357500 360000 362500 365000 367500 0 h40 i40 5 7 0 7 6
TRANSCRIPT
#0
#0
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!. !.
!.
")")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")
")")")
")
")
")
98
65432
838281
80
79
78
76
75
73
72
71
6968
656463
62
61
6059
5554
5352
51
48
47
44
41
4039
383736
3431
30
29 2827
2522
212019
14
13
1110
113112111110
109
7
1
77
58
5756
35
26
15
I180 J180
H40
L80L82
L83
I40
F131
L200
N180
N190
F132
M80
N191
M60
E50
E140
N90
D121
O191
P190
Q170
P70
R190
Q81
Q80
Q110
Q70
Q82
J181
L170
L180
K170
H140
L100
L90
L70
L71
L101
F120
K51
K50
O190
N100
P170
R121
R120
357500 360000 362500 365000 36750066
9250
066
9500
066
9750
067
0000
067
0250
067
0500
067
0750
0
PROJECT
TITLE
DRAWING No. REV
White Rock Wind FarmMOD 3 Approved Layout:
Overview Map
LEGEND
Disclaimer:This plan was prepared for the purpose and exclusive use of Goldwind Australia.Goldwind Australia gives no warranty in relationto the data (including accuracy, reliability, completeness or suitability) and accepts no liability for any loss, damage or costs (including consequential damage) relating to any use of the data in this map.
Projection: GDA94 MGA56
±0 1,000 2,000500 Metres
Approved
13/04/2016
1:50,000 @ A3
STATUS
DATE
SCALE
WRWF_MOD3_009_1H
A.Maddocks
I.Mackey
J.Bembrick
APPROVED
PRODUCED
CHECKED
1H
Site PerimeterCadastral Boundary
!. Turbine Layout 66#0 Permanent Met Mast") Involved Residence") Uninvolved Residence") Neighbour Agreement
Existing 132kV Transmission Line33kV Overhead LineSubstation / Switchyard
Note: Locations subject to micrositing allowance of 100m as long as impacts remain consistant with that assessed.
Original PA Approved LayoutOperation & Maintenance FacilityTemporary Construction CompoundLaydown AreaConcrete Batching PlantLaydown Area & Batching PlantAccess Tracks132kV Overhead Line
MOD 3 Approved LayoutOperation & Maintenance FacilityTemporary Construction CompoundLaydown AreaConcrete Batching PlantAccess Tracks132kV Overhead Line