43 pages follow - nuclear regulatory commission · 2015. 1. 5. · services corp. 40 shuman blvd....
TRANSCRIPT
![Page 1: 43 pages follow - Nuclear Regulatory Commission · 2015. 1. 5. · services corp. 40 shuman blvd. suite 340. napervile. il 60563. transitional file submittal ec 12200 tod- 13ý-2](https://reader035.vdocuments.site/reader035/viewer/2022071115/5ff9306b05f8917e7a24ad74/html5/thumbnails/1.jpg)
ENCLOSURE2
Prairie Island Nuclear Generating PlantUnit 1 Piping and Instrumentation Diagrams
NE-39790-3, REV.78 NF-39245-1, REV. 82 Transitional File Submittal EC21790 for XH-1-7, REV. 90
Transitional File Submittal EC Transitional File Submittal EC XH-1-7, REV. 9024180 for NF-39216-1, REV. 17584 (Affected Area shown87 D-4) for NF-39245-2, REV. 8
NF-39216-1, REV. 87 Transitional File Submittal EC XH-1-29, REV. 7817584 (Affected Area shownF-6) for NF-39245-2, REV. 80
NF-39216-2, REV. 80 NF-39245-2, REV. 80 XH-1-31, REV. 82
NF-39216-3, REV. 80 NF-39248, REV. 82 Transitional File Submittal EC21790 for XH-1-38, REV. 80
NF-39216-4, REV. 78 NF-39251, REV. 78 XH-1-38, REV. 80
NF-39217-1, REV. 82 NF-39252, REV. 82 XH-1-39, REV. 80
Transitional File Submittal EC Transitional File Submittal EC Transitional File Submittal EC12200 for NF-39218, REV. 24824 for NF-39255-1, REV. 24804 for XH-1-44, REV. 7780 82
NF-39218, REV. 80 NF-39255-1, REV. 82 Transitional File Submittal EC23491 for XH-1-44, REV. 77
NF-39222, REV. 83 NF-39602-1, REV. 81 XH-1-44, REV. 77
NF-39237, REV. 80 NF-39603-3, REV. 82 XH-1-45, REV. 80
NF-39238, REV. 80 NF-39774-1, REV. 80 Transitional File Submittal EC21790 for XH-1-123, REV. 81
Transitional File Submittal EC NF-86172-1, REV. 78 XH-1-123, REV. 8122499 for NF-39244, REV.93
NF-39244, REV. 93 NF-86172-3, REV. 76
Transitional File Submittal EC NF-88740, REV. 8017584 for NF-39245-1, REV.82
43 pages follow
![Page 2: 43 pages follow - Nuclear Regulatory Commission · 2015. 1. 5. · services corp. 40 shuman blvd. suite 340. napervile. il 60563. transitional file submittal ec 12200 tod- 13ý-2](https://reader035.vdocuments.site/reader035/viewer/2022071115/5ff9306b05f8917e7a24ad74/html5/thumbnails/2.jpg)
00-33-3 i,1111A1JCC-175-ý
SK
03 -017
- 0013 -~[K
TO SV-37154(NF-39245-2)
(F-6)i
TO SV-37153(NF-39245-2)
(F-6) F-J.0c-175-8 .;'cC T-175-l1
'THE FOLLOWING NOTES ARE FOR INFORMATION ONLYNOT TO BE INCORPORATED IN THE FINAL DRAWING:
PARTIAL OF NF-39245-11. THIS ENGINEERING CHANGE SKETCH CREATED FROM
PINGP DRAWING NF-39245-1 REV. 80.2. REVISIONS DENOTED BY REVISION IA ARE IN
ACCORDANCE WITH EC 17584.(AFFECTED AREA SHOWN F-5)
AM& AUTOMATEDENGINEERING
SERVICES CORP.40 SHUMAN BLVD. SUITE 340. NAPERVILE. IL 60563
![Page 3: 43 pages follow - Nuclear Regulatory Commission · 2015. 1. 5. · services corp. 40 shuman blvd. suite 340. napervile. il 60563. transitional file submittal ec 12200 tod- 13ý-2](https://reader035.vdocuments.site/reader035/viewer/2022071115/5ff9306b05f8917e7a24ad74/html5/thumbnails/3.jpg)
TRANSITIONAL FILE SUBMITTAL EC 12200
TOD- 13ý-2 0
NF-39233C-9
11/4- MS -
-MS-35NF-39605-1
F-2
1-1
![Page 4: 43 pages follow - Nuclear Regulatory Commission · 2015. 1. 5. · services corp. 40 shuman blvd. suite 340. napervile. il 60563. transitional file submittal ec 12200 tod- 13ý-2](https://reader035.vdocuments.site/reader035/viewer/2022071115/5ff9306b05f8917e7a24ad74/html5/thumbnails/4.jpg)
TRANSITIONAL FILE SUBMITTAL EC 17584
-N TO U-icc PHWS
NF-39245-1A-lII
TO U-2P-CC PMPS
W-3q246-1A-11
THE FOLLOWING NOTES ARE FOR INFORMATION ONLYNOT TO BE INCORPORATED IN THE FINAL ORAINGA1. THIS ENGINEERING CHANGE SKETCH CREATED FROM
PINGP ORAVING NF-3q245-2 REV. 76.2. REVISIONS DENOTED BY REVISION IA ARE IN
ACCOROANCE WITH EC 17584.
AUTOMATEDENGINEERINGSVCES CORP.
m . SiN% 3fO. f•W± I & mw
![Page 5: 43 pages follow - Nuclear Regulatory Commission · 2015. 1. 5. · services corp. 40 shuman blvd. suite 340. napervile. il 60563. transitional file submittal ec 12200 tod- 13ý-2](https://reader035.vdocuments.site/reader035/viewer/2022071115/5ff9306b05f8917e7a24ad74/html5/thumbnails/5.jpg)
TRANSITIONAL FILE SUBMITTAL EC 17584
11 1 A 1
V
rnl
L-- C-3-28,j -CC-9
- FROM U-ICCHX
NF-3q245-1SH-3
PARTIAL OF NF-39245-2
THE FOLLOWING NOTES ARE FOR INFORMATION ONLYNOT TO BE INCORPORATED IN THE FINAL DRAWINOi
1. THIS ENGINEERING CHANGE SKETCH CREATED FROMPINGP DRAWING NF-39245-2 REV. 7q,
2. REVISIONS DENOTED BY REVISION IA ARE INACCORDANCE WITH EC 17584.
(AFFECTED AREA SHOWN F-6)
oI NEY1 Gý1 oacwroni~ Iam Amn . -- .
to well, lum rOR cc lym It "AUTOMATED"" ENGINEERINGSERVICES CORP.
40 SHUMM BLVD, SURf 40, M4KUALE, I. O0W65
m '• I• fIW~IIW'l•IP.LA f
'w"AlWff.myIIWT4
1 -,t wama - -U
![Page 6: 43 pages follow - Nuclear Regulatory Commission · 2015. 1. 5. · services corp. 40 shuman blvd. suite 340. napervile. il 60563. transitional file submittal ec 12200 tod- 13ý-2](https://reader035.vdocuments.site/reader035/viewer/2022071115/5ff9306b05f8917e7a24ad74/html5/thumbnails/6.jpg)
The following 39 Drawings specificallyreference
Enclosure 2 If,
1.
Prairie Island Nuclear Generating PlantUnit Piping and Instrumentation Diagrams
DOI to D39