4 -ip-10g install - presentation v1.0
TRANSCRIPT
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
1/26
Proprietary and Confidential
Installation
FibeAir IP-10 G-Series
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
2/26
Proprietary and Confidential
General
2
If installation requires CFG file upload & download and / or SW fileupload & down -
1. Make sure FTP Server is installed on your PC2. FTP is configured (RD/WR permissions)
3. Latest SW version is available (FTP root directory)
FTP installation guide
is available at
Training.Ceragon.Com:
see Modules /
Installation
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
3/26
Proprietary and Confidential
Site Requirements
3
IDU must be located indoors
The environment temperature must be between -5 C and +45 C.
Easily accessible, but only by authorized personnel.
Available power source of -48 VDC, and the site must comply with
National Electric Code (NEC) standards.
Available management connection (Ethernet or dial-up). IDU-ODU connection (IF cable): no more than 300m
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
4/26
Proprietary and Confidential
Site Requirements
4
Heat Dissipation:
The IP-10 IDU overall heat dissipation is 25W max (~85 BTU/h).The ODU heat dissipation is 100W max.
Antenna Location:
As with any type of construction, a local permit may be required before installingan antenna. It is the owners responsibility to obtain any and all permits.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
5/26
Proprietary and Confidential
IDU Dimensions
5
42.60mm
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
6/26
Proprietary and Confidential
Installing standalone IDU in a 19 Rack
6
As shown in the illustration, four screws, supplied with theinstallation kit, are used to secure the IDU to the rack.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
7/26Proprietary and Confidential
Installing Nodal Enclosures in a 19 Rack
7
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
8/26Proprietary and Confidential
Installing Nodal Enclosures in a 19 Rack
8
Before you install theenclosures
Plan carefully the requiredspace within the rack !
Should you need to install 3enclosures prepare at least10Us (6Us for enclosures + 2Us freespace for maneuvering above and below
shelves)
Start the installation processfrom bottom to top, e.g. Mainenclosure should be installedfirst at the bottom of your rackspace
Main Enclosure
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
9/26Proprietary and Confidential
Installing Nodal Enclosures in a 19 Rack
9
Step #1:Install the IP-10 Main enclosurein the 19 inch rack using 4screws.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
10/26Proprietary and Confidential
Installing Nodal Enclosures in a 19 Rack
10
Step #1:Install the IP-10 Main enclosurein the 19 inch rack using 4screws.
Step #2:
Slide down the 2nd extensionenclosure. Male connectorshould plug in smoothly into theMain enclosure.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
11/26Proprietary and Confidential
Installing Nodal Enclosures in a 19 Rack
11
Step #1:Install the IP-10 Main enclosurein the 19 inch rack using 4screws.
Step #2:
Slide down the 2nd extensionenclosure. Male connectorshould plug in smoothly into theMain enclosure.
Step #3:
Slide down the 2nd extensionenclosure. Male connectorshould be plugged in smoothlyinto the Main enclosure.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
12/26Proprietary and Confidential
Installing Nodal Enclosures in a 19 Rack
12
Step #4:Secure the 2nd extension intothe Main enclosure. Use thebuilt-in screw.
Mount the 2nd extension into the
rack using the 4 screws
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
13/26
Proprietary and Confidential
Installing Nodal Enclosures in a 19 Rack
13
Step #4:Secure the 2nd extensioninto the Main enclosure.Use the built-in screw.
Mount the 2nd extension
into the rack using the 4screws
Step #5:Add the 3rd extensionwhen needed
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
14/26
Proprietary and Confidential
Preparing the IDU for a Shelf installation
14
Remove the two 19" brackets mounted on the IP-10 IDU by unscrewing the 3
screws at each side.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
15/26
Proprietary and Confidential
Installing the IDU in a Shelf
15
Slide the IP-10 IDU into the enclosure and tighten it using 2 screws. Repeat
this step in accordance with the configuration.
IDU insertion & extractionshould NOT be under power
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
16/26
Proprietary and Confidential
Installing a Blank Panel IDU in a Shelf
16
Slide the IP-10 blank panel into the enclosure, and tighten it using 2 screws.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
17/26
Proprietary and Confidential
Installing a T-Card into an IDU
17
Remove the IP-10 T-Card blank panel from the IDU, by releasing the 2 side
screws.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
18/26
Proprietary and Confidential
Installing a T-Card into an IDU
18
Insert the IP-10 T-Card panel and tighten it using the 2 side screws.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
19/26
Proprietary and Confidential
Grounding the IDU
19
Single Point Stud
Grounding Wire
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
20/26
Proprietary and Confidential
Grounding the IDU
20
The IDU is suitable for installation in a Common Bonding Network (CBN).
Only copper wire should be used.
The wire must be at least 14 AWG.
Connector and connection surfaces must be plated. Bare conductors must be
coated with antioxidant before crimp connections are made to the screws.
FibeAir provides a ground for each IDU, via a one-hole mounted lug onto asingle-point stud.
The stud must be installed using a UL-listed ring tongue terminal, and two star
washers for anti-rotation.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
21/26
Proprietary and Confidential
Power General Requirements
21
1. A readily accessible Listed branch circuit over-current protective device,rated 15 A, must be incorporated in the building wiring.
2. This equipment is designed to permit connection between the earthedconductor of the DC supply circuit and the earthing conductor at theequipment.
3. The equipment shall be connected to a properly grounded supply system
4. The DC supply system is to be local, i.e. within the same premises as theequipment
5. A disconnect device is not allowed in the grounded circuit between the DCsupply source and the frame/grounded circuit connection.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
22/26
Proprietary and Confidential
Power Requirements
22
When selecting a power source, the following must be considered:
DC power can be from -40.5 VDC to -60 VDC.
Recommended: Availability of a UPS (Uninterrupted Power Source),
battery backup, and emergency power generator.
Whether or not the power source provides constant power (i.e., power issecured on weekends or is shut off frequently and consistently).
The power supply must have grounding points on the AC and DC sides.
The user power supply GND must be connected to the positive pole in the IDU
power supply.
Any other connection may cause damage to the system!
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
23/26
Proprietary and Confidential
Power Requirements
23
Important
Make sure to use a circuit breaker to protect the circuit from damage byshort or overload.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
24/26
Proprietary and Confidential
Installing the IDU-ODU IF cable
24
Route the IF Coax Cable from the IDU to the ODU/RFU and terminate it
with N-type male connectors.
Note: Make sure you fasten the cable along the ladder!
Make sure that the inner pin of the connector does not exceed theedge of the connector.
The cable should have a maximum attenuation of 30 dB at 350 MHz.
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
25/26
Proprietary and Confidential
Logging in, assigning IP address
CLI access groups:
Viewer read-onlyaccess
Operator read-writeaccess but cannot add/remove other users
Admin read-writeaccess including add/remove other users
Tech read-writeaccess including add/remove other users as
well as access to a bridge-specific CLI shell
Currently only Admin is defined
Other groups or users can be created via CLI only
-
7/31/2019 4 -IP-10G Install - Presentation v1.0
26/26
P i t d C fid ti l
Thank You !