“ Keolis Metro Automation Projects” Observatory of Automated Metros meeting 11-12 May 2015 BUDAPEST Philippe LEGUAY International Director Urban Railway Systems

Upload: tibor-illes

Post on 05-Dec-2015

20 views

Category:

Documents


5 download

DESCRIPTION

Metro

TRANSCRIPT

Page 1: 4_Keolisautomat

“ Keolis Metro Automation Projects” Observatory of

Automated Metros meeting

11-12 May 2015 BUDAPEST

Philippe LEGUAY International Director

Urban Railway Systems

Page 2: 4_Keolisautomat

Keolis 2014 Corporate figures

French Company

15 Countries

4 Continents

60’000 employees

5.6 billion

revenue

3 billion

passengers

Keolis, Worldwide Operator Expert in public transport

Operations and Maintenance

All contracts won through competitive tendering

Page 3: 4_Keolisautomat

Keolis in 2014 Railway Operations & Projects (estimated figures)

5’754 km Lines 1’300 Trains 700 Stations 12 Networks

xx Lines 627 Mios pas./Yr 100 Mios train.km

Keolis, expert in railway public transport

660 km Lines 1’121 Trams

2’450 Stations 17 Networks

65 Lines 660 Mios pas./Yr

Trains Trams

156 km CBTC Lines 2.2 Billions

Rail passengers/yr

243 km Lines 489 Metros

344 Stations 6 Networks

19 Lines 925 Mios pas./Yr

Metro

All contracts won through competitive tendering

Page 4: 4_Keolisautomat

240 km ATO Automatic Train Operations

Driverless GOA4 NoPO (No People on-board) since 1983

90 km of Full GOA4 No Staff on-board (NoPO)

900 Million metro passengers/year

Keolis is the world leader in driverless NoPO metro systems operations

162 km of Driverless GOA3 - GOA4 Train Operations

156 km CBTC GOA2 – GOA3 – GOA4

CBTC GOA4 NoPO since 1991

Keolis in 2014 Metro Operations & Projects (estimated figures)

Page 5: 4_Keolisautomat

Grade of automation UITP / Community of Metros / Imperial College London

The strong efficiency and supremacy of GOA4 GOA4 attended / GOA4 No People Onboard (NoPO)

Page 6: 4_Keolisautomat

1 line / 9 km 30 trains

15 stations

>32 million pass./year

Rennes (FR) GOA4 Since 2002

Lille (FR) GOA4 Since 1983

2 lines / 45 km 143 trains

62 stations

>105 million pass./year

2 lines / 4 km 18 trains

8 stations

>15 million pass./year

Roissy Airport GOA4 (FR) Since 2007

30 years of experience in driverless GOA4 NoPO operations The first driverless GOA4 NoPO metro in the world

The first CBTC driverless GOA4 NoPO metro in the World Availability above 99.5% Punctuality above 99.9%

1 line / 13 km 36 trains

15 stations

>80 million pass./year

Lyon (FR) GOA4 Since 1991

6 lines / 72 km 149 trains

45 stations

>110 million pass./year

DLR London (UK) GOA3 Since 2014

Keolis in 2014 Driverless metro networks in operations (12 lines / 162 km)

Page 7: 4_Keolisautomat

Rennes (FR)

1 New Line GOA4 NoPO (Siemens 2018)

13 km - 19 trains – 90s 15 stations 9’000 pphpd

DLR (London) (UK)

6 Lines GOA3 (Thales) converted into GOA4

Attended 2016/2017)

72 km - 149 trains – 120s

45 stations 25’000 pphpd

Lille (FR)

Line 1 = GOA4 replaced by GOA4

NoPO (Alstom 2017) 13 km - 27 trains – 75s

18 stations 12’000 pphpd

Lyon (FR)

Line B = GOA2 converted into GOA4

NoPO (Auto.Coupling (2019)

15 km - 32 trains – 90s 22 stat. - 18’000 pphpd

Line D = CBTC GOA4 replaced by GOA4 NoPO Auto. Coupling

(2021)

13 km - 36 trains – 90s 15 stat. - 18’000 pphpd

Keolis in 2015 GOA4 metro projects (10 lines /126 km)

4 networks / 5 projects / 10 lines 4 lines GOA4 NoPO – 6 lines GOA4 Attended

1 line greenfield - 9 lines brownfield

Page 8: 4_Keolisautomat

Paris (France ; O&M Technical Advice to STIF) 1 Greenfield L15 = GOA4 (2020-2030)

77 km / 120 trains / 37 stations / 30’000 pphpd

Keolis Paris GOA4 metro Projects Advices to PTA (200 km Metro Projects / 4 new lines)