-5&3/5*7& - delaware department of transportation

1

Upload: others

Post on 18-Apr-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: -5&3/5*7& - Delaware Department of Transportation

NE FRONT STREET GRADE SEPERATED INTERSECTION

Number of Parcels Impacted: 20Total Estimated Cost: 32.8 Million

PREPARED: JANUARY 20, 2012

This plan contains conceptual layouts for all linework shown. Right-of-Way, property boundaries, roadway alignment, striping, and lane configurations are all subject to change and adjustment through further engineering, design, and investigation.

ALTERNATIVE 4 Cost and Impacts