2017 five year transportation improvement maintenance program · 2017-06-16 · 2017 five‐year...
TRANSCRIPT
2017 FIVE‐YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
pg. 1
2017 FIVE‐YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM 2016‐2017 THROUGH 2020‐2021
Recommended by the Transportation Advisory Committee February 28, 2017 Approved by the Board of Supervisors June 7, 2017 (Tentative)
DRAFT
2017 FIVE‐YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2016‐2017 THROUGH 2020‐2021
The Pinal County Board of Supervisors (Board) proudly presents the 2017 Five‐Year Transportation Improvement and Maintenance Program (TIMP) for Budget Years 2016‐2017 through 2020‐2021. The TIMP is Pinal County’s near‐term transportation plan that identifies potential funding and establishes a tentative schedule for planning, construction, and maintenance projects. It is fiscally constrained and updated annually with new projects added to the fifth year.
The Transportation Advisory Committee (TAC) is the Board appointed, ten member panel representing each of Pinal County’s five supervisor districts. The TAC is charged with prioritizing transportation projects for the TIMP and recommending the draft TIMP to the Board. On February 28, 2017, the TAC met in an open public meeting and recommended approval of the 2017 TIMP for Budget Years 2016‐2017 through 2020‐2021.
In recognition of their significant contributions, we would like to thank the TAC officers and members for their service to Pinal County.
First Row (L‐R): Paul Prechel, District 1; David Garcia, District 1; Vice‐Chair Maxine Brown, District 5; Jim Fabris, District 2; Second Row (L‐R): Tom Snider, District 4; Gordon Brown, District 2; Giao Pham, District 5; Chair Kevin Louis, District 3 Not pictured: Ted Hawkins, District 4 and Harold Vangilder, District 3
2017 FIVE‐YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2016‐2017 THROUGH 2020‐2021
The TAC conducts three public meetings during the months of September, November, and February in Florence and considers public comments in developing recommendations to the Board. We encourage you to attend the meetings and offer comments on the TIMP and future transportation projects.
Meetings are held on Tuesdays in the Ironwood Room (Northeast Multipurpose Room 101) of the Pinal County Administrative Complex (1891 Historic Courthouse) and begin at 2:30 p.m. as follows:
Agendas and minutes are posted in compliance with Arizona’s Open Meeting Law and can be found on Pinal County’s website: http://www.pinalcountyaz.gov/PublicWorks/TransportationPlanning/Pages/TACSchedule.aspx.
Funding for the TIMP is provided by revenues from the Pinal County Transportation Excise Tax, the half‐cent sales tax, approved by voters in 2005. The sole purpose of the tax is to fund construction, maintenance, and roadside development projects throughout the county. Shopping and buying your gasoline locally ensure that quality transportation projects are planned and implemented countywide. With your support, we can continue building and improving the county’s transportation system.
Pinal County Board of Supervisors
September 26, 2017 November 28, 2017 February 27, 2018
Vice‐Chairman Pete Rios, District 1; Mike Goodman, District 2; Chairman Stephen Miller, District 3; Anthony Smith, District 4; Todd House, District 5
2017 FIVE‐YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2016‐2017 THROUGH 2020‐2021
RESOLUTION NO.___________________________________
WHEREAS, Pinal County is empowered by Arizona Revised Statutes § 11‐251 and § 28‐6701, et seq. to layout, maintain, control, and manage public roads within the County; and,
WHEREAS, on April 21, 2010, the Pinal County Board of Supervisors (Board) approved bylaws for the Transportation Advisory Committee (TAC), a recommending body to the Board on countywide transportation planning, construction, and maintenance projects; and,
WHEREAS, pursuant to Article II of the bylaws, the TAC shall annually review, update, and recommend a five‐year transportation improvement and maintenance program to the Board; and,
WHEREAS, it is the recommendation of the TAC that the 2017 Pinal County Five‐Year Transportation Improvement and Maintenance Program for Budget Years 2016‐2017 through 2020‐2021 be approved.
THEREFORE, IT IS RESOLVED that the Pinal County Board of Supervisors approves the 2017 Five‐Year Transportation Improvement and Maintenance Program for Budget Years 2016‐2017 through 2020‐2021 and authorizes Public Works staff to proceed with pre‐construction, construction, and/or maintenance activities including expenditures for the programmed transportation projects.
IT IS FURTHER RESOLVED that this Resolution is effective upon approval and execution of this Resolution.
PASSED AND ADOPTED this __________ day of __________________________, 2017, by the PINAL COUNTY BOARD OF SUPERVISORS.
_________________________________________
Chairman of the Board
ATTEST:
____________________________________
Clerk of the Board
2017 FIVE‐YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2016‐2017 THROUGH 2020‐2021
GLOSSARY
Activity – Project work such as: pre‐construction/construction/new construction/reconstruction, drainage, dust palliative, pavement preservation or safety.
Construction – The building of roadway and/or related infrastructure improvements.
Drainage – The management of storm water to protect private and/or public infrastructure.
Dust Palliative – A surface treatment applied to unimproved roadways to control dust.
New Construction – The establishment of a roadway and/or related infrastructure improvements.
Pavement Preservation – A topical treatment that extends the service life of existing pavement surfaces.
Pre‐Construction – The project work conducted prior to construction of roadway and/or related infrastructure improvements such as: planning, environmental, design, and right‐of‐way acquisition.
Reconstruction – The rebuilding of roadway and/or related infrastructure improvements. Elements of new construction may be incorporated into the project.
Safety – The project work that eliminates or reduces the severity of roadway hazards. Examples include intersection realignment, guardrails, improved signage and/or pavement markings, traffic signals or related studies.
Status – The current state of the project such as: cancelled, closed, completed, pending, programmed, and underway
Cancelled – The project was terminated due to financial or other constraints such as unresolved right‐of‐way issues or changing priority.
Closed – The project was combined with another project (including allocated funding) to streamline activities or allocated funding for project was not used.
2017 FIVE‐YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM
2016‐2017 THROUGH 2020‐2021
GLOSSARY (continued)
Completed – The project was successfully finished/constructed and closed out.
Pending – The project is about to start or awaiting the completion of another activity.
Programmed – The project was approved/authorized and scheduled for a future budget year.
Underway – The project is in progress.
Unfunded – Funding has not been identified/allocated.
Budget Year 2016‐2017Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Battaglia Drive Overfield Rd Intersection Construction/Reconstructi $350,000 14UnderwayAngeline To aFlorence‐Kelvin Highway Cochran Rd‐Donnelly Wash Construction $275,900 11CompletedAngeline To bGantzel Road (Pathway) Bella Vista Rd‐Poston Butte High School New Construction $500,000 22CompletedCeleste Garza aGermann Road Meridian Rd‐Ironwood Dr Pre‐Construction $244,124 22UnderwayCeleste Garza bHenness Road Val Vista Rd‐Waverly Dr New Construction $350,000 33UnderwayLindsey Randall aHunt Highway ‐ Phase IV Gary Rd‐Magma Rd Pre‐Construction $250,000 32CompletedCeleste Garza bMaricopa‐Casa Grande Highway Santa Cruz Wash Crossing New Construction $2,600,000 44CompletedJohn Kraft aMitchell Trail Heritage Rd‐Arizona Farms Rd Pre‐Construction $100,000 42UnderwayCeleste Garza bSafety Program Countywide Safety $915,600 57ProgrammedJohn Kraft a
$5,585,624SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Bronco Lane Valley View Dr south .1 mile Dust Palliative $30,000 55PendingCeleste Garza bCattle Tank Road Davis Ranch Rd‐Park Link Dr Dust Palliative $750,000 61, 4PendingAngeline To aCattle Tank Road Davis Ranch Rd‐Park Link Dr Pre‐Construction $90,000 61, 4UnderwayAngeline To bChristensen Road‐Bartlett Road Martin Rd‐5th St Dust Palliative $180,000 71CompletedCeleste Garza aEstancia Drive Davis Ranch Rd‐Hedgehog Tr Dust Palliative $100,000 74PendingAngeline To bHarmon Road Toltec Hwy‐Tweedy Rd Dust Palliative $360,000 81PendingAngeline To aHuisatch Road Garnet Rd‐Amarillo Valley Rd Dust Palliative $175,000 84PendingLindsey Randall bLa Barranca Road Sage St‐Hidden Valley Rd Dust Palliative $100,000 94CompletedLindsey Randall aLa Palma Road State Route 287‐.25 north of Kleck Rd Dust Palliative $150,000 91PendingLindsey Randall bMaverick Circle Mohican Rd west .1 mile Dust Palliative $30,000 105PendingCeleste Garza aPavement Preservation Program Countywide Pavement Preservation $84,400 107ProgrammedJoe Ortiz bPavement Preservation Program Countywide Pavement Preservation $915,600 117ProgrammedJoe Ortiz aRalston Road Wildcat Ln‐Dune Shadow Rd Dust Palliative $200,000 114CompletedLindsey Randall bRedington Road Veterans Memorial Blvd‐Pima County Line Dust Palliative $665,000 121UnderwayAngeline To aSixshooter Road Jacob Waltz St north .1 mile Dust Palliative $30,000 125PendingCeleste Garza bWildwood Road Warren Rd‐Amarillo Valley Rd Dust Palliative $400,000 134CompletedLindsey Randall a
$4,260,000SUBTOTAL MAINTENANCE
$9,845,624GRAND TOTAL 2016‐2017
District 7 = Multiple districts or countywide
Budget Year 2017‐2018Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Curry Road State Route 287‐Storey Rd Construction $110,000 133ProgrammedLindsey Randall bMcCartney Road Interstate 10‐Evans Rd Reconstruction $3,500,000 141, 3UnderwayLindsey Randall aSafety Program Countywide Safety $500,000 147ProgrammedJohn Kraft bSunland Gin Road Battaglia Dr Intersection Safety $350,000 154ProgrammedAngeline To aTweedy Road State Route 287‐Storey Rd Construction $110,000 153ProgrammedLindsey Randall b
$4,570,000SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Cactus Road Kaniksu St (north)‐Frontier St Dust Palliative $20,000 165PendingCeleste Garza aDust Abatement Program Apache Junction area Dust Palliative $500,000 165PendingCeleste Garza bMcDavid Road Warren Rd‐Hidden Valley Rd Dust Palliative $110,000 174UnderwayLindsey Randall aMuleshoe Road Roundup St‐Shiprock St Dust Palliative $20,000 175PendingCeleste Garza bPavement Preservation Program Countywide Pavement Preservation $500,000 187ProgrammedJoe Ortiz aPeters Road Santa Cruz Wash‐Corrales Rd Dust Palliative $252,083 183ProgrammedLindsey Randall bWarren Road Farrell Rd‐McDavid Rd Dust Palliative $220,000 194PendingLindsey Randall a
$1,622,083SUBTOTAL MAINTENANCE
$6,192,083GRAND TOTAL 2017‐2018
District 7 = Multiple districts or countywide
Budget Year 2018‐2019Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Arizona City Safety Study Multiple Intersections Pre‐Construction $100,000 194ProgrammedAngeline To bBaseline Avenue Mohican Rd‐East 980 feet Construction $55,417 205ProgrammedCeleste Garza aCactus Wren Street Mountain View Rd‐Val Vista Rd New Construction $61,700 205ProgrammedCeleste Garza bFlorence‐Kelvin Highway Donnelly Wash‐East 2 miles Construction $800,000 211ProgrammedAngeline To aGantzel Road Chandler Heights Rd Construction $325,000 212, 5ProgrammedCeleste Garza bGermann Road Meridian Rd‐Ironwood Dr New Construction $1,728,590 222ProgrammedCeleste Garza aHohokam Road Paisano Dr‐Quartzite Dr Construction $286,300 221ProgrammedCeleste Garza bLost Dutchman Road Sun Rd‐Prospectors Rd Construction $156,000 235ProgrammedCeleste Garza aSafety Program Countywide Safety $1,000,000 237ProgrammedJohn Kraft b
$4,513,007SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Arica Road Isom Rd‐Trekell Rd Dust Palliative $120,000 244ProgrammedJohn Kraft aBattaglia Drive Chuichu Rd‐Del Rio Rd Pavement Preservation $200,000 243, 4ProgrammedAngeline To bChuichu Road Battaglia Dr‐Interstate 8 Pavement Preservation $2,000,000 253ProgrammedJohn Kraft aDust Abatement Program Countywide Dust Palliative $1,000,000 257ProgrammedJoe Ortiz bFulcar Road Hidden Valley Rd‐Table Top Rd Dust Palliative $240,000 264ProgrammedJohn Kraft aSage Street Barnes Rd‐Miller Rd Dust Palliative $120,000 264ProgrammedJohn Kraft bSotol Road Warren Rd‐Hidden Valley Rd Dust Palliative $150,000 274ProgrammedJohn Kraft aStagecoach Pass Avenue Schnepf Rd‐Ghost Rider St Pre‐Construction $50,000 275UnderwayCeleste Garza b
$3,880,000SUBTOTAL MAINTENANCE
$8,393,007GRAND TOTAL 2018‐2019
District 7 = Multiple districts or countywide
Budget Year 2019‐2020Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Florence‐Kelvin Highway Gardenshire Rd‐Apache Kid Rd Construction $700,000 281ProgrammedAngeline To aGantzel Road Queen Creek (Wash) Pre‐Construction $50,000 282, 5ProgrammedCeleste Garza bHash Knife Draw Road Schnepf Rd‐Sierra Vista Dr Construction $110,000 295ProgrammedCeleste Garza aJackpot Street Skyline Dr‐Rolling Ridge Rd Construction $82,500 295ProgrammedCeleste Garza bRoberts Road Felix Rd‐Joel Rd Construction $38,542 305ProgrammedCeleste Garza aRolling Ridge Road Schnepf Rd‐Sierra Vista Dr Construction $110,000 305ProgrammedCeleste Garza bSafety Program Countywide Safety $1,000,000 317ProgrammedJohn Kraft aSage Brush Avenue Schnepf Rd‐Sierra Vista Dr Construction $110,000 315ProgrammedCeleste Garza bStagecoach Pass Avenue Ghost Rider St‐Sierra Vista Dr Construction $28,333 325ProgrammedCeleste Garza aTombstone Street Skyline Dr‐Rolling Ridge Rd Construction $82,500 325ProgrammedCeleste Garza bVal Vista Road Warren Rd‐Hidden Valley Rd Construction $520,000 334ProgrammedJohn Kraft a
$2,831,875SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Ashmore Street Passmore Rd‐Baldwin Av Dust Palliative $59,000 333, 4ProgrammedJohn Kraft bBoyd Road Roosevelt St‐End of road (Scenic St) Dust Palliative $11,000 345ProgrammedCeleste Garza aCarefree Place State Route 347‐Pepper Pl Dust Palliative $500,000 344ProgrammedJohn Kraft bDolores Place‐Shirley Road Olberg Rd‐Avram Rd Dust Palliative $78,100 352ProgrammedCeleste Garza aDonnaloy Road Wilma Rd‐Brenner Pass Rd Dust Palliative $84,700 352ProgrammedCeleste Garza bDust Abatement Program Countywide Dust Palliative $2,000,000 367ProgrammedJoe Ortiz aMarlow Road Jacob Waltz St‐End of road Dust Palliative $15,958 365ProgrammedCeleste Garza bOlberg Road Arizona Farms Rd‐Brenner Pass Rd Dust Palliative $102,083 372ProgrammedCeleste Garza aPavement Preservation Program Countywide Pavement Preservation $700,000 377ProgrammedJoe Ortiz bPlaza Drive Moon Vista St‐Goldpoppy St Dust Palliative $6,667 385ProgrammedCeleste Garza aReed Road Bartlett Rd‐At wash before Cactus Forest Rd Dust Palliative $91,667 381ProgrammedCeleste Garza bStagecoach Pass Avenue Schnepf Rd‐Ghost Rider St Dust Palliative $250,000 395ProgrammedCeleste Garza aWhirly Bird Road Amarillo Valley Rd‐Ralston Rd Dust Palliative $300,000 394ProgrammedJohn Kraft b
$4,199,175SUBTOTAL MAINTENANCE
$7,031,050GRAND TOTAL 2019‐2020
District 7 = Multiple districts or countywide
Budget Year 2020‐2021Transportation Improvement and Maintenance ProgramIMPROVEMENT
Project Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Bunkhouse Road Veteran's Memorial Blvd‐San Manuel Lodge Reconstruction $50,000 401New ProjectAngeline To aCordones Road Catalina Hills Rd‐Biosphere Rd Pre‐Construction $250,000 404New ProjectAngeline To bHunt Highway (Old) Pioneer Path‐Wildhorse Dr Construction $125,000 412New ProjectCeleste Garza aJudd Road‐Tourmaline Drive Gantzel Rd‐Copper Basin Development Construction $1,250,000 412New ProjectCeleste Garza bKenworthy Road Germann Rd‐Pima Rd Reconstruction $550,000 422New ProjectCeleste Garza aMagma Road Hunt Hwy‐Gary Rd Construction $1,250,000 422New ProjectCeleste Garza bMountain View Road Broadway Av Intersection Construction $250,000 435New ProjectCeleste Garza aOcotillo Road Meridian Rd‐Ironwood Dr Construction $2,500,000 432New ProjectCeleste Garza b
$6,225,000SUBTOTAL IMPROVEMENT
MAINTENANCEProject Location Activity PageDistrictStatus
PROJECT TYPETotal CostArea Engineer
Bowlin Road Hidden Valley Rd‐Stonebluff Rd Dust Palliative $100,000 444New ProjectLindsey Randall aLogan Boulevard Diffin Rd‐Reed Rd Dust Palliative $125,000 441New ProjectCeleste Garza bLouis Johnson Drive Amarillo Valley Rd‐State Route 347 Dust Palliative $250,000 454New ProjectLindsey Randall aMidway Road Beggs Rd‐Marsh Rd Dust Palliative $230,000 453, 4New ProjectLindsey Randall bMount Lemmon Road Campo Benito Rd‐.5 miles south of AZ Zipline Dust Palliative $250,000 461New ProjectAngeline To aRhea Road Brennar Pass Rd‐Donnaloy Road Dust Palliative $30,000 462New ProjectCeleste Garza bRiver Road Redington Rd‐Copper Creek Rd Dust Palliative $200,000 471New ProjectAngeline To aRockcliffe Boulevard Oracle Ranch Rd (West)‐Alice St Dust Palliative $30,000 471New ProjectAngeline To bStonebluff Road Farrell Rd‐Bowlin Rd Dust Palliative $100,000 484New ProjectLindsey Randall aTweedy Road Storey Rd‐Randolph Rd Dust Palliative $250,000 483New ProjectLindsey Randall b
$1,565,000SUBTOTAL MAINTENANCE
$7,790,000GRAND TOTAL 2020‐2021
District 7 = Multiple districts or countywide
Length in Miles
Battaglia Drive Overfield Rd Intersection
Construction/Reconstruction$350,000$0$350,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 4Project Manager Angeline To E‐mail [email protected]
Comments Activity: Culvert for intersection and pavement replacementStatus: From Programmed to Underway. Design is underway (60% complete) with construction scheduled for Summer/Fall 2017.
Status Underway
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
1 a
Length in Miles
Florence‐Kelvin Highway Cochran Rd‐Donnelly Wash
Construction$275,900$0$275,900
ActivityCounty CostNon County Cost
IMPROVEMENT
District 1Project Manager Angeline To E‐mail [email protected]
Comments Activity: Asphalt rock dust palliativeBudget Year: Carryover of $275,900 from 2015‐2016 to 2016‐2017Status: From Pending to Completed. Construction on original project limits, from Adams Wy‐Cochran Rd, completed May 2015. Construction on one mile from Cochran Rd to Donnelly Wash completed Spring 2016.
Status Completed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6511204
3
1 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Gantzel Road (Pathway) Bella Vista Rd‐Poston Butte High School
New Construction$500,000$0$500,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Pathway constructionBudget Year: Carryover of $500,000 from 2015‐2016 to 2016‐2017Status: From Underway to Completed. Construction is subtantially completed as of September 2016. Project constructed in conjunction with the Hunt Highway ‐ Phase III (Gary Rd ‐ Bella Vista Rd) and Gantzel Road ‐ Phase D1 projects.
Status Completed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.8
2 a
Length in Miles
Germann Road Meridian Rd‐Ironwood Dr
Pre‐Construction$13,866$230,258$244,124
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Right‐of‐way acquisition, environmental, design for construction of two‐lane road, and plan review by the Arizona Department of TransportationCounty Cost: $13,866 reflects Pinal County's cost share matchStatus: Design underway and approximately 95% complete and pending review/management by Arizona Department of Transportation. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments.
Status Underway
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6621139
1
2 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Henness Road Val Vista Rd‐Waverly Dr
New Construction$350,000$0$350,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 3Project Manager Lindsey Randall E‐mail [email protected]
Comments Status: Right‐of‐way has been obtained, in‐house design is underway, and construction is scheduled for Summer 2017. Design (at 60%) is anticipated to be completed February 2017.
Status Underway
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
3 a
Length in Miles
Hunt Highway ‐ Phase IV Gary Rd‐Magma Rd
Pre‐Construction$250,000$0$250,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: DesignStatus: From Underway to Completed. Design is 95% completed and is now bond funded. Final design submittal mid‐February 2017. Construction is anticipated June 2017.
Status Completed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
3
3 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Maricopa‐Casa Grande Highway Santa Cruz Wash Crossing
New Construction$2,600,000$0$2,600,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 4Project Manager John Kraft E‐mail [email protected]
Comments Activity: Box culvert constructionCounty Cost: Increased from $2,300,000 to $2,600,000Budget Year: Carryover of $2,600,000 from 2015‐2016 to 2016‐2017Status: From Underway to Completed. Project completed Spring 2016.
Status Completed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6731157
0.5
4 a
Length in Miles
Mitchell Trail Heritage Rd‐Arizona Farms Rd
Pre‐Construction$100,000$0$100,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Right‐of‐way/design for new roadwayBudget Year: Carryover of $100,000 from 2015‐2016 to 2016‐2017Status: Right‐of‐way acquisition is underway but responses are not favorable at this time.
Status Underway
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
4 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Safety Program Countywide
Safety$915,600$0$915,600
ActivityCounty CostNon County Cost
IMPROVEMENT
District 7Project Manager John Kraft E‐mail [email protected]
Comments Activity: Direct funding to the Safety Program (Target Funding: 15%)
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
5 a
Length in Miles
Bronco Lane Valley View Dr south .1 mile
Dust Palliative$30,000$0$30,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Asphalt Rock Dust PalliativeStatus: Asphalt rock dust palliative scheduled Summer 2017.
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
5 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Cattle Tank Road Davis Ranch Rd‐Park Link Dr
Dust Palliative$750,000$0$750,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1, 4Project Manager Angeline To E‐mail [email protected]
Comments Activity: Asphalt rock dust palliativeStatus: Submitted final Environmental Assessment to the Bureau of Land Management. Right‐of‐way acquisition from the Arizona State Land Department is completed. Asphalt rock dust palliative is scheduled Spring 2017. Construction will be in phases starting with Davis Ranch Road to Amber Sunrise Drive.
Status Pending
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
5.5
6 a
Length in Miles
Cattle Tank Road Davis Ranch Rd‐Park Link Dr
Pre‐Construction$90,000$0$90,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1, 4Project Manager Angeline To E‐mail [email protected]
Comments Activity: Environmental and right‐of‐way for Asphalt Rock Dust PalliativeStatus: Submitted final Environmental Assessment to the Bureau of Land Management. Right‐of‐way acquisition from the Arizona State Land Department is completed. Asphalt rock dust palliative is scheduled Spring 2017. Construction will be in phases starting with Davis Ranch Road to Amber Sunrise Drive.Project Numbers: 6511213 (environmental clearance), 6511214 (right‐of‐way acquisition)
Status Underway
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6511213
5.5
6 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Christensen Road‐Bartlett Road Martin Rd‐5th St
Dust Palliative$180,000$0$180,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Celeste Garza E‐mail [email protected]
Comments Status: From Pending to Completed. Asphalt rock dust palliative completed August 2016. Comment: Project is a joint effort with the City of Coolidge.
Status Completed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
7 a
Length in Miles
Estancia Drive Davis Ranch Rd‐Hedgehog Tr
Dust Palliative$100,000$0$100,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Angeline To E‐mail [email protected]
Comments Status: From Programmed to Pending. Asphalt rock dust palliative scheduled for Summer 2017.
Status Pending
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1.1
7 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Harmon Road Toltec Hwy‐Tweedy Rd
Dust Palliative$235,000$125,000$360,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Angeline To E‐mail [email protected]
Comments County Cost: From $360,000 to $235,000Non County Cost: From $0 to $125,000Status: Cost share agreement with dairy owner pending approval by the Board of Supervisors 2/15/17. Construction scheduled for Summer 2017.
Status Pending
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
8 a
Length in Miles
Huisatch Road Garnet Rd‐Amarillo Valley Rd
Dust Palliative$175,000$0$175,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
Comments Status: Asphalt rock dust palliative is scheduled Fall 2017
Status Pending
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
8 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
La Barranca Road Sage St‐Hidden Valley Rd
Dust Palliative$100,000$0$100,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
Comments Status: From Pending to Completed. Asphalt rock dust palliative was completed August 2016.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
9 a
Length in Miles
La Palma Road State Route 287‐.25 north of Kleck Rd
Dust Palliative$150,000$0$150,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Lindsey Randall E‐mail [email protected]
Comments Status: From Programmed to Pending. Asphalt rock dust palliative is scheduled Fall 2017.Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]
Status Pending
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2.25
9 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Maverick Circle Mohican Rd west .1 mile
Dust Palliative$30,000$0$30,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Asphalt rock dust palliativeStatus: Asphalt rock dust palliative scheduled Summer 2017.
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
10 a
Length in Miles
Pavement Preservation Program Countywide
Pavement Preservation$84,400$0$84,400
ActivityCounty CostNon County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E‐mail [email protected]
Comments Activity: Direct funding to the Pavement Preservation ProgramCounty Cost: Additional allocation as recommended by the Transportation Advisory Committee (total direct funding $1,000,000.00)
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
10 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Pavement Preservation Program Countywide
Pavement Preservation$915,600$0$915,600
ActivityCounty CostNon County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E‐mail [email protected]
Comments Activity: Direct funding to the Pavement Preservation Program (Target Funding: 15%)
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
11 a
Length in Miles
Ralston Road Wildcat Ln‐Dune Shadow Rd
Dust Palliative$200,000$0$200,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
Comments Status: From Underway to Completed. Asphalt rock dust palliative completed Spring 2016.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1.75
11 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Redington Road Veterans Memorial Blvd‐Pima County Line
Dust Palliative$665,000$0$665,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Angeline To E‐mail [email protected]
Comments Activity: Asphalt rock dust palliativeStatus: Dust palliative on Redington Road from Veterans Memorial Blvd to River Rd completed September 2015. Environmental study completed on Redington Road from River Rd to Pinal‐Pima County boundary September 2016 with completion of asphalt rock dust palliative anticipated April 2017.
Status Underway
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
8
12 a
Length in Miles
Sixshooter Road Jacob Waltz St north .1 mile
Dust Palliative$30,000$0$30,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Status: Asphalt rock dust palliative scheduled Summer 2017.
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
12 b
Budget Year 2016‐2017 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Wildwood Road Warren Rd‐Amarillo Valley Rd
Dust Palliative$400,000$0$400,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
Comments Budget Year: Carryover of $400,000 from 2015‐2016 to 2016‐2017Status: From Underway to Completed. Asphalt rock dust palliative completed Spring 2016.
Status Completed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
3
13 a
Length in Miles
Curry Road State Route 287‐Storey Rd
Construction$110,000$0$110,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 3Project Manager Lindsey Randall E‐mail [email protected]
Comments Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
13 b
Budget Year 2017‐2018
Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Budget Year 2016-2017
Length in Miles
McCartney Road Interstate 10‐Evans Rd
Reconstruction$3,500,000$0$3,500,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 1, 3Project Manager Lindsey Randall E‐mail [email protected]
Comments Activity: Installation of culverts at dip crossings. Budget Year: Carryover of $1,500,000 from 2016‐2017 to 2017‐2018County Cost: Increased from $2,000,000 to $3,500,000 to consolidate 2 programmed projects.Status: From Pending to Underway. Design is underway (90% completed) with construction anticipated Fall 2017.
Status Underway
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
3.1
14 a
Length in Miles
Safety Program Countywide
Safety$500,000$0$500,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 7Project Manager John Kraft E‐mail [email protected]
Comments Activity: Direct funding to the Safety Program (Target Funding: 10%)
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
14 b
Budget Year 2017‐2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Sunland Gin Road Battaglia Dr Intersection
Safety$350,000$0$350,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 4Project Manager Angeline To E‐mail [email protected]
Comments Activity: Westbound Turn laneBudget Year: Advanced from 2019‐2020 to 2017‐2018
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 19118
0
15 a
Length in Miles
Tweedy Road State Route 287‐Storey Rd
Construction$110,000$0$110,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 3Project Manager Lindsey Randall E‐mail [email protected]
Comments Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
15 b
Budget Year 2017‐2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Cactus Road Kaniksu St (north)‐Frontier St
Dust Palliative$20,000$0$20,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Status: From Programmed to Pending. Asphalt rock dust palliative scheduled Summer 2018
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
16 a
Length in Miles
Dust Abatement Program Apache Junction area
Dust Palliative$500,000$0$500,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Area Engineer's discretionary project(s) to address fugitive dust (Particulate Matter 10) in Pinal County's Non‐Attainment area (T1N, R8E)Status: From Programmed to Pending. Asphalt rock dust palliatives scheduled Summer 2018
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
16 b
Budget Year 2017‐2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
McDavid Road Warren Rd‐Hidden Valley Rd
Dust Palliative$110,000$0$110,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
Comments Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]: From Programmed to Underway. Project is underway and may be completed Budget Year 2016‐2017.
Status Underway
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
17 a
Length in Miles
Muleshoe Road Roundup St‐Shiprock St
Dust Palliative$20,000$0$20,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Status: From Programmed to Pending. Asphalt rock dust palliative scheduled Summer 2018
Status Pending
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.1
17 b
Budget Year 2017‐2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Pavement Preservation Program Countywide
Pavement Preservation$500,000$0$500,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E‐mail [email protected]
Comments Activity: Direct funding to the Pavement Preservation Program (Target Funding: 10%)
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
18 a
Length in Miles
Peters Road Santa Cruz Wash‐Corrales Rd
Dust Palliative$252,083$0$252,083
ActivityCounty CostNon County Cost
MAINTENANCE
District 3Project Manager Lindsey Randall E‐mail [email protected]
Comments Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]
Status Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1.6
18 b
Budget Year 2017‐2018 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Warren Road Farrell Rd‐McDavid Rd
Dust Palliative$220,000$0$220,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
Comments Status: From Programmed to Pending. Dust palliative programmed for Summer 2018.Project Manager: From John Kraft to Lindsey RandallEmail: From [email protected] to [email protected]
Status Pending
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
19 a
Length in Miles
Arizona City Safety Study Multiple Intersections
Pre‐Construction$100,000$0$100,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 4Project Manager Angeline To E‐mail [email protected]
Comments Location: Battaglia Drive from Sunland Gin Road to Overfield Road, Battaglia Drive from Chuichu Road to Del Rio Road, Lamb Road from Battaglia Drive to Milligan Road, Milligan Road from Sunland Gin Road Overfield Road, Overfield Road from Battaglia Drive to Milligan Road, and Sunland Gin Road from Battaglia Drive to Milligan Road
Status Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
19 b
Budget Year 2018‐2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Budget Year 2017-2018
Length in Miles
Baseline Avenue Mohican Rd‐East 980 feet
Construction$55,417$0$55,417
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.19
20 a
Length in Miles
Cactus Wren Street Mountain View Rd‐Val Vista Rd
New Construction$61,700$0$61,700
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.22
20 b
Budget Year 2018‐2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Florence‐Kelvin Highway Donnelly Wash‐East 2 miles
Construction$800,000$0$800,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 1Project Manager Angeline To E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Riverside
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
21 a
Length in Miles
Gantzel Road Chandler Heights Rd
Construction$325,000$0$325,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2, 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
21 b
Budget Year 2018‐2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Germann Road Meridian Rd‐Ironwood Dr
New Construction$98,530$1,630,060$1,728,590
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Construction of two‐lane roadBudget Year: Carryover from 2014‐2015 to 2018‐2019County Cost: $98,530 reflects Pinal County's cost share matchStatus: Design underway and approximately 95% complete. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments.
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 6621139
1
22 a
Length in Miles
Hohokam Road Paisano Dr‐Quartzite Dr
Construction$286,300$0$286,300
ActivityCounty CostNon County Cost
IMPROVEMENT
District 1Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.33
22 b
Budget Year 2018‐2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Lost Dutchman Road Sun Rd‐Prospectors Rd
Construction$156,000$0$156,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.6
23 a
Length in Miles
Safety Program Countywide
Safety$1,000,000$0$1,000,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 7Project Manager John Kraft E‐mail [email protected]
Comments Activity: Direct funding to the Roadway Safety Program
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
23 b
Budget Year 2018‐2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Arica Road Isom Rd‐Trekell Rd
Dust Palliative$120,000$0$120,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager John Kraft E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
24 a
Length in Miles
Battaglia Drive Chuichu Rd‐Del Rio Rd
Pavement Preservation$200,000$0$200,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 3, 4Project Manager Angeline To E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
4.5
24 b
Budget Year 2018‐2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Chuichu Road Battaglia Dr‐Interstate 8
Pavement Preservation$2,000,000$0$2,000,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 3Project Manager John Kraft E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Arizona City
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
4.3
25 a
Length in Miles
Dust Abatement Program Countywide
Dust Palliative$1,000,000$0$1,000,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E‐mail [email protected]
Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non‐Attainment areas
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
25 b
Budget Year 2018‐2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Fulcar Road Hidden Valley Rd‐Table Top Rd
Dust Palliative$240,000$0$240,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager John Kraft E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
2
26 a
Length in Miles
Sage Street Barnes Rd‐Miller Rd
Dust Palliative$120,000$0$120,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager John Kraft E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
26 b
Budget Year 2018‐2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Sotol Road Warren Rd‐Hidden Valley Rd
Dust Palliative$150,000$0$150,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager John Kraft E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
1
27 a
Length in Miles
Stagecoach Pass Avenue Schnepf Rd‐Ghost Rider St
Pre‐Construction$50,000$0$50,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Project: Stagecoach Pass Av‐Ghost Rider Street to Stagecoach Pass AvenueActivity: In‐house design and right‐of‐way design. Budget Year: Carryover from 2014‐2015 to 2018‐2019Status: Design underway with construction anticipated in Budget Year 2019‐2020. Right‐of‐way acquisition underway but responses are not favorable.
Status Underway
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.8
27 b
Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Florence‐Kelvin Highway Gardenshire Rd‐Apache Kid Rd
Construction$700,000$0$700,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 1Project Manager Angeline To E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Riverside
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 3030
3
28 a
Length in Miles
Gantzel Road Queen Creek (Wash)
Pre‐Construction$50,000$0$50,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2, 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 4010
0.07
28 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Hash Knife Draw Road Schnepf Rd‐Sierra Vista Dr
Construction$110,000$0$110,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 8125
1
29 a
Length in Miles
Jackpot Street Skyline Dr‐Rolling Ridge Rd
Construction$82,500$0$82,500
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 10116
0.75
29 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Roberts Road Felix Rd‐Joel Rd
Construction$38,542$0$38,542
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 15035
0.35
30 a
Length in Miles
Rolling Ridge Road Schnepf Rd‐Sierra Vista Dr
Construction$110,000$0$110,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 16114
1
30 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Safety Program Countywide
Safety$1,000,000$0$1,000,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 7Project Manager John Kraft E‐mail [email protected]
Comments Activity: Direct funding to the Roadway Safety Program
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
31 a
Length in Miles
Sage Brush Avenue Schnepf Rd‐Sierra Vista Dr
Construction$110,000$0$110,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 17126
1
31 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Stagecoach Pass Avenue Ghost Rider St‐Sierra Vista Dr
Construction$28,333$0$28,333
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 18127
1
32 a
Length in Miles
Tombstone Street Skyline Dr‐Rolling Ridge Rd
Construction$82,500$0$82,500
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 20115
0.75
32 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Val Vista Road Warren Rd‐Hidden Valley Rd
Construction$520,000$0$520,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 4Project Manager John Kraft E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 22036
1
33 a
Length in Miles
Ashmore Street Passmore Rd‐Baldwin Av
Dust Palliative$59,000$0$59,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 3, 4Project Manager John Kraft E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 23022
0.5
33 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Boyd Road Roosevelt St‐End of road (Scenic St)
Dust Palliative$11,000$0$11,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 25015
0.1
34 a
Length in Miles
Carefree Place State Route 347‐Pepper Pl
Dust Palliative$500,000$0$500,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager John Kraft E‐mail [email protected]
Comments Activity: Dust palliative includes 4.1 miles of the following roadways: Carefree Place, Reitz Ranch Road, Padilla Road, Clayton Road, and Lopez Road.
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 27124
4.1
34 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Dolores Place‐Shirley Road Olberg Rd‐Avram Rd
Dust Palliative$78,100$0$78,100
ActivityCounty CostNon County Cost
MAINTENANCE
District 2Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 28121
0.71
35 a
Length in Miles
Donnaloy Road Wilma Rd‐Brenner Pass Rd
Dust Palliative$84,700$0$84,700
ActivityCounty CostNon County Cost
MAINTENANCE
District 2Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 29120
0.77
35 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Dust Abatement Program Countywide
Dust Palliative$2,000,000$0$2,000,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E‐mail [email protected]
Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non‐Attainment areas
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
36 a
Length in Miles
Marlow Road Jacob Waltz St‐End of road
Dust Palliative$15,958$0$15,958
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected] v
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 30012
0.15
36 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Olberg Road Arizona Farms Rd‐Brenner Pass Rd
Dust Palliative$102,083$0$102,083
ActivityCounty CostNon County Cost
MAINTENANCE
District 2Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 31119
0.93
37 a
Length in Miles
Pavement Preservation Program Countywide
Pavement Preservation$700,000$0$700,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 7Project Manager Joe Ortiz E‐mail [email protected]
Comments Activity: Direct funding to the Pavement Preservation Program
Status Programmed
Maintenance Area Multiple
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0
37 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Plaza Drive Moon Vista St‐Goldpoppy St
Dust Palliative$6,667$0$6,667
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 32016
0.06
38 a
Length in Miles
Reed Road Bartlett Rd‐At wash before Cactus Forest Rd
Dust Palliative$91,667$0$91,667
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Celeste Garza E‐mail [email protected]
CommentsStatus Programmed
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 35029
0.74
38 b
Budget Year 2019‐2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Stagecoach Pass Avenue Schnepf Rd‐Ghost Rider St
Dust Palliative$250,000$0$250,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Asphalt rock dust palliativeBudget Year: Carryover from 2015‐2016 to 2019‐2020Status: Right‐of‐way acquisitions are underway but responses are not favorable. Joint use agreement from crossing over the New Magma Irrigation is currently being processed
Status Programmed
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.75
39 a
Length in Miles
Whirly Bird Road Amarillo Valley Rd‐Ralston Rd
Dust Palliative$300,000$0$300,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager John Kraft E‐mail [email protected]
Comments Activity: Dust palliative includes Whirly Bird Road from Amarillo Valley Rd to Ralston Rd and Garnet Road from Whirly Bird Rd to Century Rd
Status Programmed
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 36008
3
39 b
Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Bunkhouse Road Veteran's Memorial Blvd‐San Manuel Lodge
Reconstruction$50,000$0$50,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 1Project Manager Angeline To E‐mail [email protected]
Comments Activity: Resize culvert to driveway and reconstruct roadway for proper drainage
Status New Project
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 134
0.2
40 a
Length in Miles
Cordones Road Catalina Hills Rd‐Biosphere Rd
Pre‐Construction$250,000$0$250,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 4Project Manager Angeline To E‐mail [email protected]
Comments Activity: Design Concept Report for new roadway
Status New Project
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 156
3.5
40 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Hunt Highway (Old) Pioneer Path‐Wildhorse Dr
Construction$125,000$0$125,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Concrete ford crossing
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 181
0
41 a
Length in Miles
Judd Road‐Tourmaline Drive Gantzel Rd‐Copper Basin Development
Construction$1,250,000$0$1,250,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Construction of new road on Judd Road alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years.
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 176
1.5
41 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Kenworthy Road Germann Rd‐Pima Rd
Reconstruction$550,000$0$550,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Rehabilitation
Status New Project
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 178
1
42 a
Length in Miles
Magma Road Hunt Hwy‐Gary Rd
Construction$1,250,000$0$1,250,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Continuation of improvements on alignment
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1420144
1
42 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Mountain View Road Broadway Av Intersection
Construction$250,000$0$250,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 5Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Intersection reconstruction and culvert installation
Status New Project
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 179
0
43 a
Length in Miles
Ocotillo Road Meridian Rd‐Ironwood Dr
Construction$2,500,000$0$2,500,000
ActivityCounty CostNon County Cost
IMPROVEMENT
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Roadway widening
Status New Project
Maintenance Area Apache Junction
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 177
1
43 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Bowlin Road Hidden Valley Rd‐Stonebluff Rd
Dust Palliative$100,000$0$100,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
CommentsStatus New Project
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.6
44 a
Length in Miles
Logan Boulevard Diffin Rd‐Reed Rd
Dust Palliative$125,000$0$125,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Celeste Garza E‐mail [email protected]
Comments Activity: Dust palliative is contingent on receiving right‐of‐way donations
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 147
1
44 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Louis Johnson Drive Amarillo Valley Rd‐State Route 347
Dust Palliative$250,000$0$250,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
CommentsStatus New Project
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 137
2
45 a
Length in Miles
Midway Road Beggs Rd‐Marsh Rd
Dust Palliative$230,000$0$230,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 3, 4Project Manager Lindsey Randall E‐mail [email protected]
CommentsStatus New Project
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 130
2
45 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Mount Lemmon Road Campo Benito Rd‐.5 miles south of AZ Zipline
Dust Palliative$250,000$0$250,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Angeline To E‐mail [email protected]
Comments Activity: Continuation of asphalt rock dust palliative and cutoff walls at wash crossings
Status New Project
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 141
2
46 a
Length in Miles
Rhea Road Brennar Pass Rd‐Donnaloy Road
Dust Palliative$30,000$0$30,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 2Project Manager Celeste Garza E‐mail [email protected]
Comments Status: Dust palliative may be completed in conjunction with the Donnaloy Road project that is programmed in Budget Year 2019‐2020.
Status New Project
Maintenance Area San Tan
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number
0.3
46 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
River Road Redington Rd‐Copper Creek Rd
Dust Palliative$200,000$0$200,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Angeline To E‐mail [email protected]
Comments Status: Dust palliative is contigent on receiving right‐of‐way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,000 will be programmed annually for 4 years.
Status New Project
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 191
8
47 a
Length in Miles
Rockcliffe Boulevard Oracle Ranch Rd (West)‐Alice St
Dust Palliative$30,000$0$30,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 1Project Manager Angeline To E‐mail [email protected]
Comments Comments: Dust palliative is contigent on receiving right‐of‐way donations
Status New Project
Maintenance Area Oracle
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 132
0.25
47 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
Length in Miles
Stonebluff Road Farrell Rd‐Bowlin Rd
Dust Palliative$100,000$0$100,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 4Project Manager Lindsey Randall E‐mail [email protected]
CommentsStatus New Project
Maintenance Area Hidden Valley
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 149
1
48 a
Length in Miles
Tweedy Road Storey Rd‐Randolph Rd
Dust Palliative$250,000$0$250,000
ActivityCounty CostNon County Cost
MAINTENANCE
District 3Project Manager Lindsey Randall E‐mail [email protected]
Comments Comments: Carmichael Road to Randolph Road is located within the City of Coolidge
Status New Project
Maintenance Area Casa Grande
Transportation Excise TaxFunding SourcePROJECT TYPE
Total Cost
Project Number 1400188
2
48 b
Budget Year 2020‐2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132
520‐866‐6411 (telephone)520‐866‐6511 (fax)
41b
2b & 22a
3b
5b
7a
10a
12b16a
17b
12a6a & 6b
1a
7b
8a
18b
21b
20b
20a
22b
23a
27b &39a
9b
3a
14a
8b
9a17a
19a
13b48b
21a
19b & 24b
28a
15a
Mesa
Tempe
Chandler
Gilbert
Queen Creek
Five-Year Transportation Improvement & Maintenance Project Map
19b
32a
Tonto National Forest
San Carlos Apache Tribe
38a36b
34a
42a43b
28b 31b29a30b
29b 32b41a
42b
30a
35b
37a
35a46b
38b44b
19b & 24b19b
47a
47b
46a
40b
40a
26a 33a
26b
27a
45b 25a
33b
24a
45a
39b 34b
48a 44a
15b
4b
43a
District 3;
District 4;
;District 2
;District 5
District 1;
WINKELMANHAYDEN
SUPERIOR
KEARNY
APACHE JUNCTION
MAMMOTH
COOLIDGEMARICOPA
FLORENCE
CASA GRANDE
ELOY
HUNT HWY
§̈¦10rx187
£¤60
rx287
rx88
rx587
rx387
rx238
rx287rx84
rx347
rx87
rx177
rx79
rx77§̈¦8
§̈¦10
MARICOPA-CASA GRANDE HWY
PARK LINK DR
Ak-Chin Indian Res.
Gila River Indian Res.
Tohono Indian Res.
FLOREN CE-KELV
INHW
Y
rx347
rx87
£¤60
rx79
Ironwood Forest National Monument
PINAL COUNTYPIMA COUNTY
PINAL
COUN
TYGR
AHAM
COUN
TY
GILA COUNTY
PINAL COUNTY
MARICOPA COUNTYPINAL COUNTY
PINAL COUNTYMARICOPA COUNTY
PINAL
COUN
TY
I-10
I-8
HIGHWAY 79
UNION PACIFIC RAILROAD
HIGHWAY 77
COPPER BASIN RR
CAMINO RIO
FREEMAN RD
SMARRCO RR
HIGHWAY 87
HIGHWAY 84
CHUICHU RD
US HIGHWAY 60
RIVER RD
PARK LINK DRPIPELINE RD
PECA
N R
DCAMINO ADELANTE
FLORENCE-KELVIN HWY
PEAK LN
SASCO RD
ELLIS RDSUNL
AND
GIN
RD
96 RANCH RD
SMITH
RD
PRICE RD
PETERS RDRUSS
ELL
RD
HUNT HWY
TOLT
EC H
WY
BARKERVILLE RD
PINAL
AVE
BURR
IS R
D
WHITE
AND
PARK
ER R
D
JOHN
WAY
NE P
KWY
BIANC
O R
D
MURP
HY R
D
ARAVAIPA RD
SACATON RD
LAMB
RD
CLAYTON RD
MIDW
AY R
D
HIGHWAY 238 MOBILE RD
CURTIS RD
COCHRAN RDPIC
ACHO
HWY
HIGHW
AY 34
7
FELIX RD
COX
RD
ROMERO RD
CASA BLANCA RD
KLECK RD
GREE
N R
D
BUNKER HILL RD
CURR
Y RD
WEBB RD
OCOTILLO RD
BARNES RD
PRETZER RD
EDWIN RD
KORTSEN RD
CAMPO BONITO RD
TWEE
DY R
D
GREENE RESERVOIR RD
SAND
MAN R
D
CALLE ZAPATA
CORNMAN RD
BARTLETT RD
BIA00
7
HIGHWAY 287
SELMA HWY
REDINGTON RD
HARMON RD
MILLIGAN RD
HONEYCUTT RD
VAL VISTA BLVD
GUILD RD
HANNA RD
MT LEMMON RD
BEGGS RD
DEEP WELL RANCH RD
MARI
COPA
RD
ST PETERS MISSION RD
SHAY RDNUTT RD
COWBOY MILLER RD
HACKBERRY WASH RD
CATT
LE TA
NK R
D
UNKNOWN
TREK
ELL
RD
HEWITT STATION RD
SARGENT RD
VAIL
RD
CLEM
ANS
RD
BAUMGARTNER RD
PARK
ER W
ASH
RD
FUQU
A RD
SMITH-ENKE RD
OVER
FIELD
RD
COTTONWOOD CANYON RD
FARRELL RD
AJAX MINE TRL
STEELE RDEARLEY RD
HOUSER RD
BRAD
Y PUM
P RD
WILLOW SPRINGS DR
LA OSA RANCH RD APENA RD
PALMER RD
WHITL
OW R
ANCH
RD
TEEL RD
POWERLINE RD
ANGEL DR
DELLA RD
WILL
Y RD
SUFFERING GULCH RD
BAR RD
TEPEE ST
BATTAGLIA DR
CONNELLEY RD
TOLT
EC BU
TTES
RD
NONA RD
SUNS
HINE
BLV
D
SILVER KING RD
PHILLIPS RD
AGUIRRE LN
NORM
A RD
MILLER RD
MARSH RDARICA RD
HOPI DR
MT LEMMON HWY
ORVILLE ST
CARPENTER RANCH RD
BATT
LE AX
E RD
CERR
O R
D
WINDSOR RD
LINDA VISTA RD
DOZER DR
LA PA
Z RD
CARRANZA RD
ACOMA ST
P Z R
ANCH
RD
MONT
GOME
RY R
D
PROJECT DR
BIA08
5
AVAL
ON S
T
DUDLEYVILLE RD
MILLRISE RDJEAN DR
ALLE
N'S PE
AK R
D
MERI
DIAN
DR
ROBSON CIRMARE
Z DR
LACERTA
LN
KIVA RD
I-10 ON 200
REYMERT RD
GUARDIA DR
LOXIA DR
JOES WAY
TRONA DR
PAWI DR
RUBEN DR
NUBE ST
HILLER RD
EAST
VIEW
RD
PEPP
ER P
L
CART
ER L
N
BOWLIN RD
SLOA
NE R
D
ATTA
WAY
RD
UNKNOWN
I-10
MILLER RD
PIPELINE RD
EDWIN RD
BIA00
7
PHILLIPS RD
PIPELINE RD
I-8
UNION PACIFIC RAILROAD
HIGH
WAY 7
9
UNKNOWN
CURTIS RD
SHAY RD
AGUIR
RE L
NPIP
ELINE
RD
Coconino
Pima
Mohave
Gila
Pinal
Yavapai
Maricopa
Yuma
Cochise
La Paz
Graham
ApacheNavajo
Greenlee
Santa Cruz
Page & Map ID Project Location Activity Status District1a Battaglia Drive Overfield Rd Intersection Construction/Reconstruction Underway 41b Florence-Kelvin Highway *Cochran Rd-Donnelly Wash Construction Completed 12a Gantzel Road (Pathway) *Bella Vista Rd-Poston Butte High School New Construction Completed 22b Germann Road Meridian Rd-Ironwood Dr Pre-Construction Underway 23b Hunt Highway - Phase IV *Gary Rd-Magma Rd Pre-Construction Completed 24b Mitchell Trail Heritage Rd-Arizona Farms Rd Pre-Construction Underway 24a Maricopa-Casa Grande Highway *Santa Cruz Wash Crossing New Construction Completed 43a Henness Road Val Vista Rd-Waverly Dr New Construction Underway 35a Safety Program *Countywide Safety Programmed 7
Page & Map ID Project Location Activity Status District6a Cattle Tank Road Davis Ranch Rd-Park Link Dr Pre-Construction Underway 1, 46b Cattle Tank Road Davis Ranch Rd-Park Link Dr Dust Palliative Pending 1, 47b Estancia Drive Davis Ranch Rd-Hedgehog Tr Dust Palliative Pending 48a Harmon Road Toltec Hwy-Tweedy Rd Dust Palliative Pending 112a Redington Road Veterans Memorial Blvd-Pima County Line Dust Palliative Underway 15b Bronco Lane Valley View Dr south .1 mile Dust Palliative Pending 57a Christensen Road-Bartlett Road *Martin Rd-5th St Dust Palliative Completed 110a Maverick Circle Mohican Rd west .1 mile Dust Palliative Pending 512b Sixshooter Road Jacob Waltz St north .1 mile Dust Palliative Pending 58b Huisatch Road Garnet Rd-Amarillo Valley Rd Dust Palliative Pending 49a La Barranca Road Sage St-Hidden Valley Rd Dust Palliative Completed 49b La Palma Road State Route 287-.25 north of Kleck Rd Dust Palliative Pending 1
11b Ralston Road *Wildcat Ln-Dune Shadow Rd Dust Palliative Completed 413a Wildwood Road *Warren Rd-Amarillo Valley Rd Dust Palliative Completed 410b Pavement Preservation Program *Countywide Pavement Preservation Programmed 711a Pavement Preservation Program *Countywide Pavement Preservation Programmed 7
Transportation Maintenance Projects
Transportation Improvement Projects Budget Year 2016 - 2017
Page & Map ID Project Location Activity Status District15a Sunland Gin Road Battaglia Dr Intersection Safety Programmed 413b Curry Road State Route 287-Storey Rd Construction Programmed 314a McCartney Road Interstate 10-Evans Rd Reconstruction Underway 1, 315b Tweedy Road State Route 287-Storey Rd Construction Programmed 314b Safety Program *Countywide Safety Programmed 7
Page & Map ID Project Location Activity Status District16a Cactus Road Kaniksu St (north)-Frontier St Dust Palliative Pending 516b Dust Abatement Program *Apache Junction area Dust Palliative Pending 517b Muleshoe Road Roundup St-Shiprock St Dust Palliative Pending 517a McDavid Road Warren Rd-Hidden Valley Rd Dust Palliative Underway 418b Peters Road Santa Cruz Wash-Corrales Rd Dust Palliative Programmed 319a Warren Road Farrell Rd-McDavid Rd Dust Palliative Pending 418a Pavement Preservation Program *Countywide Pavement Preservation Programmed 7
Transportation Maintenance Projects
Transportation Improvement Projects Budget Year 2017 - 2018
Page & Map ID Project Location Activity Status District19b Arizona City Safety Study Multiple Intersections Pre-Construction Programmed 421a Florence-Kelvin Highway Donnelly Wash-East 2 miles Construction Programmed 120a Baseline Avenue Mohican Rd-East 980 feet Construction Programmed 520b Cactus Wren Street Mountain View Rd-Val Vista Rd New Construction Programmed 521b Gantzel Road Chandler Heights Rd Construction Programmed 2, 522a Germann Road Meridian Rd-Ironwood Dr New Construction Programmed 222b Hohokam Road Paisano Dr-Quartzite Dr Construction Programmed 123a Lost Dutchman Road Sun Rd-Prospectors Rd Construction Programmed 523b Safety Program *Countywide Safety Programmed 7
Page & Map ID Project Location Activity Status District24b Battaglia Drive Chuichu Rd-Del Rio Rd Pavement Preservation Programmed 3, 427b Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Pre-Construction Underway 524a Arica Road Isom Rd-Trekell Rd Dust Palliative Programmed 425a Chuichu Road Battaglia Dr-Interstate 8 Pavement Preservation Programmed 326a Fulcar Road Hidden Valley Rd-Table Top Rd Dust Palliative Programmed 426b Sage Street Barnes Rd-Miller Rd Dust Palliative Programmed 427a Sotol Road Warren Rd-Hidden Valley Rd Dust Palliative Programmed 425b Dust Abatement Program *Countywide Dust Palliative Programmed 7
Transportation Maintenance Projects
Transportation Improvement Projects Budget Year 2018 - 2019
Page & Map ID Project Location Activity Status District28a Florence-Kelvin Highway Gardenshire Rd-Apache Kid Rd Construction Programmed 128b Gantzel Road Queen Creek (Wash) Pre-Construction Programmed 2, 529a Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr Construction Programmed 529b Jackpot Street Skyline Dr-Rolling Ridge Rd Construction Programmed 530a Roberts Road Felix Rd-Joel Rd Construction Programmed 530b Rolling Ridge Road Schnepf Rd-Sierra Vista Dr Construction Programmed 531b Sage Brush Avenue Schnepf Rd-Sierra Vista Dr Construction Programmed 532a Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr Construction Programmed 532b Tombstone Street Skyline Dr-Rolling Ridge Rd Construction Programmed 533a Val Vista Road Warren Rd-Hidden Valley Rd Construction Programmed 431a Safety Program *Countywide Safety Programmed 7
Page & Map ID Project Location Activity Status District34a Boyd Road Roosevelt St-End of road (Scenic St) Dust Palliative Programmed 535b Donnaloy Road Wilma Rd-Brenner Pass Rd Dust Palliative Programmed 235a Dolores Place-Shirley Road Olberg Rd-Avram Rd Dust Palliative Programmed 236b Marlow Road Jacob Waltz St-End of road Dust Palliative Programmed 537a Olberg Road Arizona Farms Rd-Brenner Pass Rd Dust Palliative Programmed 238a Plaza Drive Moon Vista St-Goldpoppy St Dust Palliative Programmed 538b Reed Road Bartlett Rd-At wash before Cactus Forest Rd Dust Palliative Programmed 139a Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Dust Palliative Programmed 533b Ashmore Street Passmore Rd-Baldwin Av Dust Palliative Programmed 3, 434b Carefree Place State Route 347-Pepper Pl Dust Palliative Programmed 439b Whirly Bird Road Amarillo Valley Rd-Ralston Rd Dust Palliative Programmed 436a Dust Abatement Program *Countywide Dust Palliative Programmed 737b Pavement Preservation Program *Countywide Pavement Preservation Programmed 7
Transportation Maintenance Projects
Transportation Improvement Projects Budget Year 2019 - 2020
Page & Map ID Project Location Activity Status District40a Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge Reconstruction New Project 140b Cordones Road Catalina Hills Rd-Biosphere Rd Pre-Construction New Project 441a Hunt Highway (Old) Pioneer Path-Wildhorse Dr Construction New Project 241b Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction New Project 242a Kenworthy Road Germann Rd-Pima Rd Reconstruction New Project 242b Magma Road Hunt Hwy-Gary Rd Construction New Project 243a Mountain View Road Broadway Av Intersection Construction New Project 543b Ocotillo Road Meridian Rd-Ironwood Dr Construction New Project 2
Page & Map ID Project Location Activity Status District46a Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline Dust Palliative New Project 147a River Road Redington Rd-Copper Creek Rd Dust Palliative New Project 147b Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St Dust Palliative New Project 144b Logan Boulevard Diffin Rd-Reed Rd Dust Palliative New Project 146b Rhea Road Brennar Pass Rd-Donnaloy Road Dust Palliative New Project 244a Bowlin Road Hidden Valley Rd-Stonebluff Rd Dust Palliative New Project 445a Louis Johnson Drive Amarillo Valley Rd-State Route 347 Dust Palliative New Project 445b Midway Road Beggs Rd-Marsh Rd Dust Palliative New Project 3, 448a Stonebluff Road Farrell Rd-Bowlin Rd Dust Palliative New Project 448b Tweedy Road Storey Rd-Randolph Rd Dust Palliative New Project 3
Transportation Maintenance Projects
Transportation Improvement Projects Budget Year 2020 - 2021
LegendEngineer Areas
Angeline To
Celeste Garza
Lindsey Randall
Area 1 Projects
Area 2 Projects
Area 3 Projects
Improvement and Maintenance ProjectsProject Time Frame : 2016-2021
PINAL COUNTY Public WorksArizona
Incorporated Cities
Tribal Communities
Tonto National Forest
Supervisor Districts
µ
* Not Represented On Map