21 st un/cefact forum 15-19 april 2013 palais des nations geneva

36
UN Economic Commission for Europe 21 st UN/CEFACT FORUM 15-19 April 2013 PALAIS DES NATIONS GENEVA

Upload: carrington

Post on 14-Feb-2016

60 views

Category:

Documents


0 download

DESCRIPTION

21 st UN/CEFACT FORUM 15-19 April 2013 PALAIS DES NATIONS GENEVA. 21st UN/CEFACT FORUM. Trade and Transport Facilitation Program Development Area. Guidelines on Rec. Development (15/4) Recommendation 14 (16/4) Single Window Interoperability (Rec. 36, 17/4) Consultation Approaches (18/4) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe

21st UN/CEFACT FORUM

15-19 April 2013

PALAIS DES NATIONSGENEVA

Page 2: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe

2

Page 3: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA
Page 4: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe

Trade and Transport Facilitation

Program Development Area

4

21st UN/CEFACT FORUM

Page 5: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

30

ITPD activities during the Forum

• Guidelines on Rec. Development (15/4)• Recommendation 14 (16/4)• Single Window Interoperability (Rec. 36,

17/4) • Consultation Approaches (18/4)• Public Private Partnership (18/4)• Recommendation 1 Review (19/4)• Mobile Commerce (19/1)

Page 6: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA
Page 7: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe

21st UN/CEFACT FORUM

Supply Chain Program Development Area

Mike Doran UN/CEFACT Plenary Vice Chair

7

Page 8: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe

CCL V3 publication

• Publication plan endorsed by the Bureau– Includes public review period 60 days

• Draft CCLv3 validated and ready for public review:

29th of April• Production of future v3 procedures : planned

19 April 2013

Page 9: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe Project Status

eTendering, CFEM and CII in version 3.0

• Publication plan endorsed by the Bureau– Includes public review period 60 days

• Draft RSMs and schemas ready for public review:29th of April

Page 10: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe

Sectoral Programme Development

AreaAgenda for the Week

Bruno Prepin & Harm Jan van BurgUN/CEFACT Plenary Vice Chairs

10

Page 11: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

21ST UN/CEFACT FORUM15-19 APRIL 2013

GENEVA

PDA Sectoral / Agriculture

11

Page 12: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

New project proposals Animal Traceability

A project proposal is submitted to the working group.

This project proposal is an update of the project on hold «  Lifestock Life Record » P094

12

Page 13: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

eCERT electronic signature

We discussed the possibility of electronic signature to support the paperless trade with eCert

A technical solution will be tested by EC and the Netherlands and will be included in the guidelines for implementation.

13

Page 14: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

RASFF Harmonization in progress

Coherence with core components of eCert and eLabs.

Publication expected in the CCL 13 A

Pilots expected with Spain, Italy and the Netherlands in the next few months

14

Page 15: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

15

The RASFF system in practice

Page 16: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

16

RASFF WorkflowLocal

Authority

Central Authority

Page 17: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

eLABS Status of the project : schema published in the CCL12B

Presentation of the use of this message in the Fruit and Vegetables sector in the Netherlands.

There is a business demand for additionnal messages

These messages are in development and are going to be submitted in September.

eLabs additionnal messages Request for analysis

Request for Sampling

Confirmation of receiving the sampling

17

Page 18: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

eFOOD CHAIN

The framework reference model is presented

Discussion about the ICT Architecture

Pilots using UN/CEFACT standards are presented ( eLAbs, EDIFACT INVOIC..)

18

Page 19: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

• Curent documentary process

EDI files with invoice data

Paper version of invoices/document

s

Invoice duplicate

s

Paper version of invoices/document

s

On-line consultation of

duplicates

Extranet

Agriculteurs

Accounting centre

Cooperative

Page 20: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Expected process

EDI files with invoice data

On line consultation of documents, invoices

Extranet

Farmers

Accounting centres

Cooperative

IT provider

On line consultation of documents, invoices

(With the agreement of the farmer)

PDF file

Farmer 1

Farmer 2Farmer 3

Cooperative

Storage

o Electronic signature for the cooperative and the

farmero Certification of

signatureso Indexation of files

Page 21: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Technical solution

Invoice PDF + XML fileInterface WebTracking

- PDF receipt- signatures

- Signatures certification- storage

Cooperative 1

External IT Provider

10 yearsOn line

« Safe rooms »

CertificationCOOPERATIVE

Farmer

Farmer

10 yearsOn line

Cooperative NFarmer

Searching ofDocuments sent

by the cooperative

Alerts

Printing

Internet

E-mail alerts when a new document is

available

Sending paper

Page 22: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

• 3 or 4 cooperatives and between 1 and 10 farmers per cooperative will test the process in the pilot phase. Globally we expect 50 to 80 farmers participating in the pilot phase.

• Only invoices will be tested in the pilot phase

Pilot schedule

2012 2013 2014Sept Oct Nov Dec Jan Feb Mar Apr May June July August Sept Oct Nov Dec

Technical working group meetings            

Writing of specifications          

Lauching of the call for tenders   7    

Receiving call for tenders answers     15    

Legal working group meetings

Choice and definitive selection of the provider              

Contractualization provider/Adhérents.coop/cooperatives          

Running of pilot                                  

AssesmentDeployment

The IT provider was selected and the contractualization in progress

Page 23: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe

Sectoral PDA

Utilities DomainDomain Utilities deals with administrative/commercial

information regarding distribution through a physical grid (electricity, gas, water, sewage, heat etc.)

Domain Coordinator: Kees Sparreboom and Shingo Sakaguchi

23

Page 24: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe Next steps in work to be done

• Project plan for measured data for the various consumer energy management systems:– Submit for UN/CEFACT approval– When approved, start work on the project

• Project plan for master data and measured in liberalised markets (Europe)– Continue work

• Start discussions with IEC TC57 work group(s)

24

Page 25: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe

Sectoral PDA

Travel and Tourism DomainDomain Coordinator: Akio Suzuki

25

Page 26: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe Travel/Tourism DomainSLH and DTI projects

Travel/Tourism Domain covered the two projects based on the agenda. SLH (Small scaled Lodging House) Information Process Project:1. Had a joint meeting with Library Maintenance Group to make 

unqualified ABIEs qualified. All are approved and will be published in CCL 13A.

2. The verification points and implementation organization were discussed for the AFACT pilot project, in which SLH related standards will be checked for the coming real implementation.

3. SLH related web site issues in Outputs of UNCEFACT were talked and will be taken into action by UNECE secretariat and the project group.

26

Page 27: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

UN Economic Commission for Europe DTI (Destination Travel Information Process) Project

1. Realized that one of the countries has some issue to submit a letter of support in a short while. Decided to ask some other country with the help of our PDA Vice Chair. 2. Discussed on the project name, scope and outputs to further clarify the new project.3. Decided to include the proposed ‘Stay Program’ to be one area covered by the Project. 4. All relevant items will further be contemplatedIn the coming AFACT Danang meeting.  27

Page 28: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

21th UN/CEFACT FORUM

Methodology & Technology PDAChair pro-tem: Jostein Fromyr

Geneva, Switzerland – 15-19 April 2013

28

Page 29: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Methodology & Technology PDA

• Focus of this week has been on Project Team discussions on

• Business Document Header & Envelope

• Procedure for CCTS 3 and NDR artefacts publication

• Enabling interoperability between electronic data exchange systems in domestic and cross border trade proposal 29

Page 30: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Business Document Header & Envelope

• Regrettably current project team has recognized that they don’t have the required resources to complete the assignment.

• Alternative venues are under consideration.

30

Page 31: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Procedure for CCTS 3 and NDR 3 artefacts publication

• Joint discussion with the Supply Chain PDA.

• A “proof of concept” will be made available for public review shortly.

• Based on the experience from this the project will continue its work to provide an outline for the required procedures.

31

Page 32: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Enabling interoperability …

Enabling interoperability between electronic data exchange systems in

domestic and cross border trade proposal

• Constructive discussion amongst several interested participants

• Concluded that two projects will be pursued• “interoperability between electronic data

exchange systems “• “framework for interoperable trust services in

cross border trade” 32

Page 33: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Bureau Program SupportLibrary Maintenance

EDIFACT: Gait BoxmanCCLs: Chris Hassler, Mary Kay BlantzSchema: Jostein FromyrCode Lists: VariousValidation: Hidekazu Enjo

Vienna, Austria

33

Page 34: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Results

UN/EDIFACT D.13A40 DMRs (including two recast messages)

• 19 Accepted• 18 Accepted with change• 3 Rejected

34

Page 35: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

Results

• Fully automated schema production process• Reviewed test results• Some changes to be madeGoal: fully automated schema production

from CCL 13A

• Met with Bureau and others concerning EDIFACT procedures document

35

Page 36: 21 st  UN/CEFACT FORUM 15-19 April 2013 PALAIS DES  NATIONS GENEVA

THANK YOU !!!