  used,  move  to  warehouse)  ¨  Is  this  item  func<oning  properly  and  safe  ?  (if  not,  replace)  

n Dispose  of  the  unnecessary  ¨  Use  a  “red  tag  holding  area”  for  items  you  are  unsure  of  or  can  not  dispose  of  

immediately  

1S:  Sort  –  steps  to  follow  

Red  Tag  Technique  n  Using  a  red  tag  to  determine  what  is  s<ll  needed  and  

what  is  not,  e.g.  red  tag  anything  that  is  not  needed  for  the  next  3  to  6  months  

n  Communicate  this  informa<on  to  everyone  who  will  be  involved  in  the  exercise  

n  Set-­‐up  a  temporary  Red  Tag  Holding  Area  n  Aaach  Red  Tags  to  all  unneeded  items.  n  Remove  all  items  and  store  in  the  holding  area.  n  Sort  thru  unneeded  items  and  dispose  of  them  (those  

that  are  truly  unneeded)  n  Con<nue  Red  Tagging  Regularly  

Page 10: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

10

Red  Tag  Technique  

Red  Tag  Technique  1.  STARTING  POINT  

PARTICIPANTS:                                Manufacturing/Materials/Management  

PERIOD:    1  –  2  months  

OBJECTIVE:    Ensure  workers  never  hide    unnecessary  items    

Page 11: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

11

Red  Tag  Technique  2.  DISTINGUISHING  RED  TAG  ITEMS  

STOCK:    Raw  Materials/Parts/Products  

FACILITIES:    Machines/Equipment/Jigs  and  Tools/  Molds/Carts/Desks  

SPACES:    Floor/Shelves/Storage    

Red  Tag  Technique  3.  FIXING  RED  TAG  STANDARDS  

Clarify  standards  for  unnecessary  items:  

e.g.:  “No  Tag”  for  items  to  be  used  within  the  next  month;  “Tag  On”  for  items  not  to  be  used  within  the  next  month.    

Page 12: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

12

Red  Tag  Technique  4.  DESIGN  OF  RED  TAGS  

•  A4  or  A5  Size  Red  Paper  

•  Include  name  of  item,  quan4ty,  reasons,  etc.  

Red  Tag  Technique  5.  ATTACHING  RED  TAGS  

•  Don’t  let  people  directly  concerned  a^ach  them.  

•  Listen  to  no  excuses.  

•  Be  strict  about  it.  

•  A^ach  tags  to  any  doub_ul  item.  

•  The  number  of  tags  indicate  checking  efficiency  and  not  failure.  

Page 13: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

13

Red  Tag  Technique  6.  DEALING  WITH  RED  TAG  ITEMS  AND  EVALUATION  

STOCK:  List  unnecessary  stock  by  dividing  them  as    dead  stock  and  sleeping  stock.  

EQUIPMENT:  Move  or  reject  any  items  which  hinder  the    implementa4on  of  5S  ac4vi4es.    

Red  Tag  (Sort)  Checkpoints  n  STOCK:    Raw  Materials,  Parts,  Work-­‐In-­‐Progress,  

         Component  Parts,  Finished  Products.  

n  FACILITIES:    Machines,  Equipment,  Jigs,  Tools,              Cuhng  Tools,  Molds,  Fihngs,  Carts,  

Pallets,  Liis,  Working          Tables,  Vehicles,  Desks,  Chairs.  

n  LOCATIONS:    Floors,  Shelves,  Rooms.  n  DOCUMENTS:  No<ces,  Circulars,  Minutes,  Office  

           Reports,  Drais,  Quota<ons,  Memos,              Numerical  Data.  

n  MACHINES:    Copy  Machines,  Personal  Computers,              Printers,  Fax  Machines,  Shredders.    

Page 14: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

14

Deciding  the  Standards  for  Red  Tags  

•  “It’s  wasteful  to  throw  things  away!”  

•  “It  was  so  much  trouble  for  me  to  make  these  things!”  

•  “We  might  possibly  use  these  later!”  

•  “Shouldn’t  workers  place  the  red  tags?”   NO!  

Red  Tag  (Sort)  Checkpoints  •  PERSON  RESPONSIBLE:    

Raw  Materials,  Parts,  Work-­‐In-­‐Progress,  Component  Parts,  Finished  Products.    

•  ATTACHMENT  PERIODS:    1  to  2  Days,  as  necessary.    

•  ATTITUDE:    -­‐   Workers  will  believe  everything  is  necessary!  -­‐   Look  at  situa<on  with  a  very  cri<cal  ahtude  -­‐   Be  a  Red  Tag  advocate!        

Page 15: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

15

Sort  Stra<fica<on  Table  Degree  of  Need  

Frequency  of  Use   Storage    Method  

LOW

• have not been used in the past year • have only been used once in the last 6-

12 months

• throw them out! • Store at a distance

AVERAGE

• have only used once in the last 2-6 months

• used more than once a month

• store in a central location

HIGH

• used once a week • used everyday • used hourly

• store near the workplace

Date:Machine :

1

2

3

4

5

6

7

8

9

10

11

12 13

14

15

16

17

18

19

20

4. Stores3. Scrap Yard/ Dust BinMETHODS OF DISPOSAL

1. Red Tag Area 2. Useful for others

Area :

REMARK

Hi-Tech Gears Ltd. Master List - 1S

S.NO ITEMS METHOD OF DISPOSALUNNECESSARY ()NECESSARY ()

Operator Name:

DISTINGUISH BETWEEN WHAT IS AND IS NOT NEEDED

Page 16: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

16

Quan<fying  benefits  of  1S  

n  Weight of material removed n  Occupied area recovered n  Blocked money recovered etc. These should be captured out both at zone level as well as company level

Quan4fy  the  benefits  gain  out  of  1S  ac4vi4es  in  terms  of  

The  factory  aier  1S  

Page 17: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

17

Key  2:    Seiton  (Systema<c  Arrangement)  

"A Place For Everything and Everything In Its Place"

But  how  does  it  help?  

MR.DOUBT

Page 18: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

18

2S  –  Seiton  Count these stars Now count these stars

What  is  Seiton?  n  It  is  an  ac<on  to  put  every  necessary  items  in  good  order  n  A  ra<onal,  orderly  and  methodical  arrangement  of  all  items  we  use,  re-­‐work,  store  

n  Done  with  the  objec<ve  of  minimising  search  <me  

Page 19: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

19

What  is  Seiton?  n  It  is  an  ac<on  to  put  every  necessary  items  in  good  order  n  A  ra<onal,  orderly  and  methodical  arrangement  of  all  items  we  use,  re-­‐work,  store  

n  Done  with  the  objec<ve  of  minimising  search  <me  

2S  helps  make  work  …  n  Search  free  n  Count  free  n  Air  free  n  Climb  free  n  Bend  free  And  helps  achieve  n  First  In  First  Out  n  Safety  à  avoid  accidents,  mix-­‐up  …  

Page 20: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

20

2S  helps  make  work  …  n  Search free

How  to  do  Seiton?  n  Use  ra<onal  layout  of  machines,  equipment  and  cabinets  n  Place  frequently  use  items  at  point  of  use  

Frequency of use

Hourly, daily, weekly

Weekly, monthly

Quarterly

Storage place

Close to machine

In work place, but away from machine

In store area

Page 21: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

21

How  to  do  Seiton?  n  Use rational layout of machines, equipment and cabinets n  Place frequently use items at point of use n  Pre-fix a place for everything and place everything in its

place with pre-determined quantity n  Use labels and colour codes to identify items n  Use index for files, records and drawings n  Plan storage to retrieve with ease n  Separate mixed up items in cabinets and organise them

to be self explanatory through identification aids n  Establish visual controls for checking missing items

Page 22: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

22

4  signs  of  good  Signs  2S  1.  LOCATION  :    Outline,  Arrows,  Separators  2.  IDENTITY    :  Descrip<on  -­‐  “What  is  it?”  3.  QUANTITY  :  How  many  should  be  here  4.  INSTRUCTION  :    What  do  you  want  me  to  do  

Examples  of  Visual  Controls  n  Transparent  windows  n  Colour  coding  n  Labels  n  Posi<on  markers  n  OK  marks  n  Transparent  space  markers  n  What  is  where  chart  n  Who  is  where  chart  n  Inspec<on  labels  n  How  much  of  what  (chart)  n  Warning  lights  

Page 23: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

23

Bolts

4 Pallets

1000x4

1 - PROVIDE LOCATION

2 - PROVIDE IDENTIFICATION / NAME BOARD

3 - PROVIDE INSTRUCTIONS

4 Pallets

1000x4

Bolts Delivery Time: 9.00 AM

Daily

Seiton  workplace  example  

Page 24: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

24

Seiton  workplace  example  

Seiton  workplace  example  

Page 25: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

25

Seiton  workplace  example  

A  good  example  (?)  

Page 26: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

26

What  is  needed,  in  reach,  ready  for  use    

Everything has a dedicated Home

Page 27: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

27

Example  –  improvement  in  parts  storage  

Before After

Example  –  2S  at  work  palce  These tools are stored where they are needed

Lines on floor indicate location

Page 28: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

28

Example  –  spare  part  storage  

ID card indicates •  photo of part •  part name •  maximum number •  minimum number •  order point •  part price

Before 2S After 2S

Note how many parts are unnecessary

Example  –  arranging  lubrica<on  materials   Before After

Arrange items for easy access, and minimal search time

Page 29: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

29

The  factory  aier  2S  

Key  3:    Seiso  (Cleanliness)  

“Cleaning Is Inspection"

Page 30: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

30

What  does  it  mean?  n  Keeping  everything  swept  and  clean  n  Understanding  how  to  prevent  things  from  gehng  dirty  and  ensuring  best  condi<ons  

n  Done  with  the  objec<ve  of  inspec<ng  for  problems  and  taking  quick  correc<ve  ac<on  

How  to  do  3S?  n  Elimina<ng  all  forms  of  dirt  n  Finding  ways  to  keep  the  workplace  clean  n  Adop<ng  cleaning  as  a  form  of  inspec<on  n  Making  cleaning  part  of  everyday  work  

Page 31: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

31

The  Shine  concept  

•  Clean to Inspect •  Inspect to Detect •  Detect to Correct •  Correct to Perfect

Three  phrases  of  Shine  

n  Daily Shine: Making things clean ¨  Sweep, mop, and wipe floors, walkways, and shelves ¨  Scrub away grit and dirt that has become caked onto oily

equipment surfaces

n  Shine Inspections: Using your senses ¨  Pay close attention not only to the main section of each machine

but also to its moving parts and drive chain ¨  Check for proper amounts of oil, air, ventilation, etc.

n  Shine Maintenance: Making improvements ¨  If the operator is able to quickly fix or improve the slight defect, this

should be considered part of the operator’s Shine Inspection duties ¨  If the operator finds it difficult to fix or improve the defect quickly, he

should seek help

Page 32: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

32

3S  example  

A clean work area promotes safety

Before After

The  factory  aier  3S  

Page 33: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

33

Key  4:  Seiketsu  (Standardize)  

• Check • Standardize • Maintain • Monitor • Improve

What? •  Rules of Placement of Materials •  Work Procedure •  Set up Procedure •  Tool Change Procedure •  Daily, Weekly and Monthly PM •  Displays •  FML, Control Charts

What  does  Standardise  mean?  

n  Maintain  and  monitor  the  first  three  keys  n  Standardized  Clean-­‐up,  the  4th  Key,  differs  from  Sort,  Store,  and  Shine  ¨  because  it  refers  not  to  an  ac<vity  but  to  a  standardized  state  or  condi<on  at  

a  certain  point  in  <me  ¨  Specifically,  we  may  define  it  as  “the  state  that  exists  when  the  first  3  keys  

are  properly  maintained  n  Standardizing  achieves  a  state  of  cleanliness  which  allows  you  to  immediately  tell  the  difference  between  normality  and  abnormality  

Page 34: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

34

How  to  proceed?  n  Develop  a  standard  opera<ng  procedure  for  all  ac<vi<es  n  Implement  5W1H  

¨ Who  is  responsible  for  the  task?  ¨ What  equipment,  tools,  or  materials  are  necessary?  ¨ Where  will  the  ac<vity  take  place?  ¨ How  will  the  ac<vity  be  implemented?  ¨ Why  is  the  ac<vity  necessary?  ¨ When  will  the  ac<vity  be  done?  

Examples  of  work  standard  

Page 35: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

35

The  factory  aier  4S  

Key  5:  Shitshuke  (Self-­‐Discipline)  

Monitor and Follow Daily Work Management

Page 36: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

36

What  does  it  mean?  n  A  condi<on  where  all  employees  prac<ce  the  4S  spontaneously  and  willingly  as  a  way  of  life  (culture)  

How  to  proceed?  n  Conduct  periodic  audits  /  site  patrols  n  Provide  training  n  Give  recogni<on  and  incen<ves  n  Always  measure  the  benefits  of  5S  

Page 37: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

37

The  factory  aier  5S  

Check  lists  and  audits  

Page 38: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

38

Check  lists  and  audits  

(for 1S maximum 1 week and for the 2S maximum 1~2 months). All zonal teams should abide with this master plan

1S~2S  Master  Plan    S. No

Activities

Responsibility

First Month Second Month

1 Division of factory premises into various zones using location map / layout

2 Formation of Zonal Team with Zone Leader

3 1S ~ 2S Awareness Program

4 Preparation of Master Plan

5 Go to LOCATIONS

6 Asses items available in the location

7 Decision on Requirement and actions

8 Step – 1 Audit

10 Allocation of space for items

11 Marking of the space with label

12 Keeping items in respective location

13 Arrive at simple Visual Arrangements to know Quantity.

14 Step – 2 Audit Plan Plan and Actual

Page 39: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

39

1S~2S  Zone  Mapping    1.  Divide the whole plant into maximum 9 Zones including office area..

P4

Zone - 1Mould shop

Zone - 2Tool Room and Die

Maintenance

Zone - 5LPDC shop

Zone - 6GDC shop

Zone - 3Receipt Store

Zone - 4Maintenance and Utility

Zone - 7Office

Zone - 7Office

Zone - 8Machine Shop

Zone - 9Road and Premises

Mr.2

Mr. Mould Shop1

Mr.4

Mr. 3

Zone MembersZone LeaderZone DescriptionZone No.1S ~ 2S Zone Details

Mr.2

Mr. Mould Shop1

Mr.4

Mr. 3

Zone MembersZone LeaderZone DescriptionZone No.1S ~ 2S Zone Details

Mr.2

Mr. Mould Shop1

Mr.4

Mr. 3

Zone MembersZone LeaderZone DescriptionZone No.1S ~ 2S Zone Details

Mr.2

Mr. Mould Shop1

Mr.4

Mr. 3

Zone MembersZone LeaderZone DescriptionZone No.1S ~ 2S Zone Details

1S~2S Activity Flow S. No

Phase Activities Time Result

1 Preparation 1 Division of factory premises into various zones using location map / layout

1 Day Clarity to understand What, where, when, which, who and how 2 Formation of Zonal Team with Zone Leader 1 Day

3 Preparation of Master Plan 3 Day

2 1S Activity Implementation

1 Go to LOCATIONS Max 6 Days

1) Lot of Unwanted Material moved out 2) More Space created 3) Clarity in the surroundings 4) Recovery of money

2 Asses items available in the location

3 Decision on Requirement and action Max 30 days A) Required B) Not Required C) Not able to

take decision

3a.1 Classify Runner, Repeater & Stranger items and arrive at systems for only required items

3b.1 Check with others for need

3b.2 Needed by others à Handover

3b.3 Not Needed by others à Move to scrap yard

3c.1 Move the Material to Red Tag area

3c.2 Take Decision with Z’Leader/other Z’Leaders

3c.3 Required by others à Handover

3c.4 Not Required à Move to scrap yard

Page 40: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

40

Safety – basic aspects

Why?      

n Objec<ves  &  Benefits  ¨ Reduce  workplace  injuries  and  illnesses  ¨ Minimise  risk  to  employees  and  others  ¨ Improve  business  performance  ¨ Compliance  with  legisla<on  ¨ Improve  working  condi<ons  for  workers    ¨ Improve  staff  morale  

Page 41: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

41

Unsafe  Act    on  the  part  of  persons                    88  %  

Unsafe  mechanical  /  Physical  condi4on    

10  %        

Natural  calami4es   2  %    

98  %  OF  THE  ACCIDENTS    CAN  BE  PREVENTED.  

 

 

   

 

Preventable   Accidents,   if  not   prevented   due   to   our  negligence,   it   is   nothing  short  of  a  murder.  

Page 42: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

42

Social    environ  

Fault  of  person  

Unsafe  condi4on  

Accident   Injury  

Heinrich‘s   theory   is   also   called   the   “Domino  Theory”    If  one  is  removed  the  injury  does  not  occur  

Page 43: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

43

Unsafe  Act  

A  devia<on  from  accepted  norm  or  correct  procedure   or   prac<ce,   which   has   a  poten<al  to  cause  accident.  

An  unsafe  act  may  be    an  act  of  commission  (doing  something  which  is  unsafe)  

or    

an   act   of   omission   (failing   to   do   something  that  should  have  been  done).  

Page 44: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

44

Any   physical   condi<on   which   deviates  from   accepted   norm   or   prac<ce   and  has  the  poten<al  to  cause  accident  

Unsafe  Condi4on  

*Any   physical   state   which   results   in  reduc4on   in   the   degree   of   safety  normally  present.    *It   should   be   noted   that   accidents   are  invariably  preceded  by  Unsafe  Acts  and/or  Unsafe  Condi4ons  .  

Page 45: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

45

Opera<onal  Control  n  Equipment  Controls  

¨ Equipment  and  Process  Design  ¨ Workplace  &  Equipment  layout  ¨ Equipment  &  Facili<es  Maintenance  ¨ Safety  Equipment  

n Machine  Safeguards  n  Alarm  /  warning  systems  n  Ven<la<on  n  Personal  protec<on  equipment  

Opera<onal  Control  Guards  

Interlocked

Self-Adjusting

Adjustable

Fixed

Page 46: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

46

Opera<onal  Control  Devices  

Pullback Gate

Restraint

Two-Hand Control

Opera<onal  Control  n  Personal  Protec<ve  Equipment  

¨ Hard  hats,  caps  &  hair  nets  ¨ Safety  boots  &  foot  guards  ¨ Face  shields  ¨ Safety  goggles  &  glasses  ¨ Hearing  protec<on  ¨ Protec<ve  gloves  ¨ Protec<ve  jackets  &  vests  ¨ Respirators  

Page 47: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

47

Personal Protection Equipment is used by each employee to protect himself against dangers during work.

Personal Protection Equipment

Good example

Bad examples

13

Dealing with chemicals used in metal finishing industry

Hygenic issues Food must be stored in a manner, that they cannot get in contact with chemicals.

Bad Examples Bad Examples

41

Page 48: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

48

Thank  you  for  your  aaen<on!  

Page 49: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

49

Reference  material  –  for  1S  and  2S  

Before After

Shop/Office:

1S Improvement Sheet Zone:

Location/Machine: Date: Name:

Problem/Present Status: Countermeasure:

Benefit:

Take photograph of the locations from a position clearly capturing the occupied area and situation. (Before)

Take photograph of the locations from the same position clearly capturing the new look of the area and situation (After)

Page 50: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

50

2S Improvement Sheet Zone:

Location/Machine:

Before After

Problem/Present Status: Countermeasure:

Benefit:

Date: Name:

Shop/Office:

5S Photo Display ( Fixed Point Photo ) Before After

Page 51: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

51

1S~2S  Ac<vity  Flow    S. No

Phase Activities Time Result

1 2S Activity Implementation

1 Allocation of space for items 2 Months 1 Good house keeping 2 Clarity of Function 3 Strain on operator/ users removed. 4 Various systems and procedures in place to keep 1S in place 5 Retrieval time is less then 30 seconds 6 Inventory is reduced

2 Marking of the space with label

3 Keeping items in respective location

4 Arrive at simple Visual Arrangements to know Quantity.

5 Triggering various systems like

Layout Change

2 Bin systems

Kanban Min. Max.

FIFO

1S~2S  Team  Forma<on    

1.  Form Teams to carry out 1S~2S for each zone. The senior most (Designation/post) employee of the respective zone should be leader of his zone with 7~8 employees as member.

1S ~ 2S Zone Details Zone No. Zone Description Zone Leader Zone Members

1 Mould Shop Mr.

2 Mr.

3 Mr.

4 Mr.

Page 52: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

52

Page 53: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

53

Page 54: 5S and safety - Acid Loop - work place imporvements... · 3 Roadmap## Master!plan!for! 5S 1S:Eliminang Unnecessary Items 2S:!Fixing! StoragePlaces 3S:Consolidang! Cleaning Procedures

54