Locations of fence post or railing indicatively Entry Entry Entry Entry Ladder locationnot more than 8000mm When railingfixed, provide warning tape in day warning coloured lights at night Trench by m as s excavation S ec ti on 8000 3000 Ladders Railing in case it is inside big project orfencing when plot boundary Trench vertical sides considered in goodsoil.Noslope shown 50000 50000 Typical Section applicable indicatively to all sides Excavation safety of a major building project with ordinary foundations Ramp Ingress/Egress For heavy vehicles/equipment Ramp location to be decided on site width 4000/6000 depending on requirement If required dewatering to be done Well points to be installed around & trench base Headers & Miller pumps on ground Bank/Flag Man to signal Trench by m as s excavation S ec ti on 9000 Typical Section applicable indicatively to all sides Excavation safety of a major building project with benching Manhole benchings Foundation working area to be dry Dewatering system not shown on plan Safety rails on lowe benches not shown Generally applicable in sandy strata Typical shown only for railing Ground Level Excavation Level Sump Submersible pump Dewatering hose pipe to manhole Dewatering hose pipe to manhole can be @ 2 locations Submersible pump in sump Submersible pump in sump Excavations safety Sketch 5

Upload: p-eng-suraj-singh

Post on 09-Apr-2017

4 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: 36   safety related sketches5

Locations of fence post or railing indicatively

Entry

Entry

Entry

Entry

Ladder locationnot more than 8000mm

When railingfixed, provide warning tape in day

warning coloured lights at night

Trench by m ass excavation

Section

8000

3000

Ladders

Railing in case it is ins ide big project or fencing when plot boundary

Trench v ertical s ides cons idered in good soil. No slope shown

5000

0

50000

Typical Section applicable indicatively to all sidesExcavation safety of a major building project with ordinary foundations

Ramp Ingress/Egress

For heavy vehicles/equipment

Ramp location to be decided on site

width 4000/6000 depending on requirement

If required dewatering to be doneWell points to be installed around & trench base

Headers & Miller pumps on ground

Bank/Flag Man to signal

Trench by m ass excavation

Section

9000

Typical Section applicable indicatively to all sidesExcavation safety of a major building project with benching

Manhole

benchings

Foundation working area to be dry

Dewatering system not shown on plan

Safety rails on lowe benches not shown

Generally applicable in sandy strata

Typical shown only for railing

Ground Level

Excavation Level

Sump

Submersible pump

Dewatering hose pipe to manhole

Dewatering hose pipe to manhole can be @ 2 locations

Submersible pump in sump

Submersible pump in sump

Excavations safety

Sketch 5