2018 statewide conference on local bridges · stafford bridge rehabilitation october 23-25, 2018...
TRANSCRIPT
![Page 1: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/1.jpg)
STAFFORD BRIDGE REHABILITATION
October 23-25, 2018
2018 STATEWIDE CONFERENCE
ON LOCAL BRIDGES
Matt Hunt, PE, Associate, Project ManagerSteve Hagy, PE, Project Engineer
![Page 2: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/2.jpg)
Introduction
• Stafford Bridge Rd (CR 67) over Fish Creek,
Saratoga County
• Bridge rehabilitation including deck replacement
• Locally Administered Federal-Aid (LAFA) Project
• Owner/Sponsor: Saratoga County
• Design & CI Consultant: Creighton Manning
• Contractor: New Century Construction
![Page 3: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/3.jpg)
Presentation Objectives
• Walk through the bridge rehabilitation process
• Gain insight into identifying solutions to various challenges associated with rehabilitations
• Provide recommendations to accommodate unknowns that may surface during construction
![Page 4: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/4.jpg)
![Page 5: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/5.jpg)
![Page 6: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/6.jpg)
![Page 7: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/7.jpg)
• Generally speaking, the girders were in very good condition
Evaluation of existing bridge
![Page 8: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/8.jpg)
![Page 9: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/9.jpg)
![Page 10: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/10.jpg)
![Page 11: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/11.jpg)
• Evidence of ponding on the deck at the pier
Evaluation of existing bridge
![Page 12: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/12.jpg)
![Page 13: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/13.jpg)
![Page 14: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/14.jpg)
![Page 15: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/15.jpg)
• Various pot holes and cracking of the asphalt wearing surface
Evaluation of existing bridge
![Page 16: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/16.jpg)
![Page 17: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/17.jpg)
• 6 concrete deck cores
Evaluation of existing bridge
![Page 18: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/18.jpg)
![Page 19: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/19.jpg)
![Page 20: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/20.jpg)
![Page 21: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/21.jpg)
Modeling the bridge
![Page 22: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/22.jpg)
![Page 23: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/23.jpg)
![Page 24: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/24.jpg)
![Page 25: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/25.jpg)
Defining the Alternative
• Project originally scoped as a rehab including deck replacement• Evaluated and dismissed a deck repair with overlay
alternative• Removing the deck provides access to make steel repairs
• Full deck replacement accommodated Geometry and Structural improvements
![Page 26: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/26.jpg)
Defining the Alternative
• Geometry improvements• Eliminated one of the seldom used sidewalks to widen
the roadway to include 5ft shoulders to accommodate cyclists
![Page 27: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/27.jpg)
![Page 28: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/28.jpg)
Defining the Alternative
• Structural improvements• Originally intended to simply fix the deterioration by
plating the beam webs individually
• Completed steel repairs by retrofitting the beams to be continuous for deck dead load and live load
• Replaced all bearings and made the pier bearings fixed
• Eliminated joint at the pier
• Jointless abutment details
![Page 29: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/29.jpg)
Design
• Create new AASHTOware models to assess both stages of construction and the final condition• Stage 1 – keep traffic on the existing deck supported
by 3 girders
• Stage 2 – move traffic to new deck supported by 2 retrofit girders made continuous for deck dead load and live load
• 2 Girder section required balance, stability, and torsional analysis
Stage IStage 2
![Page 30: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/30.jpg)
Design
• Beam splices• Splices designed for stresses caused by non-composite
deck dead load, composite superimposed dead load, and live load
• Splices are not designed for steel dead load because those stresses are already “locked in” to the girders for the erected simple spans
![Page 31: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/31.jpg)
Design
• Check pier for seismic considerations and longitudinal load• FHWA Seismic Retrofitting Manual for Highway
Structures
• Existing reinforcement at pier footing and stem interface sufficient to resist seismic load
![Page 32: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/32.jpg)
Design
• Deck haunch calculations to set roadway profile• Used original AASHTOware model to calculate
theoretical dead load deflections
• Used roadway profile from topographical survey to determine the original over-camber of the beams
• Used new AASHTOware model to calculate the anticipated dead load deflections for the proposed bridge
• Applied new deflections to over-cambered beams
• Set the proposed roadway profile to ensure a minimum 2” haunch
• Also used the calculations to provide reinforced haunch limits in the plans
![Page 33: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/33.jpg)
![Page 34: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/34.jpg)
Design
• Bearings• Steel laminated elastomeric
• Changed configuration to fix the continuous beams at the pier
![Page 35: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/35.jpg)
Construction
• Temporary traffic signal
![Page 36: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/36.jpg)
![Page 37: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/37.jpg)
Construction
• Stage 1 deck removal
![Page 38: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/38.jpg)
![Page 39: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/39.jpg)
![Page 40: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/40.jpg)
![Page 41: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/41.jpg)
![Page 42: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/42.jpg)
![Page 43: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/43.jpg)
![Page 44: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/44.jpg)
![Page 45: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/45.jpg)
![Page 46: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/46.jpg)
Construction
• Substructure modifications
![Page 47: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/47.jpg)
Construction
• Steel repair and girder retrofit
![Page 48: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/48.jpg)
![Page 49: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/49.jpg)
![Page 50: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/50.jpg)
![Page 51: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/51.jpg)
![Page 52: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/52.jpg)
![Page 53: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/53.jpg)
![Page 54: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/54.jpg)
![Page 55: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/55.jpg)
![Page 56: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/56.jpg)
Construction
• Anticipated tall haunches to obtain desired profile due to excess camber in the girders discovered during design
• Haunches up to 9”
![Page 57: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/57.jpg)
Construction
• Pouring the deck
![Page 58: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/58.jpg)
![Page 59: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/59.jpg)
![Page 60: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/60.jpg)
Project wrap-up
• Engineer’s Estimate: $1.94M
• Contractors bid: $2.294M
• Final construction cost: $2.322M
• Began construction: May 2015
• Construction Complete: November 2015
![Page 61: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/61.jpg)
Lessons Learned
• Do not underestimate effort and cost to make girders continuous; requires as-built geometry to be near perfect to be cost effective
• Superstructure replacement would have been a better value given final construction cost; project was under funded because it began as a simple deck replacement with minor steel repairs
![Page 62: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/62.jpg)
Recommendations for Rehabs
• Include additional quantity for unanticipated deterioration (steel, field drilling, etc)
• If possible, EIC or one of the inspectors should be experienced in bridge rehabs
• Include enough Construction Support hours to allow the design engineer to go to the site and assess unanticipated conditions
![Page 63: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/63.jpg)
PDH Question #1
The yield Strength of ASTM A441 steel is:
a) 40ksi
b) 42ksi
c) 46ksi
d) 50ksi
e) Can be any of the above depending on the structure steel shape and/or thickness
![Page 64: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/64.jpg)
PDH Question #2
The difference between the design for a retrofit to make two simple spans continuous for deck dead load and live load and a conventional continuous beam design is that the steel dead load stresses are calculated for the simple span configuration.
a) True
b) False
![Page 65: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager](https://reader034.vdocuments.site/reader034/viewer/2022052102/603ce5652e7b8d2e6004a873/html5/thumbnails/65.jpg)
PDH Question #3
To eliminate the “double hump” caused by over-cambering the original beams, the design team:
a) Relied on the contractor to propose a solution during construction
b) Made an assumption and hoped for the best
c) Calculated the theoretical camber of the original beams based on the topographical survey and AASHTOware model and set the proposed profile to ensure a minimum 2” haunch in consideration of the proposed deflections