2019-12-16 preliminary hydrogeological assessment, 388113

20
CAMBIUM INC. 866.217.7900 cambium-inc.com Peterborough |Barrie | Oshawa | Kingston Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville 2019-12-16 Prepared for: Mono Centre Brewing Company Ltd. © Cambium 2019 Reference No.: 10054-001

Upload: others

Post on 09-Jun-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

CAMBIUM INC. 866.217.7900 cambium-inc.com

Peterborough |Barrie | Oshawa | Kingston

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

2019-12-16

Prepared for: Mono Centre Brewing Company Ltd.

© Cambium 2019 Reference No.: 10054-001

Page 2: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc. Page i

Table of Contents

1.0  Introduction .......................................................................................................1 

1.1  Site Description ........................................................................................................... 1 

2.0  Methodology .....................................................................................................2 

2.1  Site Visit ...................................................................................................................... 2 

2.2  Desktop Review .......................................................................................................... 2 

3.0  Geological and Hydrogeological Setting .......................................................3 

3.1  Regulated and Sensitive Hydrogeological Areas ......................................................... 3 

3.2  Water Well Records .................................................................................................... 4 

3.2.1  On-Site Supply Well .................................................................................................... 5 

4.0  Conclusions and Recommendations .............................................................6 

5.0  References ........................................................................................................8 

List of Appended Figures

Figure 1  Site Location Map 

Figure 2  Water Well Records Within 500 m of Site 

List of Appendices

Appendix A   Photographs 

Appendix B   Land Information 

Appendix C   Well Record 

Page 3: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc. Page 1

1.0 Introduction

Cambium Inc. (Cambium) was retained by the Mono Centre Brewing Company Ltd. (Client),

care of Gerrits Engineering Ltd. to complete a preliminary hydrogeological assessment of the

property located at 388113 Mono Centre Road, Orangeville (hereafter referred to as the Site).

The Client proposes to construct a brewery at the Site. The brewery will require an estimated

7,000 L of water for daily operations. This preliminary hydrogeological assessment was

completed to determine if the proposed development is feasible and was based upon a review

of available information and a Site visit.

1.1 Site Description

The Site is approximately 21.5 hectares (ha) and is rectangular in shape. At present the Site

exists as rural/forested land with one dwelling located on the property. The dwelling is provided

potable water by a private well. As per the Water Well Information System (WWIS) the well ID

number is believed to be 1701067 (however this requires confirmation).

The topography of the Site is flat to hummocky, with the highest point being located centrally in

the property and generally slopes down to the northeast. Available information suggests that

the ground surface elevation of the Site varies between approximately 443 metres above sea

level (masl) and 420 masl.

Site is bound to the south by Mono Centre Road and to the east by 5 Line East. Rural and

rural residential land use borders the Site on all sides.

Surface water mapping indicates that the headwaters of a small watercourse are found in the

northeastern corner of the Site and flow northwards. The Site boundaries have been outlined

on Figure 1.

Page 4: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc. Page 2

2.0 Methodology

This section outlines the methodology to complete the preliminary hydrogeological

assessment.

2.1 Site Visit

On November 3, 2019 Cambium staff visited the Site to take water level and depth

measurements of the existing supply well and to complete a preliminary flow test.

The supply well was installed through a concrete dug well casing (i.e., well pit) and insulating

foam was sprayed on top of the well head. The well head was not observable or accessible;

therefore a water level depth and well depth could not be measured. Pictures of the well head

and spray foam insulation are attached in Appendix A.

2.2 Desktop Review

A desktop review of available information was completed to characterize the general

hydrogeological conditions. The information reviewed as part of this assessment included the

following sources:

Regulated areas, as mapped by the Nottawasaga Valley Conservation Authority (NVCA).

Sensitive source water protection areas, as outlined in the Source Protection Information Atlas (SPIA).

Proximal drinking water wells, as per the Ministry of Environment and Climate Change (MECP) WWIS.

Page 5: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc. Page 3

3.0 Geological and Hydrogeological Setting

The Site is located within the physiographic region known as the Horseshoe Moraines. The

Horseshoe Moraines are oriented in a horseshoe shaped pattern that flanks the upland region

of the Niagara cuesta. Meltwater stream deposits give the region two chief landform

components:

a) Irregular, stony knobs and ridges which are compose mostly of till and with some sand

and gravel deposits (kames).

b) Pitted sand and gravel terraces and, swampy valley floors.

In the area of the Site the moraines lie along the brow and slopes of the Niagara escarpment.

In general the soil composition of the moraines in the area of the Site is comprised of coarse,

stony till (Chapman, L.J. and D.F. Putnam, 1984).

According to Map 2556 of the Ontario Survey (Barnett, P.J.,Cowan, W.R. and Henry, A.P.,

1991) the soils in the area of the Site comprise of ice-contact stratified deposits consisting of

sand and gravel, minor silt, clay and till.

According to the Bedrock Geology of Ontario, southern sheet; Ontario Geological Survey, Map

2544, scale 1:1 000 000 (Ontario Geological Survey, 1991), the regional bedrock in the area of

the Site consists of the Queenston Shale Formation.

3.1 Regulated and Sensitive Hydrogeological Areas

Regulated areas mapping was accessed, as provided by the NVCA. The mapping indicates

that regulated areas cover a small portion of the Site in the northeastern corner of the property.

These areas correspond with the surface water feature present in this area.

The SPIA mapping indicates that the Site is located within a Significant Groundwater Recharge

Area (SGRA).

Mapping generated from the NVCA and the SPIA is attached in Appendix B.

Page 6: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc. Page 4

3.2 Water Well Records

According to the MECP WWIS mapping there are 13 water well records located within

approximately 500 m of the Site boundaries.

Of the 13 water well records, 11 detailed the installation of drilled wells, 1 detailed the

installation of a bored/dug well and 1 detailed the abandonment of a well.

The stratigraphy information provided in the well records indicates that the overburden

generally consisted of coarse grained sediments; however there were regular occurrences of

fine grained (silt and clay) lenses at depth. All of the drilled wells were installed in shale

bedrock. The following conclusions were drawn from a review of the water well records:

The depth of overburden ranged between 18.60 mbgs and 70.12 mbgs (average of

37.47 mbgs).

The total depth of the drilled wells varied between 44.21 mbgs and 127.44 mbgs

(average of 77.11 mbgs).

Groundwater within the shale bedrock was encountered between the depths of 21.34

mbgs and 96.04 mbgs (average 53.81 mbgs).

Static water levels reported from the drilled wells ranged between depths of 10.67 mbgs

and 36.59 mbgs (average 22.64 mbgs).

The recommended flow rate of the drilled wells ranged from 0.5 gallons per minute

(gpm) to 10 gpm (average of 3.68 gpm (approximately 11 L/min)).

These data indicate that there is a bedrock aquifer in the area that can produce a reasonably

reliable source of water. A map of the water well records within 500 m of the Site is attached

as Figure 2.

Page 7: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc. Page 5

3.2.1 On-Site Supply Well

The on-site supply well could not be accessed because the wellhead was installed in a well pit,

and since there was insulating foam covering the wellhead. The well pit casing was measured

to be approximately 1 m across and the foam was measured approximately 2.1 m down from

the top of casing. The well is located adjacent the southwest corner of the dwelling and is

found at the approximate coordinates of 577610 m E and 4877797 m N, Zone 17T. The

available well record (assumed to be number 1701067) indicates that the well was installed in

shale bedrock to a depth of 50.30 mbgs. The recommended flow rate was 4 gpm

(approximately 15 L/min) and the static water level upon completion was 13.72 mbgs. Well

record number 1701067 is attached in Appendix C.

The location of the well is outlined on Figure 1. The well ID number should be confirmed at a

later date, if possible.

Page 8: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc. Page 6

4.0 Conclusions and Recommendations

The conclusions outlined below are based on the assumption that the well record data outlined

in the MECP WWIS is accurate and valid for the Site.

The average flow rate of the wells in the area of the Site was 11 L/min. The assumed well

record for the on-site well reported a flow rate of 15 L/min. The anticipated daily water

withdrawal rate for the proposed brewery is 7,000 L/day. The reported yields indicate that the

daily demand can be achieved. The estimated pumping time required to produce 7,000 L

ranges from 8 to 11 hours of continuous water withdrawal per day (considering yields of 11 to

15 L/min).

The properties neighboring the Site are developed as agricultural land or rural residential

dwellings. The combined water withdrawal stress on local aquifer resources from land use

adjacent the Site is considered low.

Due to the availability of groundwater resources and that existing water withdrawal stress is

low, the proposed daily water withdrawal rate of 7,000 L/day is considered sustainable and will

not likely influence adjacent groundwater users.

A Permit To Take Water (as prescribed by Section 34 of the Ontario Water Resources Act) will

not be required since the daily water withdrawal rate of the brewery will be less than 50,000

L/day.

The total combined daily sewage loading rate of the Site is anticipated to be less than 10,000

L/day; therefore an Environmental Compliance Approval from the MECP will not be required.

The results of the preliminary desktop assessment indicate that developing the Site as a

brewery with a water demand rate of 7,000 L/day is sustainable and is not anticipated to

influence adjacent groundwater users.

Page 9: 2019-12-16 Preliminary Hydrogeological Assessment, 388113
Page 10: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc. Page 8

5.0 References

Barnett, P.J.,Cowan, W.R. and Henry, A.P. (1991). Quaternary geology of Ontario, southern

sheet; Ontario.

Chapman, L.J. and D.F. Putnam. (1984). The Physiography of Southern Ontario: Ontario

Geological Survey, Special Volume 2.

Ontario Geological Survey. (1991). Bedrock Geology of Ontario, southern sheet; Ontario

Geologic Survey, Map 2544, scale 1: 1 000 000.

Page 11: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc.

Appended Figures

Page 12: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

P.O. Box 325, 52 Hunter Street EastPeterborough, Ontario, K9H 1G5

Tel: (705) 742.7900 Fax: (705) 742.7907www.cambium-inc.com

&%

5T

H L

INE

EH

S

5T

HL

INE

EH

S

COUNTY ROAD 8

November 2019

1:5,000

Figure:Created by: Checked by:

Date:Project No.:

Scale: Projection:

NAD 1983 UTM Zone 17N

º

0 20 40 60 80 100

m

&%On-Site Supply Well(approximate)

Building Footprint (approximate)

Site (approximate)

LEGEND

Rev.:

O:\

GIS

\pro

ject_

MX

Ds\1

000

0-1

00

99

\10

05

4-0

01

Gerr

its E

ngin

eeri

ng

Ltd

. -

Hydro

-G -

388

113

Mon

o C

entr

e R

oad

, O

rang

evill

e\2

019

-11-2

5 F

IG 1

- S

ite

Pla

n.m

xd

TLC

10054-001

CM 1

PRELIMINARY

PRELIMINARYPRELIMINARY

PRELIMINARY

HYDROGEOLOGICAL

HYDROGEOLOGICAL HYDROGEOLOGICAL

HYDROGEOLOGICAL

ASSESSMENT

ASSESSMENTASSESSMENT

ASSESSMENT

MONO CENTRE

BREWING COMPANY LTD.

388113 Mono Centre Road,

Orangeville, Ontario

SITE PLAN

Notes:

- Site is approximate and was obtained from the Dufferin County online GIS.- Base mapping features are © Queen's Printer of Ontario, 2019 (this doesnot constitute an endorsement by the Ministry of Natural Resources or theOntario Government).- Distances on this plan are in metres and can be converted to feet bydividing by 0.3048.- Cambium Inc. makes every effort to ensure this map is free from errors butcannot be held responsible for any damages due to error or omissions. Thismap should not be used for navigation or legal purposes. It is intended forgeneral reference use only.

Page 13: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

P.O. Box 325, 52 Hunter Street EastPeterborough, Ontario, K9H 1G5

Tel: (705) 742.7900 Fax: (705) 742.7907www.cambium-inc.com

&%

&%

&%

&%

&%

&%

&%

&%

&%

&%

&%

&%&%

&%&%

&%

4T

H L

INE

EH

S

5T

H L

INE

EH

S

5T

HL

INE

EH

S

COUNTY ROAD 8

November 2019

1:10,000

Figure:Created by: Checked by:

Date:Project No.:

Scale: Projection:

NAD 1983 UTM Zone 17N

º

0 50 100 150 200 250

m

&% Water Well Record

500m Buffer

Site (approximate)

LEGEND

Rev.:

O:\

GIS

\pro

ject_

MX

Ds\1

000

0-1

00

99

\10

05

4-0

01

Gerr

its E

ngin

eeri

ng

Ltd

. -

Hydro

-G -

388

113

Mon

o C

entr

e R

oad

, O

rang

evill

e\2

019

-11-2

5 F

IG 2

- W

ate

r W

ell

Re

cord

s.m

xd

TLC

10054-001

CM 2

PRELIMINARY

PRELIMINARYPRELIMINARY

PRELIMINARY

HYDROGEOLOGICAL

HYDROGEOLOGICAL HYDROGEOLOGICAL

HYDROGEOLOGICAL

ASSESSMENT

ASSESSMENTASSESSMENT

ASSESSMENT

MONO CENTRE

BREWING COMPANY LTD.

388113 Mono Centre Road,

Orangeville, Ontario

WATER WELL RECORDSWITHIN 500m OF SITE

Notes:

- Site is approximate and was obtained from the Dufferin County online GIS.- Base mapping features are © Queen's Printer of Ontario, 2019 (this doesnot constitute an endorsement by the Ministry of Natural Resources or theOntario Government).- Distances on this plan are in metres and can be converted to feet bydividing by 0.3048.- Cambium Inc. makes every effort to ensure this map is free from errors butcannot be held responsible for any damages due to error or omissions. Thismap should not be used for navigation or legal purposes. It is intended forgeneral reference use only.

Page 14: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc.

Appendix A

Photographs

Page 15: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

November 27, 2019

Cambium Inc.

Photo 1: Top of the well pit in which the supply well was installed.

Photo 2: Looking into the well pit at foam insulation.

Page 16: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc.

Appendix B

Land Information

Page 17: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

NVCA - Regulated Areas Mapping

November 21, 2019

This map, either in whole or in part, may not be reproduced without thewritten authority from © The Corporation of the County of Simcoe.This map is intended for personal use, has been produced using data froma variety of sources and may not be current or accurate.Produced (in part) under license from:© Her Majesty the Queen in Right of Canada, Department of NaturalResources:

0 0.4 0.80.2 km

1:9,028

Page 18: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

0 km0.25

N

Legend

This map should not be relied on as a precise indicator of routes or locations, nor as a guide to navigation. The Ontario Ministry of Environment, Conservation and Parks (MECP) shall not be liable in any way for the use or any information on this map. of, or reliance upon, this map.

Significant Groundwater Recharge Area

2

4

6

Assessment Parcel

SPIA Areas

11/21/2019

44.0505 N, -80.02996 W

Map Created:

Map Center:© Queen's Printer for Ontario, 2019

Page 19: 2019-12-16 Preliminary Hydrogeological Assessment, 388113

Preliminary Hydrogeological Assessment - 388113 Mono Centre Road, Orangeville

Mono Centre Brewing Company Ltd.

Ref. No.: 10054-001

2019-12-16

Cambium Inc.

Appendix C

Well Record

Page 20: 2019-12-16 Preliminary Hydrogeological Assessment, 388113