The technical report SGF - International competition for ideas “Youth Area at the Border” for the redevelopment of the former Civil Hospital - Gorizia Urban ProjectTRANSCRIPT
■ spazio giovani alla frontiera ■
table of contents
1. Cover2. Table of contents 3. Conception4. Arrangement of buildings, relationship between different areas5. Casa Rossa and the Slovenian area - commercial axis,6. Connection between the University and SGF - the youth axis Connection between SGF and Slovenian sport areas - recreation axis, Connection between Psychiatry and SGF main building - research axis7. Arrangement of SGF area, conception8. Functions of buildings, functions of the park in SGF9. Conception drawings and views of SGF main building10. Conception drawings of SGF buildings11. Sustainability12. 1. table13. 2. table14. 3. table15. Economic efficiency, cost estimation, Summary
CASA ROSSA
ITALY
CASA ROSSA
SLOVENIA
TRADE, MAR
KETPLACE,
FRIULIA
N PRODUC
TS
SGF
SPORT
UNIVERSITY
SPORT, RECREATION, VERTOIBIZZA
YOUNG PEOPLE, BIKE ROAD, BRIDGE, SIENCE
FORMER
PSYCHIATRY
RESEARCH, HEALTH SERVICES, ASS2 PEOPLE
COMMERCIAL
SUBCENTER
CULTURAL, TURISTICAL, SIENCE
SUBCENTERI
I
I
MAP 1:2000
APARTMENTS
MARKET, PROGRAMS, FESTIVAL ON THE BORDER
MIXED FUNCTION, OFFICIES, SERVICES, APARTMENTS
APARTMENTS, HOTEL, PANSION
PEDESTRIAN AND BIKE ROAD TO SGF
URBANIZATION
CASA ROSSA
PEDESTRIAN AND BIKE ROAD
PEDESTRIAN BRIDGE ABOVE ROADGATE OF CASA ROSSA
ASS2 OFFICES
HEALTH SERVICES IN THE FIRSTPART OF NEW BUILDING
SCIENCE PARK
NEW SURFACE ON THE LINEOF OLD WATERCOURSE
WATER FALL
BANKING
NEW BRIDGES
PEDESTRIAN AND BIKE NET
REMAINING AGRICULTURALYARDS, AND SPORT COURTS
REMAINING VINEYARDS
FESTIVAL ANDRECREATION AREA
SPORT CENTER
SPORT DEVELOPMENT
SPORT COURTS
RECREATION AREA
2.
3.
4a.
4b.
8.
5.
7.
6.
hotel ****
ASS2 offices
sport center
health services
pavilion, basic courses
turist hostel
restaurant
pose theatre
house of music
research
youth center
kindergarten
church
hospital museum
"PATH" THROUGH THE ENTIRE LENGHT OF BUILDING
1. POSITIONS OF FUNCTIONS - PROPORTIONSHOSPITAL, HEALTH SERVICES
15%YOUTH HOSTEL
10%
POSE THEATER,HOUSE OF MUSIC
10%YOUTH CENTER
30%RESEARCH AREA
30%
HOSPTAL, HEALTH CENTER
2. LOCALIZATION OF DIFFERENT FUNCTIONSRESARCH THEATER YOUTH CENTER
HOUSEOF MUSIC RESEARCH
3. PASSAGES
NEAR TO A.S.S. BUILDINGS AND THEUNDERGROUND PARKING AREA
CENTRAL LOCATION,USED BOTH BY VISITORS AND
A.S.S.-WORKERS
CENTRAL LOCATION,INDIRECT CONNECTION
WITH AREAS OF YOUTH CENTER
CENTRAL LOCATION, CLOSECONNECTION WITH THE PARK
CONNECTION WITH THE SLOVENIANTERRITORY - EUROCAMPUS
PATH TO THE CHURCH
DRIVE-WAY
BRANCH
FORMER MORTUARY - HOSPITAL MUSEUM
EX-BORDER
RESTAURANT 5%
RESTAURANT
YOUTHCENTER
YOUTHCENTER
YOUTHCENTERRESEARCH RESEARCH
UNDERGROUND CARPARK
HOSTEL
YOUTH HOSTEL
PARKING SYSTEM340 PARKING PLACES
PARKING LEVEL FINISHED
BEFORE WATERCOURSE
WATER SURFACE ABOVE
UNDERGROUND LEVEL
UNDERGROUND NETWORK USING FOR SERVICES
Groundfloor
1st level
2nd level
INFO, EXHIBITION
WELFARE
YOUTH CARE ISSUES
RESTAURANT
POSE THEATRE
YOUTH CENTRE
YOUTH CENTRE
BASIC COURSES
HOUSE OF MUSIC
YOUTH CENTRE
YOUTH CENTRE
BASIC COURSES
INFO SLOVENIA
WELFARE
YOUTH CARE ISSUES
INFIRMARY
HALTH SERVICES
WELFARE
YOUTH CARE ISSUES
INFIRMARY
HALTH SERVICES
WELFARE
YOUTH CARE ISSUES
POSE THEATRE
POSE THEATRE
OFFICES
YOUTH,
TURIST HOSTEL
YOUTH CENTRE
BASIC COURSES
YOUTH CENTRE
BASIC COURSES
YOUTH CENTRE
BASIC COURSES
HOUSE OF MUSIC
RESEARCH
RESEARCH
RESEARCH
RESEARCH
RESEARCH
RESEARCH
RESEARCH
YOUTH CENTRE
BASIC COURSES
HOUSE OF MUSIC
YOUTH CENTRE
BASIC COURSES
POSE THEATRE
POSE THEATRE
OFFICES
YOUTH,
TURIST HOSTEL
YOUTH,
TURIST HOSTEL
RESEARCH
Functional section
squash
basketball volleyball
badminton
Former Sanatorium building (building no.2) -> HOTEL
Services Block (building n. 7) -> SPORT CENTER
Infections building (building n. 5) -> KINDERGARTEN
Morgue (building n. 8) -> HOSPITAL MUSEUM
rooms rooms
publicspaces
services
changingrooms
servicesservices
public spaces
services offices
offices
services
exhibition roomspublic spaces
New SGF main building (building no.1)
UNDERGROUND PARKING
BUILDING LEVELS
ROOF
SUSTAINABLE BUILDING
HEAT PUMP GROUND COOLING
CONNECTION OF CHILLED BEAMS
SUBSURFACE GROUNDWATER
SMART CONTROLS BIKE RACKS
NATURAL VENTILLATION THROUGH OPENING WINDOWSREDUCED THERMAL LOSSES, SOLAR CONTROL GLAZING
REDUCED LIGHTINGPOWER DENSITYUSE OF TASK LIGHTING
EXTERNAL SHADING TO SUD-EAST
ENERGY SUPPLY USING UNDERGROUND NETWORK
SOLAR PANELS
SOLAR PANELS
SOLAR PANELS
GREEN ROOF REDUCE HEAT ISLAND EFFECTS
RESERVE STORMWATER
STORAGE AND COLLECTION OF RECYCLABLESPROVISION FOR CHARGING POINTS FOR PLUG IN VEHICLES
E
ENERGY SUPPLY USING UNDERGROUND NETWORK
ZERO EMMISSION BULDING
SOLAR PANELS COVERS ENERGY SUPPLY FOR COMPLETE SGF AREA
Step 1.
Urban Development
Possibility of development of Casa Rossa in Italy – 25.000 sqmPossibility of development of Casa Rossa in Slovenia – 18.000 sqm
Arrangement/regulation plan of the area must be prepared. Public areas and sites to be sold must be indicated. Public utilities shall be reconstructed. Building sites must be sold out. The development is based upon private capital.The incoming profit shall cover both the self-part for developing SGF, and also cover the base-capital for city investments related to SGF.
Step 2.
Detailed development conception for SGF area shall be prepared. For instance a proposal:
ASS2
Investment of development of SGF area
SGF Areabuilding m2 Euro/m2 Euro
new SGF building indoors 14 800 1400 € 20 720 000
covered outdoors 5 500 400 € 2 200 000underground parking and ug. network 8 100 800 € 6 480 000sun power plant on roof 7 200 300 € 2 160 000
renovated housesHotel 9 400 1500 € 14 100 000Sport Center 3 800 800 € 3 040 000ASS offices 6 200 300 € 1 860 000Kinder garten 840 800 € 672 000Hospital Museum 1 060 500 € 530 000Church 800 500 € 400 000Club houses 1 020 500 € 510 000
Public utility € 1 000 000
Park145 000 40 € 5 800 000
€ 59 472 000receipts of realization of Casa Rossa € 22 000 000support for proposals EU or Gov. 40% € 23 788 800investment € 13 683 200
functions providing profit Euro/year
Hotel 9 400 € 300 000Sport Center 3 800 € 100 000Youth Hostel 1 800 € 150 000Restaurant 900 € 220 000To rent officies for design, research 5 400 € 320 000To rent places for programs € 30 000Parking € 280 000
€ 1 400 000
functions making costs
Youth center 5 400 € 150 000Theatre 1 000 € 150 000House of music 1 000 € 100 000Staff officies 6 200 € 400 000Kinder garten 840 € 40 000Hospital Museum 1 060 € 50 000Church 800 € 20 000Club houses 1 020 € 20 000
Park145 000 € 50 000
€ 980 000
average profit € 420 000rate of return 33 year
Summary
Conception of the plan is to express the definite connection between Slovenianand Italian areas with the means of architecture.Two subcentres are formed within the city:
the Commercial Centre is the surrounding area of Casa Rossa; the Centre of Culture, Touristic and Research is the former hospital
area.Development of Casa Rossa square and of the related Slovenian parts can be realized basically on business grounds. Traditional commercial functions can be placed here, such as periodical and permanent markets, shops, service units. This Commercial Area at the border is to be specialized on mainly the local producers’ goods. Above these ground-floor functions apartments can be developed. The longitudinal shaped market square is suitable for occasional programs, fairs.
The former hospital area can be developed both on business ground and on non-profit ground by municipality. Business capital, enterpreneurs should be involved to develop hotel and youth hotel functions, restaurants, some of health services, research units and indoor recreation facilities. Business development shall make profit to finance cultural functions and on the other hand cultural, environmental and touristic functions, programs shall provide a suitable environment to attract capital.We connected the SGF and the University area by pedestrian and cycle path. We put the health service functions on the territory of former Psychiatric Hospital. We lined a sports and recreation axis to Slovenian sport fields beside the stream.
The SGF Area
The present main building could be sustainable only after drastic reconstruction. The building itself represents the municipal hospital in Gorizia and around. Its meaning and spaces are not suitable for the new functions and can not be transformed. Therefore the main building shall be demolished. We keep the other buildings located in the park since they can be utilized because of their small sizes, technical conditions, architectural values. We place a new landmark-type building on the area which gives a new characteristics and orientation to the whole park. The building rearranges the park itself together with the planned functions. The building accomodates all functions related to youth. It is organized along a street parallel to the longitudinal axis. Its interior spaces can be changed flexible, it can be adapted to the constantly changing demands, but still remaining compact and preserving its landmark. The park is a living, pulsating program area. The colourful, diversified park full of life is disciplined and regularized by the architectural characteristics.
ASS2 MUNICIPARITY
Non-profit LTD.develop, operate
develop
operate kultural functions
operatefree healthservices
let orsellbuildings
operatepayablefunctions