300m3day.pdf
TRANSCRIPT
-
8/10/2019 300m3day.pdf
1/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
Date: 18.03.2014
Proposal: Supply installation and commissioning ofReverse osmosis Plant
Capacity: 300 m3/day.
Client:
Hassan Al Shaik
ETCH2O COMMERCIAL QUOTE: 2013-AR-120(R1)
COUNTRY SAUDI ARABIA
EEC HIGH-SPEED BIO TEC
-
8/10/2019 300m3day.pdf
2/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
INTRODUCTION
General Introduction
Government Agencies are always looking to find lower cost solutions to the problem ofmeeting higher water quality standards. Cost issues such as water and treatment plant
design, operation cost, and manpower requirements all influence how the Government
Agency will deal with water and wastewater treatment. This is a challenging time to findinnovative low cost engineering solutions with little down side risk. ETCH2O has designed
and produced a very successful range of High Speed Biotech Systems to help you provide
simple low-cost solutions to meet the most stringent water and wastewater standards.
WASTEWATER TREATMENT INNOVATION FROM EEC GLOBAL
EEC was founded in 1982 with approximately 5,000 environmental protection systemsinstalled with clients in more than 45 countries. ETCH2O would like to work with you to
provide a "Total Solution" with a single system or a combination of systems to satisfy yourspecific need. ETCH2Ohigh quality bio systems are fully automatic, extremely reliable, andare selected by high end clients and military around the world.
Our Engineering staff, which includes Environmental, Mechanical, Civil, and ElectricalEngineers, is able to provide a turnkey project on time and within the allocated budget. With
the assistance of our certified technicians, our engineers ensure the projects execution and
performance will always meet or exceed the required quality standards.
With a focus on customer needs and satisfaction as well as the realization of the importance
of a continuously operating plant, our teams of customer service professionals ensure roundthe clock support to all our clients. Our customer service technicians are dedicated torestoring plant operation within 24 hours minimizing the plant downtime.
According to our motto there is always room for improvement, ETCH2O is dedicated tocontinuous product, and process development. Our training programs emphasize technical
know-how, and continuous development, which are evident through our work.
We look forward to hearing from you and please feel free to contact us if you have anyquestions.
-
8/10/2019 300m3day.pdf
3/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
INTRODUCTIONTO REVERSE OSMOSIS:
PROCESS DESCRIPTION
The phenomenon of osmosis occurs when pure water flows from a dilute saline solution
through a membrane into higher concentrated saline solution. The phenomenon of osmosis is
illustrated in Figure below. A semi permeable membrane is placed between twocompartments. Semi permeable means that the membrane is permeable to some species,
and not permeable to others. Assume that this membrane is permeable to water, but not tosalt. Then, place a salt solution in one compartment and pure water in the other
compartment. The membrane will allow water to permeate through it to either side. But salt
cannot pass through the membrane. As a fundamental rule of nature, this system will try toreach equilibrium. That is, it will try to reach the same concentration on both sides of the
membrane. The only possible way to reach equilibrium is for water to pass from the purewater compartment to the salt-containing compartment, to dilute the salt solution. Figure
also shows that osmosis can cause a rise in the height of the salt solution. This height willincrease until the pressure of the column of water (salt solution) is so high that the force of
this water column stops the water flow. The equilibrium point of this water column height in
terms of water pressure against the membrane is called osmotic pressure. If a force isapplied to this column of water, the direction of water flow through the membrane can bereversed. This is the basis of the term reverse osmosis. Note that this reversed flow
produces pure water from the salt solution, since the membrane is not permeable to salt.
-
8/10/2019 300m3day.pdf
4/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
Reverse Osmosis In Practice
With a high pressure pump, pressurized saline feed water is continuously pumped to themodule system. Within the module, consisting of a pressure vessel (housing) and amembrane element, the feed water will be split into a low saline product, called permeateand a high saline brine, called concentrate or reject. A flow regulating valve, called
concentrate valve, controls the percentage of feed water that is going to the concentrate
stream and the permeate which will be obtained from the feed. In the case of a spiral woundmodule consisting of a pressure vessel and several spiral wound elements, pressurized waterflows into the vessel and through the channels between the spiral windings of the element.
Up to seven elements can be connected together within a pressure vessel. The feed water
becomes more and more concentrated and will enter the next element, and at last exits fromthe last element to the concentrate valve where the applied pressure will be released.
Permeate of each element will be collected in the common permeate tube installed in the
centre of each spiral wound element and flows to a permeate collecting pipe outside of thepressure vessel.
The feed water shall be drawn by the booster pump from the client raw water tank by thefilter feed pump and chlorinated before fed to pre-treatment filtration.
Media filtration is included having Gravel and Sand. Filtration will be manually controlled forthe operation and backwashing and the filter is expected to be washed once per day.
Pressure gauges are provided to indicate when backwashing is required.The filtered water is De-Chlorinated with sodium meta bisulphite before feeding the
membranes.
After pre-treatment the water shall comply with guidelines for feeding permeators namely,the SDI (Silt Density Index) is less than 3. There shall be no chlorine present and the
dissolved iron should be less than 0.03 mg/l.
In addition to the above parameters, ETCH2O own specially developed ETCH2O
solution sequestrant is added to prevent scaling by calcium sulphate. Furthermore, ETCH2O
solution enables the plant to operate with an LSI (Langelier Saturation Index) in the brinestream of up to 1.0 instead of the conventional operation at a negative LSI.
Since LSI is pH dependent, the use of ETCH2O solution reduces the acid consumption
required to prevent calcium carbonate scaling.
Chemical mixing is achieved in-line in the low-pressure section together with 5-
micron cartridge filtration.
The feed water is then boosted by high-pressure pump and is divided in the
permeators into permeate and reject streams by reverse osmosis pressure. The reverseosmosis membranes are ion selective and allow almost pure water to permeate through tothe product stream while salts are rejected and flow out into the brine stream. In the event
-
8/10/2019 300m3day.pdf
5/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
that the feed water analysis changes, the plant performance changes accordingly.Subsequent to reverse osmosis, the permeate will feed under remaining pressure to the
client product water storage tank.
Post-treatment chemical dosing equipment enables final correction of pH and sterilization ofthe product water, prior to storage in the product water tank.
Cleaning and maintenance of the permeator membrane are reduced by the inclusion ofmembrane flushing system.
The R.O. system will be a standard ETCH2O product pre-fabricated on a corrosion-resistant
skid. The module will include an integral panel, piping and control valves.
Performance
This system has been designed to operate on a feed Water having TDS of 40000 mg/l(max), where individual salt levels permit operation at 35 % water recovery in the Reverse
Osmosis unit.
It should be noted that the system design is based on feed water operating
temperature range of 25C - 35C and that variations in temperature will affect
performance.
The permeate water produced by the system will have a TDS of < 200 mg/l. before
post-treatment.
The plant is designed to produce the stated capacity throughout the first year of operation;
however, there may be reduction during the next two years of about 4%.
Guarantee
All equipment supplied by ETCH2O are guaranteed against defective manufacture and bad
workmanship for:
14 Months from delivery of equipment to site.
13 Months from installation of equipment.
12 Months from commissioning.
Whichever of the above dated occurs first.
-
8/10/2019 300m3day.pdf
6/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
Scope of Contract
The basis of the offer shall be supply, installation and commissioning of the Brackish WaterReverse Osmosis Plant.
SCOPE OF SUPPLY
Brackish Water Reverse Osmosis Plant, Capacity 300 m/day
The scope of supply offered comprises the following:
Item Qty. Description
1. 1 Pre-Chlorination Dosing Set
2. 2 Filter Feed / Backwash Pump (1duty / 1standby)
3. 1 Manual Multi Media Filter
4. 1 De-Chlorination Dosing Set
5. 1 Reverse Osmosis Unit Consist of:R.O. Skid.
Cartridge Filter.Acid Dosing Set.
Anti-Scalant Dosing Set.
High Pressure Pump.
Membrane.Pressure Vessel.
High & Low Pressure piping work.
Instrumentation.Flow Control Valves.
Monitoring control panel
6. 1 Post TreatmentPost-Chlorination Dosing Set.
pH Adjustment Dosing Set.
7. 1 Lot Instrument for Control Panel.
8. 1 Lot Piping work and Cabling for the proposed equipment.
-
8/10/2019 300m3day.pdf
7/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
EQUIPMENT SPECIFICATION
1.0 Pre-Chlorination Dosing Set
Quantity : One (1)
Reagent : Sodium Hypochlorite Solution 12%
Duty : Up to 3.78 LPH at 100 psi
Type : Positive displacement diaphragm pumpwith variable stroke length.
Material : PVC
Control : Manually adjusted control for stroke lengthand automatically start-up with the filterfeed pump.
Fittings : Supply to include :
-Foot Valve with Strainer-Injection Check Valve-Suction and Injection Tubing
Manufacturer : Pulsafeeder USA
Dosing Tank
Quantity : One (1)
Reagent : Sodium Hypochlorite Solution 12%
Capacity : 189 lit.
Material : Polyethylene
Fittings
Cover : Snap top with filling port and reinforcedpump base.
Manufacturer : Pulsafeeder USA
-
8/10/2019 300m3day.pdf
8/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
2.0 Filter Feed / Backwash Pumps
Quantity : Two (2) (1 Duty / 1 Standby)
Type : Centrifugal
Duty : 17.85 m/hr
Head : 40 m TDH (4 bar)
Material, Wetted Parts : Stainless Steel
Impeller material : Stainless Steel
Shaft material : Stainless Steel
Motor speed : 3500 RPM
Manufacturer : DP-Holland
Power : 380V/3PH/60Hz
-
8/10/2019 300m3day.pdf
9/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
3.0 Manual Multi Media Filter
Quantity : One (1)
Model : ETCH2O
Type : Vertical
Size : 1.4 mts
Operating pressure : 3.5 bar
Material of construction : FRP
Service flow rate : 17.85 m/hr
Filtration rate : 11.66 m/m/hr.
Media type : Silica Sand, and Gravel
Operation : Manual
Valves : 2 " Ball valves
Face piping : PVC of Class 5
Accessories : - Pressure Gauges- Air Release Valve- Sampling Points Before and After the
Filter
Manufacturer : Pentair
-
8/10/2019 300m3day.pdf
10/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
4.0 De-Chlorination Dosing Set
Quantity : One (1)
Reagent : Sodium Metabisulphite
Duty : Up to 3.78 LPH at 100 psi
Type : Positive displacement diaphragm pumpwith variable stroke length.
Material : PVC
Mode of adjustment : Manual 0 to 100% external signal frompH and chlorine meter and controller
Fittings : Supply to include :
-Foot Valve with Strainer-Injection Check Valve-Suction and Injection Tubing
Manufacturer : Pulsafeeder - USA
Dosing Tank
Quantity : One (1)
Reagent : Sodium Metabisulphite
Capacity : 189 lit.
Material : Polyethylene
Fittings
Cover : Snap top with filling port and reinforcedpump base.
Manufacturer : Pulsafeeder USA
-
8/10/2019 300m3day.pdf
11/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
5.0 Design Data for Reverse Osmosis Plant
One (1) Reverse Osmosis Plant model No. ETCH2O 250BW capable of
producing 300 m/day of product water from the total feed of 428.56 m3/day.
Design Parameters
Feed Water TDS (max.) : 3000 mg/l
Feed temperature : 25-35o C
Maximum H2S : Nil
Maximum SDI : 3
Maximum Fe : 0.03 mg/l
Maximum chlorine : Zero
Silica : < 30 mg/l
pH : 7.0 7.5
Product Water TDS : < 250 mg/l
Recovery : 70 %
-
8/10/2019 300m3day.pdf
12/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
5.1 Cartridge Filtration
Number of housings : One (1)
No. of cartridge : Ten (10) each
Material of construction : Stainless Steel 316 L
Working pressure : 4 bar
Maximum Pressure : 6 Bar
Particle cut off size : 5 Micron
Cartridge material : Polypropylene
Length of cartridge elements : 10 inches
Accessories : Pressure GaugeAir Release Valve
Manufacturer : WTP-USA
-
8/10/2019 300m3day.pdf
13/24
-
8/10/2019 300m3day.pdf
14/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
5.3 Anti-Scalant Dosing Set
Quantity : One (1)
Reagent : H2O Care50
Duty : 0-3.78 ltr/hr.
Type : Positive displacement diaphragm pumpwith variable stroke length.
Material : PVDF
Control : Manually adjusted control for strokelength and automatically start-up with
the R.O. unit.Fittings : Supply to include:
-Foot valve with strainer-Injection Check Valve-Suction and injection tubing
Manufacturer : Pulsatron - USA
Dosing Tank
Quantity : One (1)
Reagent : H2O Care 50
Capacity : 189 lit.
Material : Polyethylene
Manufacturer : Pulsafeeder - USA
-
8/10/2019 300m3day.pdf
15/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
5.4 High Pressure Pump
Quantity : One (1)
Duty : 17.85 m3/Hr
Pressure : 15 bar
Motor arrangement : Direct coupled
Winding insulation : Class F
Motor : TEFC
Starter : DOL
Manufacturer : DP Holland
Power : 380V/3PH/60Hz
5.5 Membrane
No. of Elements : Fifteen (15) elements
Type of Elements : Brackish Water Membrane
Size : 8 inch dia x 40 inches long
Staging : Two Stage (1)
No. of vessels : Three (3) vessels, Five (5) elements pervessel
Membrane Type : Filmtech / Hydranautic
-
8/10/2019 300m3day.pdf
16/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
5.6 Feed Control Valve
Quantity : (1) One
Working pressure : 15 bar
Maximum working pressure : 20 bar
Materials of construction : Stainless steel
Adjustment (setting) : Manual
Manufacturer : John Valve Italy
5.7 Brine Control Valve
Quantity : (1) One
Working pressure : 15 bar
Maximum working pressure : 20 bar
Materials of construction : Stainless steel
Adjustment (setting) : Manual
Manufacturer : John Valve Italy
-
8/10/2019 300m3day.pdf
17/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
5.8 Low Pressure Pipework
Materials of construction : PVC
Specification : Class 5
Working pressure : 10 bar
Fittings : Socket welded
Manufacturer : NEPRO PLAST KSA
5.9 High Pressure Manifold
Materials : 316 S.S.
Working pressure : 70 bar
Pipe specification : API 5L schedule 40 seamless
Connections : Fed to permeators-Victualic, othersscrewed.
-
8/10/2019 300m3day.pdf
18/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
6.0 Post Treatment
6.1 Post-Chlorination Dosing Set
Quantity : One (1)
Reagent : Sodium Hypochlorite Solution 12%
Duty : Up to 3.78 LPH at 100 psi
Type : Positive displacement diaphragm pumpWith variable stroke length.
Material : PVC
Control : Manually adjusted control for strokelength and automatically start-
up withthe R.O. unit
Fittings : Supply to include:
-Foot valve with strainer-Injection Check Valve-Suction and injection tubing
Manufacturer : Pulsafeeder USA
Dosing Tank
Quantity : One (1)
Reagent : Sodium Hypochlorite Solution 12%
Capacity : 189 lit.
Material : Polyethylene
FittingsCover : Snap top with filling port and reinforced
pump base.
Manufacturer : Pulsafeeder USA
-
8/10/2019 300m3day.pdf
19/24
-
8/10/2019 300m3day.pdf
20/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
7.0 Electrical Control & Instrumentation
7.1 Control panel
Qty : One (1)
Construction : Sheet steel
Finish : Enamel
Enclosure : NEMA-12
Protection : IP54
Cable entry : Top/Bottom
Incoming power supply : 380V/3Ph/60Hz
Running lamps included : Power on
Interlocks provided : High Pressure PumpDosing Pumps
Plant wiring cable spec. : PVC sheathed
Control : By PLC
Automatic stop for:
-Pump motor failure-System high pressure-Low Pressure feed water
-Low level, raw water tank-pH out of scale-High level, product water tank.
-
8/10/2019 300m3day.pdf
21/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
Note: The power supply mentioned above will be applied while constructingthe unit at our factory and for a different power supply a written
confirmation has to be submitted to ETCH2O.
7.2 pH Meter
Quantity : (1) OneApplication : Feed waterRange : 0-14Type : Indicating, flush mounted meter
complete with sensor and fittings.
7.3 Pressure Gauge
Quantity : (4) FourApplication : Feed waterType : Dial type liquid filledManufacturer : Wika - Germany
7.4 Flow Meter
Quantity : (2) twoApplication : Product water and Reject waterType : Indicating, flush mounted meter
Complete with sensor and fittings.
7.5 Conductivity Meter
Quantity : (1) OneApplication : Product WaterType : Indicating, flush mounted meter
Complete with sensor and fittings.
-
8/10/2019 300m3day.pdf
22/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
T: + 966 845 6931, 6933 | F: + 966 8945 6932 | W: etch2o.com | C. R. No 2051037486
8 Plant Wiring
This shall be provided where ETCH2Oscope includes installation.
Cables shall be suitably sized for the appropriate duty. PVC sheathed, andextends only between the local ETCH2Opanel and the individual drives andcontrols in the scope of offer.
Pipework
The process and interconnecting Pipework for the Brackish Water System willgenerally be Saudi Arabian manufactured Class 5 PVC.
Drawings
The drawings included in the scope are limited to the following:
- Civil Outline Drawing- Civil Arrangement of Plant Room- General Arrangement of the Overall Plant.- Flow Diagram.- Panel Schematic Wiring Diagram.
Operation & Maintenance Manuals
Two (2) comprehensive Operation & Maintenance Manuals describing theplant in detail, complete with drawings and equipments schedules, operationand lubrication schedules, equipment manuals and spare parts lists, all inEnglish language on an A4 format.
-
8/10/2019 300m3day.pdf
23/24
-
8/10/2019 300m3day.pdf
24/24
Environmental Equipment Company Ltd
Environmental Equipment Company LTD.
P .O. BOX 30655 AL KHOBAR SAUDI ARABIA
The following items and services are excluded from the scope of this offer:
- Any item not specifically described in ETCH2O's specification.- Any civil works and designs.- Any site lighting, fencing and guarding.- Excavation, backfilling, trenching and making good.- Any consumable such, but not limited to, spare parts, water, power,
chemicals, lubricants, fuels for erection, commissioning or running of theplant (except where explicitly included herein).
- Power supplies to ETCH2Olocal panel.- Offloading of equipment.- Storage on site and provision of secure space as required.
-
Transportation from storage to place of erection.- All craneage and lifting tackles.- Operation and maintenance.- Any pipe work or cabling outside the plant room.- Painting on site other than touch up of ETCH2Oinstalled equipment.- Drawing other than ETCH2Oinstallation drawings.- As built drawings.- Client's standard conditions of purchase.- Any handrail, platforms, ladders, duct and duct covers of any kind unless
specified in this offer.- Air conditioning and other utilities for the plant room.
Assuring you of our Best attention at all times and looking forward to serveyou soon.
For and on behalf of
Muhammad M.Ali
Proposals Manager