  • Commissioning BCN New L9/L10S

    1 1 M ay 2 0 1 5

  • With the commissioning of Section I, L9/10 will arrive to more strategic sites on the city

    This L9 extension will result in a relative growth of 200%

    2009-11: Section IV

    12 stations

    Barcelona F.C. Stadium

    Courts

    Trade Fair

    Port

    Airport

    Commissioning Section I: 2016

    2016: Section I & part of II

    11 km

    15 stations + 3 st. Without service

    19,6 km + 5,9 km without service

    Workshops

  • Commissioning Section I: 2016

    2014 2016

    11.0 km, 12 stations + 26 km + 15 stations

    With the commissioning of Section I, 25% of Barcelona

    Metro Network will be fully automated (GoA4)

  • Commissioning Aeroport T1 Zona Universitria: February 2016

    Camp Nou

    ZF Port

    Can Tries Gornal

    Cntric Mas Blau

    Z.Universitria

    Collblanc Torrassa

    Provenana

    Ciutat de la Justcia

    Foneria

    Foc Cisell

    Motors

    ZF Litoral

    ZF ZAL

    Europa Fira

    Fira

    Parc Logstic Mercabarna

    Les Moreres

    La Ribera

    El Prat

    Parc Nou

    Aeroport T1

    Aeroport T.Crrega

    Aeroport T2

    Campus Nord

    ZF Nova Estaci Stations : Aeroport T. Crrega, La Ribera and Camp Nou will not enter revenue service

    Commissioning Section I: 2016

  • Conventional Tunnel 9m diameter

    10 conventional stations

    Viaduct 5 elevated stations

    L9 solution (2 levels) Tunnel 12m diameter (with slab)

    4 vertical tub stations + 1 conv.

    Camp Nou

    ZF Port

    Cntric Mas Blau

    Z.Universitria

    Collblanc Torrassa

    Provenana

    Ciutat de la Justcia

    Foneria

    Foc Cisell

    Motors

    ZF Litoral

    ZF ZAL

    Europa Fira

    Fira

    Parc Logstic Mercabarna

    Les Moreres

    La Ribera

    El Prat

    Parc Nou

    Aeroport T1

    Aeroport T.Crrega

    Aeroport T2

    Campus Nord

    ZF Nova Estaci

    Can Tries Gornal

    Commissioning Section I: 2016

  • Commissioning Section I: 2016

    Trains in different levels and platforms inside tunnel

    Ramps to connect both levels

  • Commissioning Section I: 2016

  • Commissioning Section I: 2016

  • Commissioning Section I: 2016

  • Commissioning Section I: 2016

  • Commissioning Section I: 2016

    AT1

    AT2

    ATR

    LRB FIE

    AT2

    MBL

    MBL

    PCN

    PCN

    PCT

    PCT

    PET

    PET LRB

    LMR

    LMR

    MCB

    MCB

    PCL

    PCL

    FIP

    FIP

    FIE GRN

    GRN

    TRS

    TRS

    CLB

    CLB

    CPN ZUN

    1 1 1 10

    1 1 14 1

    1 1

    13 17 2

    Stabling areas:

  • Depot

    Aeroport T1

    Airport Depot

    M

  • Signaling

    Camp Nou

    ZF Port

    Can Tries Gornal

    Cntric Mas Blau

    Z.Universitria

    Collblanc Torrassa

    Provenana

    Ciutat de la Justcia

    Foneria

    Foc Cisell

    Motors

    ZF Litoral

    ZF ZAL

    Europa Fira

    Fira

    Parc Logstic Mercabarna

    Les Moreres

    La Ribera

    El Prat

    Parc Nou

    Aeroport T1

    Aeroport T.Crrega

    Aeroport T2

    Campus Nord

    ZF Nova Estaci Bretelle

    Ramps

    CBTC zone V2

    CBTC zone in service

    Transfer zone

    Restrictions on tracks to reach the workshop

    Tunnel: Single track available (MTO) Viaduct: Single track available (MTO)

    Via pantal

    Simple switch

  • Singular points

    P. Cerd

    Nothern Terminus: Zona Universitria

    1.188 m Single track

    Sense Servei

  • Driving mode change (MTO/ATPM)

    Transfer zone Is located at Workshops

    P. Cerd

    Tallers

    Bifurcation

    Punts Singulars

  • Viaduct and Workshop

  • Viaduct and Workshop

  • Transfer

    zone

    Workshop

  • Workshop

    Automated

    Wash track

  • Service Scenarios

    AT1

    AT2

    ATR

    LRB FIE

    AT2

    MBL

    MBL

    PCN

    PCN

    PCT

    PCT

    PET

    PET LRB

    LMR

    LMR

    MCB

    MCB

    PCL

    PCL

    FIP

    FIP

    FIE

    GRN

    GRN

    TRS

    TRS

    CLB

    CLB

    CPN ZUN

    Zona Universitaria 705 MTN 627 MTT 929

    36,8 Km/h 1:06:23 818

    723

    638 (*) 37,5 Km/h 1:05:41

    8

    9

    10 (*) Solo viable en MTT

    7

    L9: End to End Carrousel (Airport Zona Universitria)

  • L9: Loop APT-CLB + Shuttle CLB-ZUN

    Service Scenarios

    744

    37,7 Km/h 38,9 Km/h

    1:01:51 0:07:44

    652 1:01:51 0:06:52

    611 1:01:51 0:06:11

    537 1:01:51 0:05:37

    9

    10

    12

    11

    11 1 =

    10 1 =

    9 1 =

    8 1 =

    AT1

    AT2

    ATR

    LRB FIE

    AT2

    MBL

    MBL

    PCN

    PCN

    PCT

    PCT

    PET

    PET LRB

    LMR

    LMR

    MCB

    MCB

    PCL

    PCL

    FIP

    FIP

    FIE

    GRN

    GRN

    TRS

    TRS

    CLB

    CLB

    CPN ZUN

  • L9: Express Services... Take overs? (discarded)

    Service Scenarios

  • L9: Express services: Airport Trade Fair City

    Service Scenarios

    Para en (7):

    1. Aeroport T1

    2. Aeroport T2

    3. El Prat

    4. Fira|Pedrosa

    5. Fira|Europa

    6. Torrassa

    7. Collblanc.

    E C 2 C 1

    10+1 trenes a 611

    9+1 trenes a 652

    8+1 trenes a 744

    7+1 trenes a 850

    6+1 trenes a 1008

    718 C 2

    C 2

    C 2

    C 1

    C 1

    C 1

    C 1

    C 1

    C 2

    C 2

    5+1 trenes a 1222

    AT1

    AT2

    ATR

    LRB FIE

    AT2

    MBL

    MBL

    PCN

    PCN

    PCT

    PCT

    PET

    PET LRB

    LMR

    LMR

    MCB

    MCB

    PCL

    PCL

    FIP

    FIP

    FIE

    GRN

    GRN

    TRS

    TRS

    CLB

    CLB

    CPN ZUN

  • L9: Express services: Airport Trade Fair

    Service Scenarios

    Para en (4):

    1. Aeroport T1

    2. Aeroport T2

    3. El Prat

    4. Fira|Pedrosa

    E

    C 2 C 1

    C 2

    C 2

    C 2

    10+1 trenes a 611

    9+1 trenes a 652

    8+1 trenes a 744

    C 1

    C 1

    C 1

    7+1 trenes a 850

    6+1 trenes a 1008

    C 1

    C 1

    C 2

    C 2

    630

    AT1

    AT2

    ATR

    LRB FIE

    AT2

    MBL

    MBL

    PCN

    PCN

    PCT

    PCT

    PET

    PET LRB

    LMR

    LMR

    MCB

    MCB

    PCL

    PCL

    FIP

    FIP

    FIE

    GRN

    GRN

    TRS

    TRS

    CLB

    CLB

    CPN ZUN

  • Service Scenarios

    Flexibility!

    AT1

    AT2

    ATR

    LRB FIE

    AT2

    MBL

    MBL

    PCN

    PCN

    PCT

    PCT

    PET

    PET LRB

    LMR

    LMR

    MCB

    MCB

    PCL

    PCL

    FIP

    FIP

    FIE

    GRN

    GRN

    TRS

    TRS

    CLB

    CLB

    CPN ZUN

    AT1

    AT2

    ATR

    LRB FIE

    AT2

    MBL

    MBL

    PCN

    PCN

    PCT

    PCT

    PET

    PET LRB

    LMR

    LMR

    MCB

    MCB

    PCL

    PCL

    FIP

    FIP

    FIE

    GRN

    GRN

    TRS

    TRS

    CLB

    CLB

    CPN ZUN

  • V1 Zona d Obres

    PRV CJT FNR Tallers

    Airport T1 Fira Collblanc

    Z. Univ.

    Prat Est. Torrassa

    VIA NICA

    T2

    L10: Carrousel Foneria Collblanc

    Service Scenarios: 2017

  • Enhancements!

    New Features

    Express Services

    New Passenger Information Model: Stations & Onboard

    Derailment detector

    New communications backbone topology (OF ring, self healing)

    New Wifi Technology (backwards compatible)

    Independent ATS Servers. Improved ergonomics + more degraded modes

    Automated Train Wash Track

    OCC Layout redesign

  • Project Management

    ATC Deployment Planning

    Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28