County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ADAIR

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF LOUIE B.

NUNN CUMBERLAND PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 43.02 TO

MILEPOINT 57.79

LN-9008

PM

PM

0

400,000

4,000,000

0 4,400,000 0

20000

Total for ADAIR county PL

Total Amounts:

CN

UT

RW

DN

0

4,000,000

400,000

0 4,400,000 0

ALLEN

Project Cost:

CN

UT

RW

DN

PLIMPROVEMENTS TO KY 100: CURVE, BRIDGE,

AND INTERSECTION IMPROVEMENTS FROM

NEAR THE STONY POINT ROAD INTERSECTION

TO EAST OF THE ALONZO LONG HOLLOW

ROAD INTERSECTION (12CCR)

KY-100

SPP

SPP

1,300,000

1,300,000

12,000,000

0 12,000,000 0

320

ALLEN

Project Cost:

CN

UT

RW

DN

PLWIDENING OF KY 100 (FRANKLIN ROAD) TO 3

LANES WITH URBAN SECTION FROM OLIVER

STREET TO US 31E TO INCREASE

CAPACITY/SAFETY. MP 11.800-12.700 (14CCN)

KY-100

SPP

SPP

SPP

SPP

480,000

480,000

380,000

670,000

3,800,000

380,000 670,000 3,800,000

8802

Total for ALLEN county PL

Total Amounts:

CN

UT

RW

DN 480,000

1,300,000

1,780,000

12,000,000 3,800,000

380,000

670,000

380,000 12,670,000 3,800,000

Page 2 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ANDERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF MARTHA

LAYNE COLLINS BLUEGRASS PARKWAY

CARDINAL DIRECTION(S) FROM MILEPOINT 58.3

TO MILEPOINT 61.84

BG-9002

PM

PM

0

150,000

1,500,000

0 0 1,650,000

20001

ANDERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-62 (VERSAILLES RD.) FROM

HILLTOP DR. TO WEST END OF BRIDGE OVER

KENTUCKY RIVER AT TYRONE

US-62

SPP

SPP

SPP

3,300,000

3,300,000

4,000,000

11,300,000

4,000,000 11,300,000 0

80001

Total for ANDERSON county PL

Total Amounts:

CN

UT

RW

DN

3,300,000

3,300,000

11,300,000 1,500,000

150,000

4,000,000

4,000,000 11,300,000 1,650,000

BALLARD

Project Cost:

CN

UT

RW

DN

PLPADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM

STAFFORD ROAD TO BETHEL CHURCH ROAD

(INCLUDES KEVIL BYPASS)(TO BE LET WITH

1-115.10) (06CCR)(12CCR)(14CCR).

US-60

NH 3,500,000

3,500,000 0 0 0

115

BALLARD

Project Cost:

CN

UT

RW

DN

PLPADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM

STAFFORD ROAD TO BETHEL CHURCH ROAD

(INCLUDES KEVIL BYPASS)(TO BE LET WITH

1-115.10) (06CCR)(12CCR)(14CCR).

US-60

NH 2,500,000

2,500,000 0 0 0

115.01

Page 3 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BALLARD

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-60 FROM PROPOSED SOUTHERN

BYPASS OF LA CENTER TO EAST OF DENIS

JONES ROAD. (02CCR)

US-60

NH

NH

0

2,370,000

1,900,000

0 0 4,270,000

118

BALLARD

Project Cost:

CN

UT

RW

DN

PLPE AND ENVIRONMENTAL FOR REPLACEMENT

OF CAIRO BRIDGE AT OR BESIDE EXISTING

LOCATION. (004B00021N)(SD)

US-51

BR

BR

BR

0

1,000,000

100,000

49,500,000

0 50,600,000 0

1140.01

BALLARD

Project Cost:

CN

UT

RW

DN

PLPE AND ENVIRONMENTAL FOR REPLACEMENT

OF CAIRO BRIDGE AT OR BESIDE EXISTING

LOCATION.(SD)

US-51

BR

BR

0

6,500,000

49,500,000

6,500,000 0 49,500,000

1140.02

BALLARD

Project Cost:

CN

UT

RW

DN

PLPE AND ENVIRONMENTAL FOR REPLACEMENT

OF CAIRO BRIDGE AT OR BESIDE EXISTING

LOCATION.

US-51

BR 20,000,000

20,000,000 0 0 0

1140.03

Total for BALLARD county PL

Total Amounts:

CN

UT

RW

DN 20,000,000

2,500,000

3,500,000

26,000,000

49,500,000 49,500,000

6,500,000

1,000,000 2,370,000

100,000 1,900,000

6,500,000 50,600,000 53,770,000

Page 4 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BARREN

Project Cost:

CN

UT

RW

DN

PLPRIORITY SECTION 3: IMPROVE KY-90 EAST OF

GLASGOW FROM BRIDGE OVER FALLEN TIMBER

CREEK TO THE METCALFE COUNTY LINE.

(2002BOPC)(08CCR)(10CCR)(12CCR)

KY-90

STP

0

3,950,000

3,950,000 0 0

108.5

BARREN

Project Cost:

CN

UT

RW

DN

PLPRIORITY SECTION 3: IMPROVE KY-90 EAST OF

GLASGOW FROM BRIDGE OVER FALLEN TIMBER

CREEK TO THE METCALFE COUNTY LINE.

(2002BOPC)(08CCR)(10CCR)(12CCR)

KY-90

STP

0

9,210,000

0 9,210,000 0

108.51

BARREN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-1297 FROM CR-1366 (DONNELLY

DRIVE) TO US-31E (ROGER WELLS), AND

IMPROVE CR-1366 (DONNELLY DRIVE) FROM

KY-1297 TO US-68 IN GLASGOW. (14CCN)

(16CCN)

KY-1297

STP

STP

0

2,250,000

2,000,000

4,250,000 0 0

8821

BARREN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-1297 FROM CR-1366 (DONNELLY

DRIVE) TO US-31E (ROGER WELLS), AND

IMPROVE CR-1366 (DONNELLY DRIVE) FROM

KY-1297 TO US-68 IN GLASGOW. (14CCN)

(16CCN)

KY-1297

STP

STP

0

2,250,000

2,000,000

0 4,250,000 0

8821.01

BARREN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-065

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

45.935 TO MILEPOINT 46.881

I-65

PM

PM

0

50,000

500,000

0 0 550,000

20001

Page 5 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BARREN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF LOUIE B.

NUNN CUMBERLAND PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 20.1 TO

MILEPOINT 22.357

LN-9008

PM

PM

180,000

1,800,000

1,980,000 0 0 0

20004

BARREN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF LOUIE B.

NUNN CUMBERLAND PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 9.375 TO

MILEPOINT 14.85

LN-9008

PM

PM

440,000

4,400,000

4,840,000 0 0 0

20005

BARREN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

US-68

PM

PM

400,000

4,000,000

4,400,000 0 0 0

20006

BARREN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-68

FROM MILEPOINT 0.00 TO MILEPOINT 9.70

US-68

PM

0

1,180,000

1,180,000 0 0

20020

BARREN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-68

FROM MILEPOINT 16.95 TO MILEPOINT 23.16

US-68

PM

0

920,000

920,000 0 0

20021

Page 6 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BARREN

Project Cost:

CN

UT

RW

DN

PLNEW INTERCHANGE ON THE LOUIE NUNN

CUMBERLAND PARKWAY AT KY-249 IN

GLASGOW

LN-9008

SPP

SPP

SPP

2,000,000

2,000,000

750,000

8,000,000

750,000 0 8,000,000

80002

Total for BARREN county PL

Total Amounts:

CN

UT

RW

DN 1,020,000

2,000,000

10,200,000

13,220,000

6,050,000 9,210,000 8,500,000

50,000

2,250,000 2,250,000

2,750,000 2,000,000

11,050,000 13,460,000 8,550,000

BELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-25E

FROM MILEPOINT 0.90 TO MILEPOINT 2.86

US-25

PM

0

1,391,000

1,391,000 0 0

20021

BELL

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A NEW ROADWAY ON PAGE SPUR

RD.

SPP 650,000

650,000 0 0 0

80050

Total for BELL county PL

Total Amounts:

CN

UT

RW

DN

650,000

650,000

1,391,000

1,391,000 0 0

Page 7 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BOONE

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE KY-536 (MT. ZION ROAD)

INTERCHANGE. (14CCR)(16CCR)

I-75

NH 5,000,000

5,000,000 0 0 0

14

BOONE

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE KY-536 (MT. ZION ROAD)

INTERCHANGE. (14CCR)(16CCR)

I-75

NH

0

17,080,000

17,080,000 0 0

14.02

BOONE

Project Cost:

CN

UT

RW

DN

PLADD AUXILIARY LANES ON I-71/75 FROM

KY-536 TO US-42 (NB & SB) AS PER THE

INTERCHANGE JUSTIFICATION STUDY (IJS).

(10CCR)(12CCR)

I-75

NH

0

10,000,000

0 0 10,000,000

14.5

BOONE

Project Cost:

CN

UT

RW

DN

PLIMPROVE FREIGHT MOBILITY AT I-275 AND

GRAVES ROAD (CONTINUATION OF 6-8953:

INTERCHANGE JUSTIFICATION STUDY ON

I-275/GRAVES RD).

I-275

NH

NH

4,000,000

4,000,000

10,000,000

10,000,000 0 0

78.01

BOONE

Project Cost:

CN

UT

RW

DN

PLREDUCE CONGESTION AND IMPROVE TRAFFIC

MOBILITY AT THE INTERCHANGE OF I-75 AND

KY-14 IN WALTON.

I-75 NH 500,000

500,000 0 0 0

80

Page 8 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BOONE

Project Cost:

CN

UT

RW

DN

PLNORTHERN KENTUCKY RIDESHARE PROGRAM.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SNK 44,000

44,000 0 0 0

400.16

BOONE

Project Cost:

CN

UT

RW

DN

PLNORTHERN KENTUCKY RIDESHARE PROGRAM.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SNK

0

44,000

44,000 0 0

400.17

BOONE

Project Cost:

CN

UT

RW

DN

PLOKI REGIONAL TRANSPORTATION PLANNING.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SNK 56,000

56,000 0 0 0

401.16

BOONE

Project Cost:

CN

UT

RW

DN

PLOKI REGIONAL TRANSPORTATION PLANNING.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SNK

0

56,000

56,000 0 0

401.17

BOONE

Project Cost:

CN

UT

RW

DN

PLN KY PLANNING FY 2021 AIR QUALITY, FIAM,

LAND USE, RIDESHARE.

-0 SNK 150,000

150,000 0 0 0

401.21

Page 9 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BOONE

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ALONG KY-236 (DONALDSON ROAD) FROM

KY-842 (HOUSTON ROAD) TO KY-3076

(MINEOLA PIKE).

KY-236 STP

STP

0

1,000,000

0 1,000,000 0

444

BOONE

Project Cost:

CN

UT

RW

DN

PLIMPROVE FREIGHT MOBILITY AND REDUCE

CONGESTION ON KY-3076 (MINEOLA PIKE)

FROM KY-236 TO I-275.

KY-3076

STP

STP

0

4,000,000

750,000

4,000,000 750,000 0

445

BOONE

Project Cost:

CN

UT

RW

DN

PLIMPROVE MOBILITY AND REDUCE CONGESTION

ON US-25 FROM WINNING COLORS DRIVE TO

THE NORFOLK SOUTHERN RAILROAD

CROSSING SOUTH OF KY-1829 (INDUSTRIAL

ROAD); EXCLUDES GRADE SEPARATION AT

US-25

STP

0

3,300,000

0 3,300,000 0

447

BOONE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2021.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SNK 9,200,000

9,200,000 0 0 0

966.09

BOONE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2022.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SNK

0

9,200,000

9,200,000 0 0

966.1

Page 10 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BOONE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2023.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SNK

0

9,200,000

0 9,200,000 0

966.11

BOONE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2024.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SNK

0

9,200,000

0 0 9,200,000

966.12

BOONE

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES OF BRIDGE OVER NS

(CNO&TP)RR ON RICHARDSON ROAD (KY 842)

0.14 MI E OF US 25 NEAR INDEPENDENCE

(008B00092N)

KY-842

BR

0

3,500,000

3,500,000 0 0

1087

BOONE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-071 BOTH

DIRECTION(S) FROM MILEPOINT 69.89 TO

MILEPOINT 77.724.

I-71

PM

PM

0

650,000

6,500,000

0 0 7,150,000

20001

BOONE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-075 BOTH DIRECTION(S) FROM

MILEPOINT 183.08 (182.9 NON-CARDINAL) TO

MILEPOINT 183.312

I-75

PM

PM

100,000

1,000,000

1,100,000 0 0 0

20004

Page 11 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BOONE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-275 BOTH

DIRECTION(S) FROM MILEPOINT 13.076 TO

MILEPOINT 13.7

I-275

PM

PM

50,000

500,000

550,000 0 0 0

20005

BOONE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-275 BOTH DIRECTION(S) FROM

MILEPOINT 1.58 TO MILEPOINT 7.25

I-275

PM

PM

850,000

8,500,000

9,350,000 0 0 0

20006

BOONE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-275 BOTH DIRECTION(S) FROM

MILEPOINT 7.25 TO MILEPOINT 13.08 (13.56

NON-CARDINAL)

I-275

PM

PM

0

650,000

6,500,000

0 0 7,150,000

20007

BOONE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

KY-237

PM

PM

320,000

3,200,000

3,520,000 0 0 0

20009

BOONE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-42

FROM MILEPOINT 8.71 TO MILEPOINT 11.63

US-42

PM

0

438,000

0 438,000 0

20047

Page 12 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for BOONE county PL

Total Amounts:

CN

UT

RW

DN

650,000

1,320,000

4,000,000

27,500,000

33,470,000

39,880,000 9,638,000 32,200,000

3,300,000 1,300,000

4,000,000 1,000,000

750,000

43,880,000 14,688,000 33,500,000

BOURBON

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-460 FROM RUSSELL CAVE ROAD

TO US-27 BYPASS IN PARIS.(12CCN)(14CCR)

(16CCR)

US-460

STP 5,620,000

5,620,000 0 0 0

8705

BOURBON

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-460 FROM RUSSELL CAVE ROAD

TO US-27 BYPASS IN PARIS.(12CCN)(14CCR)

(16CCR)

US-460

STP

STP

STP

2,030,000

1,500,000

3,530,000

6,880,000

0 6,880,000 0

8705.01

Total for BOURBON county PL

Total Amounts:

CN

UT

RW

DN

2,030,000

1,500,000

5,620,000

9,150,000

6,880,000

0 6,880,000 0

BOYD

Project Cost:

CN

UT

RW

DN

PLFEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY 2021.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SAH 1,600,000

1,600,000 0 0 0

208.07

Page 13 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BOYD

Project Cost:

CN

UT

RW

DN

PLFEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY 2022.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SAH

0

1,600,000

1,600,000 0 0

208.08

BOYD

Project Cost:

CN

UT

RW

DN

PLFEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY 2023.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SAH

0

1,600,000

0 1,600,000 0

208.09

BOYD

Project Cost:

CN

UT

RW

DN

PLFEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY 2024.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

-0

SAH

0

1,600,000

0 0 1,600,000

208.1

BOYD

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-60 FROM I-64 AT INTERCHANGE

181 TO THE KY-180 INTERSECTION AT

CANNONSBURG. (08CCN) (10CCR)(12CCR)

US-60

SPP 15,000,000

15,000,000 0 0 0

8400.01

BOYD

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 183.95 TO

MILEPOINT 191.507

I-64

PM

PM

0

600,000

6,000,000

0 6,600,000 0

20003

Page 14 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BOYD

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-23

FROM MILEPOINT 10.67 TO MILEPOINT 16.95

US-23

PM

0

2,365,000

2,365,000 0 0

20015

BOYD

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-23

FROM MILEPOINT 2.92 TO MILEPOINT 10.67

US-23

PM

0

4,288,000

0 4,288,000 0

20016

Total for BOYD county PL

Total Amounts:

CN

UT

RW

DN

16,600,000

16,600,000

3,965,000 11,888,000 1,600,000

600,000

3,965,000 12,488,000 1,600,000

BOYLE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-127B

FROM MILEPOINT 0.00 TO MILEPOINT 5.27

US-127

PM

0

2,301,000

2,301,000 0 0

20024

BOYLE

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A NEW CONNECTOR ROAD ON THE

EAST SIDE OF DANVILLE CONNECTING KY-34

AND US-150 BYPASS

SPP 1,500,000

1,500,000 0 0 0

80000

Page 15 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for BOYLE county PL

Total Amounts:

CN

UT

RW

DN 1,500,000

1,500,000

2,301,000

2,301,000 0 0

BRACKEN

Project Cost:

CN

UT

RW

DN

PLOPERATION OF AUGUSTA FERRY FOR FY 2021.KY-8

SPP 190,000

190,000 0 0 0

355.23

BRACKEN

Project Cost:

CN

UT

RW

DN

PLOPERATION OF AUGUSTA FERRY FOR FY 2022.KY-8

SPP

0

190,000

190,000 0 0

355.24

BRACKEN

Project Cost:

CN

UT

RW

DN

PLOPERATION OF AUGUSTA FERRY FOR FY 2023.KY-8

SPP

0

190,000

0 190,000 0

355.25

BRACKEN

Project Cost:

CN

UT

RW

DN

PLOPERATION OF AUGUSTA FERRY FOR FY 2024.KY-8

SPP

0

190,000

0 0 190,000

355.26

Page 16 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BRACKEN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-8 FROM

MILEPOINT 13.95 TO MILEPOINT 18.99

KY-8

PM

0

552,000

0 0 552,000

20048

Total for BRACKEN county PL

Total Amounts:

CN

UT

RW

DN

190,000

190,000

190,000 190,000 742,000

190,000 190,000 742,000

BREATHITT

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-205 FROM NORTH OF KY-1812 TO

SOUTH OF PEGGS FORK RD.

KY-205

STP

STP

1,000,000

1,000,000

1,030,000

0 1,030,000 0

375

BREATHITT

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-15 FROM THE INTERSECTION OF

NEW KY-15/30 TO INTERSECTION OF KY-1812.

KY-15

NH

NH

NH

2,900,000

2,900,000

1,150,000

7,500,000

1,150,000 7,500,000 0

376

Total for BREATHITT county PL

Total Amounts:

CN

UT

RW

DN 1,000,000

2,900,000

3,900,000

7,500,000

1,030,000

1,150,000

1,150,000 8,530,000 0

Page 17 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BRECKINRIDGE

Project Cost:

CN

UT

RW

DN

PLREPLACE LOW WATER STRUCTURE ON KY 261

AT MP 15.74

KY-261

SPP

SPP

SPP

SPP

100,000

100,000

25,000

25,000

400,000

450,000 0 0

8902

BRECKINRIDGE

Project Cost:

CN

UT

RW

DN

PLMINOR WIDENING OF KY 992 BETWEEN ROCK

QUARRY AND US 60.

KY-992

SPP 580,000

580,000 0 0 0

8904

BRECKINRIDGE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-60

FROM MILEPOINT 0.00 TO MILEPOINT 2.78

US-60

PM

0

642,000

642,000 0 0

20025

BRECKINRIDGE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-60

FROM MILEPOINT 3.45 TO MILEPOINT 12.74

US-60

PM

0

1,739,000

1,739,000 0 0

20026

Total for BRECKINRIDGE county PL

Total Amounts:

CN

UT

RW

DN 100,000

580,000

680,000

2,781,000

25,000

25,000

2,831,000 0 0

Page 18 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BULLITT

Project Cost:

CN

UT

RW

DN

PLSECTION 5 - FROM US-31EX TO US-31E

BYPASS. (2008BOPC).

KY-44

SPP

SPP

0

1,550,000

550,000

0 0 2,100,000

150.5

BULLITT

Project Cost:

CN

UT

RW

DN

PLNEW TURN LANES IN FRONT OF BULLITT EAST

HIGH SCHOOL. BREAKOUT FROM 347.5

KY-44

SPP

SPP

545,000

545,000

575,000

575,000 0 0

347.51

BULLITT

Project Cost:

CN

UT

RW

DN

PLWIDEN CEDAR GROVE ROAD (KY-480) FROM

CEDAR GROVE ELEMENTARY SCHOOL TO

VALLEY VIEW DRIVE. (12CCR)(14CCR) (SEE

5-391.3 FOR INTERCHANGE IMPROVEMENTS)

KY-480

STP

0

6,240,000

6,240,000 0 0

391.2

BULLITT

Project Cost:

CN

UT

RW

DN

PLIMPROVE OPERATIONAL PERFORMANCE OF THE

I-65/KY-480 INTERCHANGE INCLUDING RAMP

IMPROVEMENTS AND TURNING LANES. (12CCR)

(14CCR)(2014BOP)(16CCR)

KY-480

NH

0

5,970,000

0 5,970,000 0

391.3

BULLITT

Project Cost:

CN

UT

RW

DN

PLWIDEN I-65 FROM 6 TO 8 LANES FROM KY-61

(PRESTON HIGHWAY) IN LEBANON JUNCTION TO

I-265 (GENE SNYDER FREEWAY)

I-65

NH

0

7,470,000

7,470,000 0 0

550

Page 19 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BULLITT

Project Cost:

CN

UT

RW

DN

PLWIDEN KY-245 FROM BERNHEIM FOREST TO THE

COMMUNITY COLLEGE. (08CCN)(10CCR)(14CCR)

(16CCR)

KY-245

STP

0

12,640,000

12,640,000 0 0

8509

BULLITT

Project Cost:

CN

UT

RW

DN

PLSOUND BARRIERS ON EAST SIDE OF I-65

BETWEEN MP 117.4 AND MP 117.8. (14CCN)

I-65

SPP

0

2,000,000

2,000,000 0 0

8856

BULLITT

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-480

FROM MILEPOINT 0.00 TO MILEPOINT 5.14

KY-480

PM

0

910,000

910,000 0 0

20036

BULLITT

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-245

FROM MILEPOINT 0.00 TO MILEPOINT 7.18

KY-245

PM

0

1,094,000

0 1,094,000 0

20037

Total for BULLITT county PL

Total Amounts:

CN

UT

RW

DN

545,000

545,000

22,365,000 7,064,000

7,470,000

1,550,000

550,000

29,835,000 7,064,000 2,100,000

Page 20 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BUTLER

Project Cost:

CN

UT

RW

DN

PLOPERATION OF REED'S FERRY AT LOGANSPORT

FOR FY 2021.(12CCR)

KY-269

SPP 157,200

157,200 0 0 0

125.16

BUTLER

Project Cost:

CN

UT

RW

DN

PLOPERATION OF REED'S FERRY AT LOGANSPORT

FOR FY 2022.(12CCR)

KY-269

SPP

0

157,200

157,200 0 0

125.17

BUTLER

Project Cost:

CN

UT

RW

DN

PLOPERATION OF REED'S FERRY AT LOGANSPORT

FOR FY 2023.

KY-269

SPP

0

157,200

0 157,200 0

125.18

BUTLER

Project Cost:

CN

UT

RW

DN

PLOPERATION OF REED'S FERRY AT LOGANSPORT

FOR FY 2024.

KY-269

SPP

0

157,200

0 0 157,200

125.19

BUTLER

Project Cost:

CN

UT

RW

DN

PLI-65 SPUR CORRIDOR: IMPROVE THE NATCHER

PARKWAY/US-231 INTERCHANGE (EXIT 36).

(2016BOP)

WN-9007

NH 6,750,000

6,750,000 0 0 0

2042.3

Page 21 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BUTLER

Project Cost:

CN

UT

RW

DN

PLOPERATION OF THE ROCHESTER FERRY BY THE

BUTLER AND OHIO COUNTY FERRY AUTHORITY

FOR FY 2021.(12CCR)

KY-369

SPP 157,200

157,200 0 0 0

8504.11

BUTLER

Project Cost:

CN

UT

RW

DN

PLOPERATION OF THE ROCHESTER FERRY BY THE

BUTLER AND OHIO COUNTY FERRY AUTHORITY

FOR FY 2022.(12CCR)

KY-369

SPP

0

157,200

157,200 0 0

8504.12

BUTLER

Project Cost:

CN

UT

RW

DN

PLOPERATION OF THE ROCHESTER FERRY BY THE

BUTLER AND OHIO COUNTY FERRY AUTHORITY

FOR FY 2023.

KY-369

SPP

0

157,200

0 157,200 0

8504.13

BUTLER

Project Cost:

CN

UT

RW

DN

PLOPERATION OF THE ROCHESTER FERRY BY THE

BUTLER AND OHIO COUNTY FERRY AUTHORITY

FOR FY 2024.

KY-369

SPP

0

157,200

0 0 157,200

8504.14

BUTLER

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 87.544 TO

MILEPOINT 88.433

WK-9001

PM

PM

70,000

700,000

770,000 0 0 0

20007

Page 22 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

BUTLER

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WILLIAM H.

NATCHER PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 21.78 TO MILEPOINT 28.5 (26.42

NON-CARDINAL)

WN-9007

PM

PM

0

540,000

5,400,000

5,940,000 0 0

20008

BUTLER

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WILLIAM H.

NATCHER PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 28.50 (26.42 NON-CARDINAL) TO

MILEPOINT 34.72

WN-9007

PM

PM

0

675,000

6,750,000

0 0 7,425,000

20009

Total for BUTLER county PL

Total Amounts:

CN

UT

RW

DN 70,000

7,764,400

7,834,400

5,714,400 314,400 7,064,400

540,000 675,000

6,254,400 314,400 7,739,400

CALDWELL

Project Cost:

CN

UT

RW

DN

PLNEW CONNECTOR FROM HOPKINSVILLE ROAD

(KY-91) TO WILSON WAREHOUSE ROAD

(KY-293) NORTHEAST OF PRINCETON. (06CCR)

(10CCR)(12CCR)(14CCR)

-0

SPP

SPP

SPP

3,000,000

3,000,000

2,000,000

14,000,000

0 2,000,000 14,000,000

153

CALDWELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-24 BOTH DIRECTION(S) FROM

MILEPOINT 54.842 TO MILEPOINT 57.389

I-24

PM

PM

0

250,000

2,500,000

2,750,000 0 0

20000

Page 23 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CALDWELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-069 BOTH

DIRECTION(S) FROM MILEPOINT 82.934 TO

MILEPOINT 86.344

I-69

PM

PM

400,000

4,000,000

4,400,000 0 0 0

20004

Total for CALDWELL county PL

Total Amounts:

CN

UT

RW

DN 400,000

3,000,000

4,000,000

7,400,000

2,500,000 14,000,000

250,000

2,000,000

2,750,000 2,000,000 14,000,000

CALLOWAY

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-641 FROM THE TENNESSEE STATE

LINE TO MURRAY PRIORITY SECTION 2; FROM

TENN. STATE LINE TO CLARKS RIVER BRIDGE.

(SEE 1-8852.00)

US-641

NH 15,000,000

15,000,000 0 0 0

314.2

CALLOWAY

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-641 FROM THE TENNESSEE STATE

LINE TO MURRAY PRIORITY SECTION 2; FROM

TENN. STATE LINE TO CLARKS RIVER BRIDGE.

(SEE 1-8852.00)

US-641

NH

0

10,000,000

10,000,000 0 0

314.21

CALLOWAY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-121

FROM MILEPOINT 10.51 TO MILEPOINT 14.08

KY-121

PM

0

635,000

0 635,000 0

20024

Page 24 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CALLOWAY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-121

FROM MILEPOINT 0.00 TO MILEPOINT 10.51

KY-121

PM

0

1,872,000

0 1,872,000 0

20025

CALLOWAY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-94

FROM MILEPOINT 13.11 TO MILEPOINT 24.21

KY-94

PM

0

1,977,000

0 1,977,000 0

20026

Total for CALLOWAY county PL

Total Amounts:

CN

UT

RW

DN

15,000,000

15,000,000

10,000,000 4,484,000

10,000,000 4,484,000 0

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLREDUCE CONGESTION ALONG THE I-471

CORRIDOR FROM US-27 TO OHIO STATE LINE.

I-471 NH

0

4,500,000

0 0 4,500,000

81

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION AT

THE I-275 INTERCHANGE WITH KY-9 (AA HWY.)

KY-9 NH 700,000

700,000 0 0 0

448

Page 25 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLUS 27 SOUTH MONMOUTH UNDERPASS.

IMPROVE FOR PEDESTRIANS BY REPLACING

OBSOLETE STAIRS/WALKWAY WITH 10'

SIDEWALK, LIGHTING BUS STOPS AT THE

UNDERPASS OF THE CSX RAILROAD BRIDGE

US-27

SNK 1,320,000

1,320,000 0 0 0

452

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-275 BOTH DIRECTION(S) FROM

MILEPOINT 73.061 TO MILEPOINT 77.58

I-275

PM

PM

0

675,000

6,750,000

0 0 7,425,000

20010

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-471 BOTH

DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT

4.75

I-471

PM

PM

0

575,000

5,750,000

0 0 6,325,000

20011

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

KY-8

PM

PM

225,000

2,250,000

2,475,000 0 0 0

20012

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

KY-9

PM

PM

225,000

2,250,000

2,475,000 0 0 0

20013

Page 26 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-1892

PM

PM

250,000

2,500,000

2,750,000 0 0 0

20014

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

US-27

PM

PM

275,000

2,750,000

3,025,000 0 0 0

20015

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

US-27

PM

PM

75,000

750,000

825,000 0 0 0

20017

CAMPBELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-8 FROM

MILEPOINT 15.97 TO MILEPOINT 19.36

KY-8

PM

0

583,000

0 0 583,000

20049

Total for CAMPBELL county PL

Total Amounts:

CN

UT

RW

DN

700,000

1,050,000

11,820,000

13,570,000

13,083,000

1,250,000

4,500,000

0 0 18,833,000

Page 27 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CARROLL

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES OF BRIDGE OVER

KENTUCKY RIVER ON US 42 IN

PRESTONSVILLE/CARROLLTON 0.13 MI E OF KY

55. (021B00043N)

US-42

BR

0

17,717,000

17,717,000 0 0

1084

CARROLL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-071 BOTH

DIRECTION(S) FROM MILEPOINT 50.808 TO

MILEPOINT 53.433

I-71

PM

PM

0

275,000

2,750,000

0 0 3,025,000

20020

CARROLL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-467

FROM MILEPOINT 0.00 TO MILEPOINT 4.52

KY-467

PM

0

365,000

365,000 0 0

20050

Total for CARROLL county PL

Total Amounts:

CN

UT

RW

DN

0

18,082,000 2,750,000

275,000

18,082,000 0 3,025,000

CARTER

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-7/KY-1 (CAROL MALONE BLVD.)

FROM LITTLE SANDY RIVER BRIDGE TO

ACADEMIC PARKWAY. (08CCR)(12CCR)(16CCR)

KY-7

SPP 3,120,000

3,120,000 0 0 0

144

Page 28 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CARTER

Project Cost:

CN

UT

RW

DN

PLSAFETY, SPOT IMPROVEMENTS AND

CONGESTION MITIGATION FOR INDUSTRIAL

PARKWAY (KY 67) IN CARTER, BOYD, AND

GREENUP COUNTIES FOR BRAIDY INDUSTRIES

ALUMINUM PLANT DEVELOPMENT. (ADDITIONAL

KY-67

STP 5,000,000

5,000,000 0 0 0

397.01

CARTER

Project Cost:

CN

UT

RW

DN

PLSAFETY, SPOT IMPROVEMENTS AND

CONGESTION MITIGATION FOR INDUSTRIAL

PARKWAY (KY 67) IN CARTER, BOYD, AND

GREENUP COUNTIES FOR BRAIDY INDUSTRIES

ALUMINUM PLANT DEVELOPMENT. (ADDITIONAL

KY-67

STP

0

5,000,000

0 5,000,000 0

397.02

CARTER

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AT THE EAST CARTER HIGH

SCHOOL. (06CCN)(08CCR)(12CCR)

KY-1

SPP

SPP

490,000

490,000

2,000,000

2,000,000 0 0

8311

CARTER

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITIONKY-9

PM

PM

320,000

3,200,000

3,520,000 0 0 0

20006

CARTER

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITIONKY-9

PM

PM

150,000

1,500,000

1,650,000 0 0 0

20007

Page 29 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CARTER

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITIONKY-9

PM

PM

350,000

3,500,000

3,850,000 0 0 0

20008

CARTER

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-60 GEOMETRY BEGINNING TERMINI

AT NEW CONSTRUCTION AT OLIVE HILL MP 12.4

EXTENDING 1.1 MILES TO I-64 EXIT 161.

US-60

SPP

SPP

SPP

SPP

0

1,900,000

2,750,000

2,300,000

7,500,000

1,900,000 0 12,550,000

80050

Total for CARTER county PL

Total Amounts:

CN

UT

RW

DN 820,000

490,000

16,320,000

17,630,000

2,000,000 5,000,000 7,500,000

1,900,000

2,750,000

2,300,000

3,900,000 5,000,000 12,550,000

CASEY

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT BELL HILL FROM MP 10.4 TO MP

11.9.(12CCN)

KY-70

SPP

SPP

1,560,000

1,560,000

3,420,000

0 3,420,000 0

8703

CASEY

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT BRUSHY CREEK HILL FROM MP

1.8 TO MP 2.8.(12CCN)

KY-49

SPP

SPP

0

1,320,000

1,040,000

0 1,320,000 1,040,000

8704

Page 30 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for CASEY county PL

Total Amounts:

CN

UT

RW

DN 1,560,000

1,560,000

4,740,000

1,040,000

0 4,740,000 1,040,000

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLEXTEND KY-1682 FROM THE E.T. BREATHITT

PARKWAY TO US-68/KY-80 EAST OF

HOPKINSVILLE (HOPKINSVILLE NORTHEAST

BYPASS).

KY-1682

SPP

0

1,000,000

0 0 1,000,000

136

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-911 FROM US-41A TO OAK

GROVE.(12CCR)

KY-911

STP 5,910,000

5,910,000 0 0 0

180.01

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY 1007 FROM US 68 TO

SANDERSON ROAD IN HOPKINSVILLE.(12CCR)

(14CCR)

KY-1007

SPP

0

11,250,000

11,250,000 0 0

227

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT NEW CONNECTOR FROM US 41

NEAR THE INDUSTRIAL PARK TO KY 115 SOUTH

OF PEMBROKE.

US-41

SPP

SPP

SPP

0

300,000

700,000

12,000,000

1,000,000 12,000,000 0

381

Page 31 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT THE BREATHITT PARKWAY

INTERCHANGE AT KY 1682 NORTH OF

HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE

INTERSTATE SPUR PROJECT)

EB-9004

NH

NH

1,000,000

1,000,000

5,000,000

0 5,000,000 0

898

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLADDRESS CONGESTION AND MOBILITY OF US

68 FROM KY 91 TO KY 1007 IN HOPKINSVILLE.

US-68

SPP

SPP

SPP

SPP

1,200,000

1,200,000

1,750,000

1,500,000

5,500,000

0 3,250,000 5,500,000

899

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-107 FROM GATEWAY LANE TO

KY-380.(12CCN)(14CCR)

KY-107

SPP

SPP

SPP

0

1,280,000

1,530,000

2,540,000

1,280,000 1,530,000 2,540,000

8703

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLIMPROVE AND WIDEN KY 115 FROM ANDERSON

ROAD (MP 6.87) TO JUST SOUTH OF PEMBROKE

(MP 9.625)

KY-115

SPP 1,000,000

1,000,000 0 0 0

8953

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF EDWARD T.

BREATHITT PENNYRILE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 4.719 TO

MILEPOINT 6.77

EB-9004

PM

PM

0

175,000

1,750,000

0 1,925,000 0

20008

Page 32 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-024 CARDINAL DIRECTION(S)

FROM MILEPOINT 69.83 TO MILEPOINT 76.142

I-24

PM

PM

0

325,000

3,250,000

3,575,000 0 0

20010

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-024 NON-CARDINAL

DIRECTION(S) FROM MILEPOINT 69.83 TO

MILEPOINT 81.83

I-24

PM

PM

0

600,000

6,000,000

0 0 6,600,000

20011

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-024

CARDINAL DIRECTION(S) FROM MILEPOINT

76.142 TO MILEPOINT 85.563

I-24

PM

PM

0

475,000

4,750,000

0 5,225,000 0

20012

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-024 BOTH DIRECTION(S) FROM

MILEPOINT 85.563 TO MILEPOINT 92

I-24

PM

PM

0

650,000

6,500,000

7,150,000 0 0

20013

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

US-68

PM

PM

75,000

750,000

825,000 0 0 0

20016

Page 33 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CHRISTIAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-41

FROM MILEPOINT 14.79 TO MILEPOINT 31.57

US-41

PM

0

1,635,000

1,635,000 0 0

20046

Total for CHRISTIAN county PL

Total Amounts:

CN

UT

RW

DN 2,275,000

1,000,000

6,660,000

9,935,000

22,635,000 23,500,000 14,040,000

975,000 650,000 1,600,000

1,580,000 1,750,000

700,000 3,030,000

25,890,000 28,930,000 15,640,000

CLARK

Project Cost:

CN

UT

RW

DN

PLEXTEND THE WINCHESTER EAST BYPASS (KY

1958) FROM IRVINE ROAD (KY 89) TO KY 627

SOUTH OF WINCHESTER. (08CCN)(10CCR)

KY-1958

SPP

SPP

0

11,000,000

12,000,000

11,000,000 0 12,000,000

8401

CLARK

Project Cost:

CN

UT

RW

DN

PLEXTEND FULTON ROAD. (BY COUNTY)(10CCN)-0

SPP 1,410,000

1,410,000 0 0 0

8639

CLARK

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT US 60 FOR SAFETY

IMPROVEMENTS FROM I-64 IN CLARK COUNTY

(MP 14.210) TO 500 FEET WEST OF SEWELL

SHOP ROAD. (MP 17.032)

US-60

SPP

SPP

SPP

SPP

0

2,000,000

6,000,000

10,500,000

36,500,000

2,000,000 0 53,000,000

8952

Page 34 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CLARK

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 89.48 TO

MILEPOINT 94.7

I-64

PM

PM

0

630,000

6,300,000

6,930,000 0 0

20004

CLARK

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 94.65 TO

MILEPOINT 98.1

I-64

PM

PM

0

525,000

5,250,000

5,775,000 0 0

20005

CLARK

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 9.45 (5.311

NON-CARDINAL) TO MILEPOINT 11.913

KY-9000

PM

PM

530,000

5,300,000

5,830,000 0 0 0

20007

Total for CLARK county PL

Total Amounts:

CN

UT

RW

DN 530,000

6,710,000

7,240,000

11,550,000 48,500,000

3,155,000

6,000,000

11,000,000 10,500,000

25,705,000 0 65,000,000

CLAY

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND SIGHT DISTANCE ALONG

KY 638 (MP 6.7 TO MP 7.1) AND ITS

INTERSECTION WITH KY 3476. (14CCN)

KY-638

SPP 1,840,000

1,840,000 0 0 0

8861

Page 35 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CLAY

Project Cost:

CN

UT

RW

DN

PLIMPROVE GEOMETRICS ALONG URBAN CREEK

ROAD (CR 1286) AND, INCLUDING

INTERSECTIONS AT HAL ROGERS PARKWAY

AND KY 687. (14CCN)

CR-1286

SPP 6,100,000

6,100,000 0 0 0

8864

CLAY

Project Cost:

CN

UT

RW

DN

PLUPGRADE ROUTE FROM SOMERSET TO HAZARD

TO INTERSTATE STANDARDS: 4 LANE FROM

CLAY/LAUREL LINE TO MANCHESTER (JUST

PAST EXIT 20 AT BRIDGE OVER KY 80/US 421),

MP 10.593 TO MP 21.498 (SEGMENT 7)

HR-9006

SPP

SPP

SPP

SPP

1,000,000

1,000,000

15,000,000

11,000,000

98,000,000

15,000,000 11,000,000 98,000,000

8910

CLAY

Project Cost:

CN

UT

RW

DN

PLUPGRADE ROUTE FROM SOMERSET TO HAZARD

TO INTERSTATE STANDARDS: 4 LANE FROM

MANCHESTER TO CLAY/LESLIE LINE; MP 21.498

TO MP 35.929 (SEGMENT 8)

HR-9006

SPP

SPP

SPP

SPP

1,000,000

1,000,000

18,000,000

13,000,000

129,900,000

18,000,000 13,000,000 129,900,000

8911

CLAY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF HAL

ROGERS DANIEL BOONE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 13.93 TO

MILEPOINT 15.958

HR-9006

PM

PM

0

80,000

800,000

880,000 0 0

20001

CLAY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF HAL

ROGERS DANIEL BOONE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 15.958 TO

MILEPOINT 19.527

HR-9006

PM

PM

0

150,000

1,500,000

0 1,650,000 0

20002

Page 36 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

CLAY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF HAL

ROGERS DANIEL BOONE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 35.08 TO

MILEPOINT 39

HR-9006

PM

PM

0

150,000

1,500,000

1,650,000 0 0

20006

Total for CLAY county PL

Total Amounts:

CN

UT

RW

DN 2,000,000

7,940,000

9,940,000

2,300,000 1,500,000 227,900,000

230,000 150,000

33,000,000

24,000,000

35,530,000 25,650,000 227,900,000

CLINTON

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-127 FROM NORTH OF THE

KY-3063 AND OLD US-127 INTERSECTION, AND

EXTENDING NORTHERLY TO EAST OF KY-1730

AND MANTOWN INTERSECTION. (SEE 8-108 &

8-115 FOR PE&ENV)(12CCR)(14CCR)

US-127

NH

0

10,060,000

0 10,060,000 0

8601.26

CLINTON

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-127 FROM NORTH OF THE

KY-3063 AND OLD US-127 INTERSECTION, AND

EXTENDING NORTHERLY TO EAST OF KY-1730

AND MANTOWN INTERSECTION. (SEE 8-108 &

8-115 FOR PE&ENV)(12CCR)(14CCR)

US-127

NH

0

11,070,000

0 0 11,070,000

8601.28

CLINTON

Project Cost:

CN

UT

RW

DN

PLRELOCATION OF US-127 FROM EAST OF THE

AARON RIDGE RD AND OLD US-127

INTERSECTION, EXTENDING NORTHERLY TO

NORTH OF THE KY-3063 AND OLD US-127

INTERSECTION. (SEE 8-108 AND 8-115 FOR

US-127

SPP

0

1,600,000

0 0 1,600,000

8601.3

Page 37 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for CLINTON county PL

Total Amounts:

CN

UT

RW

DN

0

10,060,000 11,070,000

1,600,000

0 10,060,000 12,670,000

CRITTENDEN

Project Cost:

CN

UT

RW

DN

PLOPERATION OF CAVE-IN-ROCK FERRY AT OHIO

RIVER FOR FY 2021.

KY-91

SPP 402,000

402,000 0 0 0

326.18

CRITTENDEN

Project Cost:

CN

UT

RW

DN

PLOPERATION OF CAVE-IN-ROCK FERRY AT OHIO

RIVER FOR FY 2022.

KY-91

SPP

0

402,000

402,000 0 0

326.19

CRITTENDEN

Project Cost:

CN

UT

RW

DN

PLOPERATION OF CAVE-IN-ROCK FERRY AT OHIO

RIVER FOR FY 2023.

KY-91

SPP

0

402,000

0 402,000 0

326.2

CRITTENDEN

Project Cost:

CN

UT

RW

DN

PLOPERATION OF CAVE-IN-ROCK FERRY AT OHIO

RIVER FOR FY 2024.

KY-91

SPP

0

402,000

0 0 402,000

326.21

Page 38 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for CRITTENDEN county PL

Total Amounts:

CN

UT

RW

DN

402,000

402,000

402,000 402,000 402,000

402,000 402,000 402,000

DAVIESS

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-54 FROM WEST OF THE US-60

BYPASS TO CR-1021 (JACK HINTON ROAD).

(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

KY-54

SPP

SPP

0

5,750,000

34,000,000

5,750,000 0 34,000,000

8300

DAVIESS

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-54 FROM WEST OF THE US-60

BYPASS TO CR-1021 (JACK HINTON ROAD).

(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

KY-54

SPP

SPP

4,520,000

4,520,000

13,420,000

0 13,420,000 0

8300.01

DAVIESS

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-3143 FROM KY-3335 TO KY 54.

(14CCN)

KY-3143

STP

STP

STP

680,000

680,000

2,730,000

3,380,000

0 0 6,110,000

8854

DAVIESS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-81

PM

PM

0

250,000

2,500,000

2,750,000 0 0

20017

Page 39 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

DAVIESS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC & AC

PAVEMENT

KY-331

PM

PM

50,000

500,000

550,000 0 0 0

20018

DAVIESS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-60

FROM MILEPOINT 23.77 TO MILEPOINT 27.54

US-60

PM

0

1,609,000

1,609,000 0 0

20047

Total for DAVIESS county PL

Total Amounts:

CN

UT

RW

DN 730,000

4,520,000

500,000

5,750,000

4,109,000 34,000,000

250,000

2,730,000

5,750,000 13,420,000 3,380,000

10,109,000 13,420,000 40,110,000

EDMONSON

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-70/KY-259 FROM 0.36 MILE

NORTH GREEN RIVER BRIDGE AT BROWNSVILLE

TO 0.42 MILE NORTH OF THE KY-70/KY-259

INTERSECTION.(06CCR)(2004BOPC)(12CCR)

(14CCR)

KY-259

SPP 5,480,000

5,480,000 0 0 0

7030.1

EDMONSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-065

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

43.6 TO MILEPOINT 45.935.

I-65

PM

PM

0

100,000

1,000,000

0 0 1,100,000

20012

Page 40 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

EDMONSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-31W

FROM MILEPOINT 0.00 TO MILEPOINT 8.00

US-31

PM

0

1,301,000

1,301,000 0 0

20022

Total for EDMONSON county PL

Total Amounts:

CN

UT

RW

DN

5,480,000

5,480,000

1,301,000 1,000,000

100,000

1,301,000 0 1,100,000

ELLIOTT

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-32 FROM WEST OF STEGALL

COLD SPRING ROAD TO KY-7 NEAR

NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR)

(08CCR) (10CCR)(12CCR)(14CCR)(16CCR)

KY-32

STP

STP

STP

3,900,000

3,900,000

5,000,000

15,500,000

5,000,000 15,500,000 0

192.01

ELLIOTT

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-32 FROM 0.408 MILES WEST

OF STEGALL COLD SPRING ROAD TO KY-7

NEAR NEWFOUNDLAND. (PRIORITY SECTION I)

KY-32

STP

STP

3,820,000

3,820,000

15,500,000

15,500,000 0 0

192.02

ELLIOTT

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-32 FROM 0.408 MILES WEST

OF STEGALL COLD SPRING ROAD TO KY-7

NEAR NEWFOUNDLAND. (PRIORITY SECTION I)

KY-32

STP

0

15,500,000

0 15,500,000 0

192.03

Page 41 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ELLIOTT

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-7 FROM SOUTH CITY LIMITS OF

SANDY HOOK TOWARD WRIGLEY. (12CCR)

(16CCR)

KY-7

STP

STP

STP

STP

2,890,000

2,890,000

6,620,000

6,490,000

15,420,000

6,620,000 6,490,000 15,420,000

228

ELLIOTT

Project Cost:

CN

UT

RW

DN

PLKY-32 FROM 9.2 MILE MARKER TO 10.2 MILE

MARKER WIDENING. (14CCN)

KY-32

STP

STP

STP

STP

220,000

220,000

480,000

320,000

9,340,000

480,000 320,000 9,340,000

8802

Total for ELLIOTT county PL

Total Amounts:

CN

UT

RW

DN 3,110,000

7,720,000

10,830,000

15,500,000 31,000,000 24,760,000

7,100,000

5,000,000 6,810,000

27,600,000 37,810,000 24,760,000

ESTILL

Project Cost:

CN

UT

RW

DN

PLIMPROVE LEVEL OF SERVICE, SAFETY, AND

CONNECTIVITY ON KY-82 FROM KY-89 IN ESTILL

CO. TO NEW CONSTRUCTION LOCATED NORTH

OF HUDSON MILL ROAD IN ESTILL COUNTY.

KY-82

STP

0

1,500,000

0 1,500,000 0

205

ESTILL

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY ON KY-2459 (CARHARTT

AVE.) FROM KY-89 TO THE RAILROAD BRIDGE.

KY-2459

STP

STP

250,000

250,000

500,000 0 0 0

206

Page 42 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ESTILL

Project Cost:

CN

UT

RW

DN

PLIMPROVE GEOMETRICS ON KY-89 IN ESTILL

COUNTY FROM KY-1886 TO THE ESTILL/CLARK

COUNTY LINE.

KY-89

STP 1,200,000

1,200,000 0 0 0

207

Total for ESTILL county PL

Total Amounts:

CN

UT

RW

DN 1,200,000

250,000

250,000

1,700,000

1,500,000

0 1,500,000 0

FAYETTE

Project Cost:

CN

UT

RW

DN

PLIMPROVE NEW CIRCLE ROAD FROM LEESTOWN

ROAD TO NEAR GEORGETOWN ROAD. (12CCR)

(14CCR)

KY-4

NH

NH

NH

1,300,000

1,500,000

2,800,000

11,780,000

0 0 11,780,000

113.02

FAYETTE

Project Cost:

CN

UT

RW

DN

PLIMPROVE NEW CIRCLE ROAD FROM LEESTOWN

ROAD TO NEAR GEORGETOWN ROAD. (12CCR)

(14CCR)

KY-4

NH 1,500,000

1,500,000 0 0 0

113.03

FAYETTE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR LEXINGTON URBANIZED AREA

AND SUBJECT TO MPO CONTROL. (FUNDING

SUBJECT TO FISCAL CONSTRAINT PENDING MPO

TIP)

-0

SLX

0

49,200,000

0 0 49,200,000

227

Page 43 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

FAYETTE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR LEXINGTON URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2021.

(FUNDING SUBJECT TO FISCAL CONTRAINT

PENDING MPO TIP)

-0

SLX 8,200,000

8,200,000 0 0 0

227.15

FAYETTE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR LEXINGTON URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2022.

(FUNDING SUBJECT TO FISCAL CONTRAINT

PENDING MPO TIP)

-0

SLX

0

8,200,000

8,200,000 0 0

227.16

FAYETTE

Project Cost:

CN

UT

RW

DN

PLVARIOUS 'SLX' CONTINUING PROGRAM

PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY

PLANNING, TRAFFIC SIGNAL) FOR FY 2021.

(LOCAL MATCH) (ALL WORK BY LFUCG)

(FUNDING SUBJECT TO FISCAL CONSTRAINT

-0

SLX 756,000

756,000 0 0 0

227.17

FAYETTE

Project Cost:

CN

UT

RW

DN

PLVARIOUS 'SLX' CONTINUING PROGRAM

PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY

PLANNING, TRAFFIC SIGNAL) FOR FY 2022.

(LOCAL MATCH) (ALL WORK BY LFUCG)

(FUNDING SUBJECT TO FISCAL CONSTRAINT

-0

SLX

0

756,000

756,000 0 0

227.18

FAYETTE

Project Cost:

CN

UT

RW

DN

PLVARIOUS 'SLX' CONTINUING PROGRAM

PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY

PLANNING, TRAFFIC SIGNAL) FOR FY 2023.

(LOCAL MATCH) (ALL WORK BY LFUCG)

(FUNDING SUBJECT TO FISCAL CONSTRAINT

-0

SLX

0

756,000

0 756,000 0

227.19

Page 44 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

FAYETTE

Project Cost:

CN

UT

RW

DN

PLVARIOUS 'SLX' CONTINUING PROGRAM

PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY

PLANNING, TRAFFIC SIGNAL) FOR FY 2024.

(LOCAL MATCH) (ALL WORK BY LFUCG)

(FUNDING SUBJECT TO FISCAL CONSTRAINT

-0

SLX

0

756,000

0 0 756,000

227.2

FAYETTE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR LEXINGTON URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2023.

(FUNDING SUBJECT TO FISCAL CONTRAINT

PENDING MPO TIP)

-0

SLX

0

8,200,000

0 8,200,000 0

227.21

FAYETTE

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR LEXINGTON URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2024.

(FUNDING SUBJECT TO FISCAL CONTRAINT

PENDING MPO TIP)

-0

SLX

0

8,200,000

0 0 8,200,000

227.22

FAYETTE

Project Cost:

CN

UT

RW

DN

PLIMPROVE NEWTOWN PIKE FROM KY-4 TO I-75.

(16CCR)

KY-922

NH 4,950,000

4,950,000 0 0 0

252

FAYETTE

Project Cost:

CN

UT

RW

DN

PLIMPROVE NEWTOWN PIKE FROM KY-4 TO I-75.

(16CCR)

KY-922

NH 10,050,000

10,050,000 0 0 0

252.02

Page 45 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

FAYETTE

Project Cost:

CN

UT

RW

DN

PLOPERATION OF VALLEY VIEW FERRY AT KY

RIVER FOR FY 2021.(12CCR)

KY-169

SPP 180,000

180,000 0 0 0

357.18

FAYETTE

Project Cost:

CN

UT

RW

DN

PLOPERATION OF VALLEY VIEW FERRY AT KY

RIVER FOR FY 2022.(12CCR)

KY-169

SPP

0

180,000

180,000 0 0

357.19

FAYETTE

Project Cost:

CN

UT

RW

DN

PLOPERATION OF VALLEY VIEW FERRY AT KY

RIVER FOR FY 2023.

KY-169

SPP

0

180,000

0 180,000 0

357.2

FAYETTE

Project Cost:

CN

UT

RW

DN

PLOPERATION OF VALLEY VIEW FERRY AT KY

RIVER FOR FY 2024.

KY-169

SPP

0

180,000

0 0 180,000

357.21

FAYETTE

Project Cost:

CN

UT

RW

DN

PLWIDEN NEW CIRCLE ROAD IN LEXINGTON FROM

GEORGETOWN ROAD TO BOARDWALK AVENUE

INCLUDING INTERCHANGE RECONSTRUCTION AT

NEWTOWN PIKE. (ADDITIONAL C-FUNDS FOR

7-366.00)

KY-4

NH 22,300,000

22,300,000 0 0 0

366.02

Page 46 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

FAYETTE

Project Cost:

CN

UT

RW

DN

PLREPLACE L&N RAILROAD BRIDGE OVERPASS

(MP 8.378), IMPROVE DRAINAGE AND TYPICAL

SECTION ON US 27 (NORTH BROADWAY)

(12CCR)(14CCR)

US-27

SPP

SPP

1,550,000

1,550,000

12,040,000

0 12,040,000 0

412

FAYETTE

Project Cost:

CN

UT

RW

DN

PLREDUCE CONGESTION ON KY-4 (NEW CIRCLE

RD) FROM TRADE CENTER DR TO WOODHILL DR.

KY-4

NH

0

2,000,000

0 0 2,000,000

438

FAYETTE

Project Cost:

CN

UT

RW

DN

PLNEW CIRCLE RD: IMPROVE SAFETY AND REDUCE

CONGESTION FROM US-68 (HARRODSBURG RD)

TO US-60 (VERSAILLES RD). SEE SEGMENTS 2A

& 2B IN AUGUST, 1998 ADVANCE PLANNING

STUDY.

KY-4

NH

0

2,200,000

0 0 2,200,000

439

FAYETTE

Project Cost:

CN

UT

RW

DN

PLSCOPING STUDY TO RECONSTRUCT/WIDEN

US-60/WINCHESTER ROAD TO FOUR LANES.

(06CCN)(12CCR)

US-60 SPP 280,000

280,000 0 0 0

8340

FAYETTE

Project Cost:

CN

UT

RW

DN

PLSOUND BARRIERS ALONG OUTER LOOP OF NEW

CIRCLE ROAD BETWEEN TATES CREEK ROAD

AND NICHOLASVILLE ROAD. (14CCN)

KY-4

SPP 2,300,000

2,300,000 0 0 0

8801.1

Page 47 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

FAYETTE

Project Cost:

CN

UT

RW

DN

PLIMPROVE LIBERTY ROAD FROM GRAFTONS MILL

LANE TO NEW CIRCLE ROAD AND IMPROVE

INTERSECTION WITH NEW CIRCLE ROAD.

(16CCN)

KY-1927

STP

STP

STP

1,000,000

1,000,000

1,730,000

6,190,000

1,730,000 0 6,190,000

8902

FAYETTE

Project Cost:

CN

UT

RW

DN

PLIMPROVE LIBERTY ROAD FROM GRAFTONS MILL

LANE TO NEW CIRCLE ROAD AND IMPROVE

INTERSECTION WITH NEW CIRCLE ROAD.

(16CCN)

KY-1927

STP

STP

3,300,000

3,300,000

2,600,000

0 2,600,000 0

8902.01

FAYETTE

Project Cost:

CN

UT

RW

DN

PLREDUCE CONGESTION ON I-64/I-75 FROM THE

C&O RAILROAD BRIDGE TO THE NORTHERN

SPLIT (SECTION 1). (16CCN)

I-75

NH

NH

NH

NH

3,000,000

1,000,000

1,000,000

5,000,000

25,000,000

25,000,000 0 0

8909

FAYETTE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

71 TO MILEPOINT 73.94

I-64

PM

PM

0

390,000

3,900,000

4,290,000 0 0

20008

FAYETTE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-064 BOTH DIRECTION(S) FROM

MILEPOINT 81.037 TO MILEPOINT 82.19

I-64

PM

PM

0

175,000

1,750,000

0 1,925,000 0

20010

Page 48 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

FAYETTE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 82.19 TO

MILEPOINT 89.48

I-64

PM

PM

870,000

8,700,000

9,570,000 0 0 0

20011

FAYETTE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 107.453 TO

MILEPOINT 110.213

I-75

PM

PM

330,000

3,300,000

3,630,000 0 0 0

20013

FAYETTE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 110.264 TO

MILEPOINT 111.82

I-75

PM

PM

0

190,000

1,900,000

2,090,000 0 0

20014

FAYETTE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-25

FROM MILEPOINT 19.10 TO MILEPOINT 22.29

US-25

PM

0

1,440,000

1,440,000 0 0

20025

FAYETTE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-1974

FROM MILEPOINT 7.50 TO MILEPOINT 11.55

KY-1974

PM

0

2,748,000

0 2,748,000 0

20026

Page 49 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for FAYETTE county PL

Total Amounts:

CN

UT

RW

DN

280,000

4,200,000

6,600,000

5,550,000

60,736,000

77,366,000

41,376,000 25,674,000 76,306,000

580,000 175,000 4,200,000

1,730,000 2,600,000

43,686,000 28,449,000 80,506,000

FLEMING

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND SIGHT DISTANCE ON

KY-32 BEGINNING AT 0.4 MILES WEST OF

FLEMING/ROWAN CO LINE AND ENDING 0.3

MILES EAST OF THE LINE.

US-32

SPP

SPP

SPP

SPP

800,000

800,000

1,000,000

750,000

7,000,000

0 1,750,000 7,000,000

80051

Total for FLEMING county PL

Total Amounts:

CN

UT

RW

DN 800,000

800,000

7,000,000

1,000,000

750,000

0 1,750,000 7,000,000

FLOYD

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND ACCESS ON US-23

BETWEEN KY-80 AND KY-3384.(12CCR)

US-23

NH 1,880,000

1,880,000 0 0 0

191

FLOYD

Project Cost:

CN

UT

RW

DN

PLSPOT IMPROVEMENTS FROM BRANHAM'S

CREEK TO JOHN M. STUMBO SCHOOL.(12CCR)

(16CCR)

KY-979

SPP

0

5,540,000

5,540,000 0 0

195

Page 50 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

FLOYD

Project Cost:

CN

UT

RW

DN

PLSPOT IMPROVEMENTS FROM BRANHAM'S

CREEK TO JOHN M. STUMBO SCHOOL.(12CCR)

(16CCR)

KY-979

SPP

0

2,370,000

0 2,370,000 0

195.01

FLOYD

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE MINNIE-HAROLD CONNECTOR

FROM LITTLE MUD CREEK RD TO THE MOUTH OF

TACKETT CREEK (ALT.3B SEC.2)(08CCN)

(10CCR)(12CCR)(14CCR)

KY-680

SPP 13,310,000

13,310,000 0 0 0

301.2

FLOYD

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE MINNIE-HAROLD CONNECTOR

FROM LITTLE MUD CREEK RD TO THE MOUTH OF

TACKETT CREEK (ALT.3B SEC.2)(08CCN)

(10CCR)(12CCR)(14CCR)

KY-680

SPP

0

19,970,000

19,970,000 0 0

301.22

FLOYD

Project Cost:

CN

UT

RW

DN

PLIMPROVE ACCESS TO KY 80 AT GARRETT

EASTBOUND AND ELIMINATE NECESSITY FOR

CROSSING WESTBOUND LANES TO MERGE INTO

EASTBOUND LANES. MP 1.527 TO MP 1.827

(12CCN)

KY-80

SPP

SPP

500,000

500,000

3,000,000

3,000,000 0 0

8703

FLOYD

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-23

FROM MILEPOINT 10.18 TO MILEPOINT 15.79

US-23

PM

0

2,557,000

0 2,557,000 0

20004

Page 51 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for FLOYD county PL

Total Amounts:

CN

UT

RW

DN

500,000

15,190,000

15,690,000

28,510,000 4,927,000

28,510,000 4,927,000 0

FRANKLIN

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, TRUCK MOBILITY, AND

REDUCE CONGESTION ALONG I-64 FROM

DIRECTLY EAST OF US-127 TO US-60 SOUTH OF

FRANKFORT.

I-64

NH

0

4,300,000

4,300,000 0 0

551

FRANKLIN

Project Cost:

CN

UT

RW

DN

PLWIDEN I-64 TO 6 LANES FROM KY-151 TO WEST

OF THE KY-420 BRIDGE. (2004BOPC)(DESIGN

FUNDED UNDER 5-2035.40)(16CCN)

I-64

NH

NH

NH

0

120,000

120,000

20,330,000

240,000 0 20,330,000

2035.7

FRANKLIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

US-60

PM

PM

200,000

2,000,000

2,200,000 0 0 0

20001

FRANKLIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-127

FROM MILEPOINT 11.90 TO MILEPOINT 19.00

US-127

PM

0

1,228,000

1,228,000 0 0

20038

Page 52 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for FRANKLIN county PL

Total Amounts:

CN

UT

RW

DN 200,000

2,000,000

2,200,000

1,228,000 20,330,000

4,300,000

120,000

120,000

5,768,000 0 20,330,000

FULTON

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE PURCHASE PARKWAY AT THE

KENTUCKY/TENNESSEE LINE TO SOUTHWEST

OF THE US-51 INTERCHANGE.(I-69 CORRIDOR

IMPROVEMENT)(2012BOP)

JC-9003

NH

0

2,500,000

0 0 2,500,000

25

FULTON

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE PURCHASE PARKWAY FROM

SOUTHWEST OF THE US-51 INTERCHANGE TO

CARDINAL ROAD NEAR MAYFIELD INCLUDING

THE KY-339 INTERCHANGE IN WINGO, KY. (I-69

CORRIDOR IMPROVEMENT) (2012BOP)

JC-9003

NH

NH

0

1,000,000

500,000

0 1,500,000 0

26

FULTON

Project Cost:

CN

UT

RW

DN

PLOPERATION OF HICKMAN FERRY AT MISSISSIPPI

RIVER FOR FY 2021.

KY-1354

SPP 126,000

126,000 0 0 0

320.18

FULTON

Project Cost:

CN

UT

RW

DN

PLOPERATION OF HICKMAN FERRY AT MISSISSIPPI

RIVER FOR FY 2022.

KY-1354

SPP

0

126,000

126,000 0 0

320.19

Page 53 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

FULTON

Project Cost:

CN

UT

RW

DN

PLOPERATION OF HICKMAN FERRY AT MISSISSIPPI

RIVER FOR FY 2023.

KY-1354

SPP

0

126,000

0 126,000 0

320.2

FULTON

Project Cost:

CN

UT

RW

DN

PLOPERATION OF HICKMAN FERRY AT MISSISSIPPI

RIVER FOR FY 2024.

KY-1354

SPP

0

126,000

0 0 126,000

320.21

FULTON

Project Cost:

CN

UT

RW

DN

PLSAFETY IMPROVEMENT AT INTERSECTION OF

KY-1099 AND KY-125. (14CCN)

KY-1099

SPP

SPP

SPP

500,000

780,000

1,280,000

1,460,000

0 1,460,000 0

8853

Total for FULTON county PL

Total Amounts:

CN

UT

RW

DN

500,000

780,000

126,000

1,406,000

126,000 1,586,000 126,000

1,000,000 2,500,000

500,000

126,000 3,086,000 2,626,000

GALLATIN

Project Cost:

CN

UT

RW

DN

PLSTUDY NEW CORRIDOR BETWEEN I-71 IN

GALLATIN COUNTY AND AA HIGHWAY IN

CAMPBELL COUNTY.

-0 STP 2,000,000

2,000,000 0 0 0

458

Page 54 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

GALLATIN

Project Cost:

CN

UT

RW

DN

PLIMPROVE GEOMETRICS ON I-71 FROM US-127 TO

MP 64. (16CCN).

I-71

NH

NH

NH

2,200,000

2,200,000

1,500,000

500,000

2,000,000 0 0

8910

GALLATIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-071 BOTH

DIRECTION(S) FROM MILEPOINT 53.433 TO

MILEPOINT 56.763

I-71

PM

PM

0

500,000

5,000,000

0 0 5,500,000

20021

GALLATIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-071 BOTH

DIRECTION(S) FROM MILEPOINT 59.673 TO

MILEPOINT 69.89

I-71

PM

PM

0

1,025,000

10,250,000

11,275,000 0 0

20022

Total for GALLATIN county PL

Total Amounts:

CN

UT

RW

DN

2,000,000

2,200,000

4,200,000

10,250,000 5,000,000

1,025,000 500,000

1,500,000

500,000

13,275,000 0 5,500,000

GARRARD

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-27 FROM WEST LANCASTER

BYPASS TO KY-34. (2006BOPC) (16CCN)

US-27

SPP

SPP

9,000,000

9,000,000

38,000,000

38,000,000 0 0

196.3

Page 55 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for GARRARD county PL

Total Amounts:

CN

UT

RW

DN

9,000,000

9,000,000

38,000,000

38,000,000 0 0

GRANT

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

145.5 TO MILEPOINT 152.122

I-75

PM

PM

0

275,000

2,750,000

3,025,000 0 0

20024

GRANT

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

164.4 TO MILEPOINT 166.263

I-75

PM

PM

0

125,000

1,250,000

0 1,375,000 0

20028

GRANT

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-22

PM

PM

47,500

475,000

522,500 0 0 0

20029

Total for GRANT county PL

Total Amounts:

CN

UT

RW

DN 47,500

475,000

522,500

2,750,000 1,250,000

275,000 125,000

3,025,000 1,375,000 0

Page 56 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

GRAVES

Project Cost:

CN

UT

RW

DN

PLMURRAY-MAYFIELD RD; EXTEND MAYFIELD

SOUTHERN BYPASS FROM KY-303 SOUTH OF

MAYFIELD, NORTHWEST TO JULIAN M.

CARROLL PARKWAY (PURCHASE PARKWAY).

(EXTENSION OF 1-181.30)(00CCR)(12CCR)

KY-80

SPP 7,280,000

7,280,000 0 0 0

181.51

GRAVES

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES OF BRIDGE OVER

PANTHER CREEK ON MCKENDREE CHURCH RD

(CR 1088) 0.3 MI E OF KY 301 042C00010N

CR-1088

BR

0

553,000

553,000 0 0

1157

GRAVES

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES OF MARTIN ROAD

BRIDGE OVER BRANCH-OBION CREEK.

(042C00250N)

CR-1214

BR 423,500

423,500 0 0 0

10002

GRAVES

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF JULIAN M.

CARROLL PURCHASE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 22 TO MILEPOINT

34.49

JC-9003

PM

PM

0

1,000,000

1,000,000

2,000,000 0 0

20004

GRAVES

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-94

FROM MILEPOINT 10.49 TO MILEPOINT 15.78

KY-94

PM

0

825,000

825,000 0 0

20028

Page 57 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

GRAVES

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-339

FROM MILEPOINT 6.04 TO MILEPOINT 13.40

KY-339

PM

0

1,274,000

0 1,274,000 0

20029

Total for GRAVES county PL

Total Amounts:

CN

UT

RW

DN

7,703,500

7,703,500

2,378,000 1,274,000

1,000,000

3,378,000 1,274,000 0

GRAYSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE US 62 FROM LEITCHFIELD BYPASS

(KY3155) TO JUST EAST OF BEEHIVE CURVE.

CONSTRUCTION SEGMENT 1.

US-62

STP 2,000,000

2,000,000 0 0 0

8502.11

GRAYSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE US 62 FROM JUST EAST OF BEEHIVE

CURVE TO KY224. CONSTRUCTION SEGMENT 2.

US-62

STP

0

5,000,000

0 0 5,000,000

8502.2

GRAYSON

Project Cost:

CN

UT

RW

DN

PLEXTEND THE WILLIAM THOMASON BYWAY (KY

3155) FROM THE SOUTHERN INTERSECTION AT

KY 259 WESTERLY TO KY 54

KY-3155

SPP

SPP

SPP

2,500,000

1,500,000

4,000,000

14,500,000

14,500,000 0 0

8954

Page 58 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

GRAYSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY CARDINAL

DIRECTION(S) FROM MILEPOINT 111.25 TO

MILEPOINT 112.48

WK-9001

PM

PM

0

50,000

500,000

550,000 0 0

20001

GRAYSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 112.4 TO

MILEPOINT 114.8

WK-9001

PM

PM

190,000

1,900,000

2,090,000 0 0 0

20002

GRAYSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY CARDINAL

DIRECTION(S) FROM MILEPOINT 114.8 TO

MILEPOINT 116.95

WK-9001

PM

PM

0

100,000

1,000,000

0 1,100,000 0

20003

GRAYSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-62

FROM MILEPOINT 14.49 TO MILEPOINT 20.79

US-62

PM

0

999,000

0 0 999,000

20027

Total for GRAYSON county PL

Total Amounts:

CN

UT

RW

DN 190,000

2,500,000

1,500,000

3,900,000

8,090,000

15,000,000 1,000,000 5,999,000

50,000 100,000

15,050,000 1,100,000 5,999,000

Page 59 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

GREEN

Project Cost:

CN

UT

RW

DN

PLUS68 IMPROVEMENTS FROM T DAVIS RD TO

CLOVER LICK CREEK (MP 6.425 TO 11.744) AS

PER 3-203 SCOPING STUDY (SPOT

IMPROVEMENTS #11, 12 & 13). (DESIGN UNDER

4-397)(2014BOP)

US-68

SPP

SPP

SPP

2,000,000

2,000,000

2,000,000

9,000,000

2,000,000 9,000,000 0

397.1

GREEN

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT NEW CONNECTOR FROM VAUGHN

CURVE ON US-68 BYPASS EAST OF

GREENSBURG CROSSING KY-61 AND KY-417

AND CONNECTING WITH KY-3535 NORTH OF

GREENSBURG.(SEE ITEM #8-8711)(12CCN)

-0

SPP

SPP

SPP

2,000,000

2,000,000

3,000,000

2,000,000

0 3,000,000 2,000,000

398

GREEN

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND MOBILITY ON KY-61

FROM PITMAN CREEK BRIDGE TO DOC WARD RD

(CR 1314). (12CCN)(14CCR)(16CCR)

KY-61

SPP

SPP

SPP

0

2,000,000

2,750,000

6,000,000

2,000,000 2,750,000 6,000,000

8712

GREEN

Project Cost:

CN

UT

RW

DN

PLSPOT IMPROVEMENTS & IMPROVE EXISTING

ALIGNMENT ON KY 88 FROM 0.20 MILES WEST

OF AKIN NARROWS OF PITMAN RD (MP 8.996)

TO KY 61 (MP 11.232). (14CCN)

KY-88

SPP

SPP

SPP

SPP

500,000

500,000

2,900,000

1,000,000

3,000,000

2,900,000 1,000,000 3,000,000

8853

Total for GREEN county PL

Total Amounts:

CN

UT

RW

DN 2,500,000

2,000,000

4,500,000

9,000,000 9,000,000

4,900,000 3,000,000

2,000,000 3,750,000 2,000,000

6,900,000 15,750,000 11,000,000

Page 60 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

GREENUP

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-2 FROM MP 13.2 TO US-23

(MP 17.2)(08CCN)(14CCR)

KY-2

SPP

SPP

SPP

6,070,000

6,070,000

3,380,000

36,000,000

0 3,380,000 36,000,000

132

GREENUP

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-207 FROM THE INDUSTRIAL

PARKWAY TO THE KY-693 INTERSECTION IN

FLATWOODS.(08CCN)(16CCR)

KY-207

STP

0

2,000,000

0 0 2,000,000

8509

Total for GREENUP county PL

Total Amounts:

CN

UT

RW

DN

6,070,000

6,070,000

36,000,000

2,000,000

3,380,000

0 3,380,000 38,000,000

HANCOCK

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE WESTBOUND LANES OF US-60

FROM KY-1957 TO 0.2 MILE WEST OF KY-6106.

(12CCR)(14CCR)

US-60

SPP 6,090,000

6,090,000 0 0 0

226

HANCOCK

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

US-60

PM

PM

0

525,000

5,250,000

5,775,000 0 0

20022

Page 61 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for HANCOCK county PL

Total Amounts:

CN

UT

RW

DN

6,090,000

6,090,000

5,250,000

525,000

5,775,000 0 0

HARDIN

Project Cost:

CN

UT

RW

DN

PLKY 251 IMPROVEMENTS FROM KY 3005 TO KY

434.

KY-251

BR2 8,700,000

8,700,000 0 0 0

153.01

HARDIN

Project Cost:

CN

UT

RW

DN

PLIMPROVE MOBILITY AND REDUCE CONGESTION

ON US-31W FROM US-31WB TO CS-2255

(WILSON ROAD). (10CCR)(12CCR)

US-31

SPP

SPP

SPP

SPP

500,000

500,000

1,000,000

1,000,000

9,000,000

0 0 11,000,000

154

HARDIN

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, MOBILITY AND GEOMETRICS

ON US-62 FROM I-65 TO UPPER COLESBURG

ROAD (CR-1038)

US-62

STP

0

1,500,000

1,500,000 0 0

442

HARDIN

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, GEOMETRICS, DRAINAGE

AND MAINTENANCE ISSUES ALONG KY-1357

(ST. JOHNS RD) FROM US-31W BYPASS TO

KY-3005 (RING ROAD). (14CCN)

KY-1357

SPP

SPP

2,500,000

2,500,000

9,000,000

0 0 9,000,000

8801

Page 62 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

HARDIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITIONUS-31

PM

PM

325,000

3,250,000

3,575,000 0 0 0

20013

HARDIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 119.649 TO

MILEPOINT 120.649

WK-9001

PM

PM

0

100,000

1,000,000

0 0 1,100,000

20015

HARDIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 120.93 (120.65

NON-CARDINAL) TO MILEPOINT 132.4 (130.95

NON-CARDINAL)

WK-9001

PM

PM

920,000

9,200,000

10,120,000 0 0 0

20016

HARDIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 134.923 TO

MILEPOINT 135.923

WK-9001

PM

PM

0

100,000

1,000,000

0 0 1,100,000

20019

HARDIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-62

FROM MILEPOINT 9.57 TO MILEPOINT 13.77

US-62

PM

0

689,000

689,000 0 0

20028

Page 63 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for HARDIN county PL

Total Amounts:

CN

UT

RW

DN 1,745,000

2,500,000

21,150,000

25,395,000

689,000 20,000,000

1,500,000 200,000

1,000,000

1,000,000

2,189,000 0 22,200,000

HARRISON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY ON KY-32 AT THE ENTRANCE

TO HARRISON MEMORIAL HOSPITAL IN

CYNTHIANA.(12CCR)

KY-32

SPP 2,290,000

2,290,000 0 0 0

908

HARRISON

Project Cost:

CN

UT

RW

DN

PLREPLACE BRIDGE ON OLD LAIR RD (CR-1124)

(0.071) OVER S. FORK LICKING RIVER.

(SR=14.2) 049C00035N

CR-1124

SPP 500,000

500,000 0 0 0

1093

HARRISON

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-62 FROM SALEM PIKE (CR-1005)

TO APPROXIMATELY MP 12.3. (12CCN)(14CCR)

US-62

SPP

0

2,920,000

2,920,000 0 0

8707

HARRISON

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT US 27 FROM MP 11.9 TO MP 12.4.

(12CCN)(14CCR)

US-27

SPP

SPP

500,000

500,000

5,500,000

0 5,500,000 0

8708

Page 64 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for HARRISON county PL

Total Amounts:

CN

UT

RW

DN 500,000

500,000

2,290,000

3,290,000

2,920,000 5,500,000

2,920,000 5,500,000 0

HART

Project Cost:

CN

UT

RW

DN

PLIMPROVE MOBILITY, CONNECTIVITY AND

SAFETY BY ADDRESSING COMMERCIAL AND

INDUSTRIAL TRAFFIC MOVEMENT FROM US-31W

SOUTH OF KY-218 TO I-65. (16CCR)

KY-335

NH 1,000,000

1,000,000 0 0 0

441

HART

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-31E

FROM MILEPOINT 13.18 TO MILEPOINT 21.58

US-31

PM

0

964,000

0 964,000 0

20029

Total for HART county PL

Total Amounts:

CN

UT

RW

DN

1,000,000

1,000,000

964,000

0 964,000 0

HENDERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON CS-1372 (WATSON LANE)

CS-1372

SPP

SPP

1,400,000

1,400,000

5,000,000

5,000,000 0 0

383

Page 65 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

HENDERSON

Project Cost:

CN

UT

RW

DN

PLFEDERAL 'STP' FUNDS DEDICATED TO

HENDERSON FOR FY 2021. (FUNDING SUBJECT

TO FISCAL CONSTRAINT PENDING MPO TIP).

-0

SHN 700,000

700,000 0 0 0

700.16

HENDERSON

Project Cost:

CN

UT

RW

DN

PLFEDERAL 'STP' FUNDS DEDICATED TO

HENDERSON FOR FY 2022. (FUNDING SUBJECT

TO FISCAL CONSTRAINT PENDING MPO TIP).

-0

SHN

0

700,000

700,000 0 0

700.17

HENDERSON

Project Cost:

CN

UT

RW

DN

PLFEDERAL 'STP' FUNDS DEDICATED TO

HENDERSON FOR FY 2023. (FUNDING SUBJECT

TO FISCAL CONSTRAINT PENDING MPO TIP).

-0

SHN

0

700,000

0 700,000 0

700.18

HENDERSON

Project Cost:

CN

UT

RW

DN

PLDEVELOP ALIGNMENT FOR I-69

HENDERSON/EVANSVILLE OHIO RIVER

CROSSING (TO BE DEVELOPED IN CONCERT

WITH 2-1088.00).(16CCR)(C-COST=$1.0 BILLION;

KYTC SHARE $600 MILLION)

I-69

NH

NH

19,900,000

19,900,000

8,000,000

8,000,000 0 0

1088.1

HENDERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES AND PAINTING ON US 41

BRIDGES OVER OHIO RIVER. JOINT PROJECT

WITH INDIANA. (051B0002R, 051B0007L)(BSBP)

US-41

BR

0

21,200,000

21,200,000 0 0

2091.1

Page 66 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

HENDERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-069 BOTH

DIRECTION(S) FROM MILEPOINT 142.146 TO

MILEPOINT 148.09 (150.142 NON-CARDINAL)

I-69

PM

PM

640,000

6,400,000

7,040,000 0 0 0

20023

Total for HENDERSON county PL

Total Amounts:

CN

UT

RW

DN 640,000

19,900,000

1,400,000

7,100,000

29,040,000

26,900,000 700,000

8,000,000

34,900,000 700,000 0

HENRY

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON I-71 FROM KY-53 TO KY-153.

I-71

NH

0

5,600,000

0 5,600,000 0

552

HENRY

Project Cost:

CN

UT

RW

DN

PLMAJOR RECONSTRUCTION OF KY-146 BETWEEN

NEW CASTLE AT US-421 AND PENDLETON AT

KY-153. SEGMENT 1: PENDLETON ROAD

(KY-153) TO LOST CREEK (1/2 MILE EAST OF

SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO

KY-146

SPP

0

6,930,000

0 6,930,000 0

8300.01

Total for HENRY county PL

Total Amounts:

CN

UT

RW

DN

0

6,930,000

5,600,000

0 12,530,000 0

Page 67 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

HOPKINS

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-41A FROM INDUSTRIAL DRIVE TO

YORKWOOD PLACE. (SECTION 1) (2012BOP)

(16CCR)

US-41

SPP 5,000,000

5,000,000 0 0 0

137.11

HOPKINS

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-281 FROM ISLAND PARK DRIVE TO

CARRIAGE LANE (KY-2281).

KY-281

STP

STP

STP

0

500,000

1,000,000

1,000,000

0 500,000 2,000,000

384

HOPKINS

Project Cost:

CN

UT

RW

DN

PLCONSTRUCTION OF THE CENTER STREET

CONNECTOR ROAD BEGINNING AT CENTER

STREET AND PROCEEDING TO THE CSX

RAILROAD, SECTION 1, A DISTANCE 5,173

LINEAR FEET, THENCE PROCEEDING THROUGH A

-0

SPP 4,000,000

4,000,000 0 0 0

804

HOPKINS

Project Cost:

CN

UT

RW

DN

PLIMPROVE NORTH MAIN STREET FROM HOSPITAL

DRIVE TO KY-281. (06CCN)(12CCR)

US-41

STP

STP

STP

STP

900,000

1,180,000

2,080,000

1,440,000

8,860,000

1,440,000 0 8,860,000

8305

HOPKINS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF EDWARD T.

BREATHITT PENNYRILE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 32.825 TO

MILEPOINT 34.256

EB-9004

PM

PM

170,000

1,700,000

1,870,000 0 0 0

20025

Page 68 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

HOPKINS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-069 BOTH

DIRECTION(S) FROM MILEPOINT 114.254 TO

MILEPOINT 117.936

I-69

PM

PM

0

290,000

2,900,000

0 3,190,000 0

20029

HOPKINS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-069 BOTH

DIRECTION(S) FROM MILEPOINT 124.946 TO

MILEPOINT 133.677

I-69

PM

PM

0

875,000

8,750,000

0 9,625,000 0

20031

HOPKINS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-069 BOTH

DIRECTION(S) FROM MILEPOINT 93.724 TO

MILEPOINT 95.604

I-69

PM

PM

0

150,000

1,500,000

1,650,000 0 0

20033

HOPKINS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-069 BOTH

DIRECTION(S) FROM MILEPOINT 95.604 TO

MILEPOINT 105.046

I-69

PM

PM

760,000

7,600,000

8,360,000 0 0 0

20034

HOPKINS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 42.807 TO

MILEPOINT 43.424

WK-9001

PM

PM

0

50,000

500,000

0 550,000 0

20035

Page 69 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

HOPKINS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-41A

FROM MILEPOINT 0.00 TO MILEPOINT 9.69

US-41

PM

0

1,069,000

0 1,069,000 0

20048

Total for HOPKINS county PL

Total Amounts:

CN

UT

RW

DN 1,830,000

1,180,000

18,300,000

21,310,000

1,500,000 13,219,000 8,860,000

150,000 1,715,000

1,000,000

1,440,000 1,000,000

3,090,000 14,934,000 10,860,000

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDITION OF NB AND SB AUXILIARY LANES ON

I-71 NEAR KENNEDY, INCLUDING OPERATIONAL

IMPROVEMENTS TO THE ZORN INTERCHANGE.

(2004BOPC)

I-71

NH

0

12,380,000

12,380,000 0 0

48.1

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDITION OF NB AND SB AUX. LANES ON I-71

NEAR KENNEDY, INCLUDING OPERATIONAL

IMPROVEMENTS TO THE ZORN INTERCHANGE.

(ADDITIONAL FUNDING FOR C PHASE)

I-71

NH

0

12,380,000

0 12,380,000 0

48.11

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES ON I-64 SHERMAN

MINTON BRIDGE OVER THE OHIO RIVER. (JOINT

PROJECT WITH INDIANA)(056B00279N)

I-64

BR 10,000,000

10,000,000 0 0 0

64.01

Page 70 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES ON I-64 SHERMAN

MINTON BRIDGE OVER THE OHIO RIVER. (JOINT

PROJECT WITH INDIANA)(056B00279N)

I-64

BR

0

10,000,000

10,000,000 0 0

64.02

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES ON I-64 SHERMAN

MINTON BRIDGE OVER THE OHIO RIVER. (JOINT

PROJECT WITH INDIANA)(056B00279N)

I-64

BR

0

10,000,000

0 10,000,000 0

64.03

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES ON I-64 SHERMAN

MINTON BRIDGE OVER THE OHIO RIVER. (JOINT

PROJECT WITH INDIANA)(056B00279N)

I-64

BR

0

10,000,000

0 0 10,000,000

64.04

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLCLEAN AND PAINT ALL STEEL BRIDGES AND

STEEL BEARINGS ON THE GENE SNYDER

FREEWAY(10CCR)(SD)

I-265

BR 3,790,000

3,790,000 0 0 0

136

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLWIDEN BLUE LICK ROAD FROM SNYDER

FREEWAY NORTH TO KY-61 (LOU T.I.P.)

(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)

(16CCR)

KY-1450

STP 6,500,000

6,500,000 0 0 0

247.11

Page 71 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLWIDEN GREENWOOD ROAD FROM GREENBELT

HWY TO DIXIE HWY (US-31W) (3-LANE

IMPROVEMENT) FROM MP 0.54 TO MP 3.148.

(98CCR)(R-04DEOB)(04CCR)(BOP2006P)

(10CCR)(12CCR)

KY-1931

SPP

0

4,860,000

4,860,000 0 0

323.01

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLWIDEN GREENWOOD ROAD FROM GREENBELT

HWY TO DIXIE HWY (US-31W) (3-LANE

IMPROVEMENT) FROM MP 0.54 TO MP 3.148.

(98CCR)(R-04DEOB)(04CCR)(BOP2006P)

(10CCR)(12CCR)

KY-1931

SPP

0

4,860,000

0 4,860,000 0

323.03

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-22 AT SPRINGCREST DRIVE.

(06CCN) (2004BOPC)(14CCR)(EMERGENCY

CULVERT REPLACEMENT AWARDED UNDER

5-371.12)

KY-22

STP

0

1,740,000

1,740,000 0 0

371.1

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLSIX LANE PRIORITY SECTION OF I-71 BETWEEN

I-265 AND KY-329.(16CCR)

I-71

NH 30,000,000

30,000,000 0 0 0

483.02

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLOLMSTED PARKWAYS MULTI-USE PATH

SYSTEM-SOUTHERN PKWY: CONSTRUCTION OF

A 2.5 MILE SHARED USE PATH SYSTEM ALONG

SOUTHERN PARKWAY BETWEEN SOUTH 3RD

AND NEW CUT ROAD.

KY-1020

SLO 4,672,877

4,672,877 0 0 0

495

Page 72 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLSIX LANE PRIORITY SECTION OF I-265 BETWEEN

TAYLORSVILLE ROAD AND I-71.

I-265

NH

0

15,000,000

15,000,000 0 0

537

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLSIX LANE PRIORITY SECTION OF I-265 BETWEEN

TAYLORSVILLE ROAD AND I-71.

I-265

NH

NH

NH

1,580,000

2,080,000

3,660,000

15,000,000

0 15,000,000 0

537.01

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLSIX LANE PRIORITY SECTION OF I-265 BETWEEN

TAYLORSVILLE ROAD AND I-71.

I-265

NH

0

25,000,000

0 0 25,000,000

537.02

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCTION OF THE I-265/I-64

INTERCHANGE. (2016BOP)

I-265

NH 15,000,000

15,000,000 0 0 0

549.01

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVEMENTS WITHIN THE I-64 CORRIDOR

FROM THE KENNEDY INTERCHANGE TO I-264

(WATTERSON EXPRESSWAY) ADDRESSING

SAFETY AND CONGESTION ISSUES. THE

IMPROVEMENTS MAY INCLUDE BUT ARE NOT

I-64 NH

NH

0

2,550,000

2,550,000 0 0

553

Page 73 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON I-265 FROM I-65 TO US-31E.

I-265 NH

NH

1,000,000

1,000,000

3,000,000

0 3,000,000 0

554

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON I-71 FROM ZORN AVE TO I-264.

I-71

NH

0

2,000,000

0 2,000,000 0

556

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON I-71 FROM I-264 TO I-265.

I-71 NH

NH

0

3,000,000

3,000,000 0 0

557

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON I-265 FROM US-31E (BARDSTOWN RD) TO

KY-155 (TAYLORSVILLE RD).

I-265

NH

0

7,500,000

0 7,500,000 0

558

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION AT

THE I-65/I-264 (WATTERSON EXPRESSWAY)

INTERCHANGE.

I-65 NH

NH 3,000,000

3,000,000 0 0 0

559

Page 74 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION AT

THE I-65/I-264 (WATTERSON EXPRESSWAY)

INTERCHANGE.

I-65

NH

0

3,000,000

3,000,000 0 0

559.01

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION AT

THE I-65/I-265 (GENE SNYDER FREEWAY)

INTERCHANGE.

I-65 NH 400,000

400,000 0 0 0

560

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLINTERSECTION RE-BUILD AT MAIN STREET/

STORY AVENUE / BAXTER AVENUE INCLUDING

TRANSITIONS BETWEEN WENTZEL STREET TO

THE WEST AND JOHNSON STREET TO THE EAST.

-0

SLO 3,314,319

3,314,319 0 0 0

561

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT/WIDEN I-264 (WATTERSON

EXPRESSWAY) FROM WESTPORT ROAD

(KY-1447) TO I-71, INCLUDING THE US-42

INTERCHANGE AS A SPUI.(PROJECT INCLUDES

5-594) (12CCR)(14CCR)

I-264

NH

NH

NH

5,280,000

1,270,000

6,550,000

23,590,000

0 0 23,590,000

804

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL AID STP FUNDS

EARMARKED FOR LOUISVILLE URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2021.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP).

-0

SLO 11,670,000

11,670,000 0 0 0

965.19

Page 75 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL AID STP FUNDS

EARMARKED FOR LOUISVILLE URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2022.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP).

-0

SLO

0

23,500,000

23,500,000 0 0

965.2

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL AID STP FUNDS

EARMARKED FOR LOUISVILLE URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2023.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP).

-0

SLO

0

9,262,000

0 9,262,000 0

965.21

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLDEDICATED FEDERAL AID STP FUNDS

EARMARKED FOR LOUISVILLE URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2024.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP).

-0

SLO

0

23,500,000

0 0 23,500,000

965.22

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLNORTHEAST LOUISVILLE LOOP MET SECTION 4

BECKLEY CREEK PARK TO EASTWOOD CUTOFF.

CONSTRUCT A SHARED USE PATH ALONG US 60

FROM BECKLEY CREEK PARK TO EASTWOOD

CUT OFF, 0.6 MILE. (2016BOP)

US-60

SLO 1,000,000

1,000,000 0 0 0

3030.4

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A SIDEWALK ALONG CANNONS

LANE BETWEEN WILLIS AVE. AND BOWMAN

FIELD (SENECA LOOP), 1.0 MILES (2016BOP)

CS-2048

SLO 500,000

500,000 0 0 0

3212

Page 76 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT BILLTOWN ROAD FROM NORTH

OF COLONNADES PLACE TO SOUTH OF EASUM

ROAD. (04CCN)(06CCN)(08CCR)(10CCR)

(12CCR)

KY-1819

SPP

0

2,700,000

0 0 2,700,000

8203

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLTHREE LANE WIDENING ALONG KY-1931 FROM

THE DOSS HIGH SCHOOL ENTRANCE TO

PALATKA ROAD, INCLUDING INTERSECTION

IMPROVEMENTS WITH PALATKA ROAD AND

TURN LANES. (14CCN)

KY-1931

STP

STP

0

2,630,000

4,160,000

6,790,000 0 0

8810

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLDESIGN AND CONSTRUCT A SOUND BARRIER

WALL ON THE NORTH SIDE OF I-71 FROM MP 5.4

TO MP 6.3 FOR APPROX. 4700 FEET. (14CCN)

I-71

SPP

0

2,961,000

0 0 2,961,000

8858

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLDESIGN AND CONSTRUCT A SOUND BARRIER

WALL ON THE SOUTH SIDE OF I-71 FROM MP 7.5

TO MP 7.8 (14CCN)

I-71

SPP

0

1,152,000

0 1,152,000 0

8859

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLDESIGN AND CONSTRUCT A SOUND BARRIER

WALL ON THE NORTH SIDE OF I-71 FROM MP 7.5

TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)

I-71

SPP 2,304,000

2,304,000 0 0 0

8860.1

Page 77 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLWIDEN TAYLORSVILLE RD. TO 3 LANES FROM

I-265 TO KY-148

KY-155 SPP

SPP

SPP

SPP

0

1,000,000

500,000

15,930,000

1,500,000 15,930,000 0

8908

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLWIDEN US-60 TO THREE LANES FROM

EASTWOOD CUTOFF (MP 14.7) TO ROCKCREST

WAY (MP 15.1). (16CCN) (LOCALS WILL DO

DESIGN FOR $330,000)

US-60

SPP 1,000,000

1,000,000 0 0 0

8952

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLBRIDGE PAINTING OF I-64 RIVERSIDE

EXPRESSWAY BRIDGES.

(056B00298N,056B00299N,056B00300N,056B00

301N,056B00302N,056B00285N,056B00292N,05

6B00293N,056B00142N)

I-64

BR 30,000,000

30,000,000 0 0 0

10016

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 6 TO MILEPOINT

11.57

I-64

PM

PM

0

575,000

5,750,000

0 0 6,325,000

20009

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-071 BOTH

DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT

11.32

I-71

PM

PM

0

1,150,000

11,500,000

0 0 12,650,000

20014

Page 78 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-264 BOTH DIRECTION(S) FROM

MILEPOINT 12.7 TO MILEPOINT 18.41

I-264

PM

PM

0

1,150,000

11,500,000

0 0 12,650,000

20016

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-264 BOTH

DIRECTION(S) FROM MILEPOINT 20.7 TO

MILEPOINT 22.927

I-264

PM

PM

0

450,000

4,500,000

0 4,950,000 0

20017

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-265 BOTH DIRECTION(S) FROM

MILEPOINT 15.66 TO MILEPOINT 18.8

I-265

PM

PM

0

325,000

3,250,000

3,575,000 0 0

20019

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-265 BOTH

DIRECTION(S) FROM MILEPOINT 23.364 TO

MILEPOINT 26.6

I-265

PM

PM

0

350,000

3,500,000

3,850,000 0 0

20021

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-841

PM

PM

0

725,000

7,250,000

7,975,000 0 0

20022

Page 79 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-913

PM

PM

50,000

500,000

550,000 0 0 0

20024

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-1020

PM

PM

75,000

750,000

825,000 0 0 0

20025

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-1932

PM

PM

50,000

500,000

550,000 0 0 0

20027

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-1934

PM

PM

325,000

3,250,000

3,575,000 0 0 0

20028

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-1934

PM

PM

0

375,000

3,750,000

4,125,000 0 0

20029

Page 80 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-2048

PM

PM

0

100,000

1,000,000

1,100,000 0 0

20030

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-2052

PM

PM

300,000

3,000,000

3,300,000 0 0 0

20031

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-31W

FROM MILEPOINT 0.00 TO MILEPOINT 7.25

US-31

PM

0

965,000

965,000 0 0

20039

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLWIDEN US-60 TO 6 LANES FROM OLD

SHELBYVILLE RD. TO NORTH ENGLISH STATION

RD.

US-60

SPP

SPP

SPP

550,000

550,000

720,000

1,500,000

720,000 1,500,000 0

80001

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLNEW INTERCHANGE ON I-64E EAST OF THE

GENE SNYDER FREEWAY

I-64 SPP 650,000

650,000 0 0 0

80002

Page 81 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT NEW INTERCHANGE ON KY-841 AT

THE RENAISSANCE SOUTH BUSINESS PARK

KY-841

SPP 12,500,000

12,500,000 0 0 0

80006

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLEXTEND EXISTING SOUND WALL ON I-264 NEAR

NEWBURG RD. APPROXIMATELY 750' WEST.

I-264

SPP

SPP

50,000

325,000

375,000 0 0 0

80051

JEFFERSON

Project Cost:

CN

UT

RW

DN

PLDESIGN AND CONSTRUCT A SOUND BARRIER

WALL ON THE WESTBOUND SIDE OF I-64 FROM

MP 10.3 TO MP 11.2 FOR APPROXIMATELY 4800

FEET

I-64

SPP

SPP

250,000

250,000

3,206,000

3,206,000 0 0

80052

Total for JEFFERSON county PL

Total Amounts:

CN

UT

RW

DN

2,050,000

4,100,000

7,410,000

3,350,000

140,576,196

157,486,196

90,401,000 74,584,000 116,501,000

10,425,000 12,950,000 2,875,000

3,630,000

5,380,000

109,836,000 87,534,000 119,376,000

JESSAMINE

Project Cost:

CN

UT

RW

DN

PLEAST NICHOLASVILLE BYPASS SECTION IA:

IMPROVE CONNECTIVITY AND MOBILITY EAST

AROUND NICHOLASVILLE FROM SOUTH OF

KY-39 TO NORTH OF KY-169.

-0

SPP

0

7,800,000

0 0 7,800,000

87.2

Page 82 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

JESSAMINE

Project Cost:

CN

UT

RW

DN

PLIMPROVE ROADWAY GEOMETRICS, TYPICAL

SECTION, AND ROADWAY HAZARDS ON KY

1980 (BRANNON RD) FROM US 68

(HARRODSBURG RD) TO US 27

(NICHOLASVILLE RD)(12CCR)

KY-1980

SPP

SPP

SPP

5,500,000

5,500,000

5,000,000

12,000,000

0 5,000,000 12,000,000

414

Total for JESSAMINE county PL

Total Amounts:

CN

UT

RW

DN

5,500,000

5,500,000

19,800,000

5,000,000

0 5,000,000 19,800,000

KENTON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON KY-1303 FROM KY-536 TO BEECHGROVE

ELEMENTARY (PRIORITY SECTION 4). DESIGN

PHASE UNDER PARENT NO. 6-162.01.

(2012BOP)(16CCR)

KY-1303

STP

STP

STP

0

3,000,000

3,000,000

9,000,000

0 6,000,000 9,000,000

162.1

KENTON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON KY-536 FROM THE WEST END OF THE NS

RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY

SECTION 1). DESIGN PHASE UNDER PARENT

NO. 6-162.01. (16CCN)

KY-536

STP 5,410,000

5,410,000 0 0 0

162.21

KENTON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON KY-536 FROM KY 1303 TO WILLIAMSWOOD

ROAD/CALVARY DRIVE (PRIORITY SECTION 2).

DESIGN PHASE UNDER PARENT NO. 6-162.01

(2012BOP)

KY-536

SPP

0

13,500,000

13,500,000 0 0

162.3

Page 83 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

KENTON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION

ON KY-536 FROM WILLIAMSWOOD

ROAD/CALVARY DRIVE TO KY-17 (PRIORITY

SECTION 3). DESIGN PHASE UNDER PARENT

NO. 6-162.01. (2012BOP)

KY-536

SPP

SPP

0

12,080,000

1,560,000

12,080,000 0 1,560,000

162.4

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES OF BRIDGE OVER

LICKING RIVER ON WEST 4TH STREET (KY 8) IN

COVINGTON/NEWPORT AT KENTON/CAMPBELL

CO LN. (059B00037N) *CAMPBELL CO MPS ARE

0.0-0.19

KY-8

BR

BR

BR

BR

3,900,000

3,900,000

2,440,000

1,170,000

32,900,000

3,610,000 0 32,900,000

1086

KENTON

Project Cost:

CN

UT

RW

DN

PLIMPROVE EXISTING ALIGNMENT WITH

BUTTERMILK PIKE, ORPHANAGE ROAD, AND US

25. FT. MITCHELL WILL PAY $50,000 TOWARD

DESIGN.

US-25

SPP

SPP

SPP

5,000,000

5,000,000

2,000,000

5,000,000

2,000,000 5,000,000 0

8951

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075

CARDINAL DIRECTION(S) FROM MILEPOINT

166.263 TO MILEPOINT 169.439

I-75

PM

PM

390,000

3,900,000

4,290,000 0 0 0

20030

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

166.263 TO MILEPOINT 169.439

I-75

PM

PM

0

390,000

3,900,000

0 4,290,000 0

20031

Page 84 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-075 BOTH DIRECTION(S) FROM

MILEPOINT 186.95 TO MILEPOINT 190.721

I-75

PM

PM

0

750,000

7,500,000

0 0 8,250,000

20032

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075

CARDINAL DIRECTION(S) FROM MILEPOINT

190.721 TO MILEPOINT 191.777

I-75

PM

PM

0

100,000

1,000,000

1,100,000 0 0

20034

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-275 NON-CARDINAL

DIRECTION(S) FROM MILEPOINT 1.054 TO

MILEPOINT 1.582

I-275

PM

PM

40,000

400,000

440,000 0 0 0

20036

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-275 BOTH DIRECTION(S) FROM

MILEPOINT 77.759 TO MILEPOINT 79.796

I-275

PM

PM

0

300,000

3,000,000

0 0 3,300,000

20037

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-275 BOTH DIRECTION(S) FROM

MILEPOINT 80.12 TO MILEPOINT 82.475

I-275

PM

PM

0

350,000

3,500,000

0 0 3,850,000

20038

Page 85 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-16

PM

PM

400,000

4,000,000

4,400,000 0 0 0

20040

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-16

PM

PM

75,000

750,000

825,000 0 0 0

20041

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

KY-16

PM

PM

50,000

500,000

550,000 0 0 0

20042

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

KY-17

PM

PM

880,000

8,800,000

9,680,000 0 0 0

20043

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-236

PM

PM

30,000

300,000

330,000 0 0 0

20044

Page 86 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

KY-1072

PM

PM

20,000

200,000

220,000 0 0 0

20045

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

US-25

PM

PM

325,000

3,250,000

3,575,000 0 0 0

20046

KENTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-177

FROM MILEPOINT 9.17 TO MILEPOINT 15.99

KY-177

PM

0

893,000

893,000 0 0

20051

KENTON

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY 236 (STEVENSON ROAD)

FROM ALICE STREET TO JACQUELINE DRIVE

KY 236

SPP

SPP

1,000,000

1,000,000

5,300,000

5,300,000 0 0

80002

Total for KENTON county PL

Total Amounts:

CN

UT

RW

DN 6,110,000

5,000,000

1,000,000

27,510,000

39,620,000

20,693,000 8,900,000 55,900,000

100,000 390,000 1,400,000

14,520,000 3,000,000

3,170,000 3,000,000 1,560,000

38,483,000 15,290,000 58,860,000

Page 87 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

KNOX

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND ACCESS MANAGEMENT,

AND REDUCE CONGESTION ON US-25E FROM

CORBIN BYPASS TO KNOX/LAUREL COUNTY

LINE.(12CCR)

US-25

NH 6,920,000

6,920,000 0 0 0

188.01

KNOX

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-25E

FROM MILEPOINT 21.72 TO MILEPOINT 26.20

US-25

PM

0

2,267,000

0 2,267,000 0

20022

Total for KNOX county PL

Total Amounts:

CN

UT

RW

DN

6,920,000

6,920,000

2,267,000

0 2,267,000 0

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE I-75 FROM US-25E TO THE LITTLE

LAUREL RIVER (16CCR)

I-75

NH 20,000,000

20,000,000 0 0 0

9.14

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE I-75 FROM US-25E TO THE LITTLE

LAUREL RIVER (16CCR)

I-75

NH

0

18,500,000

18,500,000 0 0

9.15

Page 88 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE I-75 FROM US-25E TO THE LITTLE

LAUREL RIVER (16CCR)

I-75

NH

0

18,500,000

0 18,500,000 0

9.16

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE I-75 FROM KY 80 AT LONDON TO

SOUTH OF THE KY-909 UNDERPASS.

I-75

NH

0

20,750,000

20,750,000 0 0

11

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE I-75 FROM KY-80 AT LONDON TO

SOUTH OF THE KY-909 UNDERPASS.

I-75

NH

0

20,750,000

0 20,750,000 0

11.02

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE I-75 FROM KY-80 AT LONDON TO

SOUTH OF THE KY-909 UNDERPASS.

I-75

NH

0

20,750,000

0 0 20,750,000

11.03

LAUREL

Project Cost:

CN

UT

RW

DN

PLREDUCE CONGESTION ON US-25 FROM KY-1006

TO KY-2069; IMPROVE CONNECTIVITY FROM

US-25 NEAR KY-2069 TO KY-229; IMPROVE

KY-229 FROM THE NEW CONNECTOR NORTH TO

KY-192; AND IMPROVE ACCESS TO THE

US-25

STP

0

10,000,000

10,000,000 0 0

147

Page 89 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LAUREL

Project Cost:

CN

UT

RW

DN

PLREDUCE CONGESTION ON US-25 FROM KY-1006

TO KY-2069; IMPROVE CONNECTIVITY FROM

US-25 NEAR KY-2069 TO KY-229; IMPROVE

KY-229 FROM THE NEW CONNECTOR NORTH TO

KY-192; AND IMPROVE ACCESS TO THE

US-25

STP

0

5,000,000

0 5,000,000 0

147.01

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, IMPROVE ACCESS

MANAGEMENT, AND REDUCE CONGESTION ON

US-25E FROM THE KNOX/LAUREL COUNTY LINE

TO KY-770 (12CCR)(16CCR)

US-25

NH 6,860,000

6,860,000 0 0 0

185.01

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, ACCESS MANAGEMENT, AND

FREIGHT MOBILITY; AND REDUCE CONGESTION

ON KY-192 NEAR KY-1006 TO US-25 IN

LONDON. (12CCR)

KY-192

NH

0

6,000,000

6,000,000 0 0

187

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, ACCESS MANAGEMENT, AND

FREIGHT MOBILITY; AND REDUCE CONGESTION

ON KY-192 NEAR KY-1006 TO US-25 IN

LONDON. (12CCR)

KY-192

NH

0

12,000,000

0 12,000,000 0

187.01

LAUREL

Project Cost:

CN

UT

RW

DN

PLREDUCE CONGESTION ON THE HAL ROGERS

PARKWAY FROM RELOCATED KY-30 TO

KY-192.

HR-9006

NH

NH

NH

NH

1,870,000

1,870,000

2,080,000

1,250,000

4,510,000

3,330,000 4,510,000 0

365

Page 90 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE CONNECTIVITY BETWEEN CORBIN AND

LONDON FROM KY-1006 TO US-25E. (08CCN)

US-25

STP

0

3,000,000

3,000,000 0 0

8515

LAUREL

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE HAL ROGERS PARKWAY TO

INTERSTATE STANDARDS FROM 4.0 MI EAST OF

KY 192 TO LAUREL/CLAY CO. LINE. (I-75 TO

HAZARD) (16CCN).

HR-9006

NH

SPP

SPP

SPP

1,000,000

1,000,000

2,200,000

1,000,000

27,000,000

2,200,000 1,000,000 27,000,000

8909

LAUREL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 29.39 TO

MILEPOINT 32.49 (33.2 NON-CARDINAL)

I-75

PM

PM

0

300,000

3,000,000

0 3,300,000 0

20010

LAUREL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 41.4 TO

MILEPOINT 50.524 (49.87 NON-CARDINAL)

I-75

PM

PM

0

1,100,000

11,000,000

0 12,100,000 0

20012

LAUREL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-490

FROM MILEPOINT 0.00 TO MILEPOINT 6.14

KY-490

PM

0

924,000

924,000 0 0

20023

Page 91 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for LAUREL county PL

Total Amounts:

CN

UT

RW

DN 2,870,000

26,860,000

29,730,000

56,174,000 74,760,000 47,750,000

3,000,000 1,400,000

4,280,000

1,250,000 1,000,000

64,704,000 77,160,000 47,750,000

LEE

Project Cost:

CN

UT

RW

DN

PLI-75 TO MOUNTAIN PARKWAY; RECONSTRUCT

KY-11 FROM KY-30 AT LEVI IN OWSLEY

COUNTY TO 0.5 MILE SOUTH OF KY-587 IN LEE

COUNTY. START AT KY-30 AT LEVI IN OWSLEY

MOVING NORTH (06CCR)(10CCR)(14CCR)

KY-11

SPP 22,620,000

22,620,000 0 0 0

292.1

Total for LEE county PL

Total Amounts:

CN

UT

RW

DN

22,620,000

22,620,000 0 0 0

LESLIE

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A NEW APPROACH FROM KY-1482

ONTO THE HAL ROGERS PARKWAY AT MP 39.

(08CCN)(10CCR)(2011BOPP)

KY-1482

SPP

SPP

SPP

SPP

1,000,000

1,000,000

920,000

420,000

5,300,000

1,340,000 5,300,000 0

8516

LESLIE

Project Cost:

CN

UT

RW

DN

PLUPGRADE ROUTE FROM SOMERSET TO HAZARD

TO INTERSTATE STANDARDS: 4 LANE FROM

CLAY/LESLIE LINE TO HYDEN SPUR, MP 35.929

TO MP 44.188 (SEGMENT 9)

HR-9006

SPP

SPP

SPP

SPP

1,000,000

1,000,000

12,000,000

9,000,000

94,400,000

21,000,000 94,400,000 0

8912

Page 92 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LESLIE

Project Cost:

CN

UT

RW

DN

PLUPGRADE ROUTE FROM SOMERSET TO HAZARD

TO INTERSTATE STANDARDS: 4 LANE FROM

HYDEN SPUR TO LESLIE/PERRY LINE (SEGMENT

10)

HR-9006

SPP

SPP

SPP

SPP

1,000,000

1,000,000

10,000,000

7,000,000

61,600,000

17,000,000 0 61,600,000

8913

LESLIE

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT RIGHT TURN LANE ON US 421 AT

INTERSECTION WITH KY 80.

US-421

SPP

SPP

SPP

SPP

500,000

500,000

100,000

250,000

1,200,000

350,000 1,200,000 0

8951

LESLIE

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES OF KY-2431 BRIDGE

OVER MIDDLE FORK OF KY RIVER.

(066B00039N)

KY-2431

BR

BR

BR

BR

300,000

300,000

75,000

180,000

1,100,000

255,000 0 1,100,000

10029

LESLIE

Project Cost:

CN

UT

RW

DN

PLSAFETY IMPROVEMENTS ON KY 3424 FROM MP

1.1 TO MP 1.5

KY 3424

SPP 1,300,000

1,300,000 0 0 0

80002

LESLIE

Project Cost:

CN

UT

RW

DN

PLINSTALL NEW GUARDRAIL ON KY 2009 FROM

MP 13.418 TO MP 14.767

KY 2009

SPP 500,000

500,000 0 0 0

80003

Page 93 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LESLIE

Project Cost:

CN

UT

RW

DN

PLINSTALL NEW GUARDRAIL ON KY 1482 FROM

MP 0 TO MP 1.9

KY 1482

SPP 107,000

107,000 0 0 0

80004

LESLIE

Project Cost:

CN

UT

RW

DN

PLINSTALL NEW GUARDRAIL ON KY 257 FROM MP

5.723 TO MP 5.853

KY 257

SPP 22,000

22,000 0 0 0

80005

LESLIE

Project Cost:

CN

UT

RW

DN

PLINSTALL NEW GUARDRAIL ON KY 1807 FROM

MP 0.914 TO MP 1.256

KY 1807

SPP 45,000

45,000 0 0 0

80006

LESLIE

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A SECONDARY RUNAWAY TRUCK

RAMP ON KY 118 (HYDEN SPUR) JUST BEFORE

THE INTERSECTION WITH KY 80/US 421 TO

INCLUDE A NEW BOX CULVERT OR BRIDGE AT

THE INTERSECTION

KY 118

SPP

SPP

SPP

SPP

400,000

400,000

300,000

50,000

1,300,000

1,650,000 0 0

80007

Total for LESLIE county PL

Total Amounts:

CN

UT

RW

DN 4,200,000

1,974,000

6,174,000

1,300,000 100,900,000 62,700,000

23,395,000

16,900,000

41,595,000 100,900,000 62,700,000

Page 94 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LETCHER

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-119 FROM NORTH OF KY-15 TO

BRASS DRIVE (SOUTH).(16CCN)

US-119

NH

NH

1,300,000

1,200,000

2,500,000 0 0 0

199.1

LETCHER

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-119 FROM KY 2034/COUGAR

DRIVE TO BRASS DRIVE (SOUTH).(16CCN)(SEE

12-199.10 FOR D, R, U)

US-119

NH 6,000,000

6,000,000 0 0 0

199.15

LETCHER

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-119

FROM MILEPOINT 17.00 TO MILEPOINT 22.63

US-119

PM

0

1,477,000

1,477,000 0 0

20005

Total for LETCHER county PL

Total Amounts:

CN

UT

RW

DN

1,300,000

1,200,000

6,000,000

8,500,000

1,477,000

1,477,000 0 0

LEWIS

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-59 FROM KY-9 (AA) IN

VANCEBURG TO JUNCTION OF KY-344 MP 18.1

TO MP 23.19

KY-59

SPP

SPP

SPP

SPP

6,000,000

6,000,000

5,000,000

3,000,000

40,000,000

5,000,000 3,000,000 40,000,000

231

Page 95 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LEWIS

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-8 FROM KY-8C IN GARRISON

TO SCAFFOLD LICK ROAD.

KY-8

SPP 500,000

500,000 0 0 0

8806.1

LEWIS

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-57 FROM KY-9 TO

FLEMING/LEWIS COUNTY LINE. (14CCN)

KY-57

SPP

SPP

SPP

SPP

0

2,100,000

5,200,000

3,400,000

20,000,000

2,100,000 8,600,000 20,000,000

8807

LEWIS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITIONKY-9

PM

PM

210,000

2,100,000

2,310,000 0 0 0

20010

LEWIS

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-9 FROM

MILEPOINT 15.77 TO MILEPOINT 21.03

KY-9

PM

0

1,070,000

1,070,000 0 0

20017

Total for LEWIS county PL

Total Amounts:

CN

UT

RW

DN 6,710,000

2,100,000

8,810,000

1,070,000 60,000,000

2,100,000

5,000,000 5,200,000

6,400,000

8,170,000 11,600,000 60,000,000

Page 96 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LINCOLN

Project Cost:

CN

UT

RW

DN

PLUS-27 CORRIDOR FROM SOMERSET TO

LEXINGTON. IMPROVE SAFETY AND REDUCE

CONGESTION ON US-27 FROM KY-1247 TO

EDUCATION WAY.

US-27

NH

NH

0

4,720,000

3,000,000

7,720,000 0 0

167

LINCOLN

Project Cost:

CN

UT

RW

DN

PLUS-27 CORRIDOR FROM SOMERSET TO

LEXINGTON. IMPROVE SAFETY AND REDUCE

CONGESTION ON US-27 FROM KY-1247 TO

EDUCATION WAY.

US-27

NH

NH

0

7,080,000

4,500,000

0 11,580,000 0

167.01

LINCOLN

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-27 FROM KY-590 TO BELL STREET

IN STANFORD. (INCLUDES NEW GOSHEN

CUT-OFF ROAD)(2005HPP-KY115)

US-27

NH 3,250,000

3,250,000 0 0 0

196.01

LINCOLN

Project Cost:

CN

UT

RW

DN

PLEXPAND US-27 TO FOUR LANES FROM THE

WALMART IN STANFORD TO THE DIX RIVER

US-27

SPP

SPP

SPP

SPP

2,100,000

2,100,000

7,500,000

6,500,000

24,300,000

7,500,000 6,500,000 24,300,000

80009

Total for LINCOLN county PL

Total Amounts:

CN

UT

RW

DN 2,100,000

3,250,000

5,350,000

24,300,000

12,220,000 7,080,000

3,000,000 11,000,000

15,220,000 18,080,000 24,300,000

Page 97 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LIVINGSTON

Project Cost:

CN

UT

RW

DN

PLPADUCAH-HENDERSON; RELOCATE US-60 FROM

EAST OF THE TENNESSEE RIVER BRIDGE TO

EAST OF RUDD-SPEES ROAD (00CCR)(12CCR)

(14CCR)

US-60

NH

NH

1,580,000

1,560,000

3,140,000 0 0 0

330

LIVINGSTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-024 BOTH

DIRECTION(S) FROM MILEPOINT 29.543 TO

MILEPOINT 33.88

I-24

PM

PM

0

350,000

3,500,000

0 3,850,000 0

20007

LIVINGSTON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-453

FROM MILEPOINT 0.00 TO MILEPOINT 4.57

KY-453

PM

0

879,000

879,000 0 0

20030

Total for LIVINGSTON county PL

Total Amounts:

CN

UT

RW

DN

1,580,000

1,560,000

3,140,000

879,000 3,500,000

350,000

879,000 3,850,000 0

LOGAN

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY BY IMPROVING SIGHT LINES

CROSSING RAILROAD BETWEEN STOCKYARDS

AND INDUSTRIAL PARK

KY-2349

SPP

SPP

SPP

SPP

150,000

150,000

100,000

150,000

850,000

250,000 850,000 0

8908

Page 98 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LOGAN

Project Cost:

CN

UT

RW

DN

PLWIDEN US-79 TO 3 LANES FROM TODD COUNTY

LINE TO INTERSECTION WITH RUSSELLVILLE

BYPASS.

US-79

STP

STP

STP

STP

4,300,000

4,300,000

6,500,000

10,700,000

28,100,000

6,500,000 10,700,000 28,100,000

80050

Total for LOGAN county PL

Total Amounts:

CN

UT

RW

DN 4,450,000

4,450,000

850,000 28,100,000

6,600,000

150,000 10,700,000

6,750,000 11,550,000 28,100,000

LYON

Project Cost:

CN

UT

RW

DN

PLADD RESTROOM FACILITY TO I-24 EASTBOUND

& WESTBOUND WEIGH STATIONS IN LYON

COUNTY (DESIGN FUNDS AUTHORIZED UNDER

ITEM NO. 99-44.00)

I-24

NH

0

1,900,000

0 1,900,000 0

7

LYON

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-641 FROM US-62 NEAR

EDDYVILLE TO SOUTH OF THE LYON/CALDWELL

COUNTY LINE.

US-641

NH

0

6,000,000

6,000,000 0 0

187.5

LYON

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-641 FROM US-62 NEAR

EDDYVILLE TO SOUTH OF THE LYON/CALDWELL

COUNTY LINE.

US-641

NH

NH

NH

2,000,000

500,000

2,500,000

6,000,000

0 6,000,000 0

187.51

Page 99 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LYON

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-641 FROM US-62 NEAR

EDDYVILLE TO SOUTH OF THE LYON/CALDWELL

COUNTY LINE. (ADDITIONAL FUNDING FOR

1-187.50)

US-641

NH

0

6,000,000

0 0 6,000,000

187.52

LYON

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-641 FROM SOUTH OF THE

LYON/CALDWELL COUNTY LINE TO FREDONIA,

4.5 MILES.

US-641

STP

0

7,500,000

7,500,000 0 0

187.6

LYON

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-641 FROM SOUTH OF THE

LYON/CALDWELL COUNTY LINE TO FREDONIA,

4.5 MILES.

US-641

NH

NH

STP

2,000,000

800,000

2,800,000

7,500,000

0 7,500,000 0

187.61

LYON

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-641 FROM SOUTH OF THE

LYON/CALDWELL COUNTY LINE TO FREDONIA,

4.5 MILES. (ADDITIONAL FUNDING FOR 1-187.60)

US-641

STP

0

7,500,000

0 0 7,500,000

187.62

LYON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-024 BOTH

DIRECTION(S) FROM MILEPOINT 33.988 TO

MILEPOINT 45.133

I-24

PM

PM

0

900,000

9,000,000

0 0 9,900,000

20008

Page 100 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

LYON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-024 NON-CARDINAL

DIRECTION(S) FROM MILEPOINT 45.171 TO

MILEPOINT 51

I-24

PM

PM

0

300,000

3,000,000

0 0 3,300,000

20010

LYON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-024 BOTH DIRECTION(S) FROM

MILEPOINT 51.89 (51.0 NON-CARDINAL) TO

MILEPOINT 54.862

I-24

PM

PM

0

400,000

4,000,000

0 0 4,400,000

20011

Total for LYON county PL

Total Amounts:

CN

UT

RW

DN

4,000,000

1,300,000

5,300,000

13,500,000 15,400,000 29,500,000

1,600,000

13,500,000 15,400,000 31,100,000

MADISON

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT 4-LANE BEREA BYPASS SECTION

2; FROM 150' EAST OF US-25, SE TO KY-21.

(2004BOPC)(08CCR)(12CCR) PHASE 2 - BEREA

BYPASS FROM KY-1016 TO KY-21.

-0

SPP 12,000,000

12,000,000 0 0 0

192.21

MADISON

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-52 FROM WALLACE MILL ROAD TO

INTERSTATE 75 AT THE DUNCANNON ROAD

INTERCHANGE. (02CCR)(12CCN)(14CCR)

(DESIGN/BUILD)(16CCR)

KY-52

SPP 9,000,000

9,000,000 0 0 0

235.1

Page 101 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MADISON

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-52 FROM WALLACE MILL ROAD TO

INTERSTATE 75 AT THE DUNCANNON ROAD

INTERCHANGE. (02CCR)(12CCN)(14CCR)

(DESIGN/BUILD)(16CCR)

KY-52

SPP

0

10,000,000

10,000,000 0 0

235.2

MADISON

Project Cost:

CN

UT

RW

DN

PLPRIORITY SECTION II & III: WIDEN US-25 FROM

US-421 TO PUMPKIN RUN.(SEE 7-251.10 FOR

SEC III UTIL & CONST) (2006BOPC)(08CCR)

(10CCR)(12CCR)(14CCR)

US-25

NH

0

3,750,000

0 0 3,750,000

251.4

MADISON

Project Cost:

CN

UT

RW

DN

PLPROPOSED ROADWAY IMPROVEMENTS FROM

DUNCANNON RD TO THE MADISON CO AIRPORT

TO INCLUDE CALEAST RD (KY 2881 MP.783-MP

2.780), JOHN BALLARD RD (KY 2877 MP

0-MP.806 & CR 1236 MP0-MP.429) FROM

KY-2881

SPP

SPP

2,700,000

2,700,000

9,000,000

9,000,000 0 0

8853

MADISON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 73.408 TO

MILEPOINT 83.4

I-75

PM

PM

1,200,000

12,000,000

13,200,000 0 0 0

20017

Total for MADISON county PL

Total Amounts:

CN

UT

RW

DN 1,200,000

2,700,000

33,000,000

36,900,000

19,000,000 3,750,000

19,000,000 0 3,750,000

Page 102 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MAGOFFIN

Project Cost:

CN

UT

RW

DN

PLMOUNTAIN PARKWAY CORRIDOR: WIDEN THE

MOUNTAIN PARKWAY TO 4 LANES FROM 0.3MI

W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE

FORK LICKING RIVER BRIDGE (69.6). (2012BOP)

(14CCR)(16CCN)

KY-9009

NH 30,000,000

30,000,000 0 0 0

126.42

MAGOFFIN

Project Cost:

CN

UT

RW

DN

PLMOUNTAIN PARKWAY CORRIDOR: WIDEN THE

MOUNTAIN PARKWAY TO 4 LANES FROM 0.3MI

W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE

FORK LICKING RIVER BRIDGE (69.6). (2012BOP)

(14CCR)(16CCN)

KY-9009

NH

0

25,000,000

25,000,000 0 0

126.43

MAGOFFIN

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-460 IN MAGOFFIN COUNTY AT IVY

POINT HILL WEST OF SALYERSVILLE. (16CCN)

US-460

STP

STP

STP

0

1,660,000

220,000

2,490,000

1,880,000 0 2,490,000

8901

MAGOFFIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-460

FROM MILEPOINT 14.57 TO MILEPOINT 20.37

US-460

PM

0

1,485,000

1,485,000 0 0

20013

Total for MAGOFFIN county PL

Total Amounts:

CN

UT

RW

DN

30,000,000

30,000,000

26,485,000 2,490,000

1,660,000

220,000

28,365,000 0 2,490,000

Page 103 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MARION

Project Cost:

CN

UT

RW

DN

PLSPOT IMPROVEMENTS ON KY-49 (MP 20.900 TO

MP 21.830) AS PER THE KY-49 PLANNING

STUDY. (14CCN)

KY-49

SPP

SPP

700,000

700,000

2,400,000

0 2,400,000 0

8802

MARION

Project Cost:

CN

UT

RW

DN

PLHEARTLAND PARKWAY: IMPROVE MOBILITY

FROM THE LEBANON BYPASS TO BOOKER

ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)

KY-55

NH

0

5,000,000

5,000,000 0 0

8916

MARION

Project Cost:

CN

UT

RW

DN

PLHEARTLAND PARKWAY: IMPROVE MOBILITY

FROM THE LEBANON BYPASS TO BOOKER

ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)

KY-55

NH

0

4,000,000

0 4,000,000 0

8916.01

MARION

Project Cost:

CN

UT

RW

DN

PLHEARTLAND PARKWAY: MARION/TAYLOR LINE

TO LEBANON BYPASS

US-68

SPP

SPP

SPP

SPP

600,000

600,000

900,000

900,000

11,000,000

0 900,000 11,900,000

8917

Total for MARION county PL

Total Amounts:

CN

UT

RW

DN 600,000

700,000

1,300,000

5,000,000 6,400,000 11,000,000

900,000

900,000

5,000,000 7,300,000 11,900,000

Page 104 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MARSHALL

Project Cost:

CN

UT

RW

DN

PLIMPROVE ACCESS AND REDUCE CONGESTION

ON US-62 FROM KY-95 TO THE EXISTING

FOUR-LANE HIGHWAY AT LONE VALLEY RD

NEAR I-24 INTERCHANGE AND FUTURE I-69

CONNECTION.

US-62

STP

STP

STP

STP

750,000

750,000

250,000

500,000

3,500,000

0 750,000 3,500,000

398

MARSHALL

Project Cost:

CN

UT

RW

DN

PLADDRESS DEFICIENCIES OF KY-1949 BRIDGE

OVER SMITH CREEK. (079B00110N)

KY-1949

BR 455,000

455,000 0 0 0

10003

MARSHALL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-024 BOTH

DIRECTION(S) FROM MILEPOINT 17.32 TO

MILEPOINT 29.14

I-24

PM

PM

0

950,000

9,500,000

0 10,450,000 0

20013

Total for MARSHALL county PL

Total Amounts:

CN

UT

RW

DN 750,000

455,000

1,205,000

9,500,000 3,500,000

950,000

250,000

500,000

0 11,200,000 3,500,000

MARTIN

Project Cost:

CN

UT

RW

DN

PLIMPROVE ALIGNMENT AND GEOMETRICS OF THE

CURVE LOCATED JUST BEFORE THE JUNCTION

OF KY-2031 AND KY-40 TO .1 MILES BEFORE

GORDON HOLLOW ROAD, AND IMPROVE THE

CULVERT/SAFETY DESIGN TO INCREASE

KY-40

SPP

0

1,460,000

0 0 1,460,000

192

Page 105 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MARTIN

Project Cost:

CN

UT

RW

DN

PLSETSER BRANCH ROAD BRIDGE AND

APPROACHES OVER MIDDLE FORK OF

ROCKCASTLE CREEK (C43) (OFF NHS) (FD04)

(2000BOP): (080C00043N)

CR-1215

SPP

0

350,000

0 0 350,000

4093

MARTIN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-645

FROM MILEPOINT 0.00 TO MILEPOINT 6.11

KY-645

PM

0

2,015,000

2,015,000 0 0

20006

Total for MARTIN county PL

Total Amounts:

CN

UT

RW

DN

0

2,015,000 1,810,000

2,015,000 0 1,810,000

MASON

Project Cost:

CN

UT

RW

DN

PLNEW FULLY CONTROLLED ACCESS ROUTE

FROM US 68 NEAR WASHINGTON EAST TO KY

11 INCLUDING A NEW I-CHNG AT KY 11.

(PRIORITY SECTION)(2004BOPC)(06CCR)

US-68

SPP

SPP

SPP

SPP

780,000

780,000

1,580,000

1,820,000

32,450,000

0 3,400,000 32,450,000

147.2

MASON

Project Cost:

CN

UT

RW

DN

PLNEW FULLY CONTROLLED ACCESS ROUTE

FROM KY 11 NORTHEAST TO KY 9 (AA HWY)

INCLUDING NEW I-CHNG AT KY 9. (2004BOPC)

(06CCR)

US-68

SPP

SPP

SPP

SPP

780,000

780,000

1,580,000

1,820,000

33,750,000

3,400,000 0 33,750,000

147.6

Page 106 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for MASON county PL

Total Amounts:

CN

UT

RW

DN 1,560,000

1,560,000

66,200,000

1,580,000 1,580,000

1,820,000 1,820,000

3,400,000 3,400,000 66,200,000

MCCRACKEN

Project Cost:

CN

UT

RW

DN

PLPADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM

BETHEL CHURCH ROAD TO KY-1154 (MARTIN

MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).

(10CCR)(12CCR)

US-60

NH

0

2,710,000

2,710,000 0 0

115.1

MCCRACKEN

Project Cost:

CN

UT

RW

DN

PLMAJOR WIDENING OF US-62 FROM KY-998 TO

PADUCAH INFORMATION AGE PARK. (12CCR)

US-62

SPP 5,740,000

5,740,000 0 0 0

152

MCCRACKEN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-1286 (FRIENDSHIP ROAD) FROM

MP 3.6 TO MP 6.4 IN PADUCAH. (PRELIMINARY

ENGINEERING) (12CCR)(14CCR)(16CCN)

KY-1286

SPP

SPP

0

2,310,000

10,000,000

0 0 12,310,000

153

MCCRACKEN

Project Cost:

CN

UT

RW

DN

PLNEW ACCESS ROAD FROM KY-305 NEAR

KY-998, EXTENDING WEST TO THE OHIO RIVER

MEGAPARK. (2-LANE INITIAL, 4-LANE ULTIMATE)

(12CCN)(14CCR)

KY-305

SPP

SPP

SPP

4,200,000

4,200,000

3,250,000

16,230,000

0 3,250,000 16,230,000

8702

Page 107 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MCCRACKEN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-024 BOTH

DIRECTION(S) FROM MILEPOINT 16.172 TO

MILEPOINT 17.32

I-24

PM

PM

0

100,000

1,000,000

0 1,100,000 0

20017

MCCRACKEN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-60

FROM MILEPOINT 2.22 TO MILEPOINT 7.70

US-60

PM

0

853,000

853,000 0 0

20031

Total for MCCRACKEN county PL

Total Amounts:

CN

UT

RW

DN

4,200,000

5,740,000

9,940,000

853,000 1,000,000 26,230,000

100,000

2,710,000 3,250,000 2,310,000

3,563,000 4,350,000 28,540,000

MCCREARY

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-92 FROM WEST OF KY-592 TO

EAST OF THE WHITLEY/MCCREARY COUNTY

LINE (SECTION 2).(2014BOP)(SAME AS

11-184.20)

KY-92

STP 9,000,000

9,000,000 0 0 0

261.32

Total for MCCREARY county PL

Total Amounts:

CN

UT

RW

DN

9,000,000

9,000,000 0 0 0

Page 108 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MEADE

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY 79 FROM KY 428 TO KY 144.

(12CCN)(14CCR)

KY-79

SPP

SPP

SPP

SPP

1,040,000

1,040,000

3,250,000

1,770,000

11,410,000

0 3,250,000 13,180,000

8702

MEADE

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY 79 FROM KY 144 TO KY

1051. (12CCN)(14CCR)

KY-79

SPP

SPP

2,030,000

2,030,000

13,530,000

0 13,530,000 0

8705

Total for MEADE county PL

Total Amounts:

CN

UT

RW

DN 1,040,000

2,030,000

3,070,000

13,530,000 11,410,000

3,250,000

1,770,000

0 16,780,000 13,180,000

MENIFEE

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND GEOMETRICS ON US-460

FROM THE END OF ROTHWELL HILL

IMPROVEMENTS TO THE BRIDGE OVER BEAVER

CREEK. (14CCN)(16CCR)

US-460

SPP 6,020,000

6,020,000 0 0 0

8802

MENIFEE

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND GEOMETRICS ON US-460

FROM THE END OF ROTHWELL HILL

IMPROVEMENTS TO THE BRIDGE OVER BEAVER

CREEK. (14CCN)(16CCR)

US-460

SPP

0

6,020,000

6,020,000 0 0

8802.01

Page 109 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for MENIFEE county PL

Total Amounts:

CN

UT

RW

DN

6,020,000

6,020,000

6,020,000

6,020,000 0 0

METCALFE

Project Cost:

CN

UT

RW

DN

PLSPOT IMPROVEMENTS ON US-68 FROM THE

CUMBERLAND PARKWAY TO THE

GREEN/METCALFE COUNTY LINE.(12CCN)

US-68

STP

STP

STP

775,000

775,000

970,000

8,650,000

970,000 8,650,000 0

8706

METCALFE

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY 163 AS A NEW ROUTE ON

THE WEST SIDE OF EDMONTON FROM KY 163 AT

GARY BELL RD (MP 10.0) S OF EDMONTON,

CROSSING US 68 (STOCKTON ST) 2000 FT

WEST OF THE COURTHOUSE SQ, TO US 68

KY-163

SPP

SPP

SPP

3,000,000

3,000,000

2,190,000

11,945,000

2,190,000 11,945,000 0

8859

METCALFE

Project Cost:

CN

UT

RW

DN

PLIMPROVE HIGHWAY SAFETY AND SYSTEMS

MOBILITY IN THE KY 163 CORRIDOR BETWEEN

KY 90 (MP 2.907) AND THE PROPOSED WEST

EDMONTON BYPASS (MP 9.777)

KY-163

SPP 2,500,000

2,500,000 0 0 0

8955

METCALFE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF LOUIE B.

NUNN CUMBERLAND PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 22.357 TO

MILEPOINT 36.16

LN-9008

PM

PM

1,100,000

11,000,000

12,100,000 0 0 0

20013

Page 110 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for METCALFE county PL

Total Amounts:

CN

UT

RW

DN 3,600,000

3,775,000

11,000,000

18,375,000

20,595,000

3,160,000

3,160,000 20,595,000 0

MONROE

Project Cost:

CN

UT

RW

DN

PLOPERATION OF TURKEY NECK BEND FERRY FOR

FY 2021.(12CCR)

KY-214

SPP 444,000

444,000 0 0 0

128.12

MONROE

Project Cost:

CN

UT

RW

DN

PLOPERATION OF TURKEY NECK BEND FERRY FOR

FY 2022.(12CCR)

KY-214

SPP

0

444,000

444,000 0 0

128.13

MONROE

Project Cost:

CN

UT

RW

DN

PLOPERATION OF TURKEY NECK BEND FERRY FOR

FY 2023.

KY-214

SPP

0

444,000

0 444,000 0

128.14

MONROE

Project Cost:

CN

UT

RW

DN

PLOPERATION OF TURKEY NECK BEND FERRY FOR

FY 2024.

KY-214

SPP

0

444,000

0 0 444,000

128.15

Page 111 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MONROE

Project Cost:

CN

UT

RW

DN

PLREPLACE BRIDGE ON KY-100 BETWEEN MP 14.7

AND 14.9

KY-100

SPP 700,000

700,000 0 0 0

80003

Total for MONROE county PL

Total Amounts:

CN

UT

RW

DN

1,144,000

1,144,000

444,000 444,000 444,000

444,000 444,000 444,000

MONTGOMERY

Project Cost:

CN

UT

RW

DN

PLWIDEN EXISTING PAVEMENT AND IMPROVE

VERTICAL AND HORIZONTAL CURVES FROM

EXISTING MOUNT STERLING BYPASS (KY 686)

TO 500' WEST OF BENTBROOK SUBDIVISION.

ADD FULL WIDTH SHOULDERS AND A CENTER

US-60

SPP

SPP

SPP

0

1,500,000

1,500,000

8,000,000

3,000,000 0 8,000,000

8810

MONTGOMERY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 104.26 TO

MILEPOINT 112.1

I-64

PM

PM

0

650,000

6,500,000

0 0 7,150,000

20018

Total for MONTGOMERY county PL

Total Amounts:

CN

UT

RW

DN

0

14,500,000

650,000

1,500,000

1,500,000

3,000,000 0 15,150,000

Page 112 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MORGAN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-2498 FROM US-460 TO THE ARH

HOSPITAL. (14CCN)(16CCN)

KY-2498

SPP

SPP

SPP

0

1,580,000

350,000

2,560,000

1,580,000 350,000 2,560,000

8804

MORGAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-7 FROM

MILEPOINT 3.90 TO MILEPOINT 8.14

KY-7

PM

0

1,207,000

1,207,000 0 0

20014

MORGAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-519

FROM MILEPOINT 0.00 TO MILEPOINT 3.94

KY-519

PM

0

1,981,000

0 1,981,000 0

20015

Total for MORGAN county PL

Total Amounts:

CN

UT

RW

DN

0

1,207,000 1,981,000 2,560,000

1,580,000

350,000

2,787,000 2,331,000 2,560,000

MUHLENBERG

Project Cost:

CN

UT

RW

DN

PLWIDEN KY-181 BY FOUR FEET ON EACH SIDE

FROM INTERSECTION 601 TO WENDELL FORD

CENTER. (14CCN)

KY-181

SPP

SPP

1,820,000

1,820,000

2,710,000

2,710,000 0 0

8802

Page 113 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

MUHLENBERG

Project Cost:

CN

UT

RW

DN

PLSTRAIGHTEN DEAN ROAD INTERSECTION OF 189

BYPASS TO KY 181 NORTH NEAR THE

INTERSECTION WITH THE WKY PARKWAY,

WENDELL FORD NATIONAL GUARD CENTER,

AND JOB CORP. (14CCN)

KY-2533

SPP

SPP

820,000

820,000

4,500,000

4,500,000 0 0

8803

MUHLENBERG

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 43.424 TO

MILEPOINT 45.95

WK-9001

PM

PM

0

200,000

2,000,000

0 2,200,000 0

20036

Total for MUHLENBERG county PL

Total Amounts:

CN

UT

RW

DN

2,640,000

2,640,000

7,210,000 2,000,000

200,000

7,210,000 2,200,000 0

NELSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, MOBILITY, AND GEOMETRICS

ON US-150 FROM THE BLUEGRASS PARKWAY

TO THE NELSON/WASHINGTON COUNTY LINE.

(2016BOP)

US-150

STP

STP

600,000

600,000

2,450,000

0 0 2,450,000

396.12

NELSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-150 FROM WEST OF KY-245

THROUGH THE BLUEGRASS PARKWAY

INTERCHANGE TO EAST OF LESLIE BALLARD LN

(CR 1110). (06CCN)(2006BOPC)(12CCR)(14CCR)

(16CCR)

US-150

SPP 4,800,000

4,800,000 0 0 0

8309.2

Page 114 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

NELSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF MARTHA

LAYNE COLLINS BLUEGRASS PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 24.24 TO

MILEPOINT 35.15

BG-9002

PM

PM

0

875,000

8,750,000

9,625,000 0 0

20022

NELSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-49

FROM MILEPOINT 0.00 TO MILEPOINT 4.52

KY-49

PM

0

484,000

484,000 0 0

20030

Total for NELSON county PL

Total Amounts:

CN

UT

RW

DN 600,000

4,800,000

5,400,000

9,234,000 2,450,000

875,000

10,109,000 0 2,450,000

NICHOLAS

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE KY-36/KY-32 INTERSECTION NEAR

THE NICHOLAS COUNTY SCHOOL PROPERTY.

(12CCR)(16CCR)

KY-36

STP

STP

0

1,380,000

890,000

0 0 2,270,000

205

NICHOLAS

Project Cost:

CN

UT

RW

DN

PLPARIS-MAYSVILLE ROAD; RECONSTRUCT FROM

MILLERSBURG TO KY-1455 AT CARLISLE

(SECTION 3).(08CCR)(12CCR)(14CCR)

US-68

NH 17,000,000

17,000,000 0 0 0

310.3

Page 115 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

NICHOLAS

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY 36/KY 928 INTERSECTION.

(14CCN)

KY-36

SPP

SPP

SPP

200,000

150,000

350,000

1,400,000

0 1,400,000 0

8811

NICHOLAS

Project Cost:

CN

UT

RW

DN

PLSAFETY IMPROVEMENTS ALONG KY 32 FROM

LAKE ROAD (MP 9.5) TO SCRUBGRASS CREEK

(MP 12.5) TO CORRECT HORIZONTAL,

VERTICAL, PAVEMENT WITH DEFICIENCIES.

(14CCN)

KY-32 SPP

0

100,000

100,000 0 0

8812

NICHOLAS

Project Cost:

CN

UT

RW

DN

PLREPLACE BRIDGE ON ABNER'S MILL ROAD (CR

1010) 2.4 MILES NORTH OF KY 32.

CR-1010

BR 100,000

100,000 0 0 0

8951

Total for NICHOLAS county PL

Total Amounts:

CN

UT

RW

DN

200,000

150,000

17,100,000

17,450,000

1,400,000

100,000

1,380,000

890,000

100,000 1,400,000 2,270,000

OHIO

Project Cost:

CN

UT

RW

DN

PLI-65 SPUR CORRIDOR; RECONSTRUCT THE

EXISTING NATCHER PARKWAY/KY-69

INTERCHANGE (EXIT 50) IN OHIO COUNTY.

(2016BOP)

WN-9007

NH 8,700,000

8,700,000 0 0 0

2092.2

Page 116 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

OHIO

Project Cost:

CN

UT

RW

DN

PLREPLACE, IMPROVE ALIGNMENTS AND

APPROACHES, AND ADDRESS SAFETY ISSUES

WITH BRIDGES ON KY-136 FROM KY-56 IN

MCLEAN COUNTY TO US-231 IN OHIO

COUNTY. (14CCN)

KY-136

SPP

SPP

SPP

0

450,000

1,250,000

6,540,000

1,700,000 0 6,540,000

8812

OHIO

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY ON KY 54 BY UPGRADING MP

7.0 TO MP 8.0 TO THREE LANES INCLUDING

CURB AND GUTTER AND ADDRESSING TWO

SHARP TURNS

KY-54

SPP

SPP

SPP

SPP

750,000

750,000

1,000,000

2,000,000

7,000,000

0 1,000,000 9,000,000

8951

OHIO

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

US-62

PM

PM

0

500,000

5,000,000

5,500,000 0 0

20038

OHIO

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-136

FROM MILEPOINT 0.00 TO MILEPOINT 9.60

KY-136

PM

0

1,177,000

1,177,000 0 0

20049

Total for OHIO county PL

Total Amounts:

CN

UT

RW

DN 750,000

8,700,000

9,450,000

6,177,000 13,540,000

500,000

450,000 1,000,000

1,250,000 2,000,000

8,377,000 1,000,000 15,540,000

Page 117 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

OLDHAM

Project Cost:

CN

UT

RW

DN

PLEXTENSION OF OLD HENRY ROAD EAST TO ASH

AVENUE (KY362). (12CCR)

-0

SPP 10,000,000

10,000,000 0 0 0

367.2

OLDHAM

Project Cost:

CN

UT

RW

DN

PLEXTENSION OF OLD HENRY ROAD EAST TO ASH

AVENUE (KY362). (12CCR)

-0

SPP

0

8,500,000

8,500,000 0 0

367.21

OLDHAM

Project Cost:

CN

UT

RW

DN

PLINTER-URBAN GREENWAY: CONSTRUCT A

NON-MOTORIZED CORRIDOR FROM LAGRANGE

TO JEFFERSON COUNTY LINE. (LOU T.I.P.)

(LOCAL MATCH)(ALL WORK BY OLDHAM

COUNTY)(2002BOPC) (FUNDING SUBJECT TO

-0

SLO 500,000

500,000 0 0 0

410

OLDHAM

Project Cost:

CN

UT

RW

DN

PLWIDEN I-71 FROM FOUR TO SIX LANES FROM

KY-329 (MP 14.1) TO KY-393 (MP 18.0). (16CCN)

I-71

NH

NH

NH

0

1,900,000

1,700,000

24,000,000

3,600,000 0 24,000,000

483.1

OLDHAM

Project Cost:

CN

UT

RW

DN

PLWIDEN I-71 FROM FOUR TO SIX LANES FROM

KY-393 (MP 18.0) TO KY-53 (MP 22.4). (16CCN)

I-71

NH

0

2,750,000

0 2,750,000 0

483.2

Page 118 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

OLDHAM

Project Cost:

CN

UT

RW

DN

PLWIDEN I-71 FROM FOUR TO SIX LANES FROM

KY-393 (MP 18.0) TO KY-53 (MP 22.4),

INCLUDING A NEW INTERCHANGE AT MP 20.6.

(16CCN)

I-71

NH

0

2,750,000

0 0 2,750,000

483.21

OLDHAM

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT NEW I-71 INTERCHANGE BETWEEN

KY-393 AND KY-53 TO RELIEVE CONGESTION IN

LAGRANGE.

I-71

NH 6,000,000

6,000,000 0 0 0

483.31

OLDHAM

Project Cost:

CN

UT

RW

DN

PLDESIGN FOR IMPROVING KY-53 FROM ZHALE

SMITH ROAD TO KY-22 (TOTAL 3.2 MILES).

(14CCN)

KY-53

SPP 2,000,000

2,000,000 0 0 0

8852

OLDHAM

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A TURN LANE ON KY 329 BYPASS

AT DOVEFIELD DRIVE

KY 329

SPP

0

300,000

300,000 0 0

80050

Total for OLDHAM county PL

Total Amounts:

CN

UT

RW

DN 2,500,000

16,000,000

18,500,000

8,800,000 24,000,000

2,750,000 2,750,000

1,900,000

1,700,000

12,400,000 2,750,000 26,750,000

Page 119 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

OWEN

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY ON KY-22 FROM KY-227 TO

KY-845. (06CCR)(08CCN)(12CCR)(14CCR)

KY-22

SPP 3,500,000

3,500,000 0 0 0

198.01

OWEN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-22

FROM MILEPOINT 11.33 TO MILEPOINT 18.56

KY-22

PM

0

947,000

947,000 0 0

20052

Total for OWEN county PL

Total Amounts:

CN

UT

RW

DN

3,500,000

3,500,000

947,000

947,000 0 0

OWSLEY

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-30 FROM KY-847 IN OWSLEY

COUNTY TO JACKSON COUNTY LINE.(LET W/

JACKSON CO. SECTION UNDER 11-278.30)(SEE

10-279.60 FOR PE & ENVIR)(AR/W)(14CCR)

(16CCR)

KY-30

STP 14,500,000

14,500,000 0 0 0

279.62

Total for OWSLEY county PL

Total Amounts:

CN

UT

RW

DN

14,500,000

14,500,000 0 0 0

Page 120 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

PERRY

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-476 FROM KY-15X IN

WALKERTOWN TO NORTH OF WALKER

CORNETT ROAD IN WABACO.

KY-476

STP 600,000

600,000 0 0 0

209

PERRY

Project Cost:

CN

UT

RW

DN

PLNEW INTERCHANGE OFF OF A NEW EXIT 55 HAL

ROGERS PARKWAY

HR-9006

STP 1,632,000

1,632,000 0 0 0

8903

PERRY

Project Cost:

CN

UT

RW

DN

PLSAFETY IMPROVEMENTS ON KY-80 FROM

LESLIE COUNTY LINE TO KY-451. (16CCN)

KY-80

STP

0

5,400,000

5,400,000 0 0

8906

PERRY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF HAL

ROGERS DANIEL BOONE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 55.966 TO

MILEPOINT 57.166

HR-9006

PM

PM

0

50,000

500,000

0 0 550,000

20002

Total for PERRY county PL

Total Amounts:

CN

UT

RW

DN 600,000

1,632,000

2,232,000

5,400,000 500,000

50,000

5,400,000 0 550,000

Page 121 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

PIKE

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY 194 FROM US 119 RAMP NEAR

SMITH FARMS BOTTOM (CR 1458) TO NEAR

DESKINS BRANCH CULVERT

KY-194

SPP

SPP

SPP

2,100,000

1,560,000

3,660,000

6,760,000

0 6,760,000 0

198

PIKE

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-194 FROM US-119 RAMP NEAR

SMITH FARMS BOTTOM (CR-1458) TO NEAR

DESKINS BRANCH CULVERT

KY-194

SPP

0

6,760,000

0 0 6,760,000

198.01

PIKE

Project Cost:

CN

UT

RW

DN

PLPIKEVILLE TO VA. STATE LINE: IMPROVE US

460/KY 80 FROM DUNLEARY HOLLOW TO KY

80 AT BEAVER CREEK (SECTION 6C) BRIDGE

ONLY.(14CCN)(16CCR)

US-460

NH 10,000,000

10,000,000 0 0 0

263.67

PIKE

Project Cost:

CN

UT

RW

DN

PLPIKEVILLE TO VA. STATE LINE; US-460/KY-80

FROM KY-195 TO DUNLEARY HOLLOW.

(SURFACING FOR SECTIONS 6A & 6B)

(2000BOP)(14CCN)

US-460

NH

0

9,000,000

0 0 9,000,000

263.69

PIKE

Project Cost:

CN

UT

RW

DN

PLPIKEVILLE TO VA. STATE LINE: IMPROVE US

460/KY 80 FROM DUNLEARY HOLLOW TO KY

80 AT BEAVER CREEK (SECTION 6C) BRIDGE

ONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING

FOR C PHASE UNDER 12-263.67)

US-460

NH

0

10,000,000

10,000,000 0 0

263.95

Page 122 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

PIKE

Project Cost:

CN

UT

RW

DN

PLPIKEVILLE TO VA. STATE LINE: IMPROVE US

460/KY 80 FROM DUNLEARY HOLLOW TO KY

80 AT BEAVER CREEK (SECTION 6C) BRIDGE

ONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING

FOR C PHASE UNDER 12-263.67)

US-460

NH

0

10,000,000

0 10,000,000 0

263.96

PIKE

Project Cost:

CN

UT

RW

DN

PLPIKEVILLE TO VA. STATE LINE: IMPROVE US

460/KY 80 FROM DUNLEARY HOLLOW TO KY

80 AT BEAVER CREEK (SECTION 6C) BRIDGE

ONLY.(14CCN)(16CCR)(ADDITIONAL FUNDING

FOR C PHASE UNDER 12-263.67)

US-460

NH

0

10,000,000

0 0 10,000,000

263.97

PIKE

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND REDUCE CONGESTION AT

THE US-460 AND KY-1460 INTERSECTION.

US-460

NH

NH

NH

NH

240,000

240,000

400,000

160,000

1,470,000

560,000 0 1,470,000

346

PIKE

Project Cost:

CN

UT

RW

DN

PLIMPROVE CONNECTIVITY BETWEEN THOMPSON

ROAD AND US-23 AT STONECOAL.(12CCN)

(14CCR)(16CCR)

CS-1215

SPP

SPP

0

600,000

5,290,000

0 0 5,890,000

8705

PIKE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

US-119

PM

PM

175,000

1,750,000

1,925,000 0 0 0

20003

Page 123 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for PIKE county PL

Total Amounts:

CN

UT

RW

DN 415,000

2,100,000

1,560,000

11,750,000

15,825,000

10,000,000 16,760,000 32,520,000

400,000

160,000 600,000

10,560,000 16,760,000 33,120,000

POWELL

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND GEOMETRICS, AND

REDUCE CONGESTION KY-213 FROM KY-11 TO

BOTTOM OF MOUNTAIN. (12CCR)(16CCR)

KY-213

SPP 6,000,000

6,000,000 0 0 0

163.01

POWELL

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND LEVEL OF SERVICE ON

KY-213 IN POWELL COUNTY FROM SONS ROAD

TO REED COURT.

KY-213

STP

0

520,000

0 520,000 0

210

POWELL

Project Cost:

CN

UT

RW

DN

PLCORRECT FLOODING ISSUES ON KY-2026 FROM

KY-11 TO THE RED RIVER IN CLAY CITY.

KY-2026

STP 1,100,000

1,100,000 0 0 0

211

POWELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 11.91 TO

MILEPOINT 19.15

KY-9000

PM

PM

0

580,000

5,800,000

6,380,000 0 0

20004

Page 124 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

POWELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 19.15 TO

MILEPOINT 22.307

KY-9000

PM

PM

0

250,000

2,500,000

0 2,750,000 0

20005

POWELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 32.788 TO

MILEPOINT 36

KY-9000

PM

PM

0

275,000

2,750,000

0 3,025,000 0

20008

Total for POWELL county PL

Total Amounts:

CN

UT

RW

DN

7,100,000

7,100,000

5,800,000 5,250,000

580,000 1,045,000

6,380,000 6,295,000 0

PULASKI

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-461 FROM KY-80 TO BUCK CREEK

BRIDGE, INCLUDING INTERCHANGE AT KY-80.

KY-461

NH 13,000,000

13,000,000 0 0 0

59.25

PULASKI

Project Cost:

CN

UT

RW

DN

PLSAFETY PROJECT TO RECONSTRUCT KY 635 TO

ELIMINATE AT GRADE RAILROAD CROSSING AND

REPLACE WITH RAILROAD SEPARATION

CROSSING AT SCIENCE HILL, KENTUCKY IN

PULASKI COUNTY. (2016BOP)

KY-635

RRS

0

6,500,000

6,500,000 0 0

9010

Page 125 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

PULASKI

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-27

FROM MILEPOINT 0.00 TO MILEPOINT 6.78

US-27

PM

0

2,708,000

2,708,000 0 0

20008

Total for PULASKI county PL

Total Amounts:

CN

UT

RW

DN

13,000,000

13,000,000

9,208,000

9,208,000 0 0

ROBERTSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE CURVE ON KY 616 AND IMPROVE

ROADWAY FROM THE NEW ROBERTSON

COUNTY SCHOOL TO MT OLIVET. (12CCN)

(14CCR)

KY-616

SPP 2,820,000

2,820,000 0 0 0

8711

ROBERTSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-62

FROM MILEPOINT 0.00 TO MILEPOINT 11.00

US-62

PM

0

863,000

863,000 0 0

20053

Total for ROBERTSON county PL

Total Amounts:

CN

UT

RW

DN

2,820,000

2,820,000

863,000

863,000 0 0

Page 126 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ROCKCASTLE

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-461 FROM US-150 TO THE

EXISTING FOUR LANE APPROACH AT US-25.

(16CCN)

KY-461

NH 2,230,000

2,230,000 0 0 0

8952

ROCKCASTLE

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-461 FROM US-150 TO THE

EXISTING FOUR LANE APPROACH AT US-25.

(16CCN)

KY-461

NH

NH

1,450,000

1,450,000

1,120,000

1,120,000 0 0

8952.01

Total for ROCKCASTLE county PL

Total Amounts:

CN

UT

RW

DN

1,450,000

2,230,000

3,680,000

1,120,000

1,120,000 0 0

ROWAN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-32 FROM PARK HILLS DRIVE TO

VIKING DRIVE NORTH. (12CCR)

KY-32

SPP

SPP

4,210,000

10,000,000

14,210,000 0 0 0

204

ROWAN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-32 FROM PARK HILLS DRIVE TO

VIKING DRIVE NORTH. (12CCR)

KY-32

SPP 10,000,000

10,000,000 0 0 0

204.01

Page 127 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ROWAN

Project Cost:

CN

UT

RW

DN

PLREPLACE BRIDGE OVER BULL FORK ON

HORSEMAN CEMETERY ROAD (CR 1140) AT JCT

WITH BULLFORK ROAD (CR 1222) (103C00108N)

(SR=32.5)(EBRP)

CR-1140

BR

BR

BR

BR

350,000

350,000

50,000

50,000

400,000

500,000 0 0

1093

ROWAN

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT US-60 FROM WEST OF

GLENWOOD HOLLOW ROAD TO EAST OF

KY-3296. THE PROJECT SHALL INCLUDE 12'

LANES, WIDE PAVED SHOULDERS,

UNOBSTRUCTED CLEAR ZONES, FLATTER

US-60

SPP

SPP

SPP

830,000

830,000

700,000

5,500,000

700,000 0 5,500,000

8401

ROWAN

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND CONNECTIVITY AND

REDUCE CONGESTION ON KY-377 FROM KY-32

TO NORTH OF KY-799. (08CCN)(10CCR)(16CCR)

KY-377

STP

STP

7,700,000

7,700,000

9,100,000

9,100,000 0 0

8406

ROWAN

Project Cost:

CN

UT

RW

DN

PLPROVIDE WEST TURN LANES ON US 60 AT

SUNNYBROOK.

US-60

SPP

SPP

SPP

SPP

300,000

300,000

250,000

400,000

2,500,000

650,000 0 2,500,000

8913

ROWAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 128.96 TO

MILEPOINT 134.75

I-64

PM

PM

0

475,000

4,750,000

0 5,225,000 0

20012

Page 128 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ROWAN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 141.5 TO

MILEPOINT 147.95

I-64

PM

PM

0

525,000

5,250,000

5,775,000 0 0

20014

Total for ROWAN county PL

Total Amounts:

CN

UT

RW

DN 650,000

830,000

11,910,000

20,000,000

33,390,000

14,750,000 4,750,000 8,000,000

525,000 475,000

300,000

1,150,000

16,725,000 5,225,000 8,000,000

RUSSELL

Project Cost:

CN

UT

RW

DN

PLRELOCATE US-127 FROM EAST OF THE KY-1730

AND MANNTOWN RD INTERSECTION, AND

EXTENDING NORTHERLY TO NORTH BANK OF

CUMBERLAND RIVER (SEE 8-108&8-115 FOR

PE/PH.2)(12CCR)(14CCR)

US-127

NH 8,280,000

8,280,000 0 0 0

8601.24

RUSSELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF LOUIE B.

NUNN CUMBERLAND PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 62.544 TO

MILEPOINT 72.087

LN-9008

PM

PM

0

775,000

7,750,000

0 8,525,000 0

20007

RUSSELL

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-127

FROM MILEPOINT 19.03 TO MILEPOINT 26.21

US-127

PM

0

1,549,000

1,549,000 0 0

20009

Page 129 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for RUSSELL county PL

Total Amounts:

CN

UT

RW

DN

8,280,000

8,280,000

1,549,000 7,750,000

775,000

1,549,000 8,525,000 0

SCOTT

Project Cost:

CN

UT

RW

DN

PLGEORGETOWN NORTHWEST BYPASS: IMPROVE

CONNECTIVITY AND MOBILITY NORTHWEST

AROUND GEORGETOWN FROM KY-32 TO I-75.

(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP"

COMPONENT)(10CCR)(12CCR)(16CCR)

-0

STP 10,000,000

10,000,000 0 0 0

102.51

SCOTT

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 138.424 TO

MILEPOINT 143.24

I-75

PM

PM

0

575,000

5,750,000

0 0 6,325,000

20021

Total for SCOTT county PL

Total Amounts:

CN

UT

RW

DN

10,000,000

10,000,000

5,750,000

575,000

0 0 6,325,000

SHELBY

Project Cost:

CN

UT

RW

DN

PLWIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST

OF THE KY-55 INTERCHANGE TO THE KY-1790

UNDERPASS. (2006BOPC)

I-64

NH

0

19,800,000

19,800,000 0 0

65.4

Page 130 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

SHELBY

Project Cost:

CN

UT

RW

DN

PLWIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST

OF THE KY-55 INTERCHANGE TO THE KY-1790

UNDERPASS. (2006BOPC)

I-64

NH

0

19,800,000

0 19,800,000 0

65.41

SHELBY

Project Cost:

CN

UT

RW

DN

PLWIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST

OF THE KY 55 INTERCHANGE TO THE KY 1790

UNDERPASS. (2006BOPC)

I-64

NH

0

19,800,000

0 0 19,800,000

65.42

SHELBY

Project Cost:

CN

UT

RW

DN

PLWIDEN I-64 TO 6 LANES FROM KY-395 TO

KY-151. (2004BOPC)(DESIGN FUNDING COVERS

5-2035.70 SECTION ALSO)

I-64

NH

NH

NH

100,000

100,000

200,000

16,330,000

0 16,330,000 0

2035.4

SHELBY

Project Cost:

CN

UT

RW

DN

PLWIDEN I-64 TO 6 LANES FROM KY-395 TO

KY-151. (2004BOPC)(DESIGN FUNDING COVERS

5-2035.70 SECTION ALSO)(ADDITIONAL

FUNDING FOR C PHASE)

I-64

NH

0

16,330,000

0 0 16,330,000

2035.41

SHELBY

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A THIRD LANE ON US-60 FROM THE

MASONIC HOME TO ROCKET LANE. (12CCN)

(14CCR)

US-60

SPP 2,170,000

2,170,000 0 0 0

8713

Page 131 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

SHELBY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 38.18 (38

NON-CARDINAL) TO MILEPOINT 43.33 (43.892

NON-CARDINAL)

I-64

PM

PM

0

775,000

7,750,000

8,525,000 0 0

20033

SHELBY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-53

FROM MILEPOINT 8.01 TO MILEPOINT 13.79

KY-53

PM

0

943,000

0 943,000 0

20040

Total for SHELBY county PL

Total Amounts:

CN

UT

RW

DN

100,000

100,000

2,170,000

2,370,000

27,550,000 37,073,000 36,130,000

775,000

28,325,000 37,073,000 36,130,000

SIMPSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-1008 FROM KY-73 TO NORTH

FRANKLIN STREET. (14CCN)

KY-1008

SPP

SPP

SPP

0

1,880,000

560,000

3,200,000

2,440,000 3,200,000 0

8855

SIMPSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-1008 FROM KY-73 TO NORTH

FRANKLIN STREET. (14CCN)

KY-1008

SPP

0

1,670,000

0 1,670,000 0

8855.01

Page 132 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

SIMPSON

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-31W FROM KY-1008 TO KY-621.

(14CCN)(16CCR)

US-31

STP

STP

1,000,000

1,000,000

2,000,000

0 2,000,000 0

8856

SIMPSON

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-065 BOTH

DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT

13.71

I-65

PM

PM

0

1,650,000

16,500,000

0 0 18,150,000

20014

Total for SIMPSON county PL

Total Amounts:

CN

UT

RW

DN 1,000,000

1,000,000

3,200,000 16,500,000

1,650,000

1,880,000 2,000,000

560,000 1,670,000

2,440,000 6,870,000 18,150,000

SPENCER

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A 2+1 ROAD ON KY 55/155

(TAYLORSVILLE ROAD) IN SPENCER COUNTY

AND KY 155 (TAYLORSVILLE LAKE ROAD) IN

JEFFERSON COUNTY BY ADDING A

CONTINUOUS THIRD LANE THAT SERVES AS AN

KY-155

SPP

0

4,750,000

0 0 4,750,000

8954

SPENCER

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY AND ADDRESS GEOMETRIC

DEFICIENCIES ALONG KY-44 NEAR DUTCHMAN

CREEK ROAD. (16CCN)

KY-44

STP

0

230,000

230,000 0 0

8955

Page 133 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

SPENCER

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-44

FROM MILEPOINT 9.93 TO MILEPOINT 14.89

KY-44

PM

0

808,000

0 808,000 0

20041

Total for SPENCER county PL

Total Amounts:

CN

UT

RW

DN

0

808,000

230,000 4,750,000

230,000 808,000 4,750,000

TAYLOR

Project Cost:

CN

UT

RW

DN

PLHEARTLAND PARKWAY: IMPROVE MOBILITY

AND CONNECTIVITY VIA NEW CAMPBELLSVILLE

BYPASS FROM KY-55 SOUTH OF

CAMPBELLSVILLE TO KY-70. SECTION 1.

(2010BOP)(14CCR)(16CCR)

KY-555

NH

0

7,600,000

7,600,000 0 0

142.2

TAYLOR

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, ACCESS, GEOMETRICS AND

DRAINAGE ON KY-70 IN CAMPBELLSVILLE

FROM US-68 TO COUNTRY VIEW COURT

(CS-1305)

KY-70

STP

0

700,000

0 0 700,000

443

Total for TAYLOR county PL

Total Amounts:

CN

UT

RW

DN

0

7,600,000

700,000

7,600,000 0 700,000

Page 134 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

TODD

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-181 (ELKTON ROAD) FROM

US-79 (MP 0.000) TO NORTH OF INTERSECTION

WITH US-41 (MP 0.214) TO INCLUDE A NEW

INTERSECTION WITH KY-294. (MP 0.000-0.400)

(14CCN)

KY-181

SPP

SPP

SPP

250,000

670,000

920,000

2,600,000

0 2,600,000 0

8811

TODD

Project Cost:

CN

UT

RW

DN

PLUS 79 WIDENING FROM MP 0 TO MP 3US 79

SPP

SPP

SPP

2,000,000

3,000,000

5,000,000

8,000,000

8,000,000 0 0

80001

Total for TODD county PL

Total Amounts:

CN

UT

RW

DN

2,250,000

3,670,000

5,920,000

8,000,000 2,600,000

8,000,000 2,600,000 0

TRIGG

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-024 CARDINAL DIRECTION(S)

FROM MILEPOINT 57.39 TO MILEPOINT 69.83

I-24

PM

PM

0

1,220,000

12,200,000

0 0 13,420,000

20020

TRIGG

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-024 NON-CARDINAL

DIRECTION(S) FROM MILEPOINT 57.389 TO

MILEPOINT 69.389

I-24

PM

PM

0

1,220,000

12,200,000

0 0 13,420,000

20022

Page 135 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for TRIGG county PL

Total Amounts:

CN

UT

RW

DN

0

24,400,000

2,440,000

0 0 26,840,000

UNION

Project Cost:

CN

UT

RW

DN

PLIMPROVE ROADWAY TO REDUCE FLOODING ON

US-60 FROM EAST OF HOUSE BRIDGE ROAD

(CR-1027) TO UNION/HENDERSON COUNTY LINE.

(16CCN)

US-60

STP

STP

STP

0

150,000

250,000

2,000,000

0 400,000 2,000,000

8955

Total for UNION county PL

Total Amounts:

CN

UT

RW

DN

0

2,000,000

150,000

250,000

0 400,000 2,000,000

WARREN

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-185 FROM NORTH OF THE

JUNCTION WITH KY-263 NEAR RICHARDSVILLE

TO THE BUTLER COUNTY LINE. (02CCR)(04CCR)

(06CCR)(10CCR)(14CCR)

KY-185

STP 5,000,000

5,000,000 0 0 0

110.01

WARREN

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-31W FROM SOUTH OF KY-242 TO

DILLARD ROAD.(12CCR)

US-31

SPP

0

2,880,000

2,880,000 0 0

199

Page 136 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

WARREN

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-31W FROM SOUTH OF KY-242 TO

DILLARD ROAD.(12CCR)

US-31

SPP

0

6,730,000

0 6,730,000 0

199.01

WARREN

Project Cost:

CN

UT

RW

DN

PLCONSTRUCT A PEDESTRIAN UNDERPASS UNDER

US-31W CONNECTING BUCHANON PARK TRAIL

TO CHANEY'S DAIRY BARN.(16CCN)

US-31

STP

STP

0

50,000

400,000

50,000 0 400,000

199.99

WARREN

Project Cost:

CN

UT

RW

DN

PLI-65 SPUR CORRIDOR: IMPROVE THE NATCHER

PARKWAY/US-231 INTERCHANGE (EXIT 9) ON

THE WEST SIDE OF BOWLING GREEN. (SEE ITEM

NO. 3-202 FOR DESIGN) (2016BOP)

WN-9007

NH 8,200,000

8,200,000 0 0 0

2042.2

WARREN

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-231 FROM PASCOE BLVD. TO

NORTH OF CAVE MILL ROAD. (12CCN)

US-231

NH 870,000

870,000 0 0 0

8702.01

WARREN

Project Cost:

CN

UT

RW

DN

PLTHREE SPRINGS ROAD EXTENSION FROM

FLEALAND TO THE NATCHER PARKWAY

INCLUDING BRIDGE OVER PARKWAY. (14CCN)

KY-884

SPP

SPP

2,800,000

2,800,000

8,930,000

0 8,930,000 0

8818

Page 137 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

WARREN

Project Cost:

CN

UT

RW

DN

PLIMPROVE US-31W FROM CAMPBELL LANE

(US-231) TO UNIVERSITY BOULEVARD

(US-231X). (14CCN)(16CCR)

US-31

SPP

0

4,250,000

4,250,000 0 0

8857

WARREN

Project Cost:

CN

UT

RW

DN

PLWIDEN US-31W FROM PARK AVE. TO FAIRVIEW

AVE MP 13.7-14.25

US-31W

STP 4,500,000

4,500,000 0 0 0

8904.1

WARREN

Project Cost:

CN

UT

RW

DN

PLIMPROVE MOBILITY AND REDUCE CONGESTION

ON US-31W FROM US-68 TO MIZPAH. (16CCN)

US-31

STP

0

2,800,000

2,800,000 0 0

8905

WARREN

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-065 BOTH

DIRECTION(S) FROM MILEPOINT 13.711 TO

MILEPOINT 25

I-65

PM

PM

0

1,350,000

13,500,000

0 14,850,000 0

20016

WARREN

Project Cost:

CN

UT

RW

DN

PLSAFETY IMPROVEMENTS AND REHABILITATION

ON KY-3225. KEEP EXISTING FOOTPRINT BY

REPLACING CURBLINE IN SAME LOCATION FROM

MP 0 TO MP 1

KY-3225

SPP

SPP

SPP

1,110,000

100,000

1,210,000

1,200,000

1,200,000 0 0

80051

Page 138 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

WARREN

Project Cost:

CN

UT

RW

DN

PLEXTEND THE 5 LANE SECTION ON KY-234 FROM

MP 11.9 TO 12.4. IMPROVEMENTS MAY INCLUDE

A ROUNDABOUT, TURN LANE, AND A SIGNAL AT

HAMPTON DR.

US-234

SPP

SPP

SPP

SPP

0

250,000

180,000

1,500,000

1,400,000

250,000 1,680,000 1,400,000

80052

Total for WARREN county PL

Total Amounts:

CN

UT

RW

DN

1,110,000

2,900,000

18,570,000

22,580,000

11,130,000 29,160,000 1,800,000

300,000 1,350,000

180,000

1,500,000

11,430,000 32,190,000 1,800,000

WASHINGTON

Project Cost:

CN

UT

RW

DN

PLIMPROVE SAFETY, MOBILITY, AND GEOMETRICS

ALONG US-150 FROM WEST OF OLD

FREDERICKTOWN-BARDSTOWN ROAD

(KY-1872) THROUGH GRUNDY HOME CURVE TO

MAYFIELD LN (CR-1336). (2016BOP)

US-150

STP

STP

STP

STP

500,000

500,000

500,000

750,000

4,000,000

1,250,000 0 4,000,000

396.2

WASHINGTON

Project Cost:

CN

UT

RW

DN

PLADDRESS SAFETY, MOBILITY, AND GEOMETRIC

ISSUES ALONG US 150 IN WASHINGTON

COUNTY FROM 400 FEET WEST OF OLD

FREDERICKTOWN-BARDSTOWN ROAD (KY

1872) TO 0.7 MILES EAST OF GRUNDY HOME

US-150

SPP

SPP

1,100,000

1,100,000

9,820,000

9,820,000 0 0

8958

Total for WASHINGTON county PL

Total Amounts:

CN

UT

RW

DN 500,000

1,100,000

1,600,000

9,820,000 4,000,000

500,000

750,000

11,070,000 0 4,000,000

Page 139 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

WAYNE

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-90 FROM OLD MILL SPRINGS ROA

TO THE BRIDGE AT MP 19.5. (12CCR)(16CCR)

KY-90

SPP 4,220,000

4,220,000 0 0 0

109.2

WAYNE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-90X

FROM MILEPOINT 0.00 TO MILEPOINT 3.54

KY-90

PM

0

1,623,000

0 0 1,623,000

20010

WAYNE

Project Cost:

CN

UT

RW

DN

PLWIDEN KY 1275 TO FOUR LANES WITH FOUR

FOOT SHOULDERS AND FIVE FOOT SIDEWALKS

FROM KY 90 TO BELL LANE

KY 1275

SPP 3,000,000

3,000,000 0 0 0

80006

Total for WAYNE county PL

Total Amounts:

CN

UT

RW

DN

7,220,000

7,220,000

1,623,000

0 0 1,623,000

WHITLEY

Project Cost:

CN

UT

RW

DN

PLTENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8

LANES FROM MP 20.2 IN WHITLEY COUNTY TO

MP 28.85, US-25E NORTH OF CORBIN.

I-75

NH 25,000,000

25,000,000 0 0 0

14.81

Page 140 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

WHITLEY

Project Cost:

CN

UT

RW

DN

PLTENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8

LANES FROM MP 20.2 IN WHITLEY COUNTY TO

MP 28.85, US-25E NORTH OF CORBIN.

I-75

NH

0

25,000,000

25,000,000 0 0

14.82

WHITLEY

Project Cost:

CN

UT

RW

DN

PLTENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8

LANES FROM MP 20.2 IN WHITLEY COUNTY TO

MP 28.85, US-25E NORTH OF CORBIN.

I-75

NH

0

25,000,000

0 25,000,000 0

14.83

WHITLEY

Project Cost:

CN

UT

RW

DN

PLRECONSTRUCT KY-92 FROM 500 FT WEST OF

THE WHITLEY/MCCREARY COUNTY LINE TO

1200 FT EAST OF OLD JELLICO CREEK ROAD.

(SECTION 1) (ADDITIONAL FUNDING FOR

11-184.10)

KY-92

STP 6,000,000

6,000,000 0 0 0

184.11

WHITLEY

Project Cost:

CN

UT

RW

DN

PLIMPROVE FREIGHT MOBILITY AND REDUCE

CONGESTION ON US-25W FROM KY-727 TO

KY-3041. (12CCR)(16CCR)

US-25

NH

NH

NH

2,770,000

4,160,000

6,930,000

3,330,000

3,330,000 0 0

186

WHITLEY

Project Cost:

CN

UT

RW

DN

PLIMPROVE FREIGHT MOBILITY AND REDUCE

CONGESTION ON US-25W FROM KY-727 TO

KY-3041. (12CCR)(16CCR)

US-25

NH

0

6,670,000

0 6,670,000 0

186.01

Page 141 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

WHITLEY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT

11.27

I-75

PM

PM

0

900,000

9,000,000

9,900,000 0 0

20015

WHITLEY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF I-075

CARDINAL DIRECTION(S) FROM MILEPOINT 20.2

TO MILEPOINT 24.645

I-75

PM

PM

0

200,000

2,000,000

2,200,000 0 0

20018

WHITLEY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-26

FROM MILEPOINT 5.46 TO MILEPOINT 13.33

KY-26

PM

0

1,313,000

1,313,000 0 0

20024

WHITLEY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-90

FROM MILEPOINT 2.78 TO MILEPOINT 8.33

KY-90

PM

0

926,000

926,000 0 0

20025

WHITLEY

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON US-25W

FROM MILEPOINT 26.17 TO MILEPOINT 32.43

US-25

PM

0

2,135,000

0 0 2,135,000

20026

Page 142 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for WHITLEY county PL

Total Amounts:

CN

UT

RW

DN

2,770,000

4,160,000

31,000,000

37,930,000

41,569,000 31,670,000 2,135,000

1,100,000

42,669,000 31,670,000 2,135,000

WOLFE

Project Cost:

CN

UT

RW

DN

PLIMPROVE THE KY-191 AND KY-1812

INTERSECTION.

KY-191

STP

STP

STP

STP

0

260,000

80,000

100,000

800,000

0 440,000 800,000

212

WOLFE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 36 TO MILEPOINT

42.85

KY-9000

PM

PM

550,000

5,500,000

6,050,000 0 0 0

20009

WOLFE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 42.853 TO

MILEPOINT 46.208

KY-9009

PM

PM

0

275,000

2,750,000

3,025,000 0 0

20010

WOLFE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 46.208 TO

MILEPOINT 55.434

KY-9009

PM

PM

370,000

3,700,000

4,070,000 0 0 0

20011

Page 143 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

WOLFE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-15S

FROM MILEPOINT 0.00 TO MILEPOINT 0.93

KY-15

PM

0

896,000

896,000 0 0

20016

WOLFE

Project Cost:

CN

UT

RW

DN

PLADDRESS PAVEMENT CONDITION ON KY-11

FROM MILEPOINT 0.35 TO MILEPOINT 5.32

KY-11

PM

0

1,228,000

0 0 1,228,000

20017

Total for WOLFE county PL

Total Amounts:

CN

UT

RW

DN 920,000

9,200,000

10,120,000

3,646,000 2,028,000

275,000 260,000

80,000

100,000

3,921,000 440,000 2,028,000

WOODFORD

Project Cost:

CN

UT

RW

DN

PLIMPROVE US 60 (VERSAILLES ROAD) FROM THE

BLUEGRASS PARKWAY/HUNTERTOWN PIKE TO

PISGAH PIKE.

US-60

NH 500,000

500,000 0 0 0

117

WOODFORD

Project Cost:

CN

UT

RW

DN

PLIMPROVE KY-169 FROM NORTH OF CLEAR

CREEK RD IN JESSAMINE COUNTY TO NORTH OF

KY-1967 IN WOODFORD COUNTY.

KY-169

STP

0

800,000

0 800,000 0

440

Page 144 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

WOODFORD

Project Cost:

CN

UT

RW

DN

PLACCESS MANAGEMENT IMPROVEMENTS ON US

60 FROM LEXINGTON ROAD AT WOODFORD

FEED TO MARSAILLES DRIVE (MP 9.38 TO MP

9.70)

US-60

SPP

SPP

SPP

950,000

950,000

750,000

2,000,000

750,000 2,000,000 0

8905

Total for WOODFORD county PL

Total Amounts:

CN

UT

RW

DN 500,000

950,000

1,450,000

2,000,000

800,000

750,000

750,000 2,800,000 0

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLBRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY

2021.

-0

BR 30,000,000

30,000,000 0 0 0

65.18

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLBRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY

2022.

-0

BR

0

30,000,000

30,000,000 0 0

65.19

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLBRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY

2023.

-0

BR

0

30,000,000

0 30,000,000 0

65.2

Page 145 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLBRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY

2024.

-0

BR

0

30,000,000

0 0 30,000,000

65.21

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLITS' ACTIVITIES ON VARIOUS NHS ROUTES IN

KENTUCKY FOR FY 2021.

-0

NH 2,000,000

2,000,000 0 0 0

66.16

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLITS' ACTIVITIES ON VARIOUS NHS ROUTES IN

KENTUCKY FOR FY 2022.

-0

NH

0

2,000,000

2,000,000 0 0

66.17

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLITS' ACTIVITIES ON VARIOUS NHS ROUTES IN

KENTUCKY FOR FY 2023.

-0

NH

0

2,000,000

0 2,000,000 0

66.18

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLITS' ACTIVITIES ON VARIOUS NHS ROUTES IN

KENTUCKY FOR FY 2024.

-0

NH

0

2,000,000

0 0 2,000,000

66.19

Page 146 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE TRANSPORTATION ENHANCEMENT

FOR FY 2021.

-0

TE 12,800,000

12,800,000 0 0 0

195.17

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE TRANSPORTATION ENHANCEMENT

FOR FY 2022.

-0

TE

0

12,800,000

12,800,000 0 0

195.18

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE TRANSPORTATION ENHANCEMENT

FOR FY 2023.

-0

TE

0

14,500,000

0 14,500,000 0

195.23

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE TRANSPORTATION ENHANCEMENT

FOR FY 2024.

-0

TE

0

14,500,000

0 0 14,500,000

195.24

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLNON-ATTAINMENT AREAS STATEWIDE CMAQ

FUNDED PROJECTS FOR FY 2021.

-0

CM 17,800,000

17,800,000 0 0 0

219.19

Page 147 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLNON-ATTAINMENT AREAS STATEWIDE CMAQ

FUNDED PROJECTS FOR FY 2022.

-0

CM

0

17,800,000

17,800,000 0 0

219.2

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLNON-ATTAINMENT AREAS STATEWIDE CMAQ

FUNDED PROJECTS FOR FY 2023.

-0

CM

0

17,800,000

0 17,800,000 0

219.21

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLNON-ATTAINMENT AREAS STATEWIDE CMAQ

FUNDED PROJECTS FOR FY 2024.

-0

CM

0

17,800,000

0 0 17,800,000

219.22

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT REHAB ON STATE (NON RS) SYSTEM

ROUTES IN KENTUCKY FOR FY 2021.

-0

PM 9,000,000

9,000,000 0 0 0

224.14

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT REHAB ON STATE (NON RS) SYSTEM

ROUTES IN KENTUCKY FOR FY 2023.

-0

PM

0

10,000,000

0 10,000,000 0

224.15

Page 148 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE BRIDGE INSPECTION FOR FY 2021.-0

BR 2,600,000

2,600,000 0 0 0

327.17

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE BRIDGE INSPECTION FOR FY 2022.-0

BR

0

2,600,000

2,600,000 0 0

327.18

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE BRIDGE INSPECTION FOR FY 2023.-0

BR

0

2,600,000

0 2,600,000 0

327.19

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE BRIDGE INSPECTION FOR FY 2024.-0

BR

0

2,600,000

0 0 2,600,000

327.2

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE FEDERAL LANDS ACCESS

PROGRAM FEDERAL HIGHWAY FUNDS FOR FY

2022.

-0

FH

0

1,641,000

1,641,000 0 0

333.15

Page 149 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE FEDERAL LANDS ACCESS

PROGRAM FEDERAL HIGHWAY FUNDS FOR FY

2023.

-0

FH

0

1,641,000

0 1,641,000 0

333.16

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE FEDERAL LANDS ACCESS

PROGRAM FEDERAL HIGHWAY FUNDS FOR FY

2024.

-0

FH

0

1,641,000

0 0 1,641,000

333.17

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE I-STATE ROUTES FOR FY 2021.

(14CCR)

-0

PM 9,000,000

9,000,000 0 0 0

337.15

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE I-STATE ROUTES FOR FY 2023.-0

PM

0

10,000,000

0 10,000,000 0

337.16

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE OFF-SYSTEM BRIDGE INSPECTION

FOR FY 2021.

-0

BR 1,100,000

1,100,000 0 0 0

346.17

Page 150 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE OFF-SYSTEM BRIDGE INSPECTION

FOR FY 2022.

-0

BR

0

1,100,000

1,100,000 0 0

346.18

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE OFF-SYSTEM BRIDGE INSPECTION

FOR FY 2023.

-0

BR

0

1,100,000

0 1,100,000 0

346.19

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE OFF-SYSTEM BRIDGE INSPECTION

FOR FY 2024.

-0

BR

0

1,100,000

0 0 1,100,000

346.2

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLRAIL PROTECTION ON VARIOUS ROUTES FOR

FY 2021.

-0

RRP 4,400,000

4,400,000 0 0 0

352.17

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLRAIL PROTECTION ON VARIOUS ROUTES FOR

FY 2022.

-0

RRP

0

4,400,000

4,400,000 0 0

352.18

Page 151 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLRAIL PROTECTION ON VARIOUS ROUTES FOR

FY 2023.

-0

RRP

0

4,400,000

0 4,400,000 0

352.19

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLRAIL PROTECTION ON VARIOUS ROUTES FOR

FY 2024.

-0

RRP

0

4,400,000

0 0 4,400,000

352.2

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT REHABILITATION FOR VARIOUS NHS

ROUTES IN KENTUCKY FOR FY 2021.

-0

PM 9,000,000

9,000,000 0 0 0

369.1

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT REHABILITATION FOR VARIOUS NHS

ROUTES IN KENTUCKY FOR FY 2023.

-0

PM

0

10,000,000

0 10,000,000 0

369.11

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLOHIO RIVER BRIDGES FRACTURE CRITICAL FOR

FY 2021.

-0

BR 1,600,000

1,600,000 0 0 0

388.11

Page 152 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLOHIO RIVER BRIDGES FRACTURE CRITICAL FOR

FY 2022.

-0

BR

0

1,600,000

1,600,000 0 0

388.12

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLOHIO RIVER BRIDGES FRACTURE CRITICAL FOR

FY 2023.

-0

BR

0

1,600,000

0 1,600,000 0

388.13

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLOHIO RIVER BRIDGES FRACTURE CRITICAL FOR

FY 2024.

-0

BR

0

1,600,000

0 0 1,600,000

388.14

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE HIGHWAY PROJECT DESIGN

ACTIVITIES.

-0

STP 1,000,000

1,000,000 0 0 0

391.06

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE HIGHWAY PROJECT DESIGN

ACTIVITIES.

-0

STP

0

5,000,000

0 5,000,000 0

391.07

Page 153 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT REPAIR AT INTERSECTIONS FOR

VARIOUS ROADWAYS FOR FY 2021.(12CCR)

-0

PM 5,000,000

5,000,000 0 0 0

395.08

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT REPAIR AT INTERSECTIONS FOR

VARIOUS ROADWAYS FOR FY 2023.(12CCR)

-0

PM

0

10,000,000

0 10,000,000 0

395.09

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUPGRADE NAVIGATIONAL LIGHTING FOR

BRIDGES OVER MAJOR STREAMS AND

WATERWAYS FOR FY 2021.

-0

SPP 1,000,000

1,000,000 0 0 0

400.07

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUPGRADE NAVIGATIONAL LIGHTING FOR

BRIDGES OVER MAJOR STREAMS AND

WATERWAYS FOR FY 2023.

-0

SPP

0

1,000,000

0 1,000,000 0

400.08

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLHONORING BORDER STATES COMMITMENTS FOR

EXISTING BRIDGES(CANNOT BE MOVED).

-0

BR 15,000,000

15,000,000 0 0 0

510.05

Page 154 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLHONORING BORDER STATES COMMITMENTS FOR

EXISTING BRIDGES(CANNOT BE MOVED).

-0

BR

0

15,000,000

15,000,000 0 0

510.06

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLHONORING BORDER STATES COMMITMENTS FOR

EXISTING BRIDGES (CANNOT BE MOVED).

-0

BR

0

15,000,000

0 15,000,000 0

510.07

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLHONORING BORDER STATES COMMITMENTS FOR

EXISTING BRIDGES (CANNOT BE MOVED).

-0

BR

0

15,000,000

0 0 15,000,000

510.08

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE CORRECTIONS OF ROCK FALL OR

EMBANKMENT STABILIZATION FOR FY 2021.

-0

STP 1,000,000

1,000,000 0 0 0

511.05

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE CORRECTIONS OF ROCK FALL OR

EMBANKMENT STABILIZATION FOR FY 2022.

-0

STP

0

2,000,000

2,000,000 0 0

511.06

Page 155 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE CORRECTIONS OF ROCK FALL OR

EMBANKMENT STABILIZATION FOR FY 2023.

-0

STP

0

8,500,000

0 8,500,000 0

511.07

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE CORRECTIONS OF ROCK FALL OR

EMBANKMENT STABILIZATION FOR FY 2024.

-0

STP

0

1,000,000

0 0 1,000,000

511.08

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPREVENTATIVE MAINTENANCE FOR BRIDGE

STRUCTURES FOR FY 2021.

-0

BR 10,000,000

10,000,000 0 0 0

514.01

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPREVENTATIVE MAINTENANCE FOR BRIDGE

STRUCTURES FOR FY 2023.

-0

BR

0

10,000,000

0 10,000,000 0

514.02

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE CORRECTIONS OF ROCKFALL OR

EMBANKMENT STABILIZATION ON NH ROUTES

FOR FY 2021.

-0

NH 6,000,000

6,000,000 0 0 0

518.02

Page 156 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE CORRECTIONS OF ROCKFALL OR

EMBANKMENT STABILIZATION ON NH ROUTES

FOR FY 2022.

-0

NH

0

7,000,000

7,000,000 0 0

518.03

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE CORRECTIONS OF ROCKFALL OR

EMBANKMENT STABILIZATION ON NH ROUTES

FOR FY 2023.

-0

NH

0

9,500,000

0 9,500,000 0

518.04

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE CORRECTIONS OF ROCKFALL OR

EMBANKMENT STABILIZATION ON NH ROUTES

FOR FY 2024.

-0

NH

0

8,000,000

0 0 8,000,000

518.05

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE SAFETY PROGRAM FOR FY 2021.

(HSIP)

-0

SAF 47,500,000

47,500,000 0 0 0

911.1

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE SAFETY PROGRAM FOR FY 2022.

(HSIP)

-0

SAF

0

47,500,000

47,500,000 0 0

911.11

Page 157 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE SAFETY PROGRAM FOR FY 2023.

(HSIP)

-0

SAF

0

47,500,000

0 47,500,000 0

911.12

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE SAFETY PROGRAM FOR FY 2024.

(HSIP)

-0

SAF

0

47,500,000

0 0 47,500,000

911.13

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE UNDERWATER BRIDGE INSPECTION

FOR FY 2021.

-0

BR 500,000

500,000 0 0 0

1063.17

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE UNDERWATER BRIDGE INSPECTION

FOR FY 2022.

-0

BR

0

500,000

500,000 0 0

1063.18

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE UNDERWATER BRIDGE INSPECTION

FOR FY 2023.

-0

BR

0

500,000

0 500,000 0

1063.19

Page 158 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE UNDERWATER BRIDGE INSPECTION

FOR FY 2024.

-0

BR

0

500,000

0 0 500,000

1063.2

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE PROGRAM TO FUND BRIDGE SCOUR

COUNTER-MEASURES FOR STATE-MAINTAINED

BRIDGES FOR FY 2021.

-0

SPP 1,500,000

1,500,000 0 0 0

1071.09

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE PROGRAM TO FUND BRIDGE SCOUR

COUNTER-MEASURES FOR STATE-MAINTAINED

BRIDGES FOR FY 2022.

-0

SPP

0

1,500,000

1,500,000 0 0

1071.1

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE PROGRAM TO FUND BRIDGE SCOUR

COUNTER-MEASURES FOR STATE-MAINTAINED

BRIDGES FOR FY 2023.

-0

SPP

0

1,500,000

0 1,500,000 0

1071.11

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE PROGRAM TO FUND BRIDGE SCOUR

COUNTER-MEASURES FOR STATE-MAINTAINED

BRIDGES FOR FY 2024.

-0

SPP

0

1,500,000

0 0 1,500,000

1071.12

Page 159 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE BRIDGE REPLACEMENT PROGRAM

FOR FY 2021.

-0

BR 18,000,000

18,000,000 0 0 0

1074.08

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE BRIDGE REPLACEMENT PROGRAM

FOR FY 2022.

-0

BR

0

20,000,000

20,000,000 0 0

1074.09

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSTATEWIDE BRIDGE REPLACEMENT PROGRAM

FOR FY 2023.

-0

BR

0

20,000,000

0 20,000,000 0

1074.1

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT PREVENTATIVE MAINTENANCE

PROGRAM FOR FY 2021.

-0

PM 5,000,000

5,000,000 0 0 0

2700.15

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT PREVENTATIVE MAINTENANCE

PROGRAM FOR FY 2022.

-0

PM

0

5,000,000

5,000,000 0 0

2700.16

Page 160 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT PREVENTATIVE MAINTENANCE

PROGRAM FOR FY 2023.

-0

PM

0

12,000,000

0 12,000,000 0

2700.17

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLPAVEMENT PREVENTATIVE MAINTENANCE

PROGRAM FOR FY 2024.

-0

PM

0

12,000,000

0 0 12,000,000

2700.18

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLAMERICANS WITH DISABILITIES ACT (ADA)

TRANSITION PLAN IMPLEMENTATION PROJECTS.

-0

STP 1,000,000

1,000,000 0 0 0

3011.02

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLAMERICANS WITH DISABILITIES ACT (ADA)

TRANSITION PLAN IMPLEMENTATION PROJECTS.

-0

STP

0

1,000,000

1,000,000 0 0

3011.03

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLAMERICANS WITH DISABILITIES ACT (ADA)

TRANSITION PLAN IMPLEMENTATION PROJECTS.

-0

STP

0

1,000,000

0 1,000,000 0

3011.04

Page 161 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLAMERICANS WITH DISABILITIES ACT (ADA)

TRANSITION PLAN IMPLEMENTATION PROJECTS.

-0

STP

0

1,000,000

0 0 1,000,000

3011.05

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSCHOOL TURN LANE PROJECTS. (08CCN)

(12CCR)

-0

SPP

0

5,000,000

5,000,000 0 0

8500.16

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLSCHOOL TURN LANE PROJECTS.-0

SPP

0

5,000,000

0 0 5,000,000

8500.17

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUS 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (STP) FOR

FY 2021.

US-68

STP 9,100,000

9,100,000 0 0 0

9068.67

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUS 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (STP) FOR

FY 2022.

US-68

STP

0

9,100,000

9,100,000 0 0

9068.68

Page 162 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUS 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (NH) FOR

FY 2021.

US-68

NH 9,100,000

9,100,000 0 0 0

9068.69

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUS 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (NH) FOR

FY 2022.

US-68

NH

0

9,100,000

9,100,000 0 0

9068.7

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUS 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (NH) FOR

FY 2023.

US-68

NH

0

21,000,000

0 21,000,000 0

9068.71

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUS 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (NH) FOR

FY 2024.

US-68

NH

0

21,000,000

0 0 21,000,000

9068.72

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUS 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (STP) FOR

FY 2023.

US-68

STP

0

21,000,000

0 21,000,000 0

9068.74

Page 163 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLUS 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (STP) FOR

FY 2024.

US-68

STP

0

21,000,000

0 0 21,000,000

9068.75

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLGARVEE BOND DEBT SERVICE FOR LOUISVILLE

BRIDGES PROJECT FOR FY 2021. (JZ1-FD53

"NH" COMPONENT)

-0

NH 62,800,000

62,800,000 0 0 0

9659.25

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLGARVEE BOND DEBT SERVICE FOR LOUISVILLE

BRIDGES PROJECT FOR FY 2022. (JZ1-FD53

"NH" COMPONENT)

-0

NH

0

62,800,000

62,800,000 0 0

9659.27

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLGARVEE BOND DEBT SERVICE FOR LOUISVILLE

BRIDGES FOR FY 2023. (JZ1-FD53 "NH"

COMPONENT)

-0

NH

0

30,000,000

0 30,000,000 0

9659.29

ZVARIOUS

Project Cost:

CN

UT

RW

DN

PLGARVEE BOND DEBT SERVICE FOR LOUISVILLE

BRIDGES FOR FY 2024. (JZ1-FD53 "NH"

COMPONENT)

-0

NH

0

30,000,000

0 0 30,000,000

9659.31

Page 164 of 166

County Item No. Route Description Phase Fund FY 2021 FY 2022 FY 2023 FY 2024

2020-2024 HIGHWAY CONSTRUCTION PLAN

Total for ZVARIOUS county PL

Total Amounts:

CN

UT

RW

DN 1,000,000

291,800,000

292,800,000

259,441,000 314,141,000 239,141,000

5,000,000

259,441,000 319,141,000 239,141,000

Page 165 of 166

Fund SummaryTotalFY 2023FY 2022FY 2021DescriptionFund FY 2024

BR FEDERAL BRIDGE REPLACEMENT 568,453,500 148,118,500 134,635,000 141,400,000 144,300,000

BR2 BRAC BOND PROJECTS SECOND PROGRAM 8,700,000 8,700,000 0 0 0

CM FEDERAL CONGESTION MITIGATION FUNDS 71,200,000 17,800,000 17,800,000 17,800,000 17,800,000

FH FEDERAL FOREST HIGHWAY FUNDS 4,923,000 0 1,641,000 1,641,000 1,641,000

NH FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS 1,406,360,000 448,380,000 368,090,000 297,800,000 292,090,000

PM PAVEMENT MANAGEMENT 796,263,500 217,427,500 188,881,000 191,095,000 198,860,000

RRP SAFETY-RAILROAD PROTECTION 17,600,000 4,400,000 4,400,000 4,400,000 4,400,000

RRS SAFETY-RAILROAD SEPARATION 6,500,000 0 6,500,000 0 0

SAF FEDERAL SAFETY FUNDS 190,000,000 47,500,000 47,500,000 47,500,000 47,500,000

SAH FEDERAL STP FUNDS DEDICATED TO ASHLAND 6,400,000 1,600,000 1,600,000 1,600,000 1,600,000

SHN FEDERAL STP FUNDS DEDICATED TO HENDERSON 2,100,000 700,000 700,000 700,000 0

SLO FEDERAL STP FUNDS DEDICATED TO LOUISVILLE 77,919,196 21,657,196 23,500,000 9,262,000 23,500,000

SLX FEDERAL STP FUNDS DEDICATED TO LEXINGTON 85,024,000 8,956,000 8,956,000 8,956,000 58,156,000

SNK FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY 38,470,000 10,770,000 9,300,000 9,200,000 9,200,000

SPP STATE CONSTRUCTION HIGH PRIORITY PROJECTS 1,906,362,600 336,374,400 366,817,400 367,533,400 835,637,400

STP FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS 562,497,000 136,617,000 132,660,000 152,090,000 141,130,000

TE FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS 54,600,000 12,800,000 12,800,000 14,500,000 14,500,000

Total Amount 1,421,800,596 5,803,372,796 1,325,780,400 1,265,477,400 1,790,314,400

2020-2024 HIGHWAY CONSTRUCTION PLAN

Page 166 of 166