4_keolisautomat
DESCRIPTION
MetroTRANSCRIPT
“ Keolis Metro Automation Projects” Observatory of
Automated Metros meeting
11-12 May 2015 BUDAPEST
Philippe LEGUAY International Director
Urban Railway Systems
Keolis 2014 Corporate figures
French Company
15 Countries
4 Continents
60’000 employees
5.6 billion
revenue
3 billion
passengers
Keolis, Worldwide Operator Expert in public transport
Operations and Maintenance
All contracts won through competitive tendering
Keolis in 2014 Railway Operations & Projects (estimated figures)
5’754 km Lines 1’300 Trains 700 Stations 12 Networks
xx Lines 627 Mios pas./Yr 100 Mios train.km
Keolis, expert in railway public transport
660 km Lines 1’121 Trams
2’450 Stations 17 Networks
65 Lines 660 Mios pas./Yr
Trains Trams
156 km CBTC Lines 2.2 Billions
Rail passengers/yr
243 km Lines 489 Metros
344 Stations 6 Networks
19 Lines 925 Mios pas./Yr
Metro
All contracts won through competitive tendering
240 km ATO Automatic Train Operations
Driverless GOA4 NoPO (No People on-board) since 1983
90 km of Full GOA4 No Staff on-board (NoPO)
900 Million metro passengers/year
Keolis is the world leader in driverless NoPO metro systems operations
162 km of Driverless GOA3 - GOA4 Train Operations
156 km CBTC GOA2 – GOA3 – GOA4
CBTC GOA4 NoPO since 1991
Keolis in 2014 Metro Operations & Projects (estimated figures)
Grade of automation UITP / Community of Metros / Imperial College London
The strong efficiency and supremacy of GOA4 GOA4 attended / GOA4 No People Onboard (NoPO)
1 line / 9 km 30 trains
15 stations
>32 million pass./year
Rennes (FR) GOA4 Since 2002
Lille (FR) GOA4 Since 1983
2 lines / 45 km 143 trains
62 stations
>105 million pass./year
2 lines / 4 km 18 trains
8 stations
>15 million pass./year
Roissy Airport GOA4 (FR) Since 2007
30 years of experience in driverless GOA4 NoPO operations The first driverless GOA4 NoPO metro in the world
The first CBTC driverless GOA4 NoPO metro in the World Availability above 99.5% Punctuality above 99.9%
1 line / 13 km 36 trains
15 stations
>80 million pass./year
Lyon (FR) GOA4 Since 1991
6 lines / 72 km 149 trains
45 stations
>110 million pass./year
DLR London (UK) GOA3 Since 2014
Keolis in 2014 Driverless metro networks in operations (12 lines / 162 km)
Rennes (FR)
1 New Line GOA4 NoPO (Siemens 2018)
13 km - 19 trains – 90s 15 stations 9’000 pphpd
DLR (London) (UK)
6 Lines GOA3 (Thales) converted into GOA4
Attended 2016/2017)
72 km - 149 trains – 120s
45 stations 25’000 pphpd
Lille (FR)
Line 1 = GOA4 replaced by GOA4
NoPO (Alstom 2017) 13 km - 27 trains – 75s
18 stations 12’000 pphpd
Lyon (FR)
Line B = GOA2 converted into GOA4
NoPO (Auto.Coupling (2019)
15 km - 32 trains – 90s 22 stat. - 18’000 pphpd
Line D = CBTC GOA4 replaced by GOA4 NoPO Auto. Coupling
(2021)
13 km - 36 trains – 90s 15 stat. - 18’000 pphpd
Keolis in 2015 GOA4 metro projects (10 lines /126 km)
4 networks / 5 projects / 10 lines 4 lines GOA4 NoPO – 6 lines GOA4 Attended
1 line greenfield - 9 lines brownfield
Paris (France ; O&M Technical Advice to STIF) 1 Greenfield L15 = GOA4 (2020-2030)
77 km / 120 trains / 37 stations / 30’000 pphpd
Keolis Paris GOA4 metro Projects Advices to PTA (200 km Metro Projects / 4 new lines)