PARIS METRO MODERNIZATION PROGRAM Main results and next steps
Emeline CHRETIEN, Automatic Metro group, RATP
2
Modernization program, 2004-2015
Future challenges
SUMMARY
3
12
Mairie d’Issy
Porte de Versailles
Porte de la Chapelle
5
Place d’Italie
Bobigny -Pablo Picasso
Gare du Nord
OCC L12
OCC L9
OCC L13
La Fourche
Montparnasse
13
Châtillon Montrouge
Invalides
Saint-Lazare
St-Denis Université
Asnières Gennevilliers Les Courtilles
Miromesnil
OCC L1/L5
Nation
9
Mairie de Montreuil
Pont de sèvres
Gambetta
République
Galliéni
3
Pont de Levallois Bécon
OCC L3
Front Populaire Aimé Césaire
Mairie d’Aubervilliers
MODERNIZATION PROGRAM, 2004-2015
Km 11,7 Stations 25 Trains 45
Km 14,6 Stations 22 Trains 50 Km 16,7
Stations 31 Trains 46
Km 18,4 Stations 32 Trains 66
Km 19,5 Stations 37 Trains 66
4
Modernization program, 2004-2015
Future challenges
SUMMARY
5
Opened in 1998 with 7 stations and 6 cars trains sets (90m) Designed from the beginning for 8 cars trains sets (120m) Extension : - 4 stations - 6 km - new connections
Need for a greater capacity
Switch to 8 cars train sets
FUTURE CHALLENGES : EXTENSION
Line 14 extension to Mairie de Saint Ouen
6
FUTURE CHALLENGES : AUTOMATION
Which line to choose?
Line 4
7
Transfer of rolling stock (rubber tire) from line 4
Modernization of Line 6 workshop for the new type of rolling stock
Modernization of ATC system (OCTYS & new OCC)
FUTURE CHALLENGES : MODERNIZATION
Modernization of line 6