4-pfmea and work

Upload: laurentiulazea

Post on 07-Jul-2018

232 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/19/2019 4-PFMEA and Work

    1/20

    POTENTIAL FAILURE MODE AND EFFECTS AN

    Or submitted with PPAP Sam!e Parts" #!ear!$PART NUM*ER

    TEAM MEM*ERS

    APPRO+ED *Y 

    PROCESS FUNCTION

    All Submissions should be sent via E-Mail to: mailto:suppl

    POTENTIALFAILURE MODE

    POTENTIALEFFECT OF

    FAILURE

    SE+

    ERIT

     Y 

    CLASS

    POTENTIAL CAUSEOF FAILURE

    OCCUR

    CURRENT PROCESSCONTROL

    DE

    TECT

    RIS,PRIORITYNUM*ER

    mailto:[email protected]:[email protected]

  • 8/19/2019 4-PFMEA and Work

    2/20

    POTENTIAL FAILURE MODE AND EFFECTS AN

    Or submitted with PPAP Sam!e Parts" #!ear!$PART NUM*ER

    TEAM MEM*ERS

    APPRO+ED *Y 

    PROCESS FUNCTION

    All Submissions should be sent via E-Mail to: mailto:suppl

    POTENTIALFAILURE MODE

    POTENTIALEFFECT OF

    FAILURE

    SE+

    ERIT

     Y 

    CLASS

    POTENTIAL CAUSEOF FAILURE

    OCCUR

    CURRENT PROCESSCONTROL

    DE

    TECT

    RIS,PRIORITYNUM*ER

    mailto:[email protected]:[email protected]

  • 8/19/2019 4-PFMEA and Work

    3/20

    POTENTIAL FAILURE MODE AND EFFECTS AN

    Or submitted with PPAP Sam!e Parts" #!ear!$PART NUM*ER

    TEAM MEM*ERS

    APPRO+ED *Y 

    PROCESS FUNCTION

    All Submissions should be sent via E-Mail to: mailto:suppl

    POTENTIALFAILURE MODE

    POTENTIAL

    EFFECT OFFAILURE

    SE+

    ERIT

     Y 

    CL

    ASS

    POTENTIAL CAUSEOF FAILURE

    OC

    CUR

    CURRENT PROCESSCONTROL

    DE

    TECT

    RIS,

    PRIORITYNUM*ER

    mailto:[email protected]:[email protected]

  • 8/19/2019 4-PFMEA and Work

    4/20

    POTENTIAL FAILURE MODE AND EFFECTS AN

    Or submitted with PPAP Sam!e Parts" #!ear!$PART NUM*ER

    TEAM MEM*ERS

    APPRO+ED *Y 

    PROCESS FUNCTION

    All Submissions should be sent via E-Mail to: mailto:suppl

    POTENTIALFAILURE MODE

    POTENTIAL

    EFFECT OFFAILURE

    SE+

    ERIT

     Y 

    CL

    ASS

    POTENTIAL CAUSEOF FAILURE

    OC

    CUR

    CURRENT PROCESSCONTROL

    DE

    TECT

    RIS,

    PRIORITYNUM*ER

    mailto:[email protected]:[email protected]

  • 8/19/2019 4-PFMEA and Work

    5/20

    Page % PFMEA TEMPLATE PF-002

    ALYSIS (PROCESS FMEA)

      ar%ed &' Pa#%ai'

    FMEA -

    RE+ISION -

    DATE

    A&T'() *ES+LTS

    ierppapalto-shaam!"om

    RECOMMENDED

    ACTION

    RESPONSI*ILITY. TAR/ET

    COMPLETIONDATE

    ACTION(S)TA,EN

    SE+

    ERIT

     Y 

    OCCUR

    DE

    TECT

    RIS,PRIORITYNUM*ER

    mailto:[email protected]:[email protected]

  • 8/19/2019 4-PFMEA and Work

    6/20

    Page , PFMEA TEMPLATE PF-002

    ALYSIS (PROCESS FMEA)

      ar%ed &' Pa#%ai'

    FMEA -

    RE+ISION -

    DATE

    A&T'() *ES+LTS

    ierppapalto-shaam!"om

    RECOMMENDED

    ACTION

    RESPONSI*ILITY. TAR/ET

    COMPLETIONDATE

    ACTION(S)TA,EN

    SE+

    ERIT

     Y 

    OCCUR

    DE

    TECT

    RIS,PRIORITYNUM*ER

    mailto:[email protected]:[email protected]

  • 8/19/2019 4-PFMEA and Work

    7/20

    Page PFMEA TEMPLATE PF-002

    ALYSIS (PROCESS FMEA)

      ar%ed &' Pa#%ai'

    FMEA -

    RE+ISION -

    DATE

    A&T'() *ES+LTS

    ierppapalto-shaam!"om

    RECOMMENDED

    ACTION

    RESPONSI*ILITY. TAR/ET

    COMPLETIONDATE

    ACTION(S)TA,EN

    SE+

    ERIT

     Y 

    OC

    CUR

    DE

    TECT

    RIS,

    PRIORITYNUM*ER

    mailto:[email protected]:[email protected]

  • 8/19/2019 4-PFMEA and Work

    8/20

    Page . PFMEA TEMPLATE PF-002

    ALYSIS (PROCESS FMEA)

      ar%ed &' Pa#%ai'

    FMEA -

    RE+ISION -

    DATE

    A&T'() *ES+LTS

    ierppapalto-shaam!"om

    RECOMMENDED

    ACTION

    RESPONSI*ILITY. TAR/ET

    COMPLETIONDATE

    ACTION(S)TA,EN

    SE+

    ERIT

     Y 

    OC

    CUR

    DE

    TECT

    RIS,

    PRIORITYNUM*ER

    mailto:[email protected]:[email protected]

  • 8/19/2019 4-PFMEA and Work

    9/20

    POTENTIAL FAILURE MODE AND

    PART NUM*ER 0122345

    TEAM MEM*ERS 6&h' D&e" Mar$ Smith" D&'a!d *r&w'" Sam 6&'es

    APPRO+ED *Y Sam 6&'es

    PROCESS FUNCTION

    010 7 2

    020 ma"hining oversied diameter .

    rong tool used

    2

    rst pie"e inspe"tion

    rst pie"e inspe"tion

    improper use o3 gage operator training

    out o3 "alibration "alibration pro"edure

    030 blanking tool wear  

    PROCESS

    FUNCTION

    POTENTIAL

    FAILURE MODE

    POTENTIALEFFECT OF

    FAILURE

    SE+E

    RIT

     Y 

    CLASS

    POTENTIAL CAUSE

    OF FAILURE

    OCCUR

    CURRENT PROCESS

    CONTROL

    Receive Incomingmaterial

    material does not meetspecification

    failure of corrosiontest

    upplier sent wrongmaterial

    material certifications wit! eac!s!ipment

    part 3ails to t ormate

    rong programentered

  • 8/19/2019 4-PFMEA and Work

    10/20

    POTENTIAL FAILURE MODE AND EFFECTS A

    PART NUM*ER 0122345

    TEAM MEM*ERS 6&h' D&e" Mar$ Smith" D&'a!d *r&w'" Sam 6&'es

    APPRO+ED *Y Sam 6&'es

    PROCESS FUNCTIONPROCESSFUNCTION

    POTENTIALFAILURE MODE

    POTENTIALEFFECT OF

    FAILURE

    SE+ERIT

     Y 

    CLASS

    POTENTIAL CAUSEOF FAILURE

    OCCUR

    CURRENT PROCESSCONTROL

    DETECT

    RIS,PRIORITNUM*E

  • 8/19/2019 4-PFMEA and Work

    11/20

    POTENTIAL FAILURE MODE AND EFFECTS A

    PART NUM*ER 0122345

    TEAM MEM*ERS 6&h' D&e" Mar$ Smith" D&'a!d *r&w'" Sam 6&'es

    APPRO+ED *Y Sam 6&'es

    PROCESS FUNCTIONPROCESSFUNCTION

    POTENTIALFAILURE MODE

    POTENTIALEFFECT OF

    FAILURE

    SE+ERIT

     Y 

    CLASS

    POTENTIAL CAUSEOF FAILURE

    OCCUR

    CURRENT PROCESSCONTROL

    DETECT

    RIS,PRIORITNUM*E

  • 8/19/2019 4-PFMEA and Work

    12/20

    POTENTIAL FAILURE MODE AND EFFECTS A

    PART NUM*ER 0122345

    TEAM MEM*ERS 6&h' D&e" Mar$ Smith" D&'a!d *r&w'" Sam 6&'es

    APPRO+ED *Y Sam 6&'es

    PROCESS FUNCTIONPROCESSFUNCTION

    POTENTIALFAILURE MODE

    POTENTIALEFFECT OF

    FAILURE

    SE+ERIT

     Y 

    CLASS

    POTENTIAL CAUSEOF FAILURE

    OCCUR

    CURRENT PROCESSCONTROL

    DETECT

    RIS,PRIORITNUM*E

  • 8/19/2019 4-PFMEA and Work

    13/20

    ALYSIS (PROCESS FMEA)

    FMEA - 112

    RE+ISION - ADATE 27073124

    A&T'() *ES+LTS

    none

    4ill 5hite 0262.61# . 1 1 .

    RECOMMENDEDACTION

    RESPONSI*ILITY .TAR/ET

    COMPLETION DATEACTION(S)

    TA,EN

    SE+ER

    IT Y 

    OCCU

    R

    DETE

    CT

    RIS, PRIORITYNUM*ER

    Automati" Tool retrieval

    s7stem

    Add last pie"einspe"tion and

    8eep nal pie"eith Tool

  • 8/19/2019 4-PFMEA and Work

    14/20Page 1$ PFMEA TEMPLATE Sample PF-002

    ALYSIS (PROCESS FMEA)

    FMEA - 112

    RE+ISION - A

    DATE 27073124

    A&T'() *ES+LTS

    RECOMMENDEDACTION

    RESPONSI*ILITY .TAR/ET

    COMPLETION DATEACTION(S)

    TA,EN

    SE+ERIT

     Y 

    OCCUR

    DETECT

    RIS, PRIORITYNUM*ER

  • 8/19/2019 4-PFMEA and Work

    15/20Page 1% PFMEA TEMPLATE Sample PF-002

    ALYSIS (PROCESS FMEA)

    FMEA - 112

    RE+ISION - A

    DATE 27073124

    A&T'() *ES+LTS

    RECOMMENDEDACTION

    RESPONSI*ILITY .TAR/ET

    COMPLETION DATEACTION(S)

    TA,EN

    SE+ERIT

     Y 

    OCCUR

    DETECT

    RIS, PRIORITYNUM*ER

  • 8/19/2019 4-PFMEA and Work

    16/20Page 1, PFMEA TEMPLATE Sample PF-002

    ALYSIS (PROCESS FMEA)

    FMEA - 112

    RE+ISION - A

    DATE 27073124

    A&T'() *ES+LTS

    RECOMMENDEDACTION

    RESPONSI*ILITY .TAR/ET

    COMPLETION DATEACTION(S)

    TA,EN

    SE+ERIT

     Y 

    OCCUR

    DETECT

    RIS, PRIORITYNUM*ER

  • 8/19/2019 4-PFMEA and Work

    17/20

    Page 1 PFMEA 'nstru"tions PF-00#

    T8E P9FMEA IS UTILI:ED *Y T8E RESPONSI*LE TEAM TO ASSURE TO T8E E;TENT POSSI*LE" POTENTIAL FAILU

    Part Number Enter the name and part number 3or the s7stem or "omponent

    Team Members Enter the team or group responsible 3or developing the FMEA

    Ar&o 3reuentl7 the 3ailure is proCe"ted to o""ur on a s"ale o3 =1= - =10=! The ran8ing number has a meaning! =meaning 3ailure is unli8el7! =%= meaning 3ailure o""urs o""asionall7 ma7be 10 - 20D o3 the time!

    Curre't Press

    An assessment o3 the probabilit7 that the &ontrol Method ill dete"t the potential 3ailure! A =1= to =10= s"ale is

    ill prevent shipment o3 the de3e"t! =1= meaning "urrent "ontrol is almost "ertain to dete"t the 3ailure! =10= me@pe"tation that "ontrol ill dete"t the 3ailure!

    Ris% Pri&rit$Number

    's the *esult o3 Multipl7ing ea"h Balue 3or =Severit7= =(""urren"e= and =9ete"tion= ;S @ ( @ 9ighest Severit7!

    Re#&mme'ded

    Res&'sibi!it$ a'dTaret Date

  • 8/19/2019 4-PFMEA and Work

    18/20

    Page 1. PFMEA 'nstru"tions PF-00#

    A#ti&'s Ta%e' Enter a brie3 des"ription o3 the a"tion implemented

    Resu!ti' RPN A3ter the "orre"tive a"tion has been implemented re-"al"ulate results o3 S @ ( @ 9! '3 no a"tion ta8en leave the

  • 8/19/2019 4-PFMEA and Work

    19/20

    Page 1/ PFMEA 'nstru"tions PF-00#

    RE MODES AND T8EIR CAUSES 8A+E *EEN CONSIDERED AND ADDRESSED

      he pro"ess or part 3ail= i!e! 4ent &ra"8ed 9irt7 improper set-up et"!

    e"t and =10= being Ma7 endanger user!

    ntrols!

    ples might in"lude Error Proong Fi@tures (perator measurements Bisual &he"8s et"!

    e automate eld operation "reate Bisual Aid et"!

    ing et" in the order o3 the manu3a"turing pro"ess! This should "arr7over 3rom the

    ! E@amples might in"lude: Part Missing 'mproper 5eld (perator Failed to Ma"hine Part

    10= meaning Failure is almost inevitable li8el7 to o""ur more than 1 in # times! =1=

    used and assumes a Failure has o""urred! 5hat 3orm o3 dete"tion is "urrentl7 in use that

    eaning there is no 8non "ontrol to dete"t the 3ailure! =%= meaning there is a Moderate

    beteen =1= and =10000= and attention should be given to those ith the highest value

  • 8/19/2019 4-PFMEA and Work

    20/20

    Page 20 PFMEA 'nstru"tions PF-00#

     *P) blan8!