22 connections

Upload: alin-fazacas

Post on 03-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 22 Connections

    1/27

    Connections

    EPLAN Training 1

    Connections

  • 8/12/2019 22 Connections

    2/27

    Connections

    EPLAN Training 2

    1 Editing the Connections...............................................................................31.1 Designate connections..............................................................................31.2 Update connections ..................................................................................41.3 Interrupt connections ................................................................................51.4 Delete connections ...................................................................................6

    2 Using Smart Connect .................................................................................103 Drawing Connection Definition Points......................................................114 Predefining Connection Properties...........................................................135 Specifying Connection Properties for the Potential ................................156 Specifying Connection Properties via Connection Definition Points ....177 Viewing and Editing the Connection Properties ......................................198 Using Existing Connections ......................................................................219 Placing Connections ..................................................................................23

    9.1 Delete connection placements................................................................24

    This functionality is only available for certain module packages. Info

  • 8/12/2019 22 Connections

    3/27

  • 8/12/2019 22 Connections

    4/27

    Connections

    EPLAN Training 4

    2. If you want to rotate the symbol, hold the [Ctrl]key down and move the mousein a circle.

    The symbol is rotated in 90steps.

    3. Click in the schematic to place the symbol on the page.

    Note:

    Autoconnecting initially generates only a graphical line, not a connection with data.

    For certain actions (e.g., closing a page) the connections are first automaticallyupdated. In doing this, new connections are generated based on the availableinformation or existing connections are updated. You can also manually call up theupdate of connections at any time.

    1.2 Update connections

    Connection properties are defined at four different locations: in the project settings, atpotential connection points, potential definition points, and connection definitionpoints. Connection data is not immediately automatically updated after changes. Youcan manually update them if you need to.

    Note:

    You can tell if connections are up-to-date by looking at the right edge of the statusbar: If the "#" sign is displayed, the project has out-of-date connections. If the "*" signis displayed, the open page has out-of-date connections.

    Precondition:

    You have opened a page in the graphical editor or selected pages in the pagenavigator.

  • 8/12/2019 22 Connections

    5/27

    Connections

    EPLAN Training 5

    1. Select the menu items Project data > Connections > Update.

    EPLAN regenerates all connections in the project. A progress bar isdisplayed allowing you to cancel the process.

    1.3 Interrupt connections

    A connection can be interrupted using a break point.

  • 8/12/2019 22 Connections

    6/27

    Connections

    EPLAN Training 6

    1. Select the menu items Insert > Connection symbol > Break pointand placethe break point on a connection line.

    EPLAN separates the corresponding connection.

    1.4 Delete connections

    Connections are automatically deleted if you move a component in the schematic

    and its connection points can no longer find its counterpart. Any existing connectiondefinition points remain.

    Unplaced connections can be deleted in the Connections - dialog:

  • 8/12/2019 22 Connections

    7/27

    Connections

    EPLAN Training 7

    1. Select the menu items Project data > Connections > Navigator.

  • 8/12/2019 22 Connections

    8/27

    Connections

    EPLAN Training 8

    2. In the Connections - dialog select the unplaced connectionsyou want to delete.

  • 8/12/2019 22 Connections

    9/27

    Connections

    EPLAN Training 9

    3. Select Popup menu > Delete.

    After a confirmation prompt the connections in question are deleted.

    This functionality is only available for certain module packages. Info

  • 8/12/2019 22 Connections

    10/27

    Connections

    EPLAN Training 10

    2 Using Smart Connect

    Smart connect allows the movement of symbols in the schematic while retaining the

    autoconnection.

    Precondition:

    You have opened a page in the graphical editor.

    Options > Smart connect

    1. Hold down the left mouse button and move a symbol in the schematic.

    After releasing the left mouse button, the autoconnect lines are

    automatically redrawn.

    2. If you no longer wish to use smart connect, reselect the menu item Options >Smart connect.

    This functionality is only available for certain module packages. Info

  • 8/12/2019 22 Connections

    11/27

    Connections

    EPLAN Training 11

    3 Drawing Connection Definition Points

    Connections also be assigned properties via connection definition points.

    1. Select the menu items Insert > Connection definition point.

    The symbol for the connection definition point hangs on the cursor.

    2. Click in the schematic to place the connection definition point.

  • 8/12/2019 22 Connections

    12/27

    Connections

    EPLAN Training 12

    3. In the Properties dialog specify the connection properties in theConnection definition pointtab (and other properties in the other tabs, ifnecessary).

    4. Click [OK].

    The properties are assigned to the connection passing through theconnection definition point.

    Tip:

    You can insert multiple connection definition points at the same time by holding theleft mouse button down and pulling the cursor over multiple autoconnect lines.At each autoconnect line intersected, a connection definition point is thenplaced.

    This functionality is only available for certain module packages. Info

  • 8/12/2019 22 Connections

    13/27

    Connections

    EPLAN Training 13

    4 Predefining Connection Properties

    Connections are given properties once from the defaults in the project and the

    properties of the potential. All other properties are specified in the connectiondefinition points.

    You can specify certain properties for connections in the project settings that are thenassigned to every connection generated.

    The properties specified in the project are inherited by the potential. The potentialsthen pass on their properties to the signals and then the connections. You canmanually change the data on the individual levels and define additional properties.

    Options > Settings > Projects > "Project name" > Connections > Properties

    1. Select the desired tab, Electrical Engineering, Hydraulic, Pneumatic,Cooling , or Lubrication.

    2. In the individual fields specify the default values for the connection properties.

  • 8/12/2019 22 Connections

    14/27

    Connections

    EPLAN Training 14

    3. Click [OK].

    The default values are saved. When generating a connection it isautomatically assigned the corresponding default values.

    This functionality is only available for certain module packages. Info

  • 8/12/2019 22 Connections

    15/27

    Connections

    EPLAN Training 15

    5 Specifying Connection Properties for thePotential

    Properties can also be assigned to a connection via the potential connection pointsor potential definition points. If a connection with a potential connection point isconnected, or it intersects a potential definition point, it automatically inherits theconnection properties.

    Precondition:

    The connection leads to a potential connection point or intersects a potentialdefinition point.

    1. Double-click the potential connection point or potential definition point.

    2. Specify the name of the signal and the potential in the Potential definitiontabof the Properties dialog in the Name of potentialand Signal namefields. Click [...]to open a selection dialog with signal and potential namesdefined in the project.

  • 8/12/2019 22 Connections

    16/27

    Connections

    EPLAN Training 16

    3. In the Propertiesfield change the values for the already specified properties,or create new ones.

    4. In the Displaytab you can change how properties are displayed in theschematic and in the Connection graphictab you can change the graphicalproperties of the connection lines.

    5. Click [OK].

    The defined properties are assigned to all connections attached to thepotential in question.

    This functionality is only available for certain module packages. Info

  • 8/12/2019 22 Connections

    17/27

  • 8/12/2019 22 Connections

    18/27

    Connections

    EPLAN Training 18

    3. In the Displaytab you can change how properties are displayed in theschematic and in the Connection graphictab you can change the graphicalproperties of the connection lines.

    4. In the Partstab you can assign parts data to the connection.

    5. Click [OK].

    The defined properties are only assigned to the connection that intersectsthe connection definition point in question. You can change the properties ofmore than one connection if you make a multiple selection of connection

    definition points.

    This functionality is only available for certain module packages. Info

  • 8/12/2019 22 Connections

    19/27

    Connections

    EPLAN Training 19

    7 Viewing and Editing the Connection Properties

    Connection properties can be viewed and edited in the Connections - dialog.

    Project data > Connections > Navigator

    1. In the Connections - dialog mark the desired connectionsand select Popup menu > Edit.

  • 8/12/2019 22 Connections

    20/27

    Connections

    EPLAN Training 20

    2. In the Properties dialog change the connection properties in theConnectiontab and the graphical properties in the Connection graphicstab.

    3. Click [OK].

    The changes are adopted.

    Connections can be assigned additional properties via Connection definition points.Edit these properties at the connection definition point.

    This functionality is only available for certain module packages. Info

  • 8/12/2019 22 Connections

    21/27

    Connections

    EPLAN Training 21

    8 Using Existing Connections

    In EPLAN you can generate unplaced connections that predefine certain properties.

    These connections can be used on existing Connection definition points. The placedconnection in question thus gets the properties of the unplaced connection. It is alsopossible to use existing placed connections. The connection in question then existsmore than once in the project and must be edited at a later point in time.

    1. Select the menu items Insert > Connection definition point and place theconnection definition point on a connection line.

    2. In the Properties dialog select the Connection definition pointtab andclick [...]next to the Displayed DTfield.

    All unplaced and placed connections of the project are listed in the Useexisting connectionsdialog. Connections where bothtargets match thetargets of the selected connections are at the top of the list. After that are the

  • 8/12/2019 22 Connections

    22/27

  • 8/12/2019 22 Connections

    23/27

  • 8/12/2019 22 Connections

    24/27

    Connections

    EPLAN Training 24

    2. Select Popup menu > Place.

    The symbol for a connection definition point hangs on the cursor.

    3. Click in the schematic to place the connection definition point.

    A connection definition point with the connection data is placed. Unplacedconnections are deleted after the placement.

    9.1 Delete connection placements

    A connection placement can only be deleted via its connection definition point. The

    connection will then exist as an unplaced connection in the project.

  • 8/12/2019 22 Connections

    25/27

    Connections

    EPLAN Training 25

    1. Mark the desired connection definition points and select the menu items Edit >Delete placement.

    The connection definition points in question will disappear and unplacedconnections will appear. This also applies if the connection it is associated

    with does not disappear. Then there are two connections: one placed withoutspecial properties and one unplaced with special properties.

    If an unplaced connection already exists with identical targets, an additionalunplaced connection is added. Because multiple connection definition pointscan be located on the same connection, this can result in inconsistencies.

    If you delete the placements on multiple connection definition points of oneconnection, multiple unplaced connections will be created. You can use orplace these unplaced connections again on multiple connection definitionpoints of oneconnection, in which case you again have the same result asbefore deleting the placements.

    Note:

  • 8/12/2019 22 Connections

    26/27

  • 8/12/2019 22 Connections

    27/27

    Connections

    EPLAN Training 27