2017 Federal Transportation Improvement Program Los Angeles County Local Highway Including Amendment 1-2 and 4-6 (In $000`s) ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment LA0G610 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0 Description: PTC 1,000 Agency AGOURA HILLS The Kanan Road/Agoura Road Ultimate Intersection Improvements Project design consists of designing a signalized intersection that would improve circulation, reduce delays, facilitate large truck movements, reduce conflict points and be located and constructed within an area close in proximity to a freeway interchange and bordered on the north side by built-out and fully improved land. The Kanan Road/Agoura Road Ultimate Intersection Improvements Project was the former Roundabout project. Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total MEASURE R 20H - HIGHWAY CAPITAL 750 250 1,000 500 500 1,000 LA0G610 Total 750 250 1,000 500 500 1,000 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment LAF7600 Los Angeles SCAB 1O1008 NCR10 L EXEMPT - 93.126 0 Description: PTC 1,028 Agency ALHAMBRA ALHAMBRA PEDESTRIAN IMPROVEMENT/WALKING VIABILITY PROJECT ON VALLEY: (1) Installs ADA curb ramps. (2) Installs bus stop improvements, including pedestrian benches, covered shelters, trash cans, wayfinding/signage, crosswalk enhancements, pedestrian hybrid beacons, pedestrian lighting, pedestrian countdown signals, and removing obstructions from walkways. Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total CITY FUNDS 363 363 33 330 363 LOCAL TRANS FUNDS 665 665 60 605 665 LAF7600 Total 1,028 1,028 93 935 1,028 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment LAF3607 Los Angeles SCAB 1NL04 NCR25 L EXEMPT - 93.126 2 Description: PTC 2,379 Agency ARCADIA Arcadia Gold Line Station Pedestrian Linkage Project. Design and construction of pedestrian improvements around the Gold Line Arcadia Station, connecting the communities with the regional rail system. Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total CMAQ 1,546 1,546 1,546 1,546 CITY FUNDS 833 833 833 833 LAF3607 Total 2,379 2,379 2,379 2,379 ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category Amendment LATP16S004 Los Angeles SCAB 1O1007 NCN26 L TCM 2 Description: PTC 1,652 Agency ARCADIA BICYCLE FACILITY IMPROVEMENTS: (1) 7.7-mile Class 2 bike lanes on Highland Oaks Dr, First Av, Baldwin Av, Sierra Madre Blvd, Sycamore Av, Colorado Blvd, Santa Clara St, and Huntington Dr. (2) 8.64-mile Class 3 bike lanes on First Av (sharrows), Second Av, Sierra Madre Bl (sharrows), Orange Grove Av (enhanced blvd), Campus Dr, Camino Real Av, and Longden Av. (3) Bike signal detection & bike parking at key locations. Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 Total CITY FUNDS 51 445 496 15 36 445 496 LOCAL TRANS FUNDS 136 136 136 136 Print Date: 3/23/2017 9:50:37 AM Page: 1 of 123

Upload: lamcong

Post on 17-Mar-2018

242 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G610 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 1,000 Agency AGOURA HILLS

The Kanan Road/Agoura Road Ultimate Intersection Improvements Project design consists of designing a signalized intersection that would improve circulation, reduce delays, facilitate large truck movements, reduce conflict points and be located and constructed within an area close in proximity to a freeway interchange and bordered on the north side by built-out and fully improved land. The Kanan Road/Agoura Road Ultimate Intersection Improvements Project was the former Roundabout project.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

750 250 1,000 500 500 1,000

LA0G610 Total 750 250 1,000 500 500 1,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7600 Los Angeles SCAB 1O1008 NCR10 L EXEMPT - 93.126 0

Description: PTC 1,028 Agency ALHAMBRA

ALHAMBRA PEDESTRIAN IMPROVEMENT/WALKING VIABILITY PROJECT ON VALLEY: (1) Installs ADA curb ramps. (2) Installs bus stop improvements, including pedestrian benches, covered shelters, trash cans, wayfinding/signage, crosswalk enhancements, pedestrian hybrid beacons, pedestrian lighting, pedestrian countdown signals, and removing obstructions from walkways.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 363 363 33 330 363LOCAL TRANS FUNDS 665 665 60 605 665LAF7600 Total 1,028 1,028 93 935 1,028

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3607 Los Angeles SCAB 1NL04 NCR25 L EXEMPT - 93.126 2

Description: PTC 2,379 Agency ARCADIA

Arcadia Gold Line Station Pedestrian Linkage Project. Design and construction of pedestrian improvements around the Gold Line Arcadia Station, connecting the communities with the regional rail system.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,546 1,546 1,546 1,546CITY FUNDS 833 833 833 833LAF3607 Total 2,379 2,379 2,379 2,379

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S004 Los Angeles SCAB 1O1007 NCN26 L TCM 2

Description: PTC 1,652 Agency ARCADIA

BICYCLE FACILITY IMPROVEMENTS: (1) 7.7-mile Class 2 bike lanes on Highland Oaks Dr, First Av, Baldwin Av, Sierra Madre Blvd, Sycamore Av, Colorado Blvd, Santa Clara St, and Huntington Dr. (2) 8.64-mile Class 3 bike lanes on First Av (sharrows), Second Av, Sierra Madre Bl (sharrows), Orange Grove Av (enhanced blvd), Campus Dr, Camino Real Av, and Longden Av. (3) Bike signal detection & bike parking at key locations.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 51 445 496 15 36 445 496LOCAL TRANS FUNDS 136 136 136 136

Print Date: 3/23/2017 9:50:37 AM Page: 1 of 123

Page 2: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ACTIVE TRANSPORTATION PROGRAM

118 902 1,020 35 83 902 1,020

LATP16S004 Total 169 1,483 1,652 50 119 1,483 1,652

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9600 Los Angeles SCAB 1O1008 NCN27 L TCM Committed 2

Description: PTC 2,221 Agency AVALON

City of Avalon Five-Corner Comprehensive Pedestrian Project: The project proposes to construct new-permenant sidewalks, median safety islands, traffic calming (round-about) and lighting in order to provide safer access for pedestrians. The total project is approximately .25 miles in length.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 485 485 48 149 288 485LOCAL TRANS FUNDS 1,736 1,736 171 533 1,032 1,736LAF9600 Total 2,221 2,221 219 682 1,320 2,221

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1285 Los Angeles SCAB REG0703 NCR31 L EXEMPT - 93.126 6

Description: PTC 360 Agency AZUSA

Rehabilitate Pavement on Azusa Avenue in Azusa. Project limits are from Fifth St. to Santa Fe Ave. This project is utilizing $90 in Toll Credits for local match requirements.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 360 360 360 360LAE1285 Total 360 360 360 360

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5309 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 5,846 Agency AZUSA

City of Azusa Traffic Management System. This project will upgrade traffic signals at 43 intersections in the City of Azusa. The project will fund the design and construction/implementation of controllers, wiring, detection, conduit, fiber optic, countdown pedestrian heads, signals, video detection, CCTV cameras and traffic control and monitoring upgrades at the 43 intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 2,338 2,338 2,338 2,338PROP "C25" FUNDS 3,508 3,508 3,508 3,508LAF5309 Total 5,846 5,846 5,846 5,846

Print Date: 3/23/2017 9:50:39 AM Page: 2 of 123

Page 3: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1140 Los Angeles SCAB 7120004 CAX77 L TCM Committed 5

Description: PTC 4,152 Agency BALDWIN PARK

Complete street improvements along Maine Ave. from Los Angeles St. to Arrow Hwy. Improvements involve the reconfiguration of the corridor by means of road diet. Project components include (1) Class II bike ways (2) Road diet from 4 travel lanes to 2 lanes (3) Share left turn lanes (4) Curb extension at 13 intersections (5) Sidewalk extension (6) High visibility crosswalks (7) Replacing ped signals at 5 intersections (8) Ped lighting and (9) ADA improvementsFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C20" FUNDS 1,951 1,951 1,951 1,951ACTIVE TRANSPORTATION PROGRAM - MPO

2,201 2,201 2,201 2,201

LA0G1140 Total 4,152 4,152 4,152 4,152

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2517 Los Angeles SCAB LAE2517 NCRH4 L EXEMPT - 93.127 0

Description: PTC 300 Agency BALDWIN PARK

WIDEN MAINE AVE. IN BALDWIN PARK ADD 1 RIGHT TURN AND 1 LEFT TURN ONLY LANE (SAFETEA-LU Demo ID #2517). Not a capacity enhancement project. Utilizing Toll Credits.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 300 300 300 300LAE2517 Total 300 300 300 300

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3507 Los Angeles SCAB 1NL04 NCN26 L TCM Committed 0

Description: PTC 820 Agency BALDWIN PARK

South Baldwin Park Commuter Bikeway Project. Construct 3-mile commuter Class I bike path along San Gabriel River and Walnut Creek connecting to major employment centers on Baldwin Park Blvd.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 100 236 336 113 223 336LOCAL TRANS FUNDS 19 465 484 465 19 484LAF3507 Total 119 701 820 113 688 19 820

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9620 Los Angeles SCAB 1O1008 NCR25 L EXEMPT - 93.126 2

Description: PTC 822 Agency BALDWIN PARK

First/Last Mile Connections for the Baldwin Park Transit Center: Improve pedestrian infrastructure by providing safe and efficient non motorized connections to and from public transit facilities and destinations within the Downtown areaFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 165 165 4 161 165PROP "C10" FUNDS 657 657 16 641 657LAF9620 Total 822 822 20 802 822

Print Date: 3/23/2017 9:50:39 AM Page: 3 of 123

Page 4: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7634 Los Angeles SCAB 7120004 NCR27 L EXEMPT - 93.126 6

Description: PTC 2,776 Agency BELL

Design work to improve conditions for pedestrians in order to increase pedestrian safety, and to improve the pedestrian environment in order to promote walking as a viable form of transportation, and encourage the use of public transit.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 2,159 2,159 2,159 2,159CITY FUNDS 184 371 555 184 371 555ACTIVE TRANSPORTATION PROGRAM

62 62 62 62

LAF7634 Total 246 2,530 2,776 246 2,530 2,776

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9200 Los Angeles SCAB 1AL04 TRNH6 L EXEMPT - 93.127 2

Description: PTC 893 Agency BELL

Eastern Avenue Operational Improvements: Signaling, sidewalk, and bus stop improvements on Eastern Avenue to reduce traffic congestion and increase safety and comfort for transit users.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 357 357 357 357PROP "C25" FUNDS 536 536 536 536LAF9200 Total 893 893 893 893

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1129 Los Angeles SCAB 7120004 NCR30 L EXEMPT - 93.126 5

Description: PTC 997 Agency BELL GARDENS

City Wide Safety Enhancement Project- construction of the project will include installation of pedestrian countdown signal heads, ADA compliant access ramps, bicycle route signage and shared lane markings as well as bicycle video detection at signalized intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 91 104 195 195 195ACTIVE TRANSPORTATION PROGRAM

802 802 802 802

LA0G1129 Total 91 906 997 997 997

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7120 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 3,384 Agency BELL GARDENS

EASTERN AVENUE AND FLORENCE AVENUE RSTI PROJECT : (1) Widen Florence Ave at intersection of Florence Ave and Eastern Ave to accommodate 2 westbound left-turn lanes and a westbound dedicated right-turn lane. (2) Widens sidewalks from 5 ft to 8 ft on Florence Av and includes high visibility crosswalks, pedestrian-level lighting, landscaping, and upgraded traffic signal timing.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 116 210 858 1,184 10 141 1,033 1,184

Print Date: 3/23/2017 9:50:39 AM Page: 4 of 123

Page 5: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C25" FUNDS 246 390 1,564 2,200 31 1,126 1,043 2,200LAF7120 Total 362 600 2,422 3,384 41 1,267 2,076 3,384

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1323 Los Angeles SCAB 1AL04 NCN95 L EXEMPT - 93.126 2

Description: PTC 7,310 Agency BELLFLOWER

Bellflower Boulevard Widening Project, between Artesia Boulevard and SR-91, LACMTA Project ID #MR31516. Widening of Bellflower Boulevard under the 91 Freeway Bridge. This project includes design, purchase of property, and reconstruction of existing roadway to enhance vehicle movement at Bellflower Boulevard and the 91 Freeway by providing longer left turn pockets. No lane addition.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 160 5,067 2,083 7,310 307 7,003 7,310LA0G1323 Total 160 5,067 2,083 7,310 307 7,003 7,310

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9804 Los Angeles SCAB 1TR1023 TDM24 L EXEMPT - 93.126 2

Description: PTC 457 Agency BELLFLOWER

Project consists of the development and implementation of a parking management program for Downtown Bellflower & circulator transit shuttle, including software & wayfinding signage

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 89 281 370 89 266 15 370PROP "C20" FUNDS 22 65 87 30 50 7 87LAF9804 Total 111 346 457 119 316 22 457

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M001 Los Angeles SCAB 7120004 PLN40 L EXEMPT - 93.126 2

Description: PTC 125 Agency BELLFLOWER

Bellflower and Paramount Joint Active Transportation Plan.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 25 25 25 25ACTIVE TRANSPORTATION PROGRAM - MPO

100 100 100 100

LATP16M001 Total 125 125 125 125

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9537 Los Angeles SCAB 1TR1023 TDM24 L TCM Committed 2

Description: PTC 564 Agency BEVERLY HILLS

Beverly Hills Bike Share Program: Regionally-compatible, public bicycles for local/regional non vehicle mobility, first/last miles connection to bus and Purple Line rail transit, reduce air pollutants, promote healthy lifestylesFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 282 282 10 10 262 282

Print Date: 3/23/2017 9:50:39 AM Page: 5 of 123

Page 6: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

LOCAL TRANS FUNDS 282 282 10 10 262 282LAF9537 Total 564 564 20 20 524 564

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G948 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 1,600 Agency BURBANK

Intersection improvement - improve traffic signal operation and timing, reduce traffic congestion at the intersection, and improve pedestrian safety through the modification of median islands, installation of new median islands, the modification of existing pedestrian crosswalks and modification of traffic signal phasing and timing.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

180 1,420 1,600 400 1,200 1,600

LA0G948 Total 180 1,420 1,600 400 1,200 1,600

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1502 Los Angeles SCAB 1NL04 NCN26 L TCM Committed 2

Description: PTC 8,239 Agency BURBANK

San Fernando Bikeway. Implement a Class I Bikeway along San Fernando Blvd, Victory Place and Burbank Western Channel to complete the Burbank leg of a 12 mile bikeway.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 632 216 5,743 6,591 748 5,843 6,591CITY FUNDS 444 54 1,150 1,648 473 1,175 1,648LAF1502 Total 1,076 270 6,893 8,239 1,221 7,018 8,239

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3313 Los Angeles SCAB 1AL04 ITS02 L TCM Committed 0

Description: PTC 1,274 Agency BURBANK

Burbank-Glendale Traffic System Coordination. Replace Type 170 traffic signal controllers with Type 2070 & associated communications equipment in Burbank & Glendale & install system detection on Glenoaks Bl & San Fernando Bl. City of Burbank and City of Glendale along Glenoaks Boulevard between Buena Vista Street in Burbank and Geneva Street in Glendale, and along San Fernandom Boulevard between Olive Avenue in Burbank and Glendale Avenue in Glendale (Sig Syn - aprox. 65 signals).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 255 255 255 255PROP "C25" FUNDS 1,019 1,019 1,019 1,019LAF3313 Total 1,274 1,274 255 1,019 1,274

Print Date: 3/23/2017 9:50:39 AM Page: 6 of 123

Page 7: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3509 Los Angeles SCAB 7120004 NCN25 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 4,384 Agency BURBANK

Burbank Channel Bikeway Regional Gap Closure - Design and construct a Class 1 bicycle and pedestrian path along the Burbank Western Flood Control Channel. The project includes bikeway treatments at three controlled local street crossings (1) Flower St/ Olive Ave, 2) Verdugo/bike path, 3) Providencia/ Lake St.), and a grade separated crossing at Alameda Av. The project limits on the Burbank Western Flood Control Channel are from Olive Ave/Flower St to Alameda Ave for approximately 0.79 miles.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 400 46 2,275 2,721 446 2,275 2,721AGENCY 100 11 570 681 111 570 681STATE PARK FUNDS 982 982 982 982LAF3509 Total 500 57 3,827 4,384 557 3,827 4,384

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5306 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 743 Agency BURBANK

Burbank Traffic Responsive Signal System; upgrade 20 signals on Hollywood Way and 18 on Buena Vista St., connect 38 signals to the fiber-optic cable-trunk line, and purchase fiber-optic modems. Includes a demand-responsive traffic signal system along Hollywood Way and Buena Vista St., license, system integration and testing of the Quick Track Adaptive Control Software.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 20 179 199 199 199PROP "C25" FUNDS 544 544 544 544LAF5306 Total 20 723 743 743 743

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5508 Los Angeles SCAB 1O1007 NCR26 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 849 Agency BURBANK

Project will design and construct a bicycle and pedestrian bridge across the Los Angeles River in the City of Burbank and the City of Los Angeles. Project would construct 0.1 mile of Class III bike route on Bob Hope Dr between Riverside Dr and the north bank LA River and 0.1 mile of Class I bike path across the LA River between Bob Hope Drive and the Forest Lawn Dr / Memorial Dr intersection in the City of Burbank and City of Los Angeles.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 115 564 679 76 39 564 679CITY FUNDS 29 141 170 19 10 141 170LAF5508 Total 144 705 849 95 49 705 849

Print Date: 3/23/2017 9:50:39 AM Page: 7 of 123

Page 8: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5701 Los Angeles SCAB 1ITS04 ITS14 L EXEMPT - 93.126 0

Description: PTC 889 Agency BURBANK

Burbank Traveler Information and Wayfinding System -This static and dynamic wayfinding signage project for providing drivers information about parking options and destinations in downtown Burbank and near Bob Hope Airport and providing transit users arrival of the next bus. Additional signage will be installed at the two rail stations in Burbank and bicycle signage will be included to help identify destination and travel distance for this mode.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 143 568 711 711 711CITY FUNDS 36 142 178 178 178LAF5701 Total 179 710 889 889 889

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7506 Los Angeles SCAB 1O1007 NCN25 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 3,299 Agency BURBANK

CHANDLER BIKEWAY EXTENSION: (1) Implement Class 1 bike/pedestrian path (0.5mi) on the Chandler ROW from Mariposa to the San Fernando Bikeway. (2) Install high-visibility crosswalks at intersections and wayfinding signage.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 321 467 1,851 2,639 321 467 1,851 2,639CITY FUNDS 80 117 463 660 80 117 463 660LAF7506 Total 401 584 2,314 3,299 401 584 2,314 3,299

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9315 Los Angeles SCAB 1ITS04 ITS14 L TCM Committed 2

Description: PTC 2,065 Agency BURBANK

Traffic respnosive system involving advanced traffic controllers, communications, video surveilance, and bicycle and system detection for 33 intersections in the City of Burbank

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 413 413 30 383 413PROP "C25" FUNDS 1,652 1,652 122 1,530 1,652LAF9315 Total 2,065 2,065 152 1,913 2,065

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9626 Los Angeles SCAB 1O1008 NCR30 L EXEMPT - 93.126 2

Description: PTC 1,016 Agency BURBANK

Midtown Commerical Corridors Improvement Project (Ped Mode): Pedestrian improvements involving high visibility crosswalks, LED crosswalk lighting, pedestrian signals, and pedestrian detection for 33 intersections in the City of BurbankFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 203 203 12 191 203

Print Date: 3/23/2017 9:50:39 AM Page: 8 of 123

Page 9: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

LOCAL TRANS FUNDS 813 813 50 763 813LAF9626 Total 1,016 1,016 62 954 1,016

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G212 Los Angeles SCAB 1AL04 CAX76 L NON-EXEMPT 2

Description: PTC 5,746 Agency CALABASAS

Convert Las Virgenes Rd. from 2 lane road to 4 lane road between Agoura Rd. and Lost Hills Rd.; 2 lanes in each direction plus turning pockets.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

350 70 5,326 5,746 2,350 3,396 5,746

LA0G212 Total 350 70 5,326 5,746 2,350 3,396 5,746

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7516 Los Angeles SCAB 1O1007 NCR25 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 545 Agency CALABASAS

MULHOLLAND HIGHWAY GAP CLOSURE: (1) Bike/ped improvements on Mulholland Hwy and on Old Topanga Canyon Rd. (2) Installation of 0.5 mile-Class 2 bike lanes on Mulholland Hwy, new sidewalks (1,450 ft), ramps and retaining walls.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 109 109 59 50 109LOCAL TRANS FUNDS 43 20 373 436 64 372 436LAF7516 Total 43 20 482 545 123 422 545

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9300 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 2

Description: PTC 738 Agency CALABASAS

The proposed project is to synchronize and add interconnect along Las Vigenes Road and synchronize Mulholland Highway and Old Topanga Canyon Road

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 148 148 148 148PROP "C25" FUNDS 590 590 590 590LAF9300 Total 738 738 738 738

Print Date: 3/23/2017 9:50:39 AM Page: 9 of 123

Page 10: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9301 Los Angeles SCAB 1O1012 ITS02 L TCM Committed 2

Description: PTC 6,456 Agency CALTRANS

Route 210: Implementation of I-210 Connected Corridors transportation management system that integrates freeway ramp meters, arterial signal systems, transit systems and traveler information [EA 32910].Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C25" FUNDS 2,046 10 4,400 6,456 2,056 4,400 6,456LAF9301 Total 2,046 10 4,400 6,456 2,056 4,400 6,456

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D173 Los Angeles SCAB LA0D173 CAX60 L NON-EXEMPT 2

Description: PTC 6,000 Agency CARSON, CITY OF

BRIDGE NO. 53C0652, SEPULVEDA BLVD, OVER DOMINGUEZ CHANNEL, 1/2 MI E/O ALAMEDA ST. Rehabilitate 4-lane bridge & widen to 6-lane, upgrade bridge railings.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 300 3,325 3,625 625 3,000 3,625MEASURE R 1,158 1,158 1,158 1,158BRIDGE - LOCAL 1,217 1,217 1,217 1,217LA0D173 Total 300 5,700 6,000 1,783 4,217 6,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1130 Los Angeles SCAB 7120004 NCR25 L TCM Committed 5

Description: PTC 1,482 Agency CARSON, CITY OF

Active Transportation Program - City-wide Bike and Pedestrian Improvements - The infrastructure component includes a Class II bike lane (1.07 mile) on Santa Fe Ave, high visibility crosswalks, countdown pedestrian signals, curb ramps, etc. The non-infrastructure component includes, education, encouragement, and enforcement programming that will occur over a three year period. Utilizing Toll Credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalACTIVE TRANSPORTATION PROGRAM

46 1,436 1,482 1,482 1,482

LA0G1130 Total 46 1,436 1,482 1,482 1,482

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1179 Los Angeles SCAB 7120004 NCN26 L TCM Committed 0

Description: PTC 1,340 Agency CARSON, CITY OF

Transform maintenance road to a new 1.3 mile class I bike ped path on Dominguez channel. Improvements include improving horizontal and vertical geometry for improved sight distance, adding a guardrail to existing bridge, and improving the Avalon Blvd. intersection signal.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 30 51 81 81 81LOCAL TRANS FUNDS 100 1,159 1,259 1,259 1,259LA0G1179 Total 130 1,210 1,340 1,340 1,340

Print Date: 3/23/2017 9:50:39 AM Page: 10 of 123

Page 11: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7322 Los Angeles SCAB 1ITS04 ITS14 L TCM Committed 0

Description: PTC 814 Agency CARSON, CITY OF

BROADWAY INTERSECTION IMPROVEMENTS TRAFFIC SIGNAL MODIFICATION : Design and Modify five signalized intersections on Broadway between Alondra Blvd and Victoria St to include longer signal mast arms to improve visibility of signal indications, improve lighting, upgrade signal cabinet and equipment, improve signal timing, and improve the operation of the intersections by adding protective/permissive left-turn phasing as warranted.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 55 230 285 138 147 285PROP "C25" FUNDS 529 529 257 272 529LAF7322 Total 55 759 814 395 419 814

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G349 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 600 Agency COMMERCE

Street and drainage reconstruction at Sheila Street and Commerce Way.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSECTION 129 - SURFACE TRANSPORTATION PRIORITIES

100 400 500 500 500

AGENCY 100 100 100 100LA0G349 Total 100 500 600 600 600

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE3085 Los Angeles SCAB LAE3085 CAY63 L NON-EXEMPT 2

Description: PTC 38,520 Agency COMMERCE

Widen and reconstruct Washington Boulevard from western City boundary at Vernon [350' west of Indiana Street] to I-5 Freeway at Telegraph Rd., widen from 2 lanes to 3 lanes in each direction, increase turn radius and medians, upgrade traffic signals and street lighting and improve sidewalks.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 2,220 2,220 2,220 2,220CITY FUNDS 176 1,792 1,580 3,548 3,548 3,548LOCAL TRANS FUNDS 90 90 90 90MEASURE R 20H - HIGHWAY CAPITAL

677 12,823 13,500 13,500 13,500

PROP "C25" FUNDS 77 13,285 13,362 13,362 13,362TRADE CORRIDOR PROGRAM 5,800 5,800 5,800 5,800LAE3085 Total 3,240 1,792 33,488 38,520 25,020 13,500 38,520

Print Date: 3/23/2017 9:50:39 AM Page: 11 of 123

Page 12: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5108 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 978 Agency COMMERCE

Garfield Ave/Washington Bl Multimodal Intersection in the City of Commerce, project will improve intersection by adding a dedicated right-turn pocket on southbound Garfield. On Washington Bl, one right-turn pocket will be added in the westbound direction. Ped features include wider new 5-foot sidewalks along Garfield Av and Washington Bl, the relocation of bus stops, high visibility crosswalks, ADA-compliant curb ramps, railroad track crossings, and pedestrian-actuated traffic signals.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 50 25 365 440 198 242 440PROP "C25" FUNDS 75 463 538 239 299 538LAF5108 Total 125 25 828 978 437 541 978

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7201 Los Angeles SCAB 1AL04 NCR30 L EXEMPT - 93.126 2

Description: PTC 1,172 Agency COMMERCE

COMMERCE GOODS MOVEMENT ATLANTIC BOULEVARD: WASHINGTON BOULEVARD TO COMO STREET: Implements southbound right-turn overlap signal phasing from Atlantic Bl onto Washington Bl to improve mobility for trucks and vehicles;Streetscape improvements, such as raised medians, crossing improvements. Ped Improvements include raised medians, HAWK installation at uncontrolled crosswalks, misc. sidewalk and ADA improvements. a little over a 1/2 mile stretch.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 49 435 484 49 435 484PROP "C25" FUNDS 69 619 688 69 619 688LAF7201 Total 118 1,054 1,172 118 1,054 1,172

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1131 Los Angeles SCAB 7120004 NCR26 L TCM Committed 5

Description: PTC 996 Agency COMPTON

Wilmington Ave Safe Streets Ped/Bicycle Improvements is a Ped/Bike safety improvement project for the communities adjacent to the Wilmington Ave by developing safer ped crossings and intersections as well as installing bike paths to improve ped/bike safety. Total length of Class II bike way is 1.09 mile along Wilmington Ave between El Segundo Blvd and Rosecrans Ave (0.9 mile) and along Rosecrans Ave between Wilmington Ave and Compton Creek (0.19 mile). Utilizing Toll Credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalACTIVE TRANSPORTATION PROGRAM

47 949 996 47 949 996

LA0G1131 Total 47 949 996 47 949 996

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G718 Los Angeles SCAB 1AL04 NCR35 L EXEMPT - 93.126 0

Description: PTC 496 Agency COMPTON

Install Safety Lights on Compton Creek.(Demo ID 205 Public Law 03 App Act 108-72002)

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSECTION 330 496 496 496 496LA0G718 Total 496 496 496 496

Print Date: 3/23/2017 9:50:39 AM Page: 12 of 123

Page 13: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1321 Los Angeles SCAB LAE1321 NCR91 L EXEMPT - 93.126 0

Description: PTC 3,840 Agency COMPTON

COMPTON ARTERIAL RECONSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY).

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 100 3,100 3,200 3,200 3,200CITY FUNDS 20 620 640 512 128 640LAE1321 Total 120 3,720 3,840 512 3,328 3,840

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2194 Los Angeles SCAB LAE2194 NCR25 L TCM Committed 0

Description: PTC 3,840 Agency COMPTON

GREENLEAF ROW COMMUNITY ENHANCEMENT PROJECT DESIGN AND CONSTRUCTION OF BIKEWAY PED WALK WAY AND UPGRADE SIGNALIZATION

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 400 2,800 3,200 400 2,800 3,200CITY FUNDS 80 560 640 240 400 640LAE2194 Total 480 3,360 3,840 640 3,200 3,840

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2819 Los Angeles SCAB LAE2819 NCR36 L EXEMPT - 93.126 0

Description: PTC 15,000 Agency COMPTON

ROSECRANS AVE OVERHEAD and ARTERIAL RECONSTRUCTION PROJECT(NON-CAPACITY).SAFTEA-LU 1321. ISTEA 36.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO - ISTEA 240 6,160 6,400 6,400 6,400DEMO-SAFETEA-LU 1,200 2,000 3,200 1,200 2,000 3,200CITY FUNDS 2,400 3,000 5,400 2,400 3,000 5,400LAE2819 Total 3,840 11,160 15,000 7,600 4,400 3,000 15,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE3768 Los Angeles SCAB LAE3768 NCR31 L EXEMPT - 93.126 0

Description: PTC 3,000 Agency COMPTON

COMPTON ARTERIAL RECONSTRUCTION AND IMPROVEMENT PROGRAM (NON-CAPACITY).

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 100 2,400 2,500 2,500 2,500CITY FUNDS 20 480 500 500 500LAE3768 Total 120 2,880 3,000 3,000 3,000

Print Date: 3/23/2017 9:50:39 AM Page: 13 of 123

Page 14: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9530 Los Angeles SCAB 1O1007 NCN25 L TCM Committed 2

Description: PTC 1,438 Agency COMPTON

Enhance safety/improve non-motorized transportation travels along Central Av by installing protective buffered bike lanes, improving intersection crossings and closing sidewalk gaps

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 361 361 4 357 361LOCAL TRANS FUNDS 1,077 1,077 11 1,066 1,077LAF9530 Total 1,438 1,438 15 1,423 1,438

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5501 Los Angeles SCAB 1O1007 NCR26 L TCM Committed 5

Description: PTC 1,048 Agency COVINA

City of Covina Bicycle Network-construct Class II bike lanes on Citrus Av (1.8 mi), Front St (0.13 mi), Second Av (0.87 mi), Badillo St (3.61 mi) and Azusa Av (1.53 miles). This project provides direct connectivity to a regionally significant bike-transit hub (Covina Metrolink Station) identified in Metro's 2006 Bicycle Transportation Strategic Plan. The project will also provide secure bike parking at a location determined to have significant need for bicyclists.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C20" FUNDS 209 209 209 209ACTIVE TRANSPORTATION PROGRAM - MPO

839 839 839 839

LAF5501 Total 1,048 1,048 1,048 1,048

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9605 Los Angeles SCAB 1O1008 NCN25 L TCM Committed 2

Description: PTC 3,284 Agency CUDAHY

The Cudahy City Wide Complete Streets Improvement Project focuses on the Atlantic Avenue Corridor and City Wide multimodal transportation improvements for the first/last mile. Project is approximately 1.1 miles long.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,149 1,149 88 1,061 1,149PROP "C25" FUNDS 2,135 2,135 164 1,971 2,135LAF9605 Total 3,284 3,284 252 3,032 3,284

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G451 Los Angeles SCAB LA0G451 CAX60 L NON-EXEMPT 6

Description: PTC 8,168 Agency CULVER CITY

BRIDGE NO. 53C0876, HIGUERA ST, OVER BALLONA CR. BETWEEN EASTHAM DRIVE AND JEFFERSON BLVD. REPLACE 3 LANE BRIDGE WITH A NEW 4 LANE BRIDGE....

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 151 57 759 967 208 759 967BRIDGE - LOCAL 1,166 181 5,854 7,201 1,347 5,854 7,201LA0G451 Total 1,317 238 6,613 8,168 1,555 6,613 8,168

Print Date: 3/23/2017 9:50:39 AM Page: 14 of 123

Page 15: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3175 Los Angeles SCAB 1AL04 NCRH4 L EXEMPT - 93.127 0

Description: PTC 6,965 Agency CULVER CITY

Culver Boulevard Realignment Project. Culver Bl. widening w/ frontage road narrowing, separated by rebuilt bike/ped median, w/ raised median, turn lanes, traffic signal, countdown ped heads and other improvements.. The project limits are Sepulveda Bl. to the west and Elenda Street to the east, located entirely within the City of Culver City. All of the realignment will be within the existing public right-of-way. SAFTEA-LU 3069 pg 119 STAT. 1375.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 2,192 2,192 2,192 2,192CITY FUNDS 500 1,417 1,917 1,917 1,917PROP "C25" FUNDS 2,856 2,856 524 2,332 2,856LAF3175 Total 500 6,465 6,965 2,441 4,524 6,965

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7303 Los Angeles SCAB 1ITS04 ITS14 L TCM Committed 0

Description: PTC 1,236 Agency CULVER CITY

NETWORK-WIDE SIGNAL SYNC WITH VID & ARTERIAL PERFORMANCE MEASUREMENT SYSTEM FOR ATCS : (1) Optimizes signal coordination timing network-wide. (2) Upgrades major intersections with enhanced system detection and arterial performance measurement capabilities along Washington Bl, Sepulveda Bl, Jefferson Bl, and others. (16 signals that are synched)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 48 199 247 48 199 247PROP "C25" FUNDS 190 799 989 501 488 989LAF7303 Total 238 998 1,236 549 687 1,236

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7507 Los Angeles SCAB 1O1007 NCN26 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 822 Agency CULVER CITY

BALLONA CREEK BIKE PATH CONNECTIVITY PROJECT AT HIGUERA BRIDGE: (1) Installs new access ramp (300 ft) from the Higuera St Bridge to the existing Ballona Creek Bike Path with wayfinding signage.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 13 193 206 13 193 206LOCAL TRANS FUNDS 37 579 616 231 385 616LAF7507 Total 50 772 822 244 193 385 822

Print Date: 3/23/2017 9:50:39 AM Page: 15 of 123

Page 16: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G918 Los Angeles SCAB REG0704 NCN27 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 210 Agency DIAMOND BAR

STEEP CANYON TRAILHEAD CONNECTOR TO THE CANYON LOOP TRAIL - RECOMMENDED FOR FUNDING UNDER THE NON-MOTORIZED ELEMENT OF THE RECREATIONAL TRAILS PROGRAM (Grant award $153,915) Rehibilitate 850 LF of trail including landscape tie steps.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalRECREATIONAL TRAILS 19 135 154 154 154CITY FUNDS 32 24 56 56 56LA0G918 Total 51 159 210 210 210

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7300 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 1,760 Agency DIAMOND BAR

DIAMOND BAR ADAPTIVE TRAFFIC CONTROL SYSTEM PROJECT : Installs Adaptive Traffic Control System (ATCS) at signalized intersections on Diamond Bar Bl, Golden Springs Dr, and Grand Av. (2) Provides fully traffic responsive signal control system based on traffic demands.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 35 318 353 353 353PROP "C25" FUNDS 140 1,267 1,407 1,407 1,407LAF7300 Total 175 1,585 1,760 1,760 1,760

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1110 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 2,120 Agency DOWNEY

The project involves the design and construction management of intersection improvements at Lakewood Boulevard/Rosemead Boulevard at Telegraph Road. Project is adding dedicated right and left turn lanes at the intersection. All lanes are adding under 400' in length.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 221 117 1,782 2,120 1,229 891 2,120LA0G1110 Total 221 117 1,782 2,120 1,229 891 2,120

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1254 Los Angeles SCAB 1O1007 NCR31 L TCM Committed 2

Description: PTC 2,274 Agency DOWNEY

Old River School Rd Pavement Rehab includes sawcut, removal and full depth reconstruction of pavement, cold milling of existing pavement, asphalt rubber hot mix (ARHM) pavement overlay, reconstruction of damaged or missing curb and gutter, sidewalk, cross gutters, and ramps, utility adjustments, traffic signal detector loop replacements, traffic striping, traffic control, and install Class II bike lane (2 miles). Utilizing toll credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 1,454 1,454 1,454 1,454MEASURE R 15 - LOCAL RETURN 220 220 220 220

Print Date: 3/23/2017 9:50:39 AM Page: 16 of 123

Page 17: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C20" FUNDS 600 600 600 600LA0G1254 Total 220 2,054 2,274 2,274 2,274

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0479 Los Angeles SCAB LAE0479 NCN95 L EXEMPT - 93.126 0

Description: PTC 2,000 Agency DOWNEY

FIRESTONE BLVD. FROM RYERSON AVE AND STEWART & GRAY RD. WIDEN SECTIONS OF FIRESTONE (BOTTLENECK FOR TURN LANES; ST RECONSTRUCTION, REHAB, & RESURFACE; & UPGRADE HANDICAP RAMPSFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 1,600 1,600 1,600 1,600CITY FUNDS 400 400 400 400LAE0479 Total 2,000 2,000 2,000 2,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1633 Los Angeles SCAB LAE1633 STUDY L EXEMPT - 93.126 0

Description: PTC 500 Agency DOWNEY

STUDY REPORT FOR THE INTER. OF OLD RIVER SCHOOL RD, FIRESTONE BLVD & UNION PACIFIC RAILROAD. REVIEW/ANALYZE OPERATIONS & SAFETY ASPECTS, DESIGN OPTIONS ETC. (E/P & PS/E ONLY)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 400 400 400 400CITY FUNDS 100 100 100 100LAE1633 Total 500 500 500 500

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3304 Los Angeles SCAB 1ITS04 ITS04 L TCM Committed 0

Description: PTC 923 Agency DOWNEY

Woodruff Av Fiber-optic Traffic Signal Communications Proj. Install fiber-optic communication & video detection system on Woodruff Av & interconnect it to existing fiber backbone to develop an ethernet-based communication network.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 185 185 185 185PROP "C25" FUNDS 738 738 738 738LAF3304 Total 923 923 923 923

Print Date: 3/23/2017 9:50:39 AM Page: 17 of 123

Page 18: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5114 Los Angeles SCAB 1AL04 NCR30 L TCM Committed 0

Description: PTC 4,738 Agency DOWNEY

Telegraph Road Traffic Throughput and Safety Enhancement between the Rio Hondo River Channel to the San Gabriel River Channel, a distance of 2.2 miles. Project involves the construction of raised median islands, minor widening at intersections, transit priority system and bike (2.2 miles in length) and pedestrian circulation improvements.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 2,787 2,787 419 2,134 234 2,787CITY FUNDS 450 1,501 1,951 526 1,299 126 1,951LAF5114 Total 450 4,288 4,738 945 3,433 360 4,738

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7118 Los Angeles SCAB 1AL04 CAR60 L NON-EXEMPT 0

Description: PTC 16,740 Agency DOWNEY

FLORENCE AVENUE BRIDGE OVER SAN GABRIEL RIVER : (1) Replaces undivided 4-lane bridge on Florence Av between Lesterford Av and Little Lake Rd at the San Gabriel River Crossing with dual 45-ft-wide, 3-lane bridge (6 lanes total, 14 ft separation). (2) Improves 200-ft approaches on each side of the bridge with widened/ADA-compliant sidewalks and 2 ft wider shoulder to improve cyclist safety. Sidewalks are new. No Bike facilities.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,917 1,917 944 973 1,917CITY FUNDS 34 14,523 14,557 34 14,523 14,557BRIDGE - LOCAL 266 266 266 266LAF7118 Total 300 16,440 16,740 1,244 973 14,523 16,740

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7311 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 1,807 Agency DOWNEY

DOWNEY CITYWIDE TRANSIT PRIORITY SYSTEM PROGRAM : (1) Synchronizes traffic signals along existing transit routes. (2) Installs new fiber optic communication along 5.5 miles of arterial streets to connect signals to the central traffic management center. (3) Installs and integrates transit priority system with the traffic signal system.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 515 515 515 515PROP "C25" FUNDS 1,292 1,292 1,292 1,292LAF7311 Total 1,807 1,807 1,807 1,807

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M003 Los Angeles SCAB 1O1007 TDM24 L EXEMPT - 93.126 2

Description: PTC 294 Agency DOWNEY

Downey Bike Share and Safety Education. Combination infrastructure/non- infrastructure program for installation of three centrally located kiosk-based Bike Share structures, including site preparation, PA&ED, and a safety education and encouragement outreach campaign.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 114 114 114 114

Print Date: 3/23/2017 9:50:39 AM Page: 18 of 123

Page 19: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ACTIVE TRANSPORTATION PROGRAM - MPO

180 180 180 180

LATP16M003 Total 294 294 180 114 294

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M004 Los Angeles SCAB 7120004 PLN40 L EXEMPT - 93.126 2

Description: PTC 300 Agency DOWNEY

Pedestrian Plan. The Pedestrian Plan seeks to remove existing barriers to mobility, close gaps, and plan future improvements of routes based on prioritized Pedestrian Action planning, and proven best countermeasures.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalACTIVE TRANSPORTATION PROGRAM - MPO

300 300 150 150 300

LATP16M004 Total 300 300 150 150 300

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5627 Los Angeles SCAB 1O1008 NCN27 L TCM Committed 5

Description: PTC 1,646 Agency DUARTE

Duarte Gold Line Station Pedestrian Improvements. This project is located in Duarte on Duarte Rd between Highland Av and Buena Vista St. It will fund pedestrian improvements around the Duarte Gold Line Station, connecting the station with surrounding land uses and other transit lines by constructing sidewalk on the north side of Duarte Rd and installing pedestrian lighting, landscaping, benches, trash receptacles, curb ramps, pedestrian crossings, and wayfinding signs.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "A" LOCAL RETURN 38 303 341 38 303 341ACTIVE TRANSPORTATION PROGRAM

148 1,157 1,305 148 1,157 1,305

LAF5627 Total 186 1,460 1,646 186 1,460 1,646

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1180 Los Angeles SCAB 7120004 NCN26 L TCM Committed 0

Description: PTC 1,113 Agency EL MONTE

A 0.5 mile Class III bike route with sharrows, a 0.7 mile Class II green-painted bike lane, and a 2 mile a Class II bike lane with buffer pavement stenciling. Improvements includes roadway resurfacing, highlighting, crosswalk improvements, camera installation at intersections, and wayfinding signage. The project runs 3.2 miles along Santa Anita from ELLIOT AVENUE (South) to WEST HONDO PARKWAY (North).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 82 397 479 82 397 479LOCAL TRANS FUNDS 634 634 634 634LA0G1180 Total 82 1,031 1,113 82 1,031 1,113

Print Date: 3/23/2017 9:50:40 AM Page: 19 of 123

Page 20: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5125 Los Angeles SCAB 1AL04 NCRH1 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 2,614 Agency EL MONTE

Ramona Blvd, Valley Blvd, & Valley Mall Intersection Improvement. City will reconfigure the five-way intersection in order to enhance the intersection. Traffic signal upgrade-dual left-turn lanes on Valley Bl and right-turn pockets on Ramona Bl. Create additional curb area for bicycle racks, pedestrian amenities, bus pads, turnouts, and Class II bike lanes less than 1/4 mile.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 241 250 555 1,046 1,008 38 1,046PROP "C25" FUNDS 135 250 1,183 1,568 1,504 64 1,568LAF5125 Total 376 500 1,738 2,614 2,512 102 2,614

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5705 Los Angeles SCAB 1TR1023 TDM24 L EXEMPT - 93.126 4

Description: PTC 630 Agency EL MONTE

Shared Parking Program/Smart Parking Detection Sys in Downtown area; I-10 Fwy, El Monte Busway, El Monte Transit Ctr, Transit Village, and El Monte Metrolink Station. Comprehensive parking strategy plan. Includes smart parking detection system and shared parking program. Utilize mobile communication devices to assess the parking availability at multiple parking lots. Provide real-time inventory of parking spaces.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 66 249 315 66 249 315LOCAL TRANS FUNDS 66 249 315 249 66 315LAF5705 Total 132 498 630 315 315 630

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7520 Los Angeles SCAB 1O1007 NCN25 L NON-REPORTABLE TCM

COMMITTED4

Description: PTC 1,416 Agency EL MONTE

EL MONTE REGIONAL BICYCLE COMMUTER ACCESS IMPROVEMENTS: (1) Installs a 200-foot bicycle/pedestrian bridge across the Rio Hondo River approximately 300 feet southwest of the San Bernardino (I-10) Freeway (2) Installs 0.74 mile Class 2 bike lanes on Tyler Av, and Merced Av. (3) Installs 1.46 mile Class 3 bike routes on Ramona Bl, Valley Bl, Towneway Dr, and Brockway St.ÿ(3) Implements wayfinding/signage, bridge lighting, bridge access points, and the Rio Hondo bike path under I-10.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 41 388 429 423 6 429LOCAL TRANS FUNDS 94 893 987 972 15 987LAF7520 Total 135 1,281 1,416 1,395 21 1,416

Print Date: 3/23/2017 9:50:40 AM Page: 20 of 123

Page 21: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G321 Los Angeles SCAB 1AL04 PLN40 L EXEMPT - 93.126 0

Description: PTC 1,235 Agency EL SEGUNDO

Park Place Extension and Rail Road Grade Separation project. (Grade separation is non-capacity). Completion of Park Place Extension & connection between Alaska Avenue and Sepulveda Boulevard in the City of El Segundo. Park Place four lane roadway extension between Nash and Allied Way.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSection 125 - Surface Transportation Priorities

735 735 470 265 735

AGENCY 150 150 150 150MEASURE R 350 350 350 350LA0G321 Total 1,235 1,235 620 615 1,235

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATR02020 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 2

Description: PTC 2,800 Agency GARDENA

Implement transit signal priority for 8.4 miles from the Harbor Gateway Transit Station to 120th Street in the city of Gardena. Also implementing real time arrival information through variety of media including smart phones, SMS texts, call centers, and website. Computer aided dispatching (CAD) system and automated vehicle location (AVL) system will also be implemented.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 800 800 800 800FEE 2,000 2,000 2,000 2,000LATR02020 Total 2,800 2,800 2,800 2,800

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1011 Los Angeles SCAB 1AL04 ITS14 L EXEMPT - 93.128 0

Description: PTC 600 Agency GLENDALE

SR-2/Holly Drive Interchange Signalization.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

50 550 600 100 500 600

LA0G1011 Total 50 550 600 100 500 600

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1031 Los Angeles SCAB 1ITS04 NCR31 L EXEMPT - 93.126 0

Description: PTC 3,315 Agency GLENDALE

Pacific Ave. Improvements:The project is a roadway improvement, traffic signal modification, and fiber optic communication installation. The project is located on Pacific Avenue, a major arterial, within less than a mile of Freeway (SR 134).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

315 3,000 3,315 3,315 3,315

LA0G1031 Total 315 3,000 3,315 3,315 3,315

Print Date: 3/23/2017 9:50:40 AM Page: 21 of 123

Page 22: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1032 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 1,200 Agency GLENDALE

The project is a roadway improvement and traffic signal installation project. The project is located on Doran Street between Brand Boulevard and Adams Street. Project location is within a mile of a freeway corridor as defined by Metro's Highway Operation Definition.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

1,200 1,200 1,200 1,200

LA0G1032 Total 1,200 1,200 1,200 1,200

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1034 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 585 Agency GLENDALE

Verdugo Road Improvement Project: The project is a roadway improvement and traffic signal modification project and is located on Verdugo Road between Colorado Street and City of Los Angeles Boundary, a major arterial, within less than a mile of Freeway (SR 2) corridor as defined by Metro’s Highway Operational definition.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

85 500 585 585 585

LA0G1034 Total 85 500 585 585 585

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1035 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 1,000 Agency GLENDALE

Verdugo Boulevard Rehabilitation Project: The project is a roadway improvement and traffic signal modification project and is located on Verdugo Boulevard between Verdugo Road and and City of La Canada Flintridge Boundary, a major arterial, within less than a mile of Freeway (SR 2) corridor as defined by Metro’s Highway Operational definition.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

100 900 1,000 1,000 1,000

LA0G1035 Total 100 900 1,000 1,000 1,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1148 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 1,500 Agency GLENDALE

Signal Installation at Various Locations- Pacific Ave. Traffic Signal Modifications. Signal synch for six (6) intersections along Pacific Avenue.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

1,500 1,500 1,500 1,500

LA0G1148 Total 1,500 1,500 1,500 1,500

Print Date: 3/23/2017 9:50:40 AM Page: 22 of 123

Page 23: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1208 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 350 Agency GLENDALE

Traffic Signal Synchronization – along parallel arterials, I-5 North corridor:This project provides for an upgrade to the traffic signal communication facilities to improve signal coordination along regional arterials in the vicinity of the I-5 North construction corridor.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

35 315 350 35 315 350

LA0G1208 Total 35 315 350 35 315 350

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1209 Los Angeles SCAB REG0703 ADM83 L EXEMPT - 93.126 0

Description: PTC 150 Agency GLENDALE

I-5 North Construction Mitigation Project Management and Support Services:This project is to provide project management and support services for oversight and administration of mitigation projects defined in the Measure R construction mitigation project.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

150 150 75 75 150

LA0G1209 Total 150 150 75 75 150

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1265 Los Angeles SCAB REG0703 PLN40 L EXEMPT - 93.126 0

Description: PTC 293 Agency GLENDALE

The Space 134 project includes preliminary engineering studies of a freeway cap on the 134 Freeway in Glendale, as well as how the cap may interface with on-ramps and off-ramps on the Freeway between Pacific Avenue and Glendale Avenue and the potential east-west transit line planned between North Hollywood and Pasadena. (PE only)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

293 293 293 293

LA0G1265 Total 293 293 293 293

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1266 Los Angeles SCAB REG0703 STUDY L EXEMPT - 93.126 0

Description: PTC 408 Agency GLENDALE

Verdugo Wash Cycle Track Feasibility and conceptual design project: A 9.4 Miles Cycle track along Verdugo Wash connecting North Glendale to downtown Glendale, Griffith Park, and Los Angeles River Trail.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

408 408 408 408

LA0G1266 Total 408 408 408 408

Print Date: 3/23/2017 9:50:40 AM Page: 23 of 123

Page 24: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1267 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 1,000 Agency GLENDALE

OCEANVIEW BOULEVARD REHABILITATION PROJECT BETWEEN VERDUGO ROAD AND CITY NORTHERLY BOUNDARY.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

1,000 1,000 1,000 1,000

LA0G1267 Total 1,000 1,000 1,000 1,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1356 Los Angeles SCAB 1AL04 NCNH2 L EXEMPT - 93.127 5

Description: PTC 1,200 Agency GLENDALE

The project will involve installing new or modifying the existing traffic signals at the intersections of Pacific Ave and Glenwood Rd, San Fernando Rd and Los Angeles St, Central Ave and Chevy Chase Dr, and Honolulu Ave and La Crescenta Ave to reduce delays and improve vehicular access to and from the I-5, SR-134 and I-210 freeways.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

120 1,080 1,200 600 600 1,200

LA0G1356 Total 120 1,080 1,200 600 600 1,200

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1357 Los Angeles SCAB 7120004 NCN26 L NON-REPORTABLE TCM

COMMITTED5

Description: PTC 165 Agency GLENDALE

Installation of Class III Bikeroutes Phase 2 on Geneva Street, Adams Street, Harvey Drive, Rossmoyne Avenue, Stocker Street, Ethel Street, Lexington Drive and California Avenue.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

165 165 165 165

LA0G1357 Total 165 165 165 165

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G808 Los Angeles SCAB REG0703 STUDY L EXEMPT - 93.126 0

Description: PTC 600 Agency GLENDALE

The Study is for the Glendale Narrows Riverwalk Bridge over the Los Angeles River will provide a connection to Griffith Park from the communities north and east of the park that are now separated from the park by the Los Angeles River Channel and the two freeways that converge along the side of the channel adjacent to Griffith Park.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

600 600 600 600

LA0G808 Total 600 600 600 600

Print Date: 3/23/2017 9:50:40 AM Page: 24 of 123

Page 25: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G809 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 0

Description: PTC 300 Agency GLENDALE

Construction of Citywide Bikeway Facility This project includes construction of class II, and Sharrows recommended in the Glendale Bicycle Master Plan and installation of citywide bike racks, and other amenities related to bicycle. The project length may include over 12 miles of bike lanes.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

300 300 300 300

LA0G809 Total 300 300 300 300

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G811 Los Angeles SCAB 1AL04 NCRH3 L EXEMPT - 93.127 0

Description: PTC 2,054 Agency GLENDALE

State Route 134 / Glendale Avenue Interchange Modification This project includes upgrading the traffic signal at the SR-134 Eastbound on and off ramps and Glendale Avenue, upgrading the traffic signal at Glendale Avenue and Monterey Road, realignment of Coronado and Monterey Rd. and Glendale Ave., realignment of medians on Monterey Rd, realignment of curb and gutter on the east side of Glendale Ave.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

149 105 1,800 2,054 2,054 2,054

LA0G811 Total 149 105 1,800 2,054 2,054 2,054

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G812 Los Angeles SCAB 7120004 NCR26 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 881 Agency GLENDALE

Glendale Narrows Bikeway Culvert Bridge This project consist of construction of a small bridge over a culvert to connect Glendale Narrows to Flower Street to create a class I bikelanes along Los Angeles River. Project length is under a mile.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

119 762 881 881 881

LA0G812 Total 119 762 881 881 881

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3714 Los Angeles SCAB 1AL04 TDM24 L EXEMPT - 93.126 0

Description: PTC 670 Agency GLENDALE

Arroyo Verdugo Commute Manager System. Development of a customized TDM-specific geographically based website.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 252 252 252 252LOCAL TRANS FUNDS 418 418 418 418LAF3714 Total 670 670 670 670

Print Date: 3/23/2017 9:50:40 AM Page: 25 of 123

Page 26: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3715 Los Angeles SCAB 1TR1023 ITS05 L TCM Committed 0

Description: PTC 694 Agency GLENDALE

Advanced Wayfinding and Guidance System. Installation of 10 permanent changeable message signs (large) and 20 street changeable message signs (small) that will provide real-time dynamic directions to available parking.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 208 208 208 208LOCAL TRANS FUNDS 486 486 486 486LAF3715 Total 694 694 694 694

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5307 Los Angeles SCAB 1ITS04 ITS04 L TCM Committed 4

Description: PTC 696 Agency GLENDALE

Glendale Sub-regional traffic management center. Project will connect to the traffic signal network citywide and will design and implement a subregional Traffic Management Center(TMC)., System will be integrated with Metro's Regional Integration of ITS (RIITS) and the County Information Exchange Network (IEN) systems.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 26 148 174 174 174PROP "C25" FUNDS 78 444 522 522 522LAF5307 Total 104 592 696 696 696

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7321 Los Angeles SCAB 1ITS04 ITS14 L EXEMPT - 93.126 2

Description: PTC 673 Agency GLENDALE

GLENDALE REGIONAL ARTERIAL TRAFFIC PERFORMANCE MEASUREMENT SYSTEM : Implements arterial performance measurement system in the Glendale Traffic Management Center (GTMC) to extract info from real-time Intelligent Transportation Systems (ITS). System will provide real-time corridor conditions and performance measures to Los Angeles County Information Exchange Network (IEN).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

18 124 142 110 32 142

PROP "C25" FUNDS 65 466 531 410 121 531LAF7321 Total 83 590 673 520 153 673

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7709 Los Angeles SCAB 1O1007 NCN26 L TCM 0

Description: PTC 1,661 Agency GLENDALE

GLENDALE REGIONAL BIKE PARKING NETWORK : Provides 2 high capacity bike parking facilities and 20 wayfinding signs for bicycle users within the City of Glendale, specifically Glendale Larry Zarian Transportation Center and the Glendale Marketplace/Public Library.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 599 599 599 599LOCAL TRANS FUNDS 747 747 747 747

Print Date: 3/23/2017 9:50:40 AM Page: 26 of 123

Page 27: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

MEASURE R 20H - HIGHWAY CAPITAL

315 315 315 315

LAF7709 Total 1,661 1,661 1,661 1,661

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9624 Los Angeles SCAB 1O1008 NCR25 L EXEMPT - 93.126 2

Description: PTC 2,267 Agency GLENDALE

First/Last Mile Complete Streets improvements connecting Tropico and Atwater Village to regional connections through the Glendale's Amtrak/Metrolink station and Metro Rapid buses

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 711 711 352 359 711PROP "C10" FUNDS 1,556 1,556 771 785 1,556LAF9624 Total 2,267 2,267 1,123 1,144 2,267

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1321 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 2

Description: PTC 2,000 Agency HAWTHORNE

The scope involves all phases PA/ED, PS&E, ROW and, Construction. The project will environmentally clear and design traffic signal modifications, traffic striping, adjustment of utilities, excavation and removal of existing pavement, concrete, asphalt, construction of curb, gutter, sidewalks, driveways, retaining walls, storm drain, raised medians and ADA ramps. Additionally, other items not listed here may be necessary to complete the improvements. Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 450 1,550 2,000 900 1,100 2,000LA0G1321 Total 450 1,550 2,000 900 1,100 2,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1353 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 2

Description: PTC 5,500 Agency HAWTHORNE

Project enhances existing multi-modal services as well as integrating new such as a Class II Bicycle Lane improved pedestrian support such as wider sidewalk pedestrian crossing signals with countdown capability improved access between transit vehicles and transit patrons through relocation and adjustment of transit stops and improved signalization along the Boulevard all of which provide a well-balanced network of circulation to region. Improvement to the storm drain system .Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 200 900 1,100 200 900 1,100MEASURE R 20H - HIGHWAY CAPITAL

600 3,800 4,400 600 1,000 2,800 4,400

LA0G1353 Total 800 4,700 5,500 800 1,900 2,800 5,500

Print Date: 3/23/2017 9:50:40 AM Page: 27 of 123

Page 28: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G737 Los Angeles SCAB LAE2906 CAX63 L NON-EXEMPT 0

Description: PTC 3,600 Agency HAWTHORNE

Marine Avenue and Aviation Boulevard Intersection improvement project includes street Widening. Proposing to widen the north side of Marine Avenue to add the needed lane capacity on Marine Avenue at Aviation Boulevard. This project will require 23’ of dedication from FFA right-of-way on the north side of Marine Avenue to accommodate a second westbound left-turn land (resulting in double left-turn lanes), a 3rd westbound through lane and a dedicated westbound right-turn pocketFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 200 100 300 300 300MEASURE R 660 140 2,500 3,300 1,800 1,500 3,300LA0G737 Total 860 240 2,500 3,600 2,100 1,500 3,600

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5101 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 7,099 Agency HAWTHORNE

El Segundo Boulevard Improvement Project. This project is located in the City of Hawthorne and will improve El Segundo Bl at the intersections of Hawthorne Bl, Prairie Av, Doty Av, Cerise Av, and Chadron Av, a distance of 1.3 miles. The intersection of El Segundo Bl and Prairie Av will be widened to accommodate a dedicated westbound right-turn lane and to restripe El Segundo Bl to accommodate dual left-turn lanes for both the eastbound and westbound directions.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 115 3,336 3,451 115 3,336 3,451PROP "C25" FUNDS 380 60 3,208 3,648 360 3,288 3,648LAF5101 Total 495 60 6,544 7,099 475 6,624 7,099

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7101 Los Angeles SCAB 1AL04 ITS02 L TCM 6

Description: PTC 5,196 Agency HAWTHORNE

PRAIRIE AVENUE MOBILITY PROJECT : (1) Widens Prairie Av interesections at El Segundo Bl and at Rosecrans Av to construct double left-turn pockets for traffic flow improvement and to install Class III bike routes on both sides. (2) Traffic signal upgrade and synchronization of 8 intersections between 118th and Marine. (3) Installs Class III bike equipments, improves pedestrian facilties, and upgrades ADA access ramps, new median curbs and landscaping at intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 1,020 1,020 1,020 1,020CITY FUNDS 30 320 350 350 350MEASURE R 116 14 1,107 1,237 1,237 1,237PROP "C25" FUNDS 476 2,113 2,589 2,589 2,589LAF7101 Total 622 14 4,560 5,196 5,196 5,196

Print Date: 3/23/2017 9:50:40 AM Page: 28 of 123

Page 29: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1257 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 2

Description: PTC 1,000 Agency HIDDEN HILLS

Intersection improvements to increase traffic flow, alleviate traffic congestion, and reduce necessary conflicts between pedestrians and vehicles along Long Valley Road and on Valley Circle Boulevard. Improvements will include: a traffic signal at the Long Valley Road/101 Freeway northbound onramp intersection; ADA compliant sidewalks on the Long Valley ramp and Valley Circle Boulevard; fence; retaining wall; retaining wall; and pedestrian route signage on the Long Valley Ramp.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

177 148 675 1,000 70 285 645 1,000

LA0G1257 Total 177 148 675 1,000 70 285 645 1,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7312 Los Angeles SCAB 1ITS04 ITS14 L TCM Committed 0

Description: PTC 1,186 Agency HUNTINGTON PARK

HUNTINGTON PARK SIGNAL SYNCHRONIZATION & BUS SPEED IMPROVEMENT : (1) Synchronizes signalized intersections, reconfigures traffic lanes to allow dual turning lanes, installs changeable message signs along Pacific Bl. (2) Signal improvements including controller upgrades, new masts, video activated traffic controllers, and synchronization of signalized mid-block pedestrian crossings on Pacific Bl.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 249 249 98 151 249PROP "C25" FUNDS 937 937 368 569 937LAF7312 Total 1,186 1,186 466 720 1,186

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7702 Los Angeles SCAB 1TR1023 TDM24 L TCM 0

Description: PTC 780 Agency HUNTINGTON PARK

DOWNTOWN HUNTINGTON PARK I-PARK SYSTEM IMPLEMENTATION : Provides 4 changeable messaging parking signs, 12 wayfinding parking signs, 10 bicycle racks, and 6 bicycle lockers at the Downtown shared parking district along Pacific Bl to improve bicycle access and improve traffic circulation.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 36 198 234 234 234LOCAL TRANS FUNDS 84 462 546 546 546LAF7702 Total 120 660 780 780 780

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M006 Los Angeles SCAB 1O1008 NCR30 L EXEMPT - 93.126 2

Description: PTC 1,793 Agency HUNTINGTON PARK

Uncontrolled Crosswalk Pedestrian Safety Enhancement Project. The project focuses on 22 existing unprotected crosswalks near schools, either mid-block or across major arterials in the City. The project will installing safety enhancements for peds at these locations or eliminating hazardous conditions.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 14 22 36 14 22 36

Print Date: 3/23/2017 9:50:40 AM Page: 29 of 123

Page 30: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ACTIVE TRANSPORTATION PROGRAM - MPO

172 1,585 1,757 172 1,585 1,757

LATP16M006 Total 186 1,607 1,793 186 1,607 1,793

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D443 Los Angeles SCAB LA0D443 NCR36 L EXEMPT - 93.126 0

Description: PTC 2,912 Agency INDUSTRY

REHABILITATING THE EXISTING AZUSA AVE. BRIDGE OVER THE UPRR TRACKS AND VALLEY BLVD, APPLY NEW PAINT TO THE EXISTING STEEL BRIDGE TO AVOID FURTHER WEATHER CORROSION. UTILIZING TOLL CREDITS TO MATCH STPLFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 5 5 5 5AGENCY 100 1,500 1,600 1,600 1,600CITY FUNDS 1,307 1,307 1,307 1,307LA0D443 Total 105 2,807 2,912 1,600 1,312 2,912

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5100 Los Angeles SCAB LAF5100 CAX63 L NON-EXEMPT 0

Description: PTC 16,819 Agency INDUSTRY

SR57/60 Confluence, Improve Grand Avenue intersection at Golden Springs Drive: Widen Grand Ave, from SR-60 Freeway to Lavender Drive, a distance of 0.2 miles. Project will add 1 thru SB lane and 2 thru NB lane. Widen Golden Springs Drive between Copley Dr and Racquet Club Drive. Add WB left-turn lane and a dedicated right-turn lane, Widen sidewalks and add pedestrian countdown signals.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 10,091 10,091 3,138 6,953 10,091PROP "C25" FUNDS 6,728 6,728 2,092 4,636 6,728LAF5100 Total 16,819 16,819 5,230 11,589 16,819

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D188 Los Angeles SCAB LA0D188 NCR29 L EXEMPT - 93.126 0

Description: PTC 3,532 Agency INGLEWOOD

ARBOR VITAE STREET FROM LA BREA AVENUE TO PRAIRIE AVENUE - RECONSTRUCTING/UPGRADING PAVEMENT, NEW C&G, SIDEWALKS, DRIVEWAYS, PEDESTRIAN RAMPS, LANDSCAPING AND STREET LIGHTING.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO - TEA 21 176 2,650 2,826 2,826 2,826CITY FUNDS 44 662 706 706 706LA0D188 Total 220 3,312 3,532 3,532 3,532

Print Date: 3/23/2017 9:50:40 AM Page: 30 of 123

Page 31: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5300 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 1,245 Agency INGLEWOOD

City of Inglewood ITS - Phase IV. 2.5 miles of fiber-optics on La Cienega Blvd., Centinela Ave., Florence Ave. and Prairie Ave. New CCTV, speed detection systems and web-based traveler information. Upgrade the current Traffic Control System (TCS) to Adaptive TCS and replace 4 Type 170 controllers with Type 2070 controllers on Prairie Ave. There are approximately 23 intersections that will receive various ITS improvements. And, upgrade legacy Ethernet switches to enhance operational system.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 68 181 249 127 122 249PROP "C25" FUNDS 270 726 996 507 489 996LAF5300 Total 338 907 1,245 634 611 1,245

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7319 Los Angeles SCAB 1ITS04 ITS14 L TCM 0

Description: PTC 1,918 Agency INGLEWOOD

Inglewood ITS - PHASE V : (1) Designs and constructs computerized traffic control and monitoring systems. (2) Expands central traffic control and advance traffic management at 39 interseections (3) improves 6.13 miles of fiber optic communications, (4) expands Closed Circuit Television Cameras (CCTV) at 10 intersections, (5) installs Changeable Message Signs (CMS) at 2 intersections, and (6) installs ew communication hubs at 3 intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 66 318 384 384 384PROP "C25" FUNDS 262 1,272 1,534 1,534 1,534LAF7319 Total 328 1,590 1,918 1,918 1,918

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9202 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 2

Description: PTC 1,542 Agency INGLEWOOD

Manchester and La Cienega Geometric Improvements: Enhance goods movement by increasing turn radii, improve traffic flow and signal operation. Improvements will benefit operations, upgrade safety & efficiency of the intersectionsFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 357 357 38 211 108 357PROP "C25" FUNDS 1,185 1,185 125 701 359 1,185LAF9202 Total 1,542 1,542 163 912 467 1,542

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9307 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 2

Description: PTC 1,508 Agency INGLEWOOD

City of Inglewood ITS phase VI project: 5,280 feet of fiber optic along Pincay Drive; Replace 170 controllers with Type 2070 controllers at twelve intersections; Traffic signal synchronization along Pincay Drive between Prairie and Crenshaw; Install changeable message sign at Century/Prairie; and Modernizing City Hall TMC to provide Adaptive Traffic Control and meet current standards.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 70 232 302 14 105 183 302

Print Date: 3/23/2017 9:50:40 AM Page: 31 of 123

Page 32: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C25" FUNDS 278 928 1,206 56 419 731 1,206LAF9307 Total 348 1,160 1,508 70 524 914 1,508

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M007 Los Angeles SCAB REG0703 PLN40 L EXEMPT - 93.126 2

Description: PTC 154 Agency IRWINDALE

Citywide Non Motorized Design Guidelines and Active Transportation Action Plan. Prepare a Citywide Non Motorized Active Transportation Plan. Project includes plan adoption, community outreach, technical studies, bicycle and pedestrian counts, and design guidelines for infrastructure and support facilities.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalACTIVE TRANSPORTATION PROGRAM - MPO

154 154 154 154

LATP16M007 Total 154 154 154 154

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5522 Los Angeles SCAB 1O1008 NCR26 L TCM 4

Description: PTC 2,038 Agency LA CANADA-FLINTRIDGE

Foothill Blvd. Link Bikeway & Pedestrian Greenbelt Project, Briggs Ave. to Alta Canyada Rd, construct 1.5 miles of Class II Bike Lanes, bike and bus facilities, raised median and 0.5 miles of pedestrian beltway with lighting and hardscape.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 122 1,244 1,366 122 1,244 1,366MEASURE R 15 - LOCAL RETURN 450 450 450 450PROP "C20" FUNDS 60 138 198 198 198PROP "A" LOCAL RETURN 24 24 24 24LAF5522 Total 182 1,856 2,038 122 1,916 2,038

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7524 Los Angeles SCAB 7120004 NCN26 L TCM Committed 2

Description: PTC 1,872 Agency LA VERNE

La Verne Regional Commuter Bicycle Gap Closure Project. A range of proposed enhancements will significantly improve the bicycle infrastructure in the city of La Verne and strengthen regional connectivity by closing critical gaps in an integrated bike network spanning the northeastern San Gabriel Valley.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 320 320 320 320ACTIVE TRANSPORTATION PROGRAM - MPO

400 1,152 1,552 400 1,152 1,552

LAF7524 Total 400 1,472 1,872 400 1,472 1,872

Print Date: 3/23/2017 9:50:40 AM Page: 32 of 123

Page 33: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G937 Los Angeles SCAB 1AL04 CAX63 L NON-EXEMPT 0

Description: PTC 2,885 Agency LAKEWOOD

Del Amo Boulevard at Lakewood Boulevard Intersection Improvements - add a second left turn lane in all directions, modify existing traffic signals, widen box culvert south of Del Amo Boulevard, remove or modify raised medians on Lakewood Boulevard, widen southside of Del Amo Boulevard (no new thru lanes), and widen Lakewood Boulevard to accomodate a third thru lane southbound through the intersection within the existing right of way in the Cities of Lakewood and Long Beach.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 597 2,288 2,885 597 2,288 2,885LA0G937 Total 597 2,288 2,885 597 2,288 2,885

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D447 Los Angeles MDAB LA0D447 CAX76 L NON-EXEMPT 0

Description: PTC 4,620 Agency LANCASTER

AVENUE L GAP CLOSURE FROM 60TH STREET WEST TO 30th West, Adding an additional lane in each direction, including a median (within City Jurisdiction)

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 400 220 4,000 4,620 300 4,320 4,620LA0D447 Total 400 220 4,000 4,620 300 4,320 4,620

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G166 Los Angeles MDAB 1NL04 CAXT2 L NON-EXEMPT 0

Description: PTC 1,140 Agency LANCASTER

Widening of 30th St West from Avenue M to Avenue L (approx. 1 mile) from 2 vehicular travel lanes to 4 lanes. 8 foot Class II bike lanes will be stripped on both sides of the street.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 205 935 1,140 205 935 1,140LA0G166 Total 205 935 1,140 205 935 1,140

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G927 Los Angeles MDAB 1AL04 CARH3 L NON-EXEMPT 2

Description: PTC 15,000 Agency LANCASTER

SR-138 (SR-14)/Avenue G Interchange Improvements. Project will widen Avenue G between 10th Street West and 25th Street West, including geometric changes to the SR-138 (SR-14) on/off ramps, improvements to the intersection controls, and pedestrian and bike improvements.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

2,450 650 11,900 15,000 3,100 11,900 15,000

LA0G927 Total 2,450 650 11,900 15,000 3,100 11,900 15,000

Print Date: 3/23/2017 9:50:40 AM Page: 33 of 123

Page 34: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G928 Los Angeles MDAB 1AL04 CAX70 L NON-EXEMPT 2

Description: PTC 10,000 Agency LANCASTER

SR-138 (SR-14)/Avenue J Interchange Improvements. Project will include a new northbound off ramp and southbound on ramp for SR-138 at Avenue J, new traffic signals at the on and off ramps, and mainline improvements to accommodate interchange geometric changes. Improvements will also be made on Avenue J between 15th Street West and 30th Street West including traffic signal modifications, pedestrian and bikeway improvements.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

1,700 1,600 6,700 10,000 1,700 1,600 6,700 10,000

LA0G928 Total 1,700 1,600 6,700 10,000 1,700 1,600 6,700 10,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G929 Los Angeles MDAB 1AL04 CAX76 L NON-EXEMPT 0

Description: PTC 15,000 Agency LANCASTER

SR138 (SR-14) Avenue K Off-Ramp Improvements:1.NB off ramp intersection at Avenue K & 15th St W a r-turn pocket (under study) 2.Intersection modifications at Ave K & 10th Street W (to support r-turn pocket under study) 3.Ave K Gap closure from 10th St W to 12th St W widen to 3 lanes in the WB direction (currently 2 WB lanes west of 10th St. W and 3 WB lanes west of 12th St. W), 4.Class I bikepath along Amargosa Creek btw Avenue K and Avenue J-8 (apox 0.001 mi), 5. Freeway landscape improvements.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

2,550 2,450 10,000 15,000 5,000 10,000 15,000

LA0G929 Total 2,550 2,450 10,000 15,000 5,000 10,000 15,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G931 Los Angeles MDAB 1AL04 CARH3 L NON-EXEMPT 2

Description: PTC 20,000 Agency LANCASTER

SR-138 (SR-14)/Avenue M Interchange Improvements. Project will widen Avenue M between 10th Street West and 20th Street West and enhance traffic operations at on and off ramps, including intersection modifications for vehicles, pedestrians and bikes.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

3,300 1,100 15,600 20,000 3,900 500 15,600 20,000

LA0G931 Total 3,300 1,100 15,600 20,000 3,900 500 15,600 20,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5304 Los Angeles MDAB 1ITS04 ITS08 L EXEMPT - 93.126 0

Description: PTC 2,018 Agency LANCASTER

Traffic Signal System Modernization. The project boundaries are from Ave H to Ave N and 70th St West to 30th St East. It will replace 28 miles of copper cable with fiber optic in existing conduit, install new Ethernet switches in existing controller cabinets, update existing fiber backbone equipment, install equipment to view images remotely through existing video detection, and install wireless communications to remote signalized intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 167 842 1,009 167 842 1,009

Print Date: 3/23/2017 9:50:40 AM Page: 34 of 123

Page 35: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C25" FUNDS 1,009 1,009 676 333 1,009LAF5304 Total 167 1,851 2,018 843 1,175 2,018

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S002 Los Angeles MDAB 1AL04 NCN29 L EXEMPT - 93.126 2

Description: PTC 7,824 Agency LANCASTER

Pedestrian Gap Closure Improvements. Construction of curb, gutter, and sidewalk improvements to close the gap between existing improvements in order to increase pedestrian safety and mobility.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 80 218 1,267 1,565 80 218 1,267 1,565ACTIVE TRANSPORTATION PROGRAM

320 873 5,066 6,259 320 873 5,066 6,259

LATP16S002 Total 400 1,091 6,333 7,824 400 1,091 6,333 7,824

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1053 Los Angeles SCAB 1AL04 CAX76 L NON-EXEMPT 0

Description: PTC 3,615 Agency LAWNDALE

Inglewood Avenue Widening Phase III - Inglewood Avenue roadway widening on the west side of the roadway to provide for the addition of a third southbound lane between Rosecrans Avenue and Marine Avenue and raised median islands with sidewalk enhancements adjacent to Lawndale High School.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalBONDS - LOCAL 1,100 1,100 1,100 1,100CITY FUNDS 343 343 343 343PROP "C25" FUNDS 200 554 1,418 2,172 2,172 2,172LA0G1053 Total 200 554 2,861 3,615 3,615 3,615

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2906 Los Angeles SCAB 1AL04 CAX76 L NON-EXEMPT 0

Description: PTC 4,515 Agency LAWNDALE

Inglewood Avenue Widening Phase I-II: Inglewood Widening between Manhattan Beach Blvd and West 156th Street the roadway widening along east side of Inglewood Avenue to accommodate a dedicated third lane in the north bound direction (Phase I); and Inglewood Avenue at Marine Avenue for roadway widening to accommodate three dedicated right turn lane pockets, as well as modification to the signal system to improve traffic operations at this intersection (Phase II).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 497 2,103 2,600 2,600 2,600AGENCY 100 146 246 246 246PROP "C20" FUNDS 595 55 650 595 55 650PROP "C25" FUNDS 1,019 1,019 1,019 1,019LAE2906 Total 595 652 3,268 4,515 595 3,920 4,515

Print Date: 3/23/2017 9:50:41 AM Page: 35 of 123

Page 36: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7500 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 0

Description: PTC 234 Agency LAWNDALE

HAWTHORNE BOULEVARD CLASS II BICYCLE LANES: (1) Installs 1.0 mile of Class 2 bike lanes on Hawthorne Blvd for both directions. (2) Provides bicycle parking.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 47 47 47 47LOCAL TRANS FUNDS 187 187 187 187LAF7500 Total 234 234 234 234

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9101 Los Angeles SCAB 1AL04 ITS02 L TCM Committed 2

Description: PTC 5,197 Agency LAWNDALE

Project includes design features to accommodate the future widening of I-405 off-ramps (pending details when Caltrans will perform this), re-striping, traffic signal upgrades at five locations, turn pockets where geometrically possible, 0.7 Miles of class II bike lanes, concrete bus pads, pavement upgrade, addition of landscaped median islands, and concrete repairs for ADA compliance. Minimal right-of-way will be required for installing additional turn pockets.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 1,834 1,834 482 1,352 1,834PROP "C25" FUNDS 3,363 3,363 883 2,480 3,363LAF9101 Total 5,197 5,197 1,365 3,832 5,197

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G972 Los Angeles SCAB 7120001 NCR30 L EXEMPT - 93.126 0

Description: PTC 900 Agency LOMITA

In Lomita, Pacific Coast Highway at Walnut St & Western Ave at Palos Verdes Drive North. Improve mutliphase signal operations, optimize cycles, employ protected -permissive left-turn phases, restrict and control turning with striping on Walnut. Employ emergency vehicle preemption. Crosswalk markings, audible ped signal and countdown devices. ADA median improvement, signal upgrades, bicycle detection, signal head, lens & visor upgrades.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

90 810 900 90 810 900

LA0G972 Total 90 810 900 90 810 900

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0C8094 Los Angeles SCAB LA0C8094 NCR31 L EXEMPT - 93.126 0

Description: PTC 440,007 Agency LONG BEACH

PIER B INTERMODAL RAILYARD EXPANSION. PROJECT WILL EXPAND PIER B INTERMODAL RAILYARD TO FACILITATE ADDITIONAL RAIL SHIPMENTS.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPORT FUNDS 41,597 14,683 480 56,760 28,767 1,572 8,290 18,131 56,760LA0C8094 Total 41,597 14,683 480 56,760 28,767 1,572 8,290 18,131 56,760

Print Date: 3/23/2017 9:50:41 AM Page: 36 of 123

Page 37: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G088 Los Angeles SCAB 1AL04 NCN31 L EXEMPT - 93.126 0

Description: PTC 110,580 Agency LONG BEACH

Grade Seperation For Reeves Crossing at Terminal Island would eliminate traffic conflicts and allow efficient movement of trains in Terminal Island without concern for impacts to vehicular traffic.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPORT FUNDS 14,120 96,460 110,580 19,120 80,000 11,460 110,580LA0G088 Total 14,120 96,460 110,580 19,120 80,000 11,460 110,580

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1318 Los Angeles SCAB 1M1004 NCNH2 L EXEMPT - 93.127 2

Description: PTC 454 Agency LONG BEACH

This is an I-605 hot spot related intersection project. The purpose of this project is to replace/adjust 2 signals for the timing, alleviate the congestion and delays.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

106 348 454 75 379 454

LA0G1318 Total 106 348 454 75 379 454

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1319 Los Angeles SCAB 1M1004 NCRH1 L EXEMPT - 93.127 2

Description: PTC 493 Agency LONG BEACH

This project is an I-605 hot spot related intersection project. The purpose of this project is to increase the left-turn storage capacity, alleviate the congestion and delays.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

83 410 493 65 428 493

LA0G1319 Total 83 410 493 65 428 493

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G171 Los Angeles SCAB 1AL04 RAN07 L EXEMPT - 93.126 0

Description: PTC 12,850 Agency LONG BEACH

Navy Mole Storage Yard: The proposed project includes three new tracks along the west side of Pier T. This project will also involve relocating the existing utilities.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPORT FUNDS 1,620 11,230 12,850 1,620 1,000 10,230 12,850LA0G171 Total 1,620 11,230 12,850 1,620 1,000 10,230 12,850

Print Date: 3/23/2017 9:50:41 AM Page: 37 of 123

Page 38: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G172 Los Angeles SCAB 1AL04 TRR15 L EXEMPT - 93.126 0

Description: PTC 22,000 Agency LONG BEACH

TI Wye Track Realignment: This project will provide for double tracking the south leg of the wye to accommodate simultaneous train switching moves from these various activities on Terminal Island.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPORT FUNDS 4,000 18,000 22,000 2,263 3,122 16,615 22,000LA0G172 Total 4,000 18,000 22,000 2,263 3,122 16,615 22,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G173 Los Angeles SCAB 1ITS04 RAN07 L EXEMPT - 93.126 0

Description: PTC 29,000 Agency LONG BEACH

Reconfiguration of Control Point (CP) Mole - The new control point at the Mole will enable increased train speeds and reduced train delays caused by manual switch operations.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPORT FUNDS 3,800 25,200 29,000 7,600 21,400 29,000LA0G173 Total 3,800 25,200 29,000 7,600 21,400 29,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G830 Los Angeles SCAB LA0G830 CAX77 L NON-EXEMPT 4

Description: PTC 85,000 Agency LONG BEACH

I-710 Improvements/Shoemaker Bridge Replacement – Replace the existing Shoemaker bridge with a new bridge. The new bridge will be reduced to have two mixed-flow lanes in the NB and in the SB directions to tie the flow into I-710. The new bridge will also include pedestrian and bicycle access. Additionally, bicycle, pedestrian, and street enhancements will be provided on adjacent thoroughfares.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 2,400 2,400 2,400 2,400CITY FUNDS 2,664 74,436 77,100 2,664 74,436 77,100MEASURE R 20H - HIGHWAY CAPITAL

5,500 5,500 2,900 2,600 5,500

LA0G830 Total 8,164 76,836 85,000 5,564 79,436 85,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0701 Los Angeles SCAB LAE0701 NCRT2 L EXEMPT - 93.126 0

Description: PTC 1,920 Agency LONG BEACH

DEVELOP AND IMPLEMENT TRAFFIC CALMING MEASURES FOR TRAFFIC EXITING THE I-710 INTO LONG BEACH

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 1,600 1,600 1,600 1,600AGENCY 64 256 320 320 320LAE0701 Total 64 1,856 1,920 1,920 1,920

Print Date: 3/23/2017 9:50:41 AM Page: 38 of 123

Page 39: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1296 Los Angeles SCAB LAE1296 ITS12 L TCM Committed 0

Description: PTC 2,880 Agency LONG BEACH

LONG BEACH INTELLIGENT TRANSPORTATION SYSTEM WILL EXPAND THE CITY FIBER OPTIC COMMUNICATION NETWORK TO DEPLOY/ INTEGRATE ITS PROJECTS (ADAPTIVE SIGNALS, TRANSIT SIGNAL PRIORITY, LIGHT RAIL SIGNAL PRIORITY, AND CONNECTIVITY TO CITY FACILITIES.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 480 1,920 2,400 2,400 2,400CITY FUNDS 96 384 480 480 480LAE1296 Total 576 2,304 2,880 2,880 2,880

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE3793 Los Angeles SCAB LAE3793 NCR91 L EXEMPT - 93.127 0

Description: PTC 1,200 Agency LONG BEACH

CALIFORNIA AVE WIDENING: FROM WILLOW AVE AND SPRING ST WIDEN CALIFORNIA AVE TO SECONDARY MODIFIED HIGHWAY STREET STANDARDS (NON-CAPACITY).

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 1,000 1,000 1,000 1,000CITY FUNDS 200 200 200 200LAE3793 Total 1,200 1,200 1,200 1,200

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1528 Los Angeles SCAB 1NL04 NCR26 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 978 Agency LONG BEACH

San Gabriel River Bike Path Gap Closure at Willow Street. Creation of off-street bicycle path to achieve bicycle route gap closure on Willow Street from the San Gabriel River Bike Path west to Studebaker Road. Bike path distance .5 miles.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 92 691 783 92 691 783CITY FUNDS 131 64 195 195 195LAF1528 Total 223 755 978 92 886 978

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1649 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 2

Description: PTC 3,097 Agency LONG BEACH

Willow Street Pedestrian Improvement Project. This project provides pedestrian-oriented improvements to Willow St including medians, pedestrian lighting, landscaping, signage and crosswalk treatments.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 2,180 2,180 2,180 2,180CITY FUNDS 531 386 917 531 386 917LAF1649 Total 531 2,566 3,097 531 2,566 3,097

Print Date: 3/23/2017 9:50:41 AM Page: 39 of 123

Page 40: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3518 Los Angeles SCAB 1NL04 NCN26 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 2,655 Agency LONG BEACH

Daisy Corridor and 6th Street Bike Boulevard. CONSTRUCT TWO (2) BICYCLE BOULEVARDS ALONG TWO CORRIDORS KNOWN AS THE DAISY CORRIDOR AND 6TH STREET IN LONG BEACH. THE PROPOSED BIKE BOULEVARD ALONG THE DAISY CORRIDOR IS A NORTH-SOUTH ROUTE BETWEEN BROADWAY. Bike lane (Class II) is less than 1 mile.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,115 1,115 1,115 1,115CITY FUNDS 182 182 182 182SAFE ROUTES TO SCHOOL (SR2S)

375 983 1,358 1,358 1,358

LAF3518 Total 375 2,280 2,655 1,358 1,297 2,655

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3615 Los Angeles SCAB 1NL04 NCN27 L EXEMPT - 93.126 0

Description: PTC 2,521 Agency LONG BEACH

Long Beach Blvd. Pedestrian Improvement Project. Project provides pedestrian-oriented improvements to Long Beach Boulevard including pedestrian lighting, street trees, and crosswalk treatments.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 1,722 1,722 1,722 1,722CITY FUNDS 200 599 799 799 799LAF3615 Total 200 2,321 2,521 2,521 2,521

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5808 Los Angeles SCAB 1O1009 NCR27 L EXEMPT - 93.126 2

Description: PTC 643 Agency LONG BEACH

Atlantic Avenue Streetscape Enhancements. This project is located in Long Beach along Atlantic Av between Market St and South St. It will install streetscape improvements, shade trees, pedestrian lighting and decorative pavement features. Funds are requested for design, construction and installation costs. The original scope of this project was reduced by eliminating the section between South St and Artesia Bl.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 322 322 322 322CITY FUNDS 50 175 225 225 225STATE CASH - RIP PRIOR 96 96 96 96LAF5808 Total 146 497 643 96 547 643

Print Date: 3/23/2017 9:50:41 AM Page: 40 of 123

Page 41: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7117 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 1,236 Agency LONG BEACH

REDONDO AVENUE AND ANAHEIM STREET INTERSECTION IMPROVEMENTS : (1) Widens Redondo Av and Anaheim St intersection and relocate bus stops and utilities to lengthen left-turn pockets in westbound and eastbound directions on Anaheim St. (2) Adds exclusive right-turn lane on southbound approach on Redondo Av. (3) Installs bus stop enhancements, bike-sensitive loop detectors, and bike ramps at intersection corners.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 74 420 494 494 494PROP "C25" FUNDS 111 631 742 742 742LAF7117 Total 185 1,051 1,236 1,236 1,236

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7204 Los Angeles SCAB 1AL04 CAY63 L NON-EXEMPT 0

Description: PTC 119,971 Agency LONG BEACH

PIER B STREET FREIGHT CORRIDOR RECONSTRUCTION : (1) Realigns Pier B St between Pico Av and Pier A Wy and widens into 2 lanes in each direction to improve goods movement mobility and enhance pedistrian travel. (2) Constructs new sidewalk on the south side of Pier B St. 3) Close the at-grade railroad crossing at 9th Street.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 10,955 10,955 10,955 10,955PORT FUNDS 24,971 25,369 50,340 1,423 2,719 5,318 5,318 5,318 4,875 25,369 50,340LAF7204 Total 24,971 36,324 61,295 1,423 2,719 5,318 5,318 5,318 15,830 25,369 61,295

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7314 Los Angeles SCAB 1ITS04 ITS14 L EXEMPT - 93.128 0

Description: PTC 3,199 Agency LONG BEACH

SANTA FE AVENUE SYNCHRONIZATION ENHANCEMENT PROJECT : (1) Upgrades traffic signals along the Santa Fe Av corridor and replaces obsolete equipments. (2) Replaces existing signal controllers with advanced traffic controllers to connect with the Adaptive Traffic Control System (ATCS). (3) Installs CCTVs and Class III bike route along Santa Fe Av. (4) Furnishs pedestrian push buttons and LED countdown pedestrian heads.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 106 1,173 1,279 141 127 1,011 1,279PROP "C25" FUNDS 160 1,760 1,920 212 191 1,517 1,920LAF7314 Total 266 2,933 3,199 353 318 2,528 3,199

Print Date: 3/23/2017 9:50:41 AM Page: 41 of 123

Page 42: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7316 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 3,045 Agency LONG BEACH

ARTESIA CORRIDOR ATCS ENHANCEMENT PROJECT : (1) Upgrades traffic signals along Artesia Bl between Long Beach Bl and Downey Av to connect with Adaptive Traffic Control System (ATCS). (2) Installs CCTV and CMS on Artesia Bl. (3) Installs fiber optic cable and devices to connect signals to each other and traffic management center (TMC). (4) Two new traffic signals in Compton (5) Installs Class II bike lane in both directions from Atlantic Av to Susana Rd. (6) Pedestrian improvements.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 220 998 1,218 249 969 1,218PROP "C25" FUNDS 44 1,783 1,827 373 1,454 1,827LAF7316 Total 264 2,781 3,045 622 2,423 3,045

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7522 Los Angeles SCAB 1O1007 NCN25 L TCM Committed 2

Description: PTC 1,336 Agency LONG BEACH

Delta Avenue Bicycle Boulevard. This north-south bicycle boulevard on Delta Ave (approximately 3 miles) in West Long Beach will consist of Class II lane segments and sharrow markings, traffic circles, a roundabout, and wayfinding signage to nearby Metro Blue Line stations and LA River Bike Path.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 261 261 131 130 261ACTIVE TRANSPORTATION PROGRAM

1,075 1,075 1,075 1,075

LAF7522 Total 261 1,075 1,336 131 1,205 1,336

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7615 Los Angeles SCAB 1O1008 NCN25 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 4,620 Agency LONG BEACH

MARKET STREET PEDESTRIAN & STREETSCAPE ENHANCEMENTS : This project is located in the City of Long Beach on Market St between Cherry Av and the Los Angeles River (1.9 mile). Improvement includes bulbouts, curb ramps, landscaping, street trees, street furniture, ped/bike wayfinding signage, enhanced crosswalks, ped lighting, flashing beacons, a Class II bike lane (0.5 mile), transit stop enhancements, new traffic signal (one at Walnut Ave), increased sidewalk width (at intersection & mid block).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 3,234 3,234 834 2,400 3,234CITY FUNDS 1,386 1,386 357 1,029 1,386LAF7615 Total 4,620 4,620 1,191 3,429 4,620

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9314 Los Angeles SCAB 1ITS04 ITS14 L TCM Committed 2

Description: PTC 3,258 Agency LONG BEACH

The project consists of signal synchronization, communication, transit, bicycle and ped improvements and inclusion of the corridor into the City's Adaptive Traffic Control System

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 652 652 1 54 597 652

Print Date: 3/23/2017 9:50:41 AM Page: 42 of 123

Page 43: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C25" FUNDS 2,606 2,606 4 216 2,386 2,606LAF9314 Total 3,258 3,258 5 270 2,983 3,258

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9808 Los Angeles SCAB 1TR1023 TDM24 L EXEMPT - 93.126 2

Description: PTC 1,063 Agency LONG BEACH

Park or Ride: A mobile application and parking guidance system infrastructure for parking, event, congestion, and multimodal options to encourage alternative transportation choices

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 480 480 34 111 141 162 32 480LOCAL TRANS FUNDS 583 583 41 135 171 197 39 583LAF9808 Total 1,063 1,063 75 246 312 359 71 1,063

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M010 Los Angeles SCAB 7120004 NCN26 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 13,749 Agency LONG BEACH

Coastal Bike Trail Connector-Ocean Blvd, Long Beach. This is a Class I bike path on Ocean Blvd Bridge, connecting the future Bixby Memorial Bicycle Path to the City of Long Beach existing/future bike network (approximately 0.5 mile). It will connect to the LA River bike path and close a gap in the California Coastal Trail. Utilizing Toll Credits as match to CMAQ.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 991 2,122 3,113 712 1,520 881 3,113PORT FUNDS 247 6,389 6,636 247 4,665 1,724 6,636ACTIVE TRANSPORTATION PROGRAM - MPO

4,000 4,000 4,000 4,000

LATP16M010 Total 1,238 12,511 13,749 959 5,520 5,546 1,724 13,749

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M011 Los Angeles SCAB 7120004 NCN25 L EXEMPT - 93.126 2

Description: PTC 9,549 Agency LONG BEACH

South Water Front/Pier j Bike and Pedestrian Path. The Pier J Bike Path will connect the Port to Downtown Long Beach via the Queensway Bridge bikeway (approximately 1.5 miles). Pedestrians and bike improvements in the Port will provide additional safety and mobility for non- motorized users and connect to Pier J.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 708 708 708 708PORT FUNDS 6,841 6,841 6,841 6,841ACTIVE TRANSPORTATION PROGRAM - MPO

2,000 2,000 2,000 2,000

LATP16M011 Total 9,549 9,549 9,549 9,549

Print Date: 3/23/2017 9:50:41 AM Page: 43 of 123

Page 44: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D461 Los Angeles SCAB LA0D461 CAYT2 L TCM Committed 0

Description: PTC 24,743 Agency LOS ANGELES COUNTY

RECONSTRUCT- THE OLD ROAD FROM HILLCREST PARKWAY TO LAKE HUGHES RD & WIDEN FROM 40' TO 68', 2 VEH. LANES and a 5' CLASS II BIKELANE IN EA DIR & STRIPPED MEDIAN (FROM 2 TO 4 LNS 2 EA DIR) for 2.1 miles.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 500 5,000 13,644 19,144 5,500 5,000 8,644 19,144PROP "C25" FUNDS 5,599 5,599 2,746 1,261 1,592 5,599LA0D461 Total 500 5,000 19,243 24,743 8,246 6,261 10,236 24,743

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D465 Los Angeles SCAB LA0D465 CAX63 L TCM 0

Description: PTC 11,538 Agency LOS ANGELES COUNTY

Colima Road-City of Whittier Limits to Fullerton Road, for a total distance of 4.9 miles. The project will widen Colima Rd by up to six feet at spot locations and restripe to accommodate three through lanes in each direction. A Class II bikeway from the City of Whittier will be extended to Allenton Av, a distance of 1.2 miles, and bus pads will be replaced. Includes median landscaping. Toll credit added in FY18/19 $28 in construction.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 4,422 4,422 4,422 4,422STP LOCAL 1,500 5,516 7,016 6,768 248 7,016LOCAL TRANS FUNDS 100 100 100 100LA0D465 Total 1,600 9,938 11,538 11,290 248 11,538

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1068 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 560 Agency LOS ANGELES COUNTY

Intersection Improvements at Norwalk Boulevard and Washington Boulevard. Provide additional westbound thru lane along Washington Boulevard. Increase northbound left turn storage along Norwalk Boulevard.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 10 10 10 10MEASURE R 20H - HIGHWAY CAPITAL

114 436 550 550 550

LA0G1068 Total 114 446 560 550 10 560

Print Date: 3/23/2017 9:50:41 AM Page: 44 of 123

Page 45: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1069 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 2,830 Agency LOS ANGELES COUNTY

Various intersection improvements at Norwalk Boulevard and Whittier Boulevard including left turn phasing, right turn phasing, adding right turn lanes, and left turn storage lengthening. A thru lane will be configured through some widening and re-stripping on southboud Norwalk about 350 feet on both sides of the intersectionFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

565 97 2,168 2,830 2,830 2,830

LA0G1069 Total 565 97 2,168 2,830 2,830 2,830

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1070 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 800 Agency LOS ANGELES COUNTY

The Project is various intersection improvements at Carmenita Road and Telegraph Rd. The work consists of: PROVIDE ADDITIONAL NB THRU LANE ALONG CARMENITA RD, PROVIDE ADDITIONAL EB LEFT TURN LANE ALONG TELEGRAPH RD, INCREASE WB LEFT TURN STORAGE ALONG TELEGRAPH RD and TELEGRAPH RD TO BE SIGNED AS A CLASS III BIKE ROUTE IN ACCORDANCE WITH THE LA COUNTY BICYCLE MASTER PLAN.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

164 11 625 800 175 625 800

LA0G1070 Total 164 11 625 800 175 625 800

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1072 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 1,740 Agency LOS ANGELES COUNTY

Various intersection improvements at Valley View Avenue and Imperial Highway including:PROVIDE ADDITIONAL WB LEFT TURN LANE ALONG IMPERIAL HIGHWAY, PROVIDE NB RIGHT TURN OVERLAP PHASING,PROVIDE ADDITIONAL EB LEFT TURN LANE ALONG IMPERIAL HIGHWAY, and VALLEY VIEW AVE TO BE SIGNED AS A CLASS III BIKE ROUTE IN ACCORDANCE WITH THE LA COUNTY BICYCLE MASTER PLANFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 100 100 100 100MEASURE R 20H - HIGHWAY CAPITAL

339 1,301 1,640 1,640 1,640

LA0G1072 Total 339 1,401 1,740 1,640 100 1,740

Print Date: 3/23/2017 9:50:41 AM Page: 45 of 123

Page 46: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1073 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 2,410 Agency LOS ANGELES COUNTY

Various intersection improvements at Painter Avenue and Mulberry Drive including: PROVIDE ADDITIONAL NB LEFT TURN LANE ALONG PAINTER AVE,PROVIDE EB RIGHT TURN POCKET ALONG MULBERRY DR, INCREASE EB LEFT TURN STORAGE ALONG MULBERRY DR, PROVIDE WB RIGHT TURN POCKET ALONG MULBERRY DR, INCREASE WB LEFT TURN STORAGE ALONG MULBERRY DR, PROVIDE NB RIGHT TURN POCKET ALONG PAINTER AVE, PROVIDE SB RIGHT TURN POCKET ALONG PAINTER AVE.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

468 143 1,799 2,410 2,410 2,410

LA0G1073 Total 468 143 1,799 2,410 2,410 2,410

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1108 Los Angeles SCAB LA000800 NCR36 L EXEMPT - 93.126 0

Description: PTC 2,499 Agency LOS ANGELES COUNTY

Match to HBP 3471 - Los Angeles County 3471 PM00043, Bridge Preventive Maintenance Program, various locations within the County of Los Angeles. This project is the match to HBP 3471 in group project LA000800. Toll Credits of $273 will be used to match FY17 federal funds for the CON phaseFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 115 2,384 2,499 115 2,384 2,499LA0G1108 Total 115 2,384 2,499 115 2,384 2,499

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1126 Los Angeles SCAB 7120004 STUDY L EXEMPT - 93.126 0

Description: PTC 1,498 Agency LOS ANGELES COUNTY

Non-infrastructure Pedestrian Plans and Programs in the unincorporated communities of West Whittier-Los Nietos, Lake Los Angeles, West Athens-Westmont and Walnut Park. Scope of work includes data collection and analysis,community participatory planning via collaboration , public awareness media campaign across unincorporated county communities, and tailored, culturally-competent outreach, education and encouragement programs specific to each community.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 53 53 53 53ACTIVE TRANSPORTATION PROGRAM

1,445 1,445 1,445 1,445

LA0G1126 Total 1,498 1,498 1,445 53 1,498

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1127 Los Angeles SCAB 7120004 NCN25 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 2,574 Agency LOS ANGELES COUNTY

The project involves construction of 0.6-mile long Class I bike and multiuse path facility. Project is located in the unincorporated area of North El Monte. The trail is a key East-West gap closure to connect Rio Hondo Bike Trail to the San Gabriel River Regional Bike Trail. Toll Credits of $23 will be used to match FY16 federal funds for the CON phase. Toll Credits - Local and State Hwyof $23 will be used to match FY17 federal funds for the CON phaseFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 200 200 200 200

Print Date: 3/23/2017 9:50:41 AM Page: 46 of 123

Page 47: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

COUNTY 500 328 828 828 828ACTIVE TRANSPORTATION PROGRAM

1,546 1,546 1,546 1,546

LA0G1127 Total 500 2,074 2,574 2,374 200 2,574

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1197 Los Angeles MDAB 1O1007 NCN26 L EXEMPT - 93.126 4

Description: PTC 898 Agency LOS ANGELES COUNTY

Install 1.8 mile bike lanes on 170th St E between Avenue M-4 and Avenue M-8 and between East Avenue P and East Palmdale Boulevard. Project is part of Highway Safety Improvement Program.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 898 898 898 898LA0G1197 Total 898 898 898 898

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1270 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 5,000 Agency LOS ANGELES COUNTY

Norwalk Blvd et al - Pavement and median work along Norwalk Blvd and Slauson Avenue in unincorporated West-Whittier/Los Nietos. Toll credit amount of $574 will be used to match STPL in FY 17.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 5,000 5,000 5,000 5,000LA0G1270 Total 5,000 5,000 5,000 5,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1271 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 4,000 Agency LOS ANGELES COUNTY

Heller Circle et al - reconstruction/resurfacing, reconstruct C&G, sidewalk, curb ramps, and LID treatments on Plum Canyon Road from Via Joyce Dr to Heller Circle and Whites Canyon Road from Heller Circle to 2,630 fr south of Heller Circle. Toll credit amount of $459 will be used to match STPL in FY17.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 4,000 4,000 4,000 4,000LA0G1271 Total 4,000 4,000 4,000 4,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1291 Los Angeles SCAB 7120004 NCN25 L TCM 2

Description: PTC 4,000 Agency LOS ANGELES COUNTY

Huntington Dr - San Gabriel Bl to 132' w/o Michillinda Ave: Pavement resurfacing, reconstruction of curbs/gutters/sidewalks, ADA and pedestrian upgrades, tree maintenance, 1.3 miles of Class II bike lanes, and 0.1 miles of new sidewalk. Utilizing Toll Credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 4,000 4,000 4,000 4,000LA0G1291 Total 4,000 4,000 4,000 4,000

Print Date: 3/23/2017 9:50:41 AM Page: 47 of 123

Page 48: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA9711031 Los Angeles SCAB LA9711031 CAX63 L NON-EXEMPT 0

Description: PTC 7,600 Agency LOS ANGELES COUNTY

CASTAIC CUTOFF FROM LAKE HUGHES RD TO SAN FRANCISQUITO CANYON RD CONTRUCT NEW ROAD 4 12-FOOT LANES AND 10-FOOT SHOULDERS

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 400 7,200 7,600 5,900 1,700 7,600LA9711031 Total 400 7,200 7,600 5,900 1,700 7,600

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0896 Los Angeles SCAB LAE0896 ITS08 L EXEMPT - 93.126 0

Description: PTC 1,510 Agency LOS ANGELES COUNTY

This project will involve installation of fiber optic communications for the traffic signals along Colima Road from Azusa Ave to Stoner CreekRoad and along Fullerton Road from Colima Road to Gale Avenue. Cameras and connecting cables will be installed at the intersection of Colima Road and Stoner Creek Road. A right turn lane will also be added to the intersection of Colima Road and Fullerton RoadFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 720 720 720 720COUNTY 32 32 32 32PROP "C20" FUNDS 568 568 568 568PROP "C25" FUNDS 190 190 190 190LAE0896 Total 1,510 1,510 1,510 1,510

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1228 Los Angeles SCAB LAE1228 NCR36 L EXEMPT - 93.126 0

Description: PTC 59 Agency LOS ANGELES COUNTY

REPAIR ROSECRANS AND ALONDRA BRIDGES PER THE COUNTY OF LOS ANGELES TRIENNIAL INSPECTION REPORT.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 40 40 40 40CITY FUNDS 9 9 9 9COUNTY 10 10 10 10LAE1228 Total 59 59 49 10 59

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1920 Los Angeles SCAB LAE1920 CAX63 L NON-EXEMPT 0

Description: PTC 29,320 Agency LOS ANGELES COUNTY

DEL AMO BLVD - FROM NORMANDIE AVE AND NEW HAMPSHIRE - RECONSTRUCT AND WIDEN . FROM 1 LANE EA. DIR TO 2 LANES IN EA DIR.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 2,400 2,400 2,400 2,400

Print Date: 3/23/2017 9:50:41 AM Page: 48 of 123

Page 49: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

MEASURE R 20H - HIGHWAY CAPITAL

1,900 25,020 26,920 1,900 25,020 26,920

LAE1920 Total 1,900 27,420 29,320 4,300 25,020 29,320

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1311 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 8,731 Agency LOS ANGELES COUNTY

South Bay Forum Traffic Signal Corridors Project. Design & construction of multijurisdictional traffic signal synchronization, intersection operational improvements, and intelligent transp. system components on regional arterials. Synchronizes 50 consecutive intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 497 1,295 1,792 1,792 1,792PROP "C25" FUNDS 1,391 5,548 6,939 6,939 6,939LAF1311 Total 1,888 6,843 8,731 8,731 8,731

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1312 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 16,893 Agency LOS ANGELES COUNTY

Gateway Cities Forum Traffic Signal Corridors, Phase V. Design and construction of multijurisdictional traffic signal synchronization and intersection operational improvements on regional arterials in the Gateway Cities region. Includes 86 consecutive intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,307 2,187 3,494 3,494 3,494PROP "C25" FUNDS 2,263 11,136 13,399 11,399 2,000 13,399LAF1312 Total 3,570 13,323 16,893 14,893 2,000 16,893

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1321 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 18,786 Agency LOS ANGELES COUNTY

San Gabriel Valley Forum Traffic Signal Corridors Project. Design & construction of multijurisdictional traffic signal synchronization, intersection operational improvements, and intelligent transportation system components. Synchronizes 83 consecutive intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 958 2,899 3,857 3,857 3,857PROP "C25" FUNDS 2,680 12,249 14,929 14,929 14,929LAF1321 Total 3,638 15,148 18,786 18,786 18,786

Print Date: 3/23/2017 9:50:42 AM Page: 49 of 123

Page 50: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1511 Los Angeles SCAB 1NL04 NCR26 L TCM Committed 5

Description: PTC 1,861 Agency LOS ANGELES COUNTY

Eastside Light Rail Bike Interface Project. Project includes design and construction of bike routes with appropriate signage and striping to access Metro Gold Line stations (Class II: 4.5 miles, Class III & Bike Blvd: 2.8 miles). Utilizing Toll Credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 184 184 184 184STP LOCAL 170 170 170 170CITY FUNDS 46 46 46 46COUNTY 156 156 156 156ACTIVE TRANSPORTATION PROGRAM

1,305 1,305 1,305 1,305

LAF1511 Total 230 1,631 1,861 230 1,631 1,861

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1634 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 0

Description: PTC 12,763 Agency LOS ANGELES COUNTY

El Pueblo Pedestrian Improvements Phase I, II, III, & IV. Design and construction of enhanced facilities to improve & assist pedestrian movement in the El Pueblo District & other landmarks in downtown LA. Wayfinding element in TDM F1718.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 231 7,058 7,289 7,289 7,289PROP "C20" FUNDS 925 4,549 5,474 2,925 2,549 5,474LAF1634 Total 1,156 11,607 12,763 10,214 2,549 12,763

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1718 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 0

Description: PTC 1,756 Agency LOS ANGELES COUNTY

El Pueblo Pedestrian Improvements Phase I, II, III & IV. Wayfinding element of enhanced pedestrian facilities to improve and assist pedestrian movement in the El Pueblo District & other landmarks in downtown LA. Also in Ped Mode (F1634)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 64 809 873 873 873COUNTY 10 10 10 10PROP "C20" FUNDS 64 809 873 873 873LAF1718 Total 128 1,628 1,756 1,746 10 1,756

Print Date: 3/23/2017 9:50:42 AM Page: 50 of 123

Page 51: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3136 Los Angeles SCAB 1A1005 CAX76 L NON-EXEMPT 2

Description: PTC 61,798 Agency LOS ANGELES COUNTY

Widen The Old Road from north of Magic Mountain Pkwy to Henry Mayo Dr to 1200 ft west of The Old Road. Project is located on The Old Rd.from approximately 700 ft north of Magic Mountain Parkway to Henry Mayo Dr from The Old Road to the SR126 hook ramps, and Rye Canyon Rd btwn The Old Radd and Avenue Stanford. Widening from 4 to 6 lanes to reduce bottleneck. Toll Credits will be used to match STPL funds.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 621 7,805 8,426 621 7,805 8,426STP LOCAL - REGIONAL 15,001 15,001 15,001 15,001BRIDGE - LOCAL 4,796 33,575 38,371 4,796 33,575 38,371LAF3136 Total 5,417 56,381 61,798 5,417 15,001 41,380 61,798

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3308 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 24,812 Agency LOS ANGELES COUNTY

San Gabriel Valley Forum Traffic Signal Corridors Project. Design and construction of multijurisdictional traffic signal synch, intersection operational improvements, and intelligent transportation system components on regional arterials. Aprox. 183 signals total.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 4,962 4,962 4,962 4,962PROP "C25" FUNDS 19,850 19,850 19,850 19,850LAF3308 Total 24,812 24,812 24,812 24,812

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3309 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 14,786 Agency LOS ANGELES COUNTY

Gateway Cities Forum Traffic Signal Corridors Proj, Phase VI. Design and construct multijurisdictional traffic signal synchronization, intersection operational improvements & ITS components on regional arterials in Gateway Cites area. (aprox. 126 signals)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,366 1,366 1,366 1,366PROP "C25" FUNDS 13,420 13,420 13,420 13,420LAF3309 Total 14,786 14,786 14,786 14,786

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3310 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 12,980 Agency LOS ANGELES COUNTY

South Bay Forum Traffic Signal Corridors Project. Design and construction of multijurisdictional traffic signal synchronization, operational improvements & ITS components on arterials in the South Bay area of LA County. (aprox 40+ signals)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 2,596 2,596 2,596 2,596

Print Date: 3/23/2017 9:50:42 AM Page: 51 of 123

Page 52: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C25" FUNDS 10,384 10,384 10,384 10,384LAF3310 Total 12,980 12,980 12,980 12,980

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3311 Los Angeles SCAB 1ITS04 ITS08 L EXEMPT - 93.126 2

Description: PTC 3,486 Agency LOS ANGELES COUNTY

Information Exchange Network (IEN) traffic management system Phase III. Including 1) software that will automatically generate IEN intersection, 2) on-line web tutorial 3) IEN Command/Data Interface Installation and Support 4) Enhancement to the IEN which will enable a user to know when a traffic signal is giving a priority to transit vehicles 5) Existing Traffic Signal Controller and Firmware Upgrades so they can communicate with the IEN. (previously 1ITS04)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 2,391 2,391 1,311 1,080 2,391PROP "C20" FUNDS 1,095 1,095 495 600 1,095LAF3311 Total 3,486 3,486 1,806 1,680 3,486

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3519 Los Angeles SCAB 1NL04 NCN26 L TCM 0

Description: PTC 2,645 Agency LOS ANGELES COUNTY

North County Bikeways. Install three Class II and three Class III bikeway segments, including signage, striping, road widening, & road shoulder improvements. (aprox. 3.88 miles of bike lanes and 3.18 miles of bike routes.)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 820 820 820 820CITY FUNDS 197 1,174 1,371 197 1,174 1,371STP ENHANCE-RIP TEA 454 454 454 454LAF3519 Total 651 1,994 2,645 651 1,994 2,645

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3628 Los Angeles SCAB 1AL04 NCR27 L EXEMPT - 93.126 2

Description: PTC 6,590 Agency LOS ANGELES COUNTY

Willowbrook Area Access Improvements to MLK MACC. This project will construct sidewalk improvements and relocate signal facilities between the Imperial/Wilmington Metro Rail Station and the MLK MACC. The project is located in the unincorporated Willowbrook area near the Rosa Parks Metro Rail Station and the MLK Jr. Multi-Service Ambulatory Care Center (MACC) Toll credits will be used.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 1,400 1,400 1,108 292 1,400COUNTY 309 466 775 775 775ACTIVE TRANSPORTATION PROGRAM

3,865 3,865 3,865 3,865

STP-ENTRANCEMENT PRIOR STIP

550 550 550 550

LAF3628 Total 859 5,731 6,590 6,298 292 6,590

Print Date: 3/23/2017 9:50:42 AM Page: 52 of 123

Page 53: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5110 Los Angeles SCAB 1AL04 NCN26 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 918 Agency LOS ANGELES COUNTY

Fullerton Road at Pathfinder Road, et al. Project scope includes widening and restriping the intersections of Pathfinder Rd at Fullerton Rd and Pathfinder Rd at Brea Canyon Cutoff to add turn lanes. The project will add a 5-foot wide Class II bike lane on both sides of Pathfinder Rd leading from the intersection of Pathfinder Rd at Fullerton Rd to the Pathfinder County Park entrance, a one-quarter mile distance.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 459 459 459 459PROP "C25" FUNDS 459 459 459 459LAF5110 Total 918 918 918 918

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5115 Los Angeles MDAB 1AL04 CAX63 L NON-EXEMPT 4

Description: PTC 11,094 Agency LOS ANGELES COUNTY

Avenue L Roadway Widening Project; widen Avenue L from one lane to two lanes in each direction from 40th St West to 57th St (total distance 1.7 mi) include left- and right-turn pockets where Avenue L intersects with 40th, 42nd, 45th, 50th and 55th Streets, curbs and gutter reconstruction, a 12-foot wide Class II bike lane in each direction and 8-foot wide sidewalks on both sides of the street.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 1,500 1,500 1,500 1,500STP LOCAL - REGIONAL 2,000 2,797 4,797 1,500 3,297 4,797LOCAL TRANS FUNDS 2,000 2,797 4,797 1,500 3,297 4,797LAF5115 Total 1,500 4,000 5,594 11,094 4,500 6,594 11,094

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5310 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 4,242 Agency LOS ANGELES COUNTY

Ramona Boulevard/Badillo Street/Covina Boulevard TSSP/BSP. Implemention of a Traffic Signal Synchronization Project (TSSP) on Ramona Bl/Badillo St/Covina Bl from Santa Anita Av to the 57 Freeway. A Bus Signal Priority (BSP) project will be implemented on Ramona Bl/Badillo St from Tyler Av to Grand Av to give transit priority for Foothill Transit operations (aprox. 48 signal locations)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,484 1,484 1,484 1,484PROP "C25" FUNDS 2,758 2,758 2,758 2,758LAF5310 Total 4,242 4,242 4,242 4,242

Print Date: 3/23/2017 9:50:42 AM Page: 53 of 123

Page 54: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5314 Los Angeles SCAB 1AL04 ITS02 L TCM Committed 0

Description: PTC 2,481 Agency LOS ANGELES COUNTY

Gateway Cities Forum Traffic Signal Corridors Project - improve traffic signal operations by upgrading each traffic signal to federal and state standards, providing additional vehicle detection to enable operation as a fully traffic-actuated signal, installing the appropriate components to enable each signal to be capable of time-based coordination and retiming signals to improve the overall progression of traffic.(aproximatly 17 signals included)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C20" FUNDS 23 473 496 23 473 496PROP "C25" FUNDS 91 1,894 1,985 91 1,894 1,985LAF5314 Total 114 2,367 2,481 114 2,367 2,481

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5315 Los Angeles SCAB 1AL04 ITS02 L TCM Committed 0

Description: PTC 1,551 Agency LOS ANGELES COUNTY

San Gabriel Valley Forum Traffic Signal Corridors Project. This project includes 6 intersections at Myrtle Av/Peck Rd between Huntington Dr and Clark St and provides for system wide coordination, timing and operational improvements and traffic signal synchronization, equipment upgrades and intersection operational improvements. (aprox. 20+ signals)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C20" FUNDS 22 288 310 22 288 310PROP "C25" FUNDS 88 1,153 1,241 88 1,153 1,241LAF5315 Total 110 1,441 1,551 110 1,441 1,551

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5316 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 2,351 Agency LOS ANGELES COUNTY

South Bay Forum Traffic Signal Corridors Project - systemwide coordination, timing and operational improvements and traffic signal synchronization, equipment upgrades and intersection operational improvements in South Bay region. 25 signals system wide. Additionally, this project will install any warranted and feasible roadway improvements along the routes to improve overall progression.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C20" FUNDS 15 456 471 15 456 471PROP "C25" FUNDS 56 1,824 1,880 56 1,824 1,880LAF5316 Total 71 2,280 2,351 71 2,280 2,351

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5514 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 6

Description: PTC 1,317 Agency LOS ANGELES COUNTY

Vermont Ave Bike Lane - Manchester Blvd to El Segundo Blvd. Funds are requested to design and construct Class II bike lanes on Vermont Av (3.0 miles). Short term bicycle racks (14) are also proposed at key destinations. Toll Credits will be used to match STPL.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 87 87 87 87COUNTY 473 81 554 473 81 554

Print Date: 3/23/2017 9:50:42 AM Page: 54 of 123

Page 55: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ACTIVE TRANSPORTATION PROGRAM

676 676 676 676

LAF5514 Total 473 844 1,317 473 844 1,317

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5515 Los Angeles SCAB 1O1007 NCN26 L TCM 0

Description: PTC 1,677 Agency LOS ANGELES COUNTY

Florence Metro Blue Line Station Bikeway Access Improvements.Design and construct 11.19 miles of Class III bike routes with sharrows and enhanced treatments (bicycle boulevard). Short-term bicycle parking will be provided and limit line loop detectors will be upgraded to detect bicycles at all required signalized intersections. $176k in toll credits will be used to match Federal funds (ATP and STP-Local)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 350 350 350 350COUNTY 139 139 139 139ACTIVE TRANSPORTATION PROGRAM

1,188 1,188 1,188 1,188

LAF5515 Total 139 1,538 1,677 1,327 350 1,677

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5704 Los Angeles SCAB 7120004 TDM24 L EXEMPT - 93.126 0

Description: PTC 496 Agency LOS ANGELES COUNTY

Metro Green Line Vermont Station Wayfinding Signage. This project is located in the unincorporated community of West Athens/Westmont within one-and-a-half mile radius of the Metro Green Line Vermont Station.. This wayfinding signage project will direct cyclists and pedestrians who are traveling to or from the Green Line Vermont Station.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 77 319 396 77 319 396COUNTY 20 80 100 20 80 100LAF5704 Total 97 399 496 97 399 496

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7305 Los Angeles SCAB 1ITS04 ITS14 L TCM 0

Description: PTC 4,048 Agency LOS ANGELES COUNTY

GATEWAY CITIES FORUM TRAFFIC SIGNAL CORRIDOR PROJECT : Designs and constructs ITS improvements along Norwalk Bl, San Antonio Dr, Pioneer Bl between Beverly Bl and Carson St including synchronization and retiming of traffic signals, equipment upgrades, system detection, CCTV cameras (upto 14 CCTVs), and changeable message signs.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 138 672 810 810 810PROP "C25" FUNDS 370 2,868 3,238 3,238 3,238LAF7305 Total 508 3,540 4,048 4,048 4,048

Print Date: 3/23/2017 9:50:42 AM Page: 55 of 123

Page 56: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7306 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 3,660 Agency LOS ANGELES COUNTY

FOOTHILL BOULEVARD TRAFFIC SIGNAL CORRIDOR PROJECT : (1) Traffic signal synchronization, equipment upgrades and intersection operational improvements for 28 intersections along Foothill Bl between Lowell Av and Crown Av. (2) Installs two (2) Closed Circuit Television (CCTV) cameras and wireless network communications infrastructure which will provide for expansion of Advanced Transportation Management System (ATMS) along Foothill Bl.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 732 732 732 732PROP "C25" FUNDS 2,928 2,928 2,928 2,928LAF7306 Total 732 2,928 3,660 3,660 3,660

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7307 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 4,531 Agency LOS ANGELES COUNTY

SAN GABRIEL VALLEY FORUM TRAFFIC SIGNAL CORRIDOR PROJECT : Implements ITS enhancements including synchronization and retiming of traffic signals, equipment upgrades, system detection, CCTV cameras, and changeable message signs to expand Advanced Transportation Management System (ATMS).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 126 780 906 906 906PROP "C25" FUNDS 500 3,125 3,625 3,625 3,625LAF7307 Total 626 3,905 4,531 4,531 4,531

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7308 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 3,430 Agency LOS ANGELES COUNTY

EAST LOS ANGELES TRAFFIC SIGNAL CORRIDOR PROJECT : (1) Synchronizes traffic signals and implements upgrades at 13 signalized intersections along 3.5 mile segment of Eastern Av. between Medford St and Olympic Blvd. (2) Installs Fiber Optic Communications along Cesar Chavez Av, Ramona Bl, and Atlantic Bl to connect traffic signals to LADPW Advanced Transportation Management System (ATMS).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 89 597 686 686 686PROP "C25" FUNDS 371 2,373 2,744 2,744 2,744LAF7308 Total 460 2,970 3,430 3,430 3,430

Print Date: 3/23/2017 9:50:42 AM Page: 56 of 123

Page 57: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7310 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 5,103 Agency LOS ANGELES COUNTY

SOUTH BAY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT : Project area is Normandie Av between 92nd St and El Segundo Bl, Manhattan Beach Bl between Manhattan Av and Van Ness Av, and Hawthorne Bl between Imperial Highway and Manhattan Beach Bl. Project scope includes (1) Synchronization and retiming traffic signals, equipment upgrades, system detection, CCTV cameras, changeable message signs. (2) Upgrade traffic signal operations to be capable of time-based coordination.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 1,000 1,041 2,041 2,041 2,041PROP "C25" FUNDS 615 2,447 3,062 3,062 3,062LAF7310 Total 1,615 3,488 5,103 5,103 5,103

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7508 Los Angeles SCAB 1O1007 NCN26 L TCM 2

Description: PTC 4,399 Agency LOS ANGELES COUNTY

Vincent Community Bikeways. Install 2 miles of bike paths along the Big Dalton Wash between Irwindale Ave and Lark Ellen Ave and between Arrow Hwy and Citrus Ave, and 1.3 miles of bike lanes and 1.4 miles of bike routes to connect to the existing and proposed bikeways in the surrounding areas.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 150 730 880 50 100 730 880ACTIVE TRANSPORTATION PROGRAM

600 2,919 3,519 200 400 2,919 3,519

LAF7508 Total 750 3,649 4,399 250 500 3,649 4,399

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7512 Los Angeles SCAB 1O1007 NCN26 L TCM 2

Description: PTC 806 Agency LOS ANGELES COUNTY

West Athens Community Bikeways. Design and construction of Class II bike lanes on 120th Street between Western Ave and Vermont Ave (1.00 miles). Also implementing bicycle boulevard on Lohengrin Avenue/110th Street between Imperial Hwy and Denker Ave (0.80 miles) and on 110th Street between Budlong Ave and Vermont Ave (0.25 miles).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 28 133 161 28 133 161LOCAL TRANS FUNDS 113 532 645 113 532 645LAF7512 Total 141 665 806 141 665 806

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7609 Los Angeles SCAB 1O1007 NCR25 L EXEMPT - 93.126 2

Description: PTC 3,008 Agency LOS ANGELES COUNTY

Hawthorne/Lennox Green Line Station Community Linkages. The project includes pedestrian and bicycle facility improvements, wayfinding, and landscaping on major corridors near the Hawthorne/Lennox Station Metro Green Line Station.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 95 507 602 25 70 507 602

Print Date: 3/23/2017 9:50:42 AM Page: 57 of 123

Page 58: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ACTIVE TRANSPORTATION PROGRAM

380 2,026 2,406 100 280 2,026 2,406

LAF7609 Total 475 2,533 3,008 125 350 2,533 3,008

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7610 Los Angeles SCAB 7120004 NCN25 L TCM Committed 2

Description: PTC 2,506 Agency LOS ANGELES COUNTY

Aviation /LAX Green Line Station Community Linkages.The project includes improvements on corridors near the Metro Aviation/LAX Station including pedestrian and bicycle facilities, wayfinding signs, landscaping and traffic calming. An approximate total of 2 miles of bikeway and 2.5 miles of upgraded pedestrian facilities will be implemented.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 80 485 565 40 120 405 565ACTIVE TRANSPORTATION PROGRAM

320 1,621 1,941 80 240 1,621 1,941

LAF7610 Total 400 2,106 2,506 120 360 2,026 2,506

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7703 Los Angeles SCAB 1TR1023 ITS12 L TCM Committed 0

Description: PTC 974 Agency LOS ANGELES COUNTY

EXPERIENCELA 3.0-MOBILITY IN THE CLOUD : Develops and implements cloud computing based software technology to provide transit users location specific information via personal mobile devices and interactive kiosks at key transportation facilities.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 195 195 180 15 195LOCAL TRANS FUNDS 779 779 779 779LAF7703 Total 974 974 959 15 974

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7806 Los Angeles SCAB 1O1008 NCN46 L EXEMPT - 93.126 0

Description: PTC 956 Agency LOS ANGELES COUNTY

VERMONT AVENUE STREETSCAPE IMPROVEMENT PROJECT: (1) Installs streetscape improvements that include landscaping and planting of drought tolerant trees, permeable concrete pavers, non-permeable interlocking concrete pavers at bus stops, and decorative crosswalks. (2) Landscaping will have automated irrigation system and flow-through filtration planters.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCOUNTY 117 74 191 117 69 5 191LOCAL TRANS FUNDS 765 765 62 662 41 765LAF7806 Total 117 839 956 179 731 46 956

Print Date: 3/23/2017 9:50:42 AM Page: 58 of 123

Page 59: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9114 Los Angeles SCAB 1AL04 CART2 L NON-EXEMPT 2

Description: PTC 8,759 Agency LOS ANGELES COUNTY

Widen Fullerton Road from SR-60 EB ramp to Camino Bello south of Colima Road (0.45 mile) to add one lane in each direction and install 2.2 miles of enhanced Class III bike facilities along Batson Avenue, parallel to FullertonFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 855 2,731 3,586 855 2,731 3,586PROP "C25" FUNDS 1,233 3,940 5,173 1,233 3,940 5,173LAF9114 Total 2,088 6,671 8,759 2,088 6,671 8,759

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9116 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 2

Description: PTC 1,134 Agency LOS ANGELES COUNTY

Michillinda Avenue Intersections Improvement Project: The proposed project includes various roadway, intersection, signal, and pedestrian improvements on Michillinda Avenue between Foothill Boulevard and Colorado BoulevardFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 48 179 227 48 179 227PROP "C25" FUNDS 192 715 907 192 715 907LAF9116 Total 240 894 1,134 240 894 1,134

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9504 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 2

Description: PTC 2,252 Agency LOS ANGELES COUNTY

E. Pasadena & E. San Gabriel Bikeway Access Improvements: Install approximately 4.8 miles of bike lanes and enhanced bike routes in the East Pasadena and East San Gabriel comunities

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,802 1,802 408 1,394 1,802AGENCY 450 450 102 348 450LAF9504 Total 2,252 2,252 510 1,742 2,252

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9511 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 2

Description: PTC 3,988 Agency LOS ANGELES COUNTY

South Whittier Community Bikeway Access Improvements: Construction of Class II & Class III bike facilities in the unincorporated County area of South Whittier along with various pedestrian intersection improvementsFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 617 2,574 3,191 617 2,574 3,191AGENCY 154 643 797 154 643 797LAF9511 Total 771 3,217 3,988 771 3,217 3,988

Print Date: 3/23/2017 9:50:42 AM Page: 59 of 123

Page 60: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S007 Los Angeles SCAB 1O1007 NCN26 L NON-REPORTABLE TCM 2

Description: PTC 532 Agency LOS ANGELES COUNTY

West Carson Community Bikeways. Design and construct 0.99 miles of Class II bicycle lanes on Lomita Boulevard and Carson Street, as well as 0.65 miles of Class III bicycle route on 220th Street.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 19 88 107 5 14 88 107ACTIVE TRANSPORTATION PROGRAM

74 351 425 18 56 351 425

LATP16S007 Total 93 439 532 23 70 439 532

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S008 Los Angeles SCAB 1O1008 PLN40 L EXEMPT - 93.126 2

Description: PTC 1,250 Agency LOS ANGELES COUNTY

Rosemead Boulevard Complete Street Improvements Phase 1. Develop preliminary design and obtain environmental clearance for a complete streets treatment with bike lanes and ADA- compliant accessibility on a 2.6-mile segment of Rosemead Boulevard (SR 165) between the cities of South El Monte and Pico Rivera.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 250 250 250 250ACTIVE TRANSPORTATION PROGRAM

1,000 1,000 1,000 1,000

LATP16S008 Total 1,250 1,250 1,250 1,250

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATR02018 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 2

Description: PTC 615 Agency LOS ANGELES COUNTY

The Whittier Boulevard Transit Signal Priority Project (Project) includes the deployment of ITS infrastructure to enhance arterial operations and monitoring in East Los Angeles. Wireless communications and upgraded controller equipment will be deployed along a critical segment of Whitter Blvd. that serves Metro Rapid Line 720 and provides parallel capacity to the 1-10 ExpressLanes.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 98 98 98 98FEE 517 517 517 517LATR02018 Total 615 615 615 615

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLSTEA0010 Los Angeles SCAB 7120004 NCN26 L NON-REPORTABLE TCM 2

Description: PTC 1,904 Agency LOS ANGELES COUNTY

Los Angeles County - San Jose/Puente Creek Bike Trails - Along San Jose Creek from Workman Mill Rd. to San Gabriel River Confluence - construct bike trail bridges over San Jose Creek and San Gabriel River extend bike path along Puente Creek from its confluence with San Jose Creek Bike Trail eastward to Azusa Avenue.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,243 1,243 1,243 1,243CITY FUNDS 161 161 161 161

Print Date: 3/23/2017 9:50:42 AM Page: 60 of 123

Page 61: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

COUNTY 500 500 500 500LSTEA0010 Total 1,904 1,904 161 1,743 1,904

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1047 Los Angeles SCAB 1TL204 NCN31 L EXEMPT - 93.126 2

Description: PTC 137,200 Agency LOS ANGELES COUNTY MTA

Rosecrans/Marquardt Grade Separation: This project includes construction a grade separation at the intersection of Rosecrans/Marquardt in the City of Santa Fe Springs. This will result in enhancing the safety and traffic flow on surface streets throughout the rail corridor as well as enhancing the efficiency of train movement.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalTIGER DISCRETIONARY GRANT 15,000 15,000 15,000 15,000LOCAL TRANS FUNDS 54,000 14,600 68,600 54,000 14,600 68,600MEASURE R 20H - HIGHWAY CAPITAL

16,600 10,000 26,600 3,000 13,600 10,000 26,600

PRIVATE FUNDS 7,000 7,000 7,000 7,000SECTION 190 GRADE SEPARATION PROGRAM

20,000 20,000 20,000 20,000

LA0G1047 Total 16,600 81,000 39,600 137,200 3,000 13,600 81,000 29,600 10,000 137,200

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1050 Los Angeles SCAB REG0703 NCN31 L EXEMPT - 93.126 0

Description: PTC 85,849 Agency LOS ANGELES COUNTY MTA

Doran Street and Broadway/Brazil safety and access project: Develop grade separation, safety and roadway improvements to close the Doran Street and Broadway/Brazil at-grade crossings on the Metrolink Valley SubdivisionFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 79,249 79,249 45,970 33,279 79,249MEASURE R 03 - METROLINK CAPITAL

6,600 6,600 6,600 6,600

LA0G1050 Total 6,600 79,249 85,849 6,600 45,970 33,279 85,849

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1247 Los Angeles SCAB 1O1007 NCN25 L TCM Committed 2

Description: PTC 34,300 Agency LOS ANGELES COUNTY MTA

The Project consists of bicycle and pedestrian transportation linkage improvements to the Rail to Rail Active Transportation Corridor (ATC) Connector Project Segment A comprised of Sub-segments A-1 through A-3)along an approximately 6.5-mile long corridor from the future Metro Crenshaw/LAX Fairview Heights Station at Florence Ave & West Blvd to just east of the existing Metro Blue Line Slauson Station at Slauson Ave & Santa Fe Ave.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalTIGER DISCRETIONARY GRANT 5,760 9,240 15,000 15,000 15,000LOCAL TRANS FUNDS 2,200 1,440 7,334 10,974 10,974 10,974ACTIVE TRANSPORTATION PROGRAM - MPO

8,326 8,326 8,326 8,326

LA0G1247 Total 2,200 7,200 24,900 34,300 25,974 8,326 34,300

Print Date: 3/23/2017 9:50:42 AM Page: 61 of 123

Page 62: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G609 Los Angeles SCAB REG0703 ADM83 L EXEMPT - 93.126 0

Description: PTC 6,754 Agency LOS ANGELES COUNTY MTA

South Bay Measure R Highway Program Development, Administration, Inter-governmental Relations, and Project Oversight.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

6,754 6,754 4,649 726 634 745 6,754

LA0G609 Total 6,754 6,754 4,649 726 634 745 6,754

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA29202N Los Angeles SCAB LA29202N PPM01 L EXEMPT - 93.126 0

Description: PTC 83,457 Agency LOS ANGELES COUNTY MTA

MTA TIP ADMINISTRATION PLANNING, PROGRAMMING AND MONITORING FOR STIP PROJECTS THROUGH OUT LA COUNTY (200 CFP 7116 STATE ONLY 3594,2001 CFP 8401, PPNO 3535, 9001A, 9001)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C25" FUNDS 3,837 3,837 3,837 3,837STATE CASH (AB 3090) 3,529 3,529 3,529 3,529STIP ADVANCE CON-RIP 76,091 76,091 60,343 6,136 4,995 4,617 76,091LA29202N Total 83,457 83,457 67,709 6,136 4,995 4,617 83,457

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0938 Los Angeles SCAB LAE0938 NCRH4 L EXEMPT - 93.127 0

Description: PTC 300 Agency LOS ANGELES COUNTY MTA

DESIGN AND CONSTRUCT REALIGNMENT OF BRAHMA DRIVE AT WINNETKA TO ELIMINATE HAZARDOUS CONDITION

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 240 240 24 216 240BONDS - LOCAL 60 60 60 60LAE0938 Total 300 300 24 276 300

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1148 Los Angeles SCAB LAE1148 VER02 L EXEMPT - 93.126 0

Description: PTC 449 Agency LOS ANGELES COUNTY MTA

LOS ANGELES REGIONAL DIESEL EMISSIONS REDUCTION PROGRAM FOR ENGINE RETROFIT PROVIDES INCENTIVE GRANTS TO OWNER OPERATORS OLD DIESEL TRUCKS TO UPGRADE EQUIPMENT TO REDUCE EMISSIONSFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 359 359 359 359LOCAL TRANS FUNDS 90 90 90 90LAE1148 Total 449 449 449 449

Print Date: 3/23/2017 9:50:42 AM Page: 62 of 123

Page 63: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S003 Los Angeles SCAB 1AL04 PLN40 L EXEMPT - 93.126 2

Description: PTC 2,150 Agency LOS ANGELES COUNTY MTA

Union Station Master Plan: Alameda Esplanade.The Union Station Master Plan: Alameda Esplanade will create a multi-modal connection between Union Station and surrounding Downtown Los Angeles communities through a road-diet and a shared pedestrian and bicyclist esplanade. Utilizing Toll Credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalACTIVE TRANSPORTATION PROGRAM

2,150 2,150 2,150 2,150

LATP16S003 Total 2,150 2,150 2,150 2,150

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0C8046 Los Angeles SCAB LA0C8046 CAX63 L NON-EXEMPT 0

Description: PTC 15,416 Agency LOS ANGELES, CITY OF

BURBANK BLVD WIDENING-LANKERSHIM BLVD TO CLEON AVE. FROM VARYING ROADWAY WIDTH TO MODIFIED MAJOR HIGHWAY STANDARDS. FROM 1 LN TO 2 LNS IN EACH DIRECTION. PPNO 3097.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 6,226 6,226 2,900 2,700 626 6,226CITY FUNDS 601 1,499 2,955 5,055 1,058 972 1,409 1,312 304 5,055PROP "C25" FUNDS 1,115 3,020 4,135 2,135 2,000 4,135LA0C8046 Total 1,716 4,519 9,181 15,416 3,193 2,972 4,309 4,012 930 15,416

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0C8075 Los Angeles SCAB LA0C8075 NCRH1 L EXEMPT - 93.127 0

Description: PTC 10,933 Agency LOS ANGELES, CITY OF

CESAR CHAVEZ AVE/ LORENA ST / INDIANA ST INTERSECTION IMPROVEMENTS. Reconstruction of a five-legged signalized intersection into a modern roundabout. The construction of the roundabout will reduce the complexity of the intersection and will improve traffic flow and safety.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 235 1,921 1,670 3,826 3,826 3,826PROP "C25" FUNDS 565 3,401 3,141 7,107 6,279 828 7,107LA0C8075 Total 800 5,322 4,811 10,933 10,105 828 10,933

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0C8086 Los Angeles SCAB LA0C8086 NCR36 L EXEMPT - 93.126 0

Description: PTC 48,267 Agency LOS ANGELES, CITY OF

NORTH SPRING ST, OVER LOS ANGELES RIVER .4 MILES WEST OF I-5. REHABILITATE AND WIDEN 4 LANE BRIDGE (NO ADDED LANES) ADD SIDEWALKS UPGRADE BRIDGE RAILINGS (53C0859). High cost project agreement required.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 2,277 2,485 4,336 9,098 4,762 4,336 9,098CITY FUNDS 1,378 1,231 867 3,476 2,609 867 3,476BRIDGE - LOCAL 4,000 5,599 20,864 30,463 30,463 30,463

Print Date: 3/23/2017 9:50:42 AM Page: 63 of 123

Page 64: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT

229 229 229 229

STATE CASH - RIP 5,001 5,001 5,001 5,001LA0C8086 Total 7,655 9,315 31,297 48,267 43,064 5,203 48,267

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0F007 Los Angeles SCAB LA0F007 NCR36 L EXEMPT - 93.126 2

Description: PTC 48,879 Agency LOS ANGELES, CITY OF

GLENDALE BLVD.-HYPERION AVE. COMPLEX OF BRIDGES OVER LA RIVER, I-5 AND RIVERSIDE DR, REHABILITATION/SEISMIC RETROFIT; UPGRADE BRIDGE RAILING; INCLUDES BRIDGES 53C-1881, 53C-1882, 53C-1883, 53C-1884, 53C-1179 AND 53-1069. NO ADDITIONAL LANES. REALIGN I-5 NORTH BOUND OFF RAMP. CONSTRUCT A PEDESTRIAN BRIDGE OVER LA RIVER (approx. 426 feet).(FED PROJECT ID: BHLS-5006(181)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 686 80 3,913 4,679 493 273 5,133 -1,220 4,679LOCAL ADVANCE CONSTRUCTION

39,617 -39,617

BRIDGE - LOCAL 2,743 620 39,617 42,980 2,186 1,177 39,617 42,980LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT

1,220 1,220 1,220 1,220

LA0F007 Total 3,429 700 44,750 48,879 2,679 1,450 44,750 48,879

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0F008 Los Angeles SCAB LA0F008 NCR36 L EXEMPT - 93.126 2

Description: PTC 2,030 Agency LOS ANGELES, CITY OF

GLENDALE BLVD. OVER L.A RIVER, REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET, UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 (53C1881) GLENDALE-HYPERION COMPLEX OF BRIDGES. (#53C-1883)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 406 406 386 20 406BRIDGE - LOCAL 1,624 1,624 1,544 80 1,624LA0F008 Total 2,030 2,030 1,930 100 2,030

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0F009 Los Angeles SCAB LA0F009 PLN40 L EXEMPT - 93.126 2

Description: PTC 2,450 Agency LOS ANGELES, CITY OF

GLENDALE BLVD. OVER LA RIVER. REHABILITATE / RETROFIT BRIDGE AND WIDEN BY 12 FEET. UPGRADE BRIDGE RAILINGS. NO ADDED LANES. PRELIMINARY ENGINEERING ONLY. CONSTRUCTION TO BE DONE UNDER LA0F007 GLENDALE-HYPERION COMPLEX OF BRIDGES. (BRIDGE #53C1884, BHLS-5006(187))Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 490 490 470 20 490BRIDGE - LOCAL 1,960 1,960 1,880 80 1,960LA0F009 Total 2,450 2,450 2,350 100 2,450

Print Date: 3/23/2017 9:50:43 AM Page: 64 of 123

Page 65: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0F073 Los Angeles SCAB LA0F073 CAX76 L EXEMPT - 93.126 0

Description: PTC 5,067 Agency LOS ANGELES, CITY OF

PROJECTS WITHIN AND NEAR LOS ANGELES INTERNATIONAL AIRPORT TO ELIMINATE TRAFFIC BOTTLENECKS. (LOS ANGELES WORLD AIRPORTS) SEC. 336 FUNDING

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO - ISTEA 2,481 2,481 2,481 2,481AGENCY 2,586 2,586 2,586 2,586LA0F073 Total 5,067 5,067 5,067 5,067

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G104 Los Angeles SCAB REG0701 NCR36 L EXEMPT - 93.126 2

Description: PTC 739,108 Agency LOS ANGELES, CITY OF

Bridge No. 53C1880,530595, SIXTH STREET, OVER LA RIVER, E SANTA ANA FREEWAY. REPLACE SEISMICALLY/STRUCTURALLY DEFICIENT SIXTH STREET VIADUCT WITH NEW VIADUCT. INSTALL BIKEWAY AND PEDESTRIAN CONNECTION FROM THE NEW SIXTH STREET VIADUCT BIKE RAMP NEAR MISSION ROAD AND SIXTH STREET TO MYER STREET AND 7TH STREET. NO LANES BEING ADDED. TOLL CREDITS USED IN LIEU OF PROP 1B SEISMIC BOND FUNDS.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 6,298 29,177 35,475 60,467 -6,478 -2,074 -5,210 -11,230 35,475LOCAL ADVANCE CONSTRUCTION

285,203 285,203 436,341 -50,000 -34,244 -40,214 -26,680 285,203

ACTIVE TRANSPORTATION PROGRAM - MPO

500 2,052 2,552 2,552 2,552

BRIDGE - LOCAL 35,868 116,842 232,386 385,096 173,958 50,000 34,244 40,214 86,680 385,096LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT

30,782 30,782 5,790 6,478 2,074 5,210 11,230 30,782

LA0G104 Total 42,666 116,842 579,600 739,108 679,108 60,000 739,108

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1214 Los Angeles SCAB REG0703 ADM83 L EXEMPT - 93.126 0

Description: PTC 360 Agency LOS ANGELES, CITY OF

Staff ATSAC Center during Traffic Detours and to deploy traffic officers at key intersections for congestion relieves. Deployment of LADOT Engineers, Signal Electricians, Paint-n-Signs Posters, and Traffic Officers on As-Needed Basis. As-Needed Labor Assumes $ 120K/year.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 360 360 120 120 120 360LA0G1214 Total 360 360 120 120 120 360

Print Date: 3/23/2017 9:50:43 AM Page: 65 of 123

Page 66: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1215 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 575 Agency LOS ANGELES, CITY OF

Install ATSAC traffic signal interconnect from Glenoaks Bl/Hollywood Way to Glenoaks Bl/Cabrini Dr. Install ATSAC fiber connection between Freeways termini to Sun Valley and Eagale Rock ATSAC Hubs; and install two new ATSAC Cameras. The project will modify three signals for the installation of interconnect.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 575 575 70 190 315 575LA0G1215 Total 575 575 70 190 315 575

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1216 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 2,300 Agency LOS ANGELES, CITY OF

Upgrade existing ATSAC traffic signals in the Glenoaks/San Fernando and I-5 Freeway corridor to include real-time adaptive traffic and signal control capability, install 2 additional video surveillance and its communications equipment, and re-time traffic signal timing to accommodate traffic fluctuations.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 2,300 2,300 613 1,043 644 2,300LA0G1216 Total 2,300 2,300 613 1,043 644 2,300

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G686 Los Angeles SCAB 1OM0702 NCR27 L TCM Committed 0

Description: PTC 250 Agency LOS ANGELES, CITY OF

Highland Park Pedestrian Improvements along Figueroa between Avenue 50 and Avenue 60 approximately 1.75miles.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSECTION 129 - SURFACE TRANSPORTATION PRIORITIES

50 200 250 250 250

LA0G686 Total 50 200 250 250 250

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G860 Los Angeles SCAB 1NL04 NCR35 L EXEMPT - 93.126 5

Description: PTC 267 Agency LOS ANGELES, CITY OF

LEMON GROVE LIGHTING PHASE 2, project boundaries, Santa Monica Blvd (N), Western Ave (W), Lemon Grove Ave (S) and the Hollywood Freeway (E). Install new street lighting system on Oxford Ave. from Romaine St. to Lemon Grove Ave. and on Lemon Grove from Western Ave. to Serrano Ave. Using toll credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalTRANS AND COMM AND SYS PRESRV PILOT PROG

66 201 267 267 267

LA0G860 Total 66 201 267 267 267

Print Date: 3/23/2017 9:50:43 AM Page: 66 of 123

Page 67: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA996425 Los Angeles SCAB LA996425 CAX63 L NON-EXEMPT 0

Description: PTC 8,301 Agency LOS ANGELES, CITY OF

INSTALL REVERSIBLE LANE ON SEPULVEDA BL THROUGH TUNNEL AT MULHOLLAND DR, INSTALL BIKE FACILITIES FROM SKIRBALL CENTER DR TO BEL AIR CREST RD, IMPLEMENT INTERSECTION IMPROVEMENTS AT SKIRBALL CENTER DR, I-405 FWY SB ON-RAMP, MORAGA DR, WILSHIRE BL. BIKE FACILITIES LESS THAN A MILE.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 8,301 8,301 8,301 8,301LA996425 Total 8,301 8,301 8,301 8,301

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0346 Los Angeles SCAB LAE0346 NCR31 L EXEMPT - 93.126 0

Description: PTC 6,500 Agency LOS ANGELES, CITY OF

LIGHTING, AND SAFETY IMPROVEMENTS ON ROAD LEADING TO HANSEN DAM RECREATION AREA. Access improvements including hillside stabilization and parking lot rehabilitation along Osborne Street between Glenoaks Boulevard and Dronfield Avenue [ref P.L. 110-244, Sec 105(a)(234)] (Change per H.R.1195-6/6/08)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 1,040 4,160 5,200 1,040 4,160 5,200CITY FUNDS 260 1,040 1,300 260 1,040 1,300LAE0346 Total 1,300 5,200 6,500 1,300 5,200 6,500

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0388B Los Angeles SCAB LAE0388B NCNH2 L EXEMPT - 93.127 0

Description: PTC 125 Agency LOS ANGELES, CITY OF

CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF INDEPENDENCE AVE. AND SHERMAN WAY.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 100 100 100 100CITY FUNDS 25 25 25 25LAE0388B Total 125 125 125 125

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0427 Los Angeles SCAB 1OM0702 NCR29 L EXEMPT - 93.126 0

Description: PTC 4,000 Agency LOS ANGELES, CITY OF

Implement streetscape project on Central Ave. from 103rd Street to Imperial Highway near the Watts/103rd Street Station, Watts.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 320 2,880 3,200 320 2,880 3,200AGENCY 80 520 600 80 520 600CITY FUNDS 200 200 200 200LAE0427 Total 400 3,600 4,000 400 3,600 4,000

Print Date: 3/23/2017 9:50:43 AM Page: 67 of 123

Page 68: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0518 Los Angeles SCAB LAE0518 NCR29 L EXEMPT - 93.126 0

Description: PTC 2,500 Agency LOS ANGELES, CITY OF

IN THE CITY OF LOS ANGELES, ON BROADWAY W/S FROM 4TH ST. TO 235 N/O 4TH ST, AND 4TH ST FROM BROADWAY TO 120 W/O BROADWAY. REMOVE AND REPLACE SIDEWALKS INCLUDING PORTIONS THAT SPAN.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 2,000 2,000 2,000 2,000AGENCY 500 500 500 500LAE0518 Total 2,500 2,500 2,500 2,500

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0550 Los Angeles SCAB LAE0550 NCR31 L EXEMPT - 93.126 0

Description: PTC 43 Agency LOS ANGELES, CITY OF

REHABILITATE STREET SURFACE OF CEDROS AVE BETWEEN BURBANK BLVD AND MAGNOLIA BLVD. WILL PROVIDE FOR ASPHALT CONCRETE RESURFACING. NON CAPACITY ENHANCING AND ALL ON LA ROWFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 34 34 34 34CITY FUNDS 9 9 9 9LAE0550 Total 43 43 43 43

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0732 Los Angeles SCAB LAE0732 NCRH1 L EXEMPT - 93.127 0

Description: PTC 400 Agency LOS ANGELES, CITY OF

RIVERSIDE DRIVE NON-CAPACITY IMPROVEMENTS BETWEEN VAN NUYS BLVD AND TILDEN AVE.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 64 256 320 64 256 320LOCAL TRANS FUNDS 16 64 80 16 64 80LAE0732 Total 80 320 400 80 320 400

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0937 Los Angeles SCAB LAE0937 NCR31 L EXEMPT - 93.126 0

Description: PTC 123 Agency LOS ANGELES, CITY OF

REHABILITATE STREET SURFACES IN SHERMAN OAKS; PROJECT WILL PROVIDE ASPHALT CONCRETE RESURFACING OF VARIOUS STREETS IN THE SHERMAN OAKS AREA. PROJECT WILL NOT ENHANCE TRAFFIC CAP.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 99 99 99 99CITY FUNDS 24 24 24 24LAE0937 Total 123 123 123 123

Print Date: 3/23/2017 9:50:43 AM Page: 68 of 123

Page 69: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1093 Los Angeles SCAB LAE1093 NCR30 L EXEMPT - 93.126 2

Description: PTC 1,060 Agency LOS ANGELES, CITY OF

SAN FERNANDO RD NORTH - FROM ASTORIA ST TO SAYRE ST. WIDEN ROADWAY AND CONSTRUCT CONCRETE SIDEWALK, CURB, GUTTER, ACCESS RAMPS, AND BULKHEAD.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 84 763 847 164 683 847CITY FUNDS 22 191 213 22 191 213LAE1093 Total 106 954 1,060 186 874 1,060

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1440 Los Angeles SCAB LAE1440 NCR91 L EXEMPT - 93.126 0

Description: PTC 6,450 Agency LOS ANGELES, CITY OF

RECONFIGURE SAN FERNANDO RD. FROM FLETCHER DR. TO I-5 FWY.Install left-turn channelization, improve pedestrian amenities, install wider sidewalks, median islands and landscaping where feasible between Cazador Street to just south of Alice Street.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 828 276 4,056 5,160 828 276 4,056 5,160LOCAL TRANS FUNDS 207 69 1,014 1,290 207 69 1,014 1,290LAE1440 Total 1,035 345 5,070 6,450 1,035 345 5,070 6,450

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1531 Los Angeles SCAB LAE1531 NCR30 L EXEMPT - 93.126 0

Description: PTC 50 Agency LOS ANGELES, CITY OF

CONSTRUCTION OF A SMART CROSSWALK SYSTEM AT THE INTERSECTION OF ARMINTA ST. AND MASON AVE.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 40 40 40 40CITY FUNDS 10 10 10 10LAE1531 Total 50 50 50 50

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1601 Los Angeles SCAB LAE1601 NCN29 L EXEMPT - 93.126 0

Description: PTC 1,200 Agency LOS ANGELES, CITY OF

TRANSPORTATION ENHANCEMENT TO CHILDREN'S MUSEUM OF LOS ANGELES. This project will provide for new sidewalks, curb, gutter, ADA-compliant access ramps, and street trees along Foothill Bl and Osborne St, adjacent to the future Children's Museum of Los Angeles.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 80 880 960 960 960AGENCY 20 220 240 240 240LAE1601 Total 100 1,100 1,200 1,200 1,200

Print Date: 3/23/2017 9:50:43 AM Page: 69 of 123

Page 70: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1867 Los Angeles SCAB LAE1867 NCR30 L EXEMPT - 93.126 0

Description: PTC 50 Agency LOS ANGELES, CITY OF

CONSTRUCTION OF SMART CROSSWALK AT THE INTERSECTION OF TOPANGA CANYON AND GAULT ST.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 40 40 40 40CITY FUNDS 10 10 10 10LAE1867 Total 50 50 50 50

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1933 Los Angeles SCAB LAE1933 NCN46 L EXEMPT - 93.126 0

Description: PTC 450 Agency LOS ANGELES, CITY OF

ENHANCE BYZANTINE LATINO QUARTER TRANSIT PLAZAS AT NORMANDIE AND PICO, AND HOOVER AND PICO, LOS ANGELES BY IMPROVING STREETSCAPES, INCLUDING EXPANDING CONCRETE AND PAVINGFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 80 280 360 80 280 360CITY FUNDS 20 70 90 20 70 90LAE1933 Total 100 350 450 100 350 450

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2147 Los Angeles SCAB LAE2147 NCR35 L EXEMPT - 93.126 0

Description: PTC 1,000 Agency LOS ANGELES, CITY OF

NORTHWEST SAN FERNANDO VALLEY RD & SAFETY IMPROVEMENT. LINDLEY AVE. (STRATHERN TO CHASE), ROSCOE BLVD. CONSTRUCTION OF NEW ROADWAY LIGHTING ON MAJOR TRANSPORTATION CORRIDORS.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 120 680 800 120 680 800CITY FUNDS 30 170 200 30 170 200LAE2147 Total 150 850 1,000 150 850 1,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2279 Los Angeles SCAB LAE2279 NCR29 L EXEMPT - 93.126 0

Description: PTC 4,000 Agency LOS ANGELES, CITY OF

STREETSCAPE IMPROVMENTS ALONG CENTRAL AVE FROM WASHINGTON BLVD TO VERNON AVE INCLUDING PED LIGHTING, NEW BUS STOPS AND STREET FURNITURE, SIDEWALK WIDENING, CROSSWALK ENHANCEMENTS, TREES ETC.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 300 1,356 1,656 300 1,356 1,656AGENCY 83 2,261 2,344 83 2,261 2,344LAE2279 Total 383 3,617 4,000 383 3,617 4,000

Print Date: 3/23/2017 9:50:43 AM Page: 70 of 123

Page 71: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2299 Los Angeles SCAB REG0703 NCR30 L EXEMPT - 93.126 0

Description: PTC 200 Agency LOS ANGELES, CITY OF

Widen Haskell Avenue between Chase St. and Roscoe Blvd - Safety Improvements.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 32 128 160 32 128 160LOCAL TRANS FUNDS 8 32 40 8 32 40LAE2299 Total 40 160 200 40 160 200

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2515 Los Angeles SCAB LAE2515 CAX63 L NON-EXEMPT 0

Description: PTC 4,250 Agency LOS ANGELES, CITY OF

WIDEN BUNDY DR. BETWEEN WILSHIRE AND SANTA MONICA BLVD - WIDEN FROM 2 LANES TO 4 LANES.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 680 800 1,920 3,400 680 800 1,920 3,400CITY FUNDS 170 200 480 850 170 200 480 850LAE2515 Total 850 1,000 2,400 4,250 850 1,000 2,400 4,250

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2538 Los Angeles SCAB LAE2538 NCN46 L EXEMPT - 93.126 0

Description: PTC 250 Agency LOS ANGELES, CITY OF

KOREATOWN PAVILION GARDEN-TO ENHANCE THE NORTHEAST CORNER OF NORMANDIE AND OLYMPIC BL. Enhance an existing pocket park at the intersection Olympic and Normandie/Irolo with decorative concrete paving and improve streetscape by adding pedestrian improvements such as street furniture, lighting, landscaping, and community identifiers.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 40 160 200 40 160 200CITY FUNDS 10 40 50 10 40 50LAE2538 Total 50 200 250 50 200 250

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2634 Los Angeles SCAB LAE2634 NCNH2 L EXEMPT - 93.127 0

Description: PTC 125 Agency LOS ANGELES, CITY OF

CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF HAMLIN ST. AND CORBIN AVE.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 100 100 100 100CITY FUNDS 25 25 25 25LAE2634 Total 125 125 125 125

Print Date: 3/23/2017 9:50:43 AM Page: 71 of 123

Page 72: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2699 Los Angeles SCAB LAE2699 NCN25 L EXEMPT - 93.126 0

Description: PTC 574 Agency LOS ANGELES, CITY OF

CONSTRUCTION OF NEW MULTI-USE PATH/TRAIL ALONG RIVER BANK BETWEEN SEPULVEDA BLVD & KESTER AVE INCLUDING ACCESS RAMPS, REATAINING WALLS, LANDSCAPING ETC.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 459 459 459 459CITY FUNDS 115 115 115 115LAE2699 Total 574 574 574 574

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2828 Los Angeles SCAB LAE2828 NCN27 L EXEMPT - 93.126 0

Description: PTC 100 Agency LOS ANGELES, CITY OF

IMPLEMENT STREETSCAPE IMPROVEMENTS ALONG WILBUR AVE TO ENHANCE TRAFFIC AND PEDESTRIAN SAFETY. Project will provide for sidewalk improvements, ADA-compliant access ramps, and street trees to enhance Wilbur Ave and provide for pedestrian safety.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 8 72 80 80 80CITY FUNDS 2 18 20 20 20LAE2828 Total 10 90 100 100 100

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE3157 Los Angeles SCAB LAE3157 NCR31 L EXEMPT - 93.126 0

Description: PTC 47 Agency LOS ANGELES, CITY OF

REHABILITATE ADDISON ST BETWEEN KESTER AVE AND LEMONA AVE: PROVIDE ASHALT CONCRETE RESURFACING ON THE PROPOSED PROJECT LIMITS. WILL NOT ENHANCE TRAFFIC CAPACITY.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 38 38 38 38CITY FUNDS 9 9 9 9LAE3157 Total 47 47 47 47

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE3201 Los Angeles SCAB LAE3201 NCNH2 L EXEMPT - 93.127 0

Description: PTC 125 Agency LOS ANGELES, CITY OF

CONSTRUCTION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF OSO AVE. AND VANOWEN ST.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 100 100 100 100CITY FUNDS 25 25 25 25LAE3201 Total 125 125 125 125

Print Date: 3/23/2017 9:50:43 AM Page: 72 of 123

Page 73: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE3764 Los Angeles SCAB LAE3764 ITS02 L EXEMPT - 93.128 0

Description: PTC 1,250 Agency LOS ANGELES, CITY OF

ITS & INTERSECTION IMPROVEMENTS IN AND NEAR LAX AIRPORT, WHICH MAY INCLUDE RESTRIPING, SIGNAL PHASE CHANGES, AND THE ADDITION OF INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 1,000 1,000 1,000 1,000CITY FUNDS 250 250 250 250LAE3764 Total 1,250 1,250 1,250 1,250

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1141 Los Angeles SCAB 1AL04 CAX63 L NON-EXEMPT 0

Description: PTC 11,655 Agency LOS ANGELES, CITY OF

Victory Bl Widening from Topanga Cyn Bl to De Soto Av. Widen the south side of Victory Bl from Topanga Cyn Bl to De Soto Av to provide an additional EB travel lane

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 382 1,580 3,144 5,106 3,539 1,567 5,106PROP "C25" FUNDS 709 5,840 6,549 3,638 2,911 6,549LAF1141 Total 1,091 1,580 8,984 11,655 7,177 4,478 11,655

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1338 Los Angeles SCAB 1AL04 NCR30 L EXEMPT - 93.126 2

Description: PTC 6,338 Agency LOS ANGELES, CITY OF

Highway-Rail Grade Crossing Improvement System. Provide upgrades to traffic signal equipment at Highway-Rail Grade Crossings in LA to improve safety.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C25" FUNDS 52 6,286 6,338 5,838 500 6,338LAF1338 Total 52 6,286 6,338 5,838 500 6,338

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1611 Los Angeles SCAB 1NL04 NCN46 L EXEMPT - 93.126 5

Description: PTC 2,350 Agency LOS ANGELES, CITY OF

Cesar Chavez Transit Corridor (110 Fwy to Alameda). Installation of pedestrian/transit rider amenities inc. bus stop gardens at three intersections, new pedestrian lighting, street trees in a landscaped parkway & wayfinding signage.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 283 283 283 283CITY FUNDS 110 392 502 110 392 502ACTIVE TRANSPORTATION PROGRAM

1,565 1,565 1,565 1,565

LAF1611 Total 393 1,957 2,350 393 1,957 2,350

Print Date: 3/23/2017 9:50:43 AM Page: 73 of 123

Page 74: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1612 Los Angeles SCAB 1NL04 TRRH6 L EXEMPT - 93.127 0

Description: PTC 3,342 Agency LOS ANGELES, CITY OF

Century City Urban Design and Pedestrian Connection Plan. Project will implement sidewalk improvements, decorative crosswalks, median island, curb ramps, pedestrian lighting, shelters, benches, trash receptacles & street trees. The physical improvements will consist of a meandering pedestrian walkway, solar-powered pedestrian scale lighting, street lighting, trash receptacles, bus benches, (10)bicycle racks.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 297 1,308 1,605 1,605 1,605CITY FUNDS 1,336 1,336 1,336 1,336LOCAL TRANS FUNDS 74 327 401 401 401LAF1612 Total 371 2,971 3,342 3,342 3,342

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1615 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 0

Description: PTC 2,990 Agency LOS ANGELES, CITY OF

Eastside Light Rail Pedestrian Linkage. Improve pedestrian linkages to Metro's Gold Line LRT on 1st St between Soto St to Rivera St and Fresno St to Concord St. Pedestrian linkage elements to include sidewalk improvements, street trees, crosswalk enhancements, pedestrian lighting, and streetscape amenities. The project’s purpose is to promote and facilitate pedestrian activity and increase pedestrian safety leading to Metro’s Gold line Eastside Extension stations.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 320 2,072 2,392 320 2,072 2,392CITY FUNDS 80 518 598 80 518 598LAF1615 Total 400 2,590 2,990 400 2,590 2,990

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1617 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 0

Description: PTC 860 Agency LOS ANGELES, CITY OF

Hollywood Pedestrian/Transit Crossroads Phase II. Design and install pedestrian and transit user enhancements, extending the original Hollywood Pedestrian/Transit Improvement project to include Highland Avenue and Vine Street.Distance 0.56 miles.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 88 531 619 88 531 619AGENCY 12 229 241 12 229 241LAF1617 Total 100 760 860 100 760 860

Print Date: 3/23/2017 9:50:43 AM Page: 74 of 123

Page 75: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1639 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 4

Description: PTC 1,971 Agency LOS ANGELES, CITY OF

Fashion District Streetscape Phase II. Streetscape improvements enhancing the pedestrian environment to facilitate increased pedestrian usage between LA Fashion District's core and the 7th St transit corridor for a distance of 1 mile.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 130 1,438 1,568 1,568 1,568CITY FUNDS 71 332 403 71 332 403LAF1639 Total 201 1,770 1,971 1,639 332 1,971

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1708 Los Angeles SCAB 1TL104 ITS12 L TCM Committed 2

Description: PTC 2,708 Agency LOS ANGELES, CITY OF

Hollywood Integrated Modal Information System. Installation of electronic, direction and parking availability signs with internet connectivity to provide advance and real-time information intended to increase transit ridershipFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,682 1,682 274 1,408 1,682AGENCY 1,026 1,026 1,026 1,026LAF1708 Total 2,708 2,708 274 2,434 2,708

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1844 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 4

Description: PTC 764 Agency LOS ANGELES, CITY OF

Angels Walk Crenshaw. To promote pedestrian activity within the project limits with a guidebook and 15 on-street information markers (historic stanchions) at strategic locations.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 271 340 611 611 611CITY FUNDS 68 85 153 68 85 153LAF1844 Total 339 425 764 679 85 764

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1845 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 0

Description: PTC 784 Agency LOS ANGELES, CITY OF

Angels Walk Highland Park. To promote pedestrian activity within the project limits with a guidebook and 15 on-street information markers at strategic locations.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 305 321 626 305 321 626CITY FUNDS 77 81 158 77 81 158LAF1845 Total 382 402 784 382 402 784

Print Date: 3/23/2017 9:50:43 AM Page: 75 of 123

Page 76: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3142 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 4,477 Agency LOS ANGELES, CITY OF

Exposition Park Traffic Circulation Improvements. Widen the intersections of Vermont Ave & Martin Luther King, Jr. Blvd & Figueroa St & Martin Luther King Jr Blvd to provide exclusive right turn lanes..

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 293 520 2,097 2,910 293 520 2,097 2,910LOCAL TRANS FUNDS 157 280 1,130 1,567 157 280 1,130 1,567LAF3142 Total 450 800 3,227 4,477 450 800 3,227 4,477

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3144 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 1,860 Agency LOS ANGELES, CITY OF

Foothill Blvd and Sierra Hwy Intersection Improvements. Widen Foothill Bl to provide an additional N/B through lane, restripe Sierra Hwy to provide additional W/B right turn lane, & signalize the intersection. New lane length is approximately 280feet.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 129 522 651 129 522 651PROP "C25" FUNDS 241 968 1,209 241 968 1,209LAF3144 Total 370 1,490 1,860 370 1,490 1,860

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3146 Los Angeles SCAB 1AL04 NCN95 L EXEMPT - 93.126 0

Description: PTC 5,804 Agency LOS ANGELES, CITY OF

Highland Avenue Widening-Odin Street to Franklin Avenue. Widen the existing roadway from 75 ft to 87 ft to add additional turning traffic lane along Highland Ave & upgrade the highway to Major Highway Standards.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 887 665 2,220 3,772 887 665 2,220 3,772CITY FUNDS 478 359 1,195 2,032 478 359 1,195 2,032LAF3146 Total 1,365 1,024 3,415 5,804 1,365 1,024 3,415 5,804

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3171 Los Angeles SCAB 1AL04 NCRT2 L TCM Committed 0

Description: PTC 11,536 Agency LOS ANGELES, CITY OF

De Soto Ave Widening: Ronald Reagan Fwy to Devonshire St.. Minor widening of De Soto Ave fr SR-118 to Devonshire St to provide uniform rodway width in each direction as well as installing 10' sidewalk, curb and gutter. Sidewalk is 1.42 miles, 90% of the sidewalks along the project limits will be new.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 1,193 6,305 7,498 1,193 6,305 7,498CITY FUNDS 643 3,395 4,038 643 3,395 4,038LAF3171 Total 1,836 9,700 11,536 1,836 9,700 11,536

Print Date: 3/23/2017 9:50:43 AM Page: 76 of 123

Page 77: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3314 Los Angeles Various 1ITS04 ITS04 L TCM Committed 0

Description: PTC 5,493 Agency LOS ANGELES, CITY OF

Intelligent Transportation System (ITS) Communication System. Upgrade and replace under capacity communication system hardware in order to provide a viable and cost effective communication link between traffic corridors and the LA County IEN.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 4,394 4,394 4,394 4,394LOCAL TRANS FUNDS 1,099 1,099 1,099 1,099LAF3314 Total 5,493 5,493 5,493 5,493

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3630 Los Angeles SCAB 1O1008 NCR27 L EXEMPT - 93.126 2

Description: PTC 992 Agency LOS ANGELES, CITY OF

MAIN ST PED ENHANCEMENT: 2ND-4TH ST: Enhance walkability for pedestrians and transit users by installing curb and pedestrian enhancements along Main St. between 2nd St. and 4th St. in Downtown LA. Improvements will include decorative crosswalks, street trees, bump-outs (sidewalk extensions), pedestrian lighting, and public bus stop improvements. (1/4 mile)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 165 662 827 165 662 827CITY FUNDS 41 124 165 41 124 165LAF3630 Total 206 786 992 206 786 992

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3631 Los Angeles SCAB 1NL04 NCN27 L EXEMPT - 93.126 0

Description: PTC 1,674 Agency LOS ANGELES, CITY OF

Westlake MacArthur Park Pedestrian Improvement Project. Install pedestrian improvements incl pedestrian lighting, sidewalk enhancements, street furniture & trees, enhanced crosswalks, & bus stop amenities.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 268 1,071 1,339 268 1,071 1,339CITY FUNDS 56 279 335 56 279 335LAF3631 Total 324 1,350 1,674 324 1,350 1,674

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3632 Los Angeles SCAB 1NL04 NCN46 L EXEMPT - 93.126 0

Description: PTC 1,472 Agency LOS ANGELES, CITY OF

Western Av Bus Stop & Pedestrian Improvement Project. Install pedestrian and transit amenities to enhance the pedestrian environment along Western Av btw Exposition Bl & I-10 Freeway.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 236 942 1,178 1,178 1,178CITY FUNDS 59 235 294 169 125 294LAF3632 Total 295 1,177 1,472 1,347 125 1,472

Print Date: 3/23/2017 9:50:43 AM Page: 77 of 123

Page 78: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3640 Los Angeles SCAB 1NL04 NCN27 L EXEMPT - 93.126 0

Description: PTC 1,075 Agency LOS ANGELES, CITY OF

LANI - Evergreen Park Street Enhancement Project. Increase pedestrian safety and access by providing improved crosswalks, new bus shelters and street trees to enhance connectivity between transit and area landmarks.. The proposed project is located in the Boyle Heights community of Los Angeles.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 169 675 844 169 675 844CITY FUNDS 46 185 231 28 203 231LAF3640 Total 215 860 1,075 197 878 1,075

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3643 Los Angeles SCAB 1AL04 NCR27 L EXEMPT - 93.126 2

Description: PTC 5,227 Agency LOS ANGELES, CITY OF

Boyle Heights Chavez Ave Streetscape/Pedestrian Improvements. Enhance use of public transit, provide new ped. amenities & safe access to Metro Gold Line stations on 1st Street.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 558 2,230 2,788 558 2,230 2,788CITY FUNDS 488 1,951 2,439 488 1,951 2,439LAF3643 Total 1,046 4,181 5,227 1,046 4,181 5,227

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3644 Los Angeles SCAB 1AL04 NCR27 L TCM Committed 2

Description: PTC 7,690 Agency LOS ANGELES, CITY OF

Broadway Historic Theater District Pedestrian Improvements 4th-6th Streets. The project will improve pedestrian safety by installing curb extensions, widening sidewalks, improving pedestrian lighting, enhancing crosswalks, and provide pedestrian amenities; benches, street trees, landscaped buffers from traffic and 10 bike racks.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 145 683 828 15 130 683 828ACTIVE TRANSPORTATION PROGRAM - MPO

1,200 5,662 6,862 120 1,080 5,662 6,862

LAF3644 Total 1,345 6,345 7,690 135 1,210 6,345 7,690

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3646 Los Angeles SCAB 1NL04 NCN46 L TCM Committed 5

Description: PTC 4,439 Agency LOS ANGELES, CITY OF

Arts District/Little Tokyo Gold Line Station Linkages. Pedestrian enhancements including sidewalk/path paving; ped lights; street trees/planting; district signage; entry elements; street furniture; crosswalk paving; and bike parking. (10 bike racks)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 225 898 1,123 225 898 1,123ACTIVE TRANSPORTATION PROGRAM

663 2,653 3,316 663 2,653 3,316

LAF3646 Total 888 3,551 4,439 888 3,551 4,439

Print Date: 3/23/2017 9:50:43 AM Page: 78 of 123

Page 79: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3647 Los Angeles SCAB 1NL04 NCR27 L EXEMPT - 93.126 2

Description: PTC 3,302 Agency LOS ANGELES, CITY OF

Menlo Ave/MLK Vermont Expo Station Pedestrian Improvements. Improve pedestrian access to the new Expo station on Vermont Ave by installing sidewalks, landscaping, and lighting along Menlo Ave. and MLK Jr. Blvd. plus a median on MLK Blvd.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 337 1,350 1,687 337 1,350 1,687CITY FUNDS 323 1,292 1,615 323 1,292 1,615LAF3647 Total 660 2,642 3,302 660 2,642 3,302

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3650 Los Angeles SCAB 1NL04 NCN27 L EXEMPT - 93.126 0

Description: PTC 858 Agency LOS ANGELES, CITY OF

Western Ave Expo Line Station Linkage Project (South). Project will design and construct pedestrian & safety enhancements intended to increase the usage of public transportation and create a link to Metro Expo LR station at Western & Exposition. Proposed improvements include sidewalk improvements, safety lighting at bus stops, street furniture, and enhanced crosswalks.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 70 616 686 70 616 686CITY FUNDS 18 154 172 18 154 172LAF3650 Total 88 770 858 88 770 858

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3653 Los Angeles SCAB 1NL04 NCN46 L EXEMPT - 93.126 0

Description: PTC 2,567 Agency LOS ANGELES, CITY OF

Pasadena Ave Ped Connection to Gold Line Heritage Sq Station. This project will implement sidewalk improvements, street furniture, safety lighting, street trees, and enhanced crosswalks along Pasadena Ave between Broadway to to Figueroa St. This project will improve pedestrian connectivity to the Gold Line Heritage Square Station.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 200 1,853 2,053 200 1,853 2,053CITY FUNDS 50 464 514 50 464 514LAF3653 Total 250 2,317 2,567 250 2,317 2,567

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3656 Los Angeles SCAB 1AL04 NCR30 L NON-REPORTABLE TCM

COMMITTED5

Description: PTC 2,588 Agency LOS ANGELES, CITY OF

Central Avenue Historic Corridor Streetscape. Central Ave: Washington Bl-Slauson Ave; pedestrian/transit improvements at high volume intersections-transit stops w/wider landscaped sidewalk areas/enhanced pedestrian crossings.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 204 1,493 1,697 204 1,493 1,697AGENCY 26 426 452 452 452

Print Date: 3/23/2017 9:50:44 AM Page: 79 of 123

Page 80: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

CITY FUNDS 439 439 439 439LAF3656 Total 230 2,358 2,588 204 2,384 2,588

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3657 Los Angeles SCAB 1AL04 NCN46 L EXEMPT - 93.126 5

Description: PTC 1,374 Agency LOS ANGELES, CITY OF

Beverly Boulevard Transportation Enhancements. Provide transit-oriented streetscape improvements to increase ped safety & transit use along Beverly Bl, Vermont, Alvarado, Toluca. Tree root pruning, tree wells, ADA access, landscaping.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 27 248 275 27 248 275ACTIVE TRANSPORTATION PROGRAM

992 992 992 992

STP-ENTRANCEMENT PRIOR STIP

107 107 107 107

LAF3657 Total 134 1,240 1,374 134 1,240 1,374

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3721 Los Angeles SCAB 1AL04 NCN27 L EXEMPT - 93.126 0

Description: PTC 844 Agency LOS ANGELES, CITY OF

Angels Walk Silverlake. Promote pedestrian activity within the project limits with a guidebook and 15 on-street information markers (historic stanchions) at strategic locations.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 78 91 169 78 91 169LOCAL TRANS FUNDS 312 363 675 312 363 675LAF3721 Total 390 454 844 390 454 844

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3722 Los Angeles SCAB 1AL04 NCN27 L EXEMPT - 93.126 0

Description: PTC 818 Agency LOS ANGELES, CITY OF

Angels Walk Boyle Heights. Promote pedestrian activity within the project limits with a guidebook and 15 on-street information markers (historic stanchions) at strategic locations.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 75 88 163 75 88 163LOCAL TRANS FUNDS 303 352 655 303 352 655LAF3722 Total 378 440 818 378 440 818

Print Date: 3/23/2017 9:50:44 AM Page: 80 of 123

Page 81: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3726 Los Angeles SCAB 1TDL04 TDM24 L EXEMPT - 93.126 0

Description: PTC 1,641 Agency LOS ANGELES, CITY OF

First and Last Mile Transit Connectivity Options. Implement a pilot shared fleet vehicle program that includes, bikes, alternative green vehicles for first & last miles from Union Station to and other Downtown locations.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 105 1,208 1,313 105 1,208 1,313CITY FUNDS 26 302 328 26 302 328LAF3726 Total 131 1,510 1,641 131 1,510 1,641

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3731 Los Angeles SCAB 1TDL04 ITS01 L TCM Committed 0

Description: PTC 1,612 Agency LOS ANGELES, CITY OF

Downtown LA Inter-Modal Transit Information and Wayfinding. Install transit information monitors, variable message signs, interactive kiosks & parking availability signage along Broadway Corridor to Olympic.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 322 322 322 322LOCAL TRANS FUNDS 1,290 1,290 1,290 1,290LAF3731 Total 1,612 1,612 1,612 1,612

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5121 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 4

Description: PTC 1,858 Agency LOS ANGELES, CITY OF

Balboa Bl Widening at Devonshire St. This project will improve the intersection of Balboa Bl and Devonshire St by widening Balboa Bl by three feet for a distance of 0.1 mile in both directions. This widening will enable the intersection of Balboa Bl and Devonshire St to be restriped and reconfigured to accommodate dual left-turn lanes in the northbound and southbound directions of Balboa Bl. The project includes curb and gutter work and modifications to the existing sidewalk.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 207 1,001 1,208 1,208 1,208CITY FUNDS 111 539 650 650 650LAF5121 Total 318 1,540 1,858 1,858 1,858

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5207 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 7,132 Agency LOS ANGELES, CITY OF

Alameda Street Downtown LA: Goods Movement, Phase I. This project will provide congestion relief, improve mobility/reduce conflicts, and improve safety for both autos and trucks by providing intersection improvements. Project will also remove abandoned rail lines, repair pavement, add new street lighting, and construct pedestrian improvements.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 767 3,000 3,767 3,767 3,767

Print Date: 3/23/2017 9:50:44 AM Page: 81 of 123

Page 82: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

CITY FUNDS 331 3,034 3,365 3,365 3,365LAF5207 Total 1,098 6,034 7,132 7,132 7,132

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5317 Los Angeles SCAB 1ITS01 ITS02 L TCM 0

Description: PTC 2,875 Agency LOS ANGELES, CITY OF

ITS Platform Upgrades-This project includes two parts: Computer Network Architecture Upgrade (CNA) and Communications System & Central Computer Core Upgrade (CSC). The CNA will increase capacity of the ATSAC central computer network. The CSC involves upgrade of new software communications stacks to increase capability of each communications channel to transmit various traffic data.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 575 575 575 575PROP "C25" FUNDS 2,300 2,300 2,300 2,300LAF5317 Total 2,875 2,875 2,875 2,875

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5519 Los Angeles SCAB 1O1007 NCN25 L EXEMPT - 93.126 0

Description: PTC 732 Agency LOS ANGELES, CITY OF

This project is located in the City of Los Angeles. Construction of Bicycle Friendly Street treatments: at least 100 directional signs, at least 500 shared lane markings, and bicycle detectors and markings provided to at least 15 signalized intersections. Other treatments will include traffic calming devices and diversion, which include at least one diverter and roundabout.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 110 476 586 586 586CITY FUNDS 28 118 146 146 146LAF5519 Total 138 594 732 732 732

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5525 Los Angeles SCAB 1O1007 NCN25 L TCM 0

Description: PTC 1,215 Agency LOS ANGELES, CITY OF

To design and construct curb-side bicycle parking (bicycle corral) that will serve each Council District. The project requires surface modifications to curbside parking areas for installing at least 150 bike racks.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 146 826 972 247 725 972CITY FUNDS 22 221 243 62 181 243LAF5525 Total 168 1,047 1,215 309 906 1,215

Print Date: 3/23/2017 9:50:44 AM Page: 82 of 123

Page 83: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5624 Los Angeles SCAB 7120004 NCN27 L EXEMPT - 93.126 4

Description: PTC 2,296 Agency LOS ANGELES, CITY OF

Washington Blvd Pedestrian Transit Access(Hooper/Alameda) II, located on Washington Bl between Hooper Av and Alameda St and on Long Beach Av between Washington Bl and 20th St. Pedestrian improvements, pedestrian lighting, crosswalk enhancements, curb extensions, new railroad crossing signals, and new access to the station from the south. Distance 0.59 miles.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 178 1,314 1,492 178 1,314 1,492CITY FUNDS 96 708 804 96 708 804LAF5624 Total 274 2,022 2,296 274 2,022 2,296

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5629 Los Angeles SCAB 1O1008 NCR30 L EXEMPT - 93.126 2

Description: PTC 1,441 Agency LOS ANGELES, CITY OF

Orange Line-Sherman Way Pedestrian Links. Pedestrian and bike improvements linking Metro Orange Line Sherman Way station with nearby destinations. Improvements designed to improve safety include pedestrian lighting, wayfinding signage, curb extensions, benches, ADA-curb cuts, etc.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 52 236 288 52 236 288ACTIVE TRANSPORTATION PROGRAM

205 948 1,153 205 948 1,153

LAF5629 Total 257 1,184 1,441 257 1,184 1,441

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5632 Los Angeles SCAB 1O1008 NCR27 L EXEMPT - 93.126 5

Description: PTC 3,923 Agency LOS ANGELES, CITY OF

Hollywood/Western Streetscape Public and Pedestrian Improvements on Hollywood Blvd between Gower St and Western Av and on Western Av between Hollywood Bl and Carlton Way. Installation of new sidewalk paving, curb ramps, bus safety lighting, trash receptacles, benches, bike racks, street trees, landscaping, curb extensions, public art, and decorative crosswalks.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 456 1,179 1,635 1,635 1,635ACTIVE TRANSPORTATION PROGRAM

322 1,966 2,288 2,288 2,288

LAF5632 Total 778 3,145 3,923 3,923 3,923

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5707 Los Angeles SCAB 1O1008 NCN27 L EXEMPT - 93.126 0

Description: PTC 858 Agency LOS ANGELES, CITY OF

Angels Walk Central Avenue. This project will provide 15 on-street information markers (historic stanchions), guide books and digital access on the Internet to guide pedestrians and transit users in a significant segment of Central Av, informing them of the history and culture of the area. It will also link the pedestrian to Downtown via connections to public transit options along this Angels Walk Route.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 320 366 686 320 366 686

Print Date: 3/23/2017 9:50:44 AM Page: 83 of 123

Page 84: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

CITY FUNDS 80 92 172 80 92 172LAF5707 Total 400 458 858 400 458 858

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5821 Los Angeles SCAB 1O1009 NCR10 L EXEMPT - 93.126 2

Description: PTC 851 Agency LOS ANGELES, CITY OF

Valencia Triangle Landscape Beautification Plaza. Will install streetscape improvements including a landscaped island enhancement, benches, enhanced sidewalks, bus stop pedestrian lighting, and a crosswalk enhancement. Funds are requested for design, construction and installation costs.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 111 442 553 111 442 553CITY FUNDS 60 238 298 60 238 298LAF5821 Total 171 680 851 171 680 851

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7109 Los Angeles SCAB 1AL04 CAXT2 L NON-EXEMPT 0

Description: PTC 9,330 Agency LOS ANGELES, CITY OF

SOTO STREET WIDENING FROM MULTNOMAH STREET TO MISSION ROAD : (1) Widens Soto St between Multnomah St and North Mission Rd (0.6 mile) from a bi-directional 1-lane roadway to 2-lane roadway in each direction. (2) Widens existing sidewalks from 4 ft to 8 ft for wheelchair accessibility. (3) Constructs Class II bike lane in both directions, pedestrian lighting, a new striped median, and shoulders on both sides of the street.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 264 115 2,896 3,275 176 88 1,754 1,257 3,275PROP "C25" FUNDS 487 214 5,354 6,055 325 162 3,244 2,324 6,055LAF7109 Total 751 329 8,250 9,330 501 250 4,998 3,581 9,330

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7123 Los Angeles SCAB 1AL04 CAR63 L NON-EXEMPT 4

Description: PTC 8,402 Agency LOS ANGELES, CITY OF

MAGNOLIA BOULEVARD WIDENING (NORTH SIDE) - CAHUENGA BOULEVARD TO VINELAND : (1) Widens Magnolia Bl from a 50-ft to a 65-ft roadway for approximately 3,000 linear feet from Cahuenga Bl to Vineland Av to accomodate a center left-turn lane, on-street parking, and two traffic lanes in each direction. (2) Install 8-ft continous sidewalk. (3) Improvements to traffic signals, lights, and general landscaping.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 975 4,486 5,461 975 2,843 1,643 5,461CITY FUNDS 579 2,362 2,941 579 1,531 831 2,941LAF7123 Total 1,554 6,848 8,402 1,554 4,374 2,474 8,402

Print Date: 3/23/2017 9:50:44 AM Page: 84 of 123

Page 85: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7125 Los Angeles SCAB 1OM0702 CAXT3 L EXEMPT - 93.127 0

Description: PTC 1,481 Agency LOS ANGELES, CITY OF

SHERMAN WAY WIDENING BETWEEN WHITSETT AVENUE TO HOLLYWOOD FREEWAY : (1) Widen a south side of Sherman Wy by approx 20 ft to provide a through and dedicated right-turn only lane onto the Hollywood Fwy southbound on-ramp. (2) Installs pedestrian facilities and landscaping. (3) Widens the outside curb lane by 6 ft to accommodate safer bike travel.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 186 770 956 142 44 770 956CITY FUNDS 101 424 525 88 13 424 525LAF7125 Total 287 1,194 1,481 230 57 1,194 1,481

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7131 Los Angeles SCAB 1AL04 CAXT5 L NON-EXEMPT 0

Description: PTC 11,129 Agency LOS ANGELES, CITY OF

CENTURY BOULEVARD EXTENSION BETWEEN GRAPE STREET AND ALAMEDA STREET : Extends Century Bl by approx 2,600 ft from Grapte St to Alameda St with a 2 lane roadway, sidewalks on both sides, Class II bike lane, ped/bike facilities, and landscaping.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 5,898 5,898 5,898 5,898CITY FUNDS 5,231 5,231 5,231 5,231LAF7131 Total 11,129 11,129 11,129 11,129

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7205 Los Angeles SCAB 1AL04 CAY63 L NON-EXEMPT 5

Description: PTC 9,708 Agency LOS ANGELES, CITY OF

ALAMEDA STREET WIDENING FROM ANAHEIM STREET TO 300 FT. SOUTH OF PCH : (1) Widens Alameda St between Anaheim St and 300 ft south of Pacific Coast Highway from 2 to 3 lanes in each direction for congestion relief and improve goods movement mobility.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 1,014 340 4,519 5,873 3,170 2,703 5,873CITY FUNDS 662 221 2,952 3,835 2,069 1,766 3,835LAF7205 Total 1,676 561 7,471 9,708 5,239 4,469 9,708

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7207 Los Angeles SCAB 1AL04 CAY63 L NON-EXEMPT 0

Description: PTC 6,566 Agency LOS ANGELES, CITY OF

ANAHEIM STREET WIDENING - FARRAGUT AVENUE TO DOMINGUEZ CHANNEL : Widen Anaheim St between Farragut Av and Dominguez Channel from 2 to 3 lanes in each direction for congestion relief and improve goods movement mobility. This upgrades the arterial to Major Highway standards.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL - REGIONAL 3,142 3,142 3,142 3,142CITY FUNDS 3,424 3,424 3,424 3,424LAF7207 Total 6,566 6,566 6,566 6,566

Print Date: 3/23/2017 9:50:44 AM Page: 85 of 123

Page 86: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7622 Los Angeles SCAB 1O1008 NCR27 L EXEMPT - 93.126 2

Description: PTC 1,724 Agency LOS ANGELES, CITY OF

LANI-WEST BOULEVARD COMMUNITY LINKAGES PROJECT: Pedestrian improvements on W 67th St, Crenshaw Bl, Florence Av, and West Bl which include Installing 8 bus shelters, 32 pedestrian lights, 130 street trees, benches, wayfinding signage, bike sharrows, and new and enhanced crosswalks.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 276 1,103 1,379 276 1,103 1,379CITY FUNDS 36 309 345 36 309 345LAF7622 Total 312 1,412 1,724 312 1,412 1,724

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7624 Los Angeles SCAB 1O1008 NCR27 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 2,301 Agency LOS ANGELES, CITY OF

WALK PICO! A CATALYST FOR COMMUNITY VITALITY & CONNECTIVITY: (1) Installs new sidewalk, sidewalk buffer, landscaping, street trees, ped/bike wayfinding signage, curb ramps, ped lighting, benches, trash receptacles, ped refuge median, rectangular rapid flashing beacons, traffic diverters, roundabouts, continental crosswalks, advance stop bars, curb extensions, and accessible pedestrian signal, sharrows. (2) Removes obstructions from the walkway.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 222 1,619 1,841 222 1,619 1,841CITY FUNDS 29 431 460 29 431 460LAF7624 Total 251 2,050 2,301 251 2,050 2,301

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7628 Los Angeles SCAB 1O1008 NCN27 L TCM Committed 0

Description: PTC 836 Agency LOS ANGELES, CITY OF

WATTS STREETSCAPE IMPROVEMENTS PHASE 2: Installs ADA ramps, landscaping street trees, street furniture, ped lighting, crosswalk enhancements, curb extensions, sharrows, and ped & bike wayfinding signage.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 25 142 167 25 142 167LOCAL TRANS FUNDS 98 571 669 98 571 669LAF7628 Total 123 713 836 123 713 836

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7636 Los Angeles SCAB 1O1008 NCR27 L EXEMPT - 93.126 2

Description: PTC 2,981 Agency LOS ANGELES, CITY OF

BROADWAY STREETSCAPE IMPLEMENTATION (8TH – 9TH): Implements curb extensions, widened sidewalks, ped lighting, street furniture, street trees and biofiltration planters, crosswalk enhancements, and decorative edge band paving.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 426 1,958 2,384 426 1,958 2,384

Print Date: 3/23/2017 9:50:44 AM Page: 86 of 123

Page 87: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

CITY FUNDS 56 541 597 56 541 597LAF7636 Total 482 2,499 2,981 482 2,499 2,981

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7708 Los Angeles SCAB 1TR1023 TDM24 L EXEMPT - 93.126 0

Description: PTC 684 Agency LOS ANGELES, CITY OF

INTERACTIVE BICYCLE BOARD DEMO PROJECT : Installs 12 interactive display screens and 96 bicycle counters to encourage greater use of bicycles and reducing Vehicle Miles Traveled.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 137 137 137 137LOCAL TRANS FUNDS 34 513 547 26 257 264 547LAF7708 Total 34 650 684 26 257 401 684

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7814 Los Angeles SCAB 1TR1023 NCN25 L TCM 0

Description: PTC 546 Agency LOS ANGELES, CITY OF

LADOT STREETS FOR PEOPLE: TRANSIT CORRIDOR PARKLETS AND PLAZAS: Installs 12 parklets and 3 plazas. The limits of the parklets will be equal to two curbside parking spaces (apprx. 40x 6). The plaza limit varies ranging from 2,000 to 6,000 SF.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 109 109 109 109LOCAL TRANS FUNDS 437 437 437 437LAF7814 Total 109 437 546 546 546

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7817 Los Angeles SCAB 1AL04 NCN46 L EXEMPT - 93.126 6

Description: PTC 2,937 Agency LOS ANGELES, CITY OF

Vermont Avenue Stormwater Capture & Green Street Transit Project.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 138 1,654 1,792 138 1,654 1,792LOCAL TRANS FUNDS 100 1,045 1,145 100 1,045 1,145LAF7817 Total 238 2,699 2,937 238 2,699 2,937

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9123 Los Angeles SCAB 1AL04 NCR91 L EXEMPT - 93.126 2

Description: PTC 2,193 Agency LOS ANGELES, CITY OF

Implement Complete Streets elements on Colorado Boulevard by installing new signals (two non consecutive intersections), turn lanes, median islands, bump-outs, and pedestrian lighting.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 347 1,407 1,754 347 1,407 1,754

Print Date: 3/23/2017 9:50:44 AM Page: 87 of 123

Page 88: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

CITY FUNDS 87 352 439 87 352 439LAF9123 Total 434 1,759 2,193 434 1,759 2,193

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9204 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 2

Description: PTC 2,412 Agency LOS ANGELES, CITY OF

Slauson Avenue - Western Avenue to Crenshaw Boulevard: Improve a 1.26 mile section of Slauson by increasing curb radii, installing new signalization equipment at key intersections, reconstructing failing AC pavement, providing street lighting, and installing ADA compliant curb rampsFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,930 1,930 501 1,429 1,930CITY FUNDS 482 482 125 357 482LAF9204 Total 2,412 2,412 626 1,786 2,412

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9206 Los Angeles SCAB 1AL04 NCR91 L EXEMPT - 93.126 2

Description: PTC 8,733 Agency LOS ANGELES, CITY OF

Improvements at three intersections and installation of bike facilities on Hyperion Ave and Glendale Blvd corridors, to enhance goods movement and implement multi-modal elements

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 209 213 1,325 1,747 209 213 1,325 1,747PROP "C25" FUNDS 834 853 5,299 6,986 834 853 5,299 6,986LAF9206 Total 1,043 1,066 6,624 8,733 1,043 1,066 6,624 8,733

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9207 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 2

Description: PTC 12,032 Agency LOS ANGELES, CITY OF

Enhance goods movement by increasing turning radii, upgrading signals, adding lighting & signage, removing old railroad tracks, improving storm drains, & eliminating hazards

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 988 171 8,466 9,625 988 171 8,466 9,625CITY FUNDS 247 43 2,117 2,407 128 162 2,117 2,407LAF9207 Total 1,235 214 10,583 12,032 1,116 333 10,583 12,032

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9309 Los Angeles SCAB 1AL04 NCNH2 L EXEMPT - 93.127 2

Description: PTC 5,224 Agency LOS ANGELES, CITY OF

The project will provide upgrades to traffic signals and railroad crossing equipment at highway-rail grade crossings where both systems are interconnected and preemption exists

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,045 1,045 51 104 288 401 201 1,045

Print Date: 3/23/2017 9:50:44 AM Page: 88 of 123

Page 89: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C25" FUNDS 4,179 4,179 204 417 1,151 1,603 804 4,179LAF9309 Total 5,224 5,224 255 521 1,439 2,004 1,005 5,224

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9311 Los Angeles SCAB 1ITS04 ITS14 L EXEMPT - 93.126 2

Description: PTC 2,135 Agency LOS ANGELES, CITY OF

The project will include the design, construction and installation of a digital video transport system for City's ATSAC transportation management system in Los Angeles

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 427 427 65 267 95 427PROP "C25" FUNDS 1,708 1,708 261 1,066 381 1,708LAF9311 Total 2,135 2,135 326 1,333 476 2,135

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9520 Los Angeles SCAB 1O1007 NCR26 L EXEMPT - 93.126 2

Description: PTC 2,290 Agency LOS ANGELES, CITY OF

Mid-City Low Stress Bicycle Enhancement Corridors: The Project is a compilation of bicycle wayfinding and traffic calming treatments along two neighborhood corridors in Mid-City area to support regional low-stress bicycle networkFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,807 1,807 312 1,495 1,807CITY FUNDS 483 483 83 400 483LAF9520 Total 2,290 2,290 395 1,895 2,290

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9527 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 2

Description: PTC 3,972 Agency LOS ANGELES, CITY OF

Project will construct a 3.1 mile cycletrack along Chandler Boulevard, connectin the Chandler and Orange Line Bike Paths and bridging a gap in the low-stress bicycle network

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 3,177 3,177 459 2,718 3,177CITY FUNDS 795 795 115 680 795LAF9527 Total 3,972 3,972 574 3,398 3,972

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9803 Los Angeles SCAB 1TR1023 TDM24 L EXEMPT - 93.126 2

Description: PTC 1,029 Agency LOS ANGELES, CITY OF

Create Bicycle Friendly Business Districts that coordinate with business districts to offer TDM incentives, provide app and amenities that encourage short trips by bicycle

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 206 206 56 74 76 206

Print Date: 3/23/2017 9:50:44 AM Page: 89 of 123

Page 90: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

LOCAL TRANS FUNDS 823 823 225 296 302 823LAF9803 Total 1,029 1,029 281 370 378 1,029

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M009 Los Angeles SCAB 1O1008 NCR25 L EXEMPT - 93.126 2

Description: PTC 9,843 Agency LOS ANGELES, CITY OF

Colorado Bl Pedestrian and Bicycle Active Transportation Improvements. Improved conditions for those who walk or bicycle in the Eagle Rock neighborhood of the City of Los Angeles including curb extensions, refuge median islands, sidewalk improvements, street furniture, pedestrian lighting, and bicycle lane improvements.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 20 80 100 20 80 100ACTIVE TRANSPORTATION PROGRAM - MPO

1,438 8,305 9,743 1,438 8,305 9,743

LATP16M009 Total 1,458 8,385 9,843 1,458 8,385 9,843

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S005 Los Angeles SCAB 1O1007 NCRH1 L EXEMPT - 93.127 2

Description: PTC 2,616 Agency LOS ANGELES, CITY OF

Pedestrian and Bicycle Neighborhood Intersection Enhancements. This project designs and constructs pedestrian & bicycle neighborhood intersection enhancements at 4 locations identified in the City's Mobility Plan 2035 as part of the Neighborhood Enhanced Network, with accompanying outreach and education.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 733 733 733 733CITY FUNDS 75 302 377 60 15 302 377ACTIVE TRANSPORTATION PROGRAM

300 1,206 1,506 240 60 1,206 1,506

LATP16S005 Total 375 2,241 2,616 300 75 2,241 2,616

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S006 Los Angeles SCAB 1O1008 NCN27 L TCM Committed 2

Description: PTC 5,000 Agency LOS ANGELES, CITY OF

Boyle Heights Pedestrian Linkages. Pedestrian infrastructure improvements including sidewalk repairs, 3,400 linear feet of new sidewalk, and installation of pedestrian lighting, continental crosswalks, and curb ramps to improve connectivity within community and to 6th Street Viaduct Replacement Project. Utilizing Toll Credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalACTIVE TRANSPORTATION PROGRAM

893 4,107 5,000 893 4,107 5,000

LATP16S006 Total 893 4,107 5,000 893 4,107 5,000

Print Date: 3/23/2017 9:50:44 AM Page: 90 of 123

Page 91: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1401 Los Angeles SCAB LAE1401 NCR31 L EXEMPT - 93.126 4

Description: PTC 4,820 Agency LYNWOOD

RECONSTRUCT LONG BEACH BLVD WITH MEDIANS AND IMPROVED DRAINAGE PHASE II FROM IMPERIAL HWY TO TWEEDY BLVD.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 2,300 2,300 2,300 2,300STP LOCAL 773 773 773 773PROP "C25" FUNDS 1,747 1,747 1,747 1,747LAE1401 Total 2,300 2,520 4,820 3,073 1,747 4,820

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7620 Los Angeles SCAB 1O1008 NCR30 L EXEMPT - 93.126 2

Description: PTC 2,891 Agency LYNWOOD

Community Linkages to Civic Center and Long Beach blvd Metro Station. Pedestrian safety Improvements on Bullis Rd from Martin Luther King Jr. Blvd to Fernwood Ave and from Fernwood Ave west to the Long Beach Green Line Station and ehnanced pedestrian crossings at key intervals Fernwood Ave between Bullis Rd and First Ave.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 572 572 500 72 572ACTIVE TRANSPORTATION PROGRAM - MPO

2,319 2,319 2,319 2,319

LAF7620 Total 2,891 2,891 500 2,391 2,891

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1022 Los Angeles SCAB 1AL04 NCR30 L EXEMPT - 93.126 0

Description: PTC 950 Agency MALIBU

Pacific Coast Highway at Big Rock Dr. Intersection Improvements and at La Costa Area Pedestrian Improvements. The project will involve the installation of traffic signals, addition of protected signal phases and flashings beacons.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

105 845 950 350 600 950

LA0G1022 Total 105 845 950 350 600 950

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1287 Los Angeles SCAB 1AL04 NCRH4 L EXEMPT - 93.127 2

Description: PTC 3,000 Agency MALIBU

This project is intended to improve Civic Center Way for all modes of travel by improving the curvature of the roadway.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

300 2,700 3,000 2,250 750 3,000

LA0G1287 Total 300 2,700 3,000 2,250 750 3,000

Print Date: 3/23/2017 9:50:44 AM Page: 91 of 123

Page 92: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1696 Los Angeles SCAB LAE1696 NCR27 L EXEMPT - 93.126 2

Description: PTC 2,241 Agency MANHATTAN BEACH

RECONSTRUCTION OF THE STRAND STAIRWAYS IN THE CITY OF MANHATTAN BEACH TO IMPROVE BEACH ACCESS AND ACCOMMODATE INCREASED PEDESTRIAN TRAFFIC.. Toll Credits - Local and State Hwy will be used.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 1,440 1,440 1,440 1,440STP LOCAL 481 481 481 481CITY FUNDS 320 320 320 320LAE1696 Total 320 1,921 2,241 1,760 481 2,241

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G861 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 2,028 Agency MONROVIA

Huntington Drive Phase II from Magnolia to Shamrock - Construction activities will remove/ replace damaged concrete panels,replace curbing in the median island, upgrade handicap access ramps, upgrade pedestrian counters on traffic signals, re-stripe and install pavement markers, replace street signs with new regulatory signs, crack seal and joint repairs and install bus turnouts. (aprox 0.8 mi). Utilizing toll credits to match STPL and RSTP.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 228 228 228 228STP LOCAL - REGIONAL 1,800 1,800 1,800 1,800LA0G861 Total 228 1,800 2,028 228 1,800 2,028

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE0881 Los Angeles SCAB 1OM0702 NCNH2 L EXEMPT - 93.127 0

Description: PTC 600 Agency MONTEREY PARK

Pedestrian control improvements on North Atlantic Bl. to include wireless interconnect, video detection, signal timing synchronization, and equipment upgrades. All signals on Atlantic Bl. from Hellman to Newmark Ave. would be upgraded.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 480 480 480 480CITY FUNDS 120 120 120 120LAE0881 Total 600 600 600 600

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9502 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 2

Description: PTC 3,988 Agency MONTEREY PARK

Monterey Pass Road Complete Streets Bike Project is a 1.6 mile corridor providing multimodal transportation alternatives increasing ped, bike & transit use for the first last mile.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,994 1,994 93 39 1,395 467 1,994

Print Date: 3/23/2017 9:50:44 AM Page: 92 of 123

Page 93: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C25" FUNDS 1,994 1,994 93 39 1,395 467 1,994LAF9502 Total 3,988 3,988 186 78 2,790 934 3,988

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1063 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 1,670 Agency NORWALK

Studebaker Road at Rosecrans Avenue Intersection Improvements - provide additional NB & SB left turn lanes on Studebaker, additional EB & WB left turn lanes on Rosecrans, & EB & SB right turn overlap phasing, increase NB left turn storage on Studebaker & WB left turn storage on Rosecrans, widen 2' on north side of Rosecrans east of Studebaker & south side of Rosecrans west of Studebaker within ex. ROW, modify existing median island on Rosecrans, modify traffic signals, & relocate street lightsFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

346 1,324 1,670 1,670 1,670

LA0G1063 Total 346 1,324 1,670 1,670 1,670

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1064 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 920 Agency NORWALK

Bloomfield Avenue at Imperial Highway Intersection Improvements - provide additional WB left turn lane on Imperial, protected SB left turn phasing, and NB right turn overlap phasing, increase WB & EB left turn storage on Imperial and NB & SB left turn storage on Bloomfield, widen 1' on north side of Imperial east of Bloomfield within existing ROW, modify existing median island, modify traffic signal, and relocate street lightsFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

184 736 920 920 920

LA0G1064 Total 184 736 920 920 920

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1065 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 1,510 Agency NORWALK

Pioneer Boulevard at Imperial Highway Intersection Improvements - provide additional EB left turn lane on Imperial and SB & WB right turn overlap phasing, acquire 2' ROW & widen 5' on south side of Imperial west of Pioneer within proposed ROW, modify/remove existing median island, modify traffic signal, and relocate street lightsFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

309 17 1,184 1,510 1,510 1,510

LA0G1065 Total 309 17 1,184 1,510 1,510 1,510

Print Date: 3/23/2017 9:50:45 AM Page: 93 of 123

Page 94: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1282 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 0

Description: PTC 1,407 Agency NORWALK

Rehabilitate Pioneer Boulevard from Rosecrans Avenue to Imperial Highway.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalHIGHWAY-RAILROAD CROSSING SAFETY ACCOUNT

1,375 1,375 1,375 1,375

PROP "C25" FUNDS 32 32 32 32LA0G1282 Total 1,407 1,407 1,407 1,407

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1342 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 2

Description: PTC 3,381 Agency NORWALK

Imperial Highway ITS Project, from San Gabriel River to Shoemaker Road: Traffic Signal Synchronization

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

507 2,874 3,381 3,381 3,381

LA0G1342 Total 507 2,874 3,381 3,381 3,381

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3849 Los Angeles SCAB 1O1009 NCN46 L EXEMPT - 93.126 2

Description: PTC 3,415 Agency NORWALK

Pioneer Arterial Transportation Enhancements. Construct 1 mile of landscaped median islands including gateway signage along the center of Pioneer Boulevard from Alondra Boulevard to Rosecrans Avenue. The project is located within the right-of-way of Pioneer Boulevard and extends from Alondra Boulevard to the downtown Norwalk 5-Points intersection at Rosecrans Avenue.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 631 631 631 631GENERAL FUNDS 1,575 1,575 1,575 1,575LOCAL TRANS FUNDS 1,209 1,209 1,209 1,209LAF3849 Total 3,415 3,415 2,206 1,209 3,415

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D145B Los Angeles MDAB LA0D145 CAX63 L NON-EXEMPT 4

Description: PTC 6,900 Agency PALMDALE

TIERRA SUBIDA WIDENING FROM AVENUE S TO Avenue Rayburn Rd. - FROM 2 TO 4 LANES; WITH TRAFFIC SIGNALS, STREETLIGHTS, RAISED MEDIANS, DRAINAGE IMPROVEMENTS AND PEDESTRIAN IMPROVEMENTS. Split from LA0D145.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 500 200 3,200 3,900 3,900 3,900COUNTY 3,000 3,000 3,000 3,000LA0D145B Total 500 200 6,200 6,900 3,900 3,000 6,900

Print Date: 3/23/2017 9:50:45 AM Page: 94 of 123

Page 95: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G895 Los Angeles MDAB 1AL04 CARH3 L NON-EXEMPT 5

Description: PTC 26,800 Agency PALMDALE

Widen 10th St West from 6 lanes to 8 lanes 600’ s/o Rancho Vista Blvd (RVB) to Ave O-4; Additional right turn lanes from 10th West unto NB SR138/14 on ramp and AV Mall Entrance; traffic signal upgrades and modifications at the intersections of 10th St West and RVB, AV Mall Entrance, Destination O-8, and SR 138/14 SB off-ramp; Add NB and SB right turn lanes on 10th St West at RVB; modify existing SR 138/14 on and off-ramps at 10th St West; and other required improvements.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 3,200 6,600 17,000 26,800 1,300 1,900 6,600 14,800 2,200 26,800LA0G895 Total 3,200 6,600 17,000 26,800 1,300 1,900 6,600 14,800 2,200 26,800

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1104B Los Angeles MDAB 1AL04 CAX61 L NON-EXEMPT 4

Description: PTC 58,400 Agency PALMDALE

Phase 2-Construct a railroad grade separation of Rancho Vista Boulevard at both Sierra Highway and the double-track at-grade crossing of the Southern California Regional Rail Authority (SCRRA) Metro-link and Union Pacific Railroad (UPRR) tracks. The project extends easterly on Rancho Vista Boulevard from Fairway Drive to 10th Street East and southerly on Sierra Highway from approximately 400 feet north of East Avenue O-8 to Avenue P-8Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSection 125 - Surface Transportation Priorities

475 475 475 475

CITY FUNDS 9,525 45,400 54,925 54,925 54,925MEASURE R 3,000 3,000 3,000 3,000LAF1104B Total 3,475 9,525 45,400 58,400 3,475 54,925 58,400

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1300 Los Angeles MDAB 1ITS04 ITS02 L NON-EXEMPT 5

Description: PTC 15,212 Agency PALMDALE

North County Traffic Forum ITS Expansion. Multijurisdictional project will upgrade central TOC software and signal controllers; connect to LA County IEN; and add traffic signals/corridors to existing interconnect system. (4 signals)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 534 2,400 2,934 2,257 339 338 2,934PROP "C25" FUNDS 258 12,020 12,278 8,889 1,695 1,694 12,278LAF1300 Total 792 14,420 15,212 11,146 2,034 2,032 15,212

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7121 Los Angeles SCAB 1AL04 CAX76 L NON-EXEMPT 0

Description: PTC 7,500 Agency PALMDALE

RANCHO VISTA BOULEVARD WIDENING : Widens two segments of Rancho Vista blvd (total 1.4 miles) bewteen 23rd st W and 15th st W (0.9 mile) and between Arnie Quinones Park and West Av N (0.5 miles), to accommodate 3 continuous lanes without gaps or bottlenecks, 10-ft sidewalk, and 5-ft Class III bike route in each direction.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 180 28 2,417 2,625 180 28 1,900 517 2,625

Print Date: 3/23/2017 9:50:45 AM Page: 95 of 123

Page 96: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "C25" FUNDS 334 52 4,489 4,875 334 52 3,529 960 4,875LAF7121 Total 514 80 6,906 7,500 514 80 5,429 1,477 7,500

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7304 Los Angeles MDAB 1ITS04 ITS02 L NON-EXEMPT 6

Description: PTC 3,750 Agency PALMDALE

NORTH COUNTY ITS - PALMDALE EXTENSION (Fiber from Avenue R 40th East - 70th East & Avenue S 55th East - 60th East; New signals at R/65th East, R/70th East and S/60th East, also include 8 CCTV's)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 240 160 2,600 3,000 240 160 2,600 3,000CITY FUNDS 150 50 550 750 100 100 550 750LAF7304 Total 390 210 3,150 3,750 340 260 3,150 3,750

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3501 Los Angeles SCAB 1NL04 NCR26 L TCM Committed 4

Description: PTC 2,495 Agency PASADENA

Detection of Bicycles at Signal Controlled Intersections. Bicycle detection systems at intersections controlled by traffic signals along bike corridors. Project corridor length is 15.5 miles.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 270 1,726 1,996 1,996 1,996CITY FUNDS 67 432 499 67 432 499LAF3501 Total 337 2,158 2,495 2,063 432 2,495

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3701 Los Angeles SCAB 1ITS04 TDM24 L TCM 2

Description: PTC 893 Agency PASADENA

Pasadena ARTS Enhanced Passenger Information. Enhancement of the Pasadena Area Rapid Transit System Vehicle Arrival Information System via telephone and 26-50 wayside signs..

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 210 210 210 210LOCAL TRANS FUNDS 683 683 683 683LAF3701 Total 893 893 893 893

Print Date: 3/23/2017 9:50:45 AM Page: 96 of 123

Page 97: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5305 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 1,623 Agency PASADENA

Mobility Corridors - Rose Bowl Access Systems along Colorado Bl, Lincoln Bl and Orange Grove Bl in the City of Pasadena. Signal Synchronization of 28 intersections - upgraded and signal sync. Project improvements include: new 332-type traffic-signal cabinets, advanced Type 2070 traffic-signal controllers, new vehicular video-detection systems and advanced communication systems (fiber optic cable and communication devices necessary) to allow for connectivity to the City's TMC.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 40 285 325 325 325PROP "C25" FUNDS 200 1,098 1,298 1,298 1,298LAF5305 Total 240 1,383 1,623 1,623 1,623

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7317 Los Angeles SCAB 1ITS04 ITS14 L EXEMPT - 93.128 0

Description: PTC 1,448 Agency PASADENA

PASADENA AREA RAPID TRANSIT SYSTEM TSP : Designs and installs Transit Signal Priority equipments for 23 Pasadena Area Rapid Transit System (ARTS) buses and 42 intersections. Enhancements include installation of traffic signal controllers and cabinets, and closed circuit television cameras (CCTV).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 290 290 114 176 290PROP "C25" FUNDS 1,158 1,158 455 703 1,158LAF7317 Total 1,448 1,448 569 879 1,448

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7318 Los Angeles SCAB 1ITS04 ITS14 L EXEMPT - 93.128 0

Description: PTC 2,072 Agency PASADENA

ADAPTIVE TRAFFIC CONTROL NETWORK - PHASE II : Installs adaptive traffic control capabilities along California Bl between St. John Av and Lake Av, Del Mar Bl between St. John Av to Oak Knoll Av, Arroyo Parkway between Union St to Fillmore St, and Foothill Bl between Sierra Madre Bl to Michillinda Av. Enhancements include cabinet and controller upgrades, adaptive traffic control hardware & software installation, and communication hardware to connect to the Citys fiber optics infrastructure.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 414 414 163 251 414PROP "C25" FUNDS 1,658 1,658 652 1,006 1,658LAF7318 Total 2,072 2,072 815 1,257 2,072

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9515 Los Angeles SCAB 1O1007 TDM24 L EXEMPT - 93.126 2

Description: PTC 1,990 Agency PASADENA

Pasadena is 1 of 3 pilot cities coordinating with Metro to launch a regional bike share program. The City is requesting capital cost funding to launch a bike share program.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 995 995 995 995

Print Date: 3/23/2017 9:50:45 AM Page: 97 of 123

Page 98: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

LOCAL TRANS FUNDS 995 995 995 995LAF9515 Total 1,990 1,990 1,990 1,990

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9802 Los Angeles SCAB 1TR1023 TDM24 L EXEMPT - 93.126 2

Description: PTC 465 Agency PASADENA

The SEED program will provide no-cost, short-term EV rentals to Pasadena employees to gain first-hand experience with driving Evs to their workplace and connecting to transit

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 130 130 39 91 130LOCAL TRANS FUNDS 335 335 101 234 335LAF9802 Total 465 465 140 325 465

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1105 Los Angeles SCAB 1AL04 CAX60 L NON-EXEMPT 1

Description: PTC 22,057 Agency PICO RIVERA

Bridge No. 53C0057 - Telegraph Road over San Gabriel River Bridge; 1. Demolish existing bridge with four lanes. 2. Construct, two parallel, 3-lane structures w/ CIP/PS box girders.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 190 177 2,163 2,530 5 185 177 2,163 2,530BRIDGE - LOCAL 1,469 1,364 16,694 19,527 40 1,429 1,364 16,694 19,527LA0G1105 Total 1,659 1,541 18,857 22,057 45 1,614 1,541 18,857 22,057

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1106 Los Angeles SCAB 1AL04 CAX60 L NON-EXEMPT 1

Description: PTC 33,143 Agency PICO RIVERA

Bridge No. 53C0471 - Washington Boulevard over Rio Hondo River Bridge - Replacing existing 6-lane bridge with an 8-lane bridge increasing capacity.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 351 239 3,211 3,801 5 346 3,450 3,801BRIDGE - LOCAL 2,714 1,841 24,787 29,342 40 2,674 26,628 29,342LA0G1106 Total 3,065 2,080 27,998 33,143 45 3,020 30,078 33,143

Print Date: 3/23/2017 9:50:45 AM Page: 98 of 123

Page 99: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G942 Los Angeles SCAB 7120001 NCRH1 L EXEMPT - 93.127 2

Description: PTC 1,388 Agency PICO RIVERA

Rosemead Boulevard at Whittier Boulevard Intersection Improvements - provide northbound right turn pocket and additional southbound left turn lane along Rosemead Bl. and increase eastbound and westbound left turn storage along Whittier Bl.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

124 1,264 1,388 600 788 1,388

LA0G942 Total 124 1,264 1,388 600 788 1,388

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G945 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 5

Description: PTC 8,474 Agency PICO RIVERA

Intersection Improvement - Rosemead Boulevard at Beverly Boulevard - provide southbound right turn pocket, dual right turn lanes westbound with closure of Lindell Ave, additional northbound left turn lane, additional non-capacity enhancing southbound & northbound thru lanes, overlap phasing for southbound right turn onto Beverly Bl, and restrict peak hour parking along west side of Rosemead Bl. Right of way is required, 22 feet on north side of Beverly Bl from Lindell Ave to Rosemead Bl.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 20H - HIGHWAY CAPITAL

532 6,448 1,494 8,474 4,040 4,434 8,474

LA0G945 Total 532 6,448 1,494 8,474 4,040 4,434 8,474

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7502 Los Angeles SCAB 1O1007 NCN25 L TCM Committed 2

Description: PTC 4,918 Agency PICO RIVERA

Regional Bikeway Project. The project will install a bicycle/pedestrian bridge, Class II bicycle lanes, a Class I shared- use path, traffic calming medians, sidewalks, curb ramps, signal modifications, and wayfinding signage, connecting to two regional Class I routes.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 986 986 493 493 986ACTIVE TRANSPORTATION PROGRAM

772 100 3,060 3,932 463 409 3,060 3,932

LAF7502 Total 772 100 4,046 4,918 463 902 3,553 4,918

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1135 Los Angeles SCAB 7120004 NCN25 L TCM Committed 5

Description: PTC 2,270 Agency POMONA

Design and construct 14.5 mile of new bikeways and improve pedestrian safety through crossing improvements at eight major intersections. Bike improvements include 3.8 miles of Class II buffered bike lanes, 2.9 miles of Class II bike lanes, and 7.8 miles of Class III bike routes.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 260 260 260 260

Print Date: 3/23/2017 9:50:45 AM Page: 99 of 123

Page 100: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ACTIVE TRANSPORTATION PROGRAM

2,010 2,010 2,010 2,010

LA0G1135 Total 2,270 2,270 2,270 2,270

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G865 Los Angeles SCAB 7120018 NCR93 L EXEMPT - 93.126 0

Description: PTC 143,000 Agency PORT OF LOS ANGELES

POLA Cargo Transportation Improvements - Emission Reduction (CTIER) Program - Phase 2. Berths 142-143 Backland will construct 72 acres of backland improvements; including, grading, paving, storm drain and susmp, rail, reefer racks, tele-communication system, electrical and lighting system, fire protection system, utility relocations, fencing and gates, and striping.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPORT FUNDS 14,000 102,336 116,336 103,470 12,866 116,336TRADE CORRIDOR PROGRAM 26,664 26,664 26,664 26,664LA0G865 Total 14,000 129,000 143,000 130,134 12,866 143,000

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9119 Los Angeles SCAB 1AL04 NCRH1 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 11,206 Agency PORT OF LOS ANGELES

San Pedro Waterfront Motorized/Non-Motorized Access Improvements: Harbor Boulevard & Sampson Way realignment/intersection consolidation; Class II Bike lanes (0.4 mile)

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalPROP "C25" FUNDS 4,952 4,952 2,553 2,399 4,952PORT FUNDS 6,254 6,254 3,227 3,027 6,254LAF9119 Total 11,206 11,206 5,780 5,426 11,206

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1506 Los Angeles SCAB 1NL04 NCR26 L TCM Committed 2

Description: PTC 788 Agency RANCHO PALOS VERDES

Bike Compatible Rdwy Safety and Linkage on Palos Verdes Dr. The Project will have a Class II bike lane on both sides of Palos Verdes Drive South, with an unpaved shoulder for emergency use. (Distance 1.3 miles)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 56 574 630 56 574 630CITY FUNDS 14 144 158 14 144 158LAF1506 Total 70 718 788 70 718 788

Print Date: 3/23/2017 9:50:45 AM Page: 100 of 123

Page 101: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G721 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 847 Agency REDONDO BEACH

N58 - Aviation Blvd. Intersection Improvements at Artesia Blvd. Plans, specifications, estimates, obtaining right of way, and construction of a right turn only lane on northbound Aviation Blvd at Artesia Blvd. Project No. MR312.20. FA No. MOU.MR312.20.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 125 260 462 847 515 332 847LA0G721 Total 125 260 462 847 515 332 847

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G997 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 5,175 Agency REDONDO BEACH

N18 - Intersection improvements on Inglewood Ave at Manhattan Beach Blvd. Feasibility analysis, plans, specifications, estimates, obtaining right of way, and construction of a right turn only lane on southbound Inglewood Ave at Manhattan Beach Blvd.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 310 3,000 1,865 5,175 310 4,865 5,175LA0G997 Total 310 3,000 1,865 5,175 310 4,865 5,175

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3502 Los Angeles SCAB 1NL04 NCN26 L TCM Committed 0

Description: PTC 1,949 Agency REDONDO BEACH

Redondo Beach Bicycle Transportation Plan Implementation. Implement Class II and III bike facilities identified in the City of Redondo Beach's adopted Bicycle Transportation Plan. Approximately 2.1 centerline miles of bike lanes and 15.8 centerline miles of bike routes throughout the City of Redondo Beach.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,559 1,559 1,559 1,559PROP "C20" FUNDS 390 390 390 390LAF3502 Total 1,949 1,949 1,949 1,949

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5301 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 1,535 Agency REDONDO BEACH

Grant Avenue Signal Improvements. This project is located in Redondo Beach in the South Bay subregion on Grant Av between Inglewood Av and Aviation Bl. The project will upgrade six existing traffic signals. The project involves synchronization, bike detection, signal replacement, video detection, adaptive signal coordination, wireless connection and integration into the Redondo Beach Traffic Management Center (TMC).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 12 301 313 313 313PROP "C25" FUNDS 48 1,174 1,222 1,222 1,222LAF5301 Total 60 1,475 1,535 1,535 1,535

Print Date: 3/23/2017 9:50:45 AM Page: 101 of 123

Page 102: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5129 Los Angeles SCAB LAF5129 CAX63 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 1,420 Agency ROSEMEAD

Valley Blvd Capacity Enhancement Project. Project will improve a 1.7-mile section of Valley Bl from Temple City Bl to Charlotte Av by widening and reconfiguring to accommodate an add'l peak-period travel lane in each dir, relocate traffic signals and ped lights, add raised center-median with ped lighting, landscaping, sidewalk improvements, a Class III bikelane (1.7 miles)and wayfinding signage.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalMEASURE R 15 - LOCAL RETURN 130 509 639 416 223 639PROP "C25" FUNDS 781 781 508 273 781LAF5129 Total 130 1,290 1,420 924 496 1,420

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7523 Los Angeles SCAB 1O1007 NCN26 L TCM 0

Description: PTC 1,320 Agency ROSEMEAD

ROSEMEAD/SOUTH EL MONTE REGIONAL BICYCLE CONNECTOR PROJECT: (1) Installs 7.8-mile bidirectional Class 2 bike lanes on Garvey Av, on Walnut Grove St, and on Rush St. (2) Installs bike parking at the Rosemead Civic Center and wayfinding signage at key decision points.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 924 924 924 924MEASURE R 15 - LOCAL RETURN 396 396 396 396LAF7523 Total 1,320 1,320 1,320 1,320

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3307 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 1,674 Agency SAN DIMAS

Intersection Improvements on Bonita Ave. at Cataract Ave. Installation of new traffic signal, lighting on Bonita Ave at Cataract Ave and the synchronization of existing signals along Bonita Ave between Eucla Ave and easterly City limit. New traffic signal on Bonita Avenue at Cataract Avenue, and synchronization of the existing signals on Bonita Avenue at Eucla Avenue, San Dimas Avenue, Iglesia Street, Walnut Avenue, San Dimas Canyon Road with the new signal (5 consecutive signals).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 335 335 335 335PROP "C25" FUNDS 1,339 1,339 1,339 1,339LAF3307 Total 1,674 1,674 1,674 1,674

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1012 Los Angeles SCAB 7120004 NCN26 L TCM 0

Description: PTC 182 Agency SAN FERNANDO

Citywide Bike-way and Bicycle Parking Project: Establish Class II and III bike lanes (total of 15 miles), install signage, bicycle detection loops, and bike racks.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 18 18 18 18

Print Date: 3/23/2017 9:50:45 AM Page: 102 of 123

Page 103: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

LOCAL TRANS FUNDS 164 164 164 164LA0G1012 Total 182 182 182 182

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1505 Los Angeles SCAB 1O1007 NCN25 L NON-REPORTABLE TCM 2

Description: PTC 2,495 Agency SAN FERNANDO

San Fernando Pacoima Wash Bike Path. The San Fernando Pacoima Wash Bike Path will be a 1.6-mile long Class I facility along the Pacoima Wash in San Fernando. It includes 3 bridges, 5 overpasses and 8 access points.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,513 1,513 1,513 1,513CITY FUNDS 149 833 982 982 982LAF1505 Total 149 2,346 2,495 2,495 2,495

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9313 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 2

Description: PTC 968 Agency SAN FERNANDO

This project improves operation of 6 major arterials by synchronizing 35 intersections along 6 corridors, minor lane/signal modification & installation of 3 changeable message signs.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalAGENCY 193 193 19 153 21 193PROP "C25" FUNDS 775 775 77 613 85 775LAF9313 Total 968 968 96 766 106 968

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE2389 Los Angeles SCAB LAE2389 NCR27 L EXEMPT - 93.126 0

Description: PTC 1,184 Agency SAN GABRIEL

Las Tunas Drive Streetscape/Pedestrian Enhancements. Las Tunas Drive from Bridge Street to Sycamore Drive. Construct landscaped medians, street furniture, enhanced crosswalks, and reconstruct ADA curb ramps.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 641 641 641 641DEMO-SAFETEA-LU 50 70 120 120 120GENERAL FUNDS 320 103 423 423 423LAE2389 Total 370 814 1,184 1,184 1,184

Print Date: 3/23/2017 9:50:45 AM Page: 103 of 123

Page 104: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF1100 Los Angeles SCAB 1OM0702 NCNH2 L EXEMPT - 93.127 0

Description: PTC 130 Agency SAN GABRIEL

San Gabriel Blvd. Intersection Improvements at Broadway and at Las Tunas. Modify & upgrade traffic signals for improved efficiency and install ADA compliant ramps as needed. Project will use Toll Credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 130 130 130 130LAF1100 Total 130 130 130 130

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA990359 Los Angeles SCAB LA990359 NCN31 L TCM Committed 6

Description: PTC 1,521,708 Agency SAN GABRIEL VALLEY COG

GRADE SEP XINGS SAFETY IMPR; 35- MI FREIGHT RAIL CORR. THRGH SAN.GAB. VALLEY - EAST. L.A. TO POMONA ALONG UPRR ALHAMBRA &L.A. SUBDIV - ITS 2318 SAFETEA #2178;1436 #1934 PPNO 2318. NOGALES(LA) PROJECT INCLUDES WIDENING FROM 2 TRAVEL LANES TO 4 TRAVEL LANES OF E.WALNUT DRIVE NO. EAST OF NOGALES FOR 2600 LINEAR FEET AND WIDENING FROM 2 TRAVEL LANES TO 4 TRAVEL LANES OF GALE AVE. WEST OF NOGALES FOR 1900 LINEAR FEET.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 6,347 6,347 6,347 6,347DEMO - ISTEA 6,936 6,936 6,936 6,936DEMO-SAFETEA-LU 3,791 34,966 3,955 42,712 38,757 72 3,883 42,712DEMO - TEA 21 29,585 39,163 79,615 148,363 145,042 3,321 148,363NAT'L CORRIDOR INFRASTRUCTURE IMP PROGRAM

68 1,813 1,881 1,881 1,881

PROJECTS OF NATIONAL AND REGIONAL SIGNIFICANCE

15,562 2,878 12,810 31,250 31,250 31,250

Section 125 - Surface Transportation Priorities

1,849 570 2,419 2,419 2,419

SURFACE TRANS PROG 4,454 12,385 30,815 47,654 47,654 47,654STP LOCAL - REGIONAL 202 202 202 202FEDERAL RAILROAD ADMINISTRATION EARMARK

1,109 1,476 2,585 2,544 41 2,585

AGENCY 30,000 30,000 30,000 30,000MEASURE R 50,100 152,400 91,500 294,000 135,000 159,000 294,000PROP "C10" FUNDS 133 137 270 270 270PROP "C25" FUNDS 22,850 44,388 234,106 301,344 291,365 9,979 301,344STATE TRANSIT ASSISTANCE - PROPOSITION 1B FUNDS

43,906 43,906 25,600 18,306 43,906

STATE PUC 25,000 25,000 25,000 25,000STATE CASH - IIP 486 556 1,042 1,042 1,042TRADE CORRIDOR PROGRAM 405,497 405,497 405,497 405,497TRAFFIC CONGESTION RELIEF 6,900 5,500 117,900 130,300 130,300 130,300LA990359 Total 133,375 302,128 1,086,205 1,521,708 1,326,904 190,921 3,883 1,521,708

Print Date: 3/23/2017 9:50:45 AM Page: 104 of 123

Page 105: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7119 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 4

Description: PTC 1,445 Agency SAN MARINO

HUNTINGTON DRIVE MULTIMODAL CAPACITY ENHANCEMENTS : (1) Construct a second left-turn lane at the 2 intersections at San Marino Av and at San Grabiel Bl (eastbound on Huntington Dr and northbound on San Marino Av and San Gabriel Bl) to increse capacity and traffic flow. (2) Modifies signal timing to shorten the left-turn movement on Huntington Dr. (3) Extends sidewalks and enhance pedestrian facilities.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 45 461 506 45 461 506PROP "C25" FUNDS 85 854 939 85 854 939LAF7119 Total 130 1,315 1,445 130 1,315 1,445

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D476 Los Angeles SCAB LA0D476 CAX63 L TCM 0

Description: PTC 22,102 Agency SANTA CLARITA

VIA PRINCESSA EXTENSION (3 OF 3) FROM MAGIC MOUNTAIN PKWY TO GOLDEN VALLEY RD: CONSTRUCT APPROXMTLY A 1-MILE FACILITY (3 LANES IN EACH DIRECTION), OUTSIDE CURB & GUTTER, & DRAINAGE IMPRVMTFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 2,236 19,866 22,102 2,236 19,866 22,102LA0D476 Total 2,236 19,866 22,102 2,236 19,866 22,102

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G740 Los Angeles SCAB LA0G740 CAN76 L TCM 0

Description: PTC 2,300 Agency SANTA CLARITA

CONSTRUCT INTERSECTION IMPROVEMENTS, WIDEN AND RESTRIPE LYONS AVENUE FROM WILEY CANYON ROAD TO RAILROAD AVENUE TO ACCOMODATE A CHANGE FROM 4 TO 6 LANES; APPROXIMATELY 1.7 MILESFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 300 2,000 2,300 300 2,000 2,300LA0G740 Total 300 2,000 2,300 300 2,000 2,300

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G742 Los Angeles SCAB LA0G742 CAX76 L NON-EXEMPT 0

Description: PTC 1,850 Agency SANTA CLARITA

RESTRIPE ORCHARD VILLAGE ROAD FROM MCBEAN PARKWAY TO LYONS AVENUE FROM 4 TO 6 LANES; APPROXIMATELY 1.3 MILES

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 250 1,600 1,850 1,850 1,850LA0G742 Total 250 1,600 1,850 1,850 1,850

Print Date: 3/23/2017 9:50:45 AM Page: 105 of 123

Page 106: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G744 Los Angeles SCAB LA0G744 CAX76 L NON-EXEMPT 0

Description: PTC 2,300 Agency SANTA CLARITA

CONSTRUCT INTERSECTION IMPROVEMENTS, WIDEN AND RESTRIPE RAILROAD AVENUE FROM NEWHALL AVENUE TO BOUQUET CANYON ROAD TO ACCOMODATE A CHANGE FROM 4 TO 6 LANES; APPROXIMATELY 3 MILESFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 300 2,000 2,300 300 2,000 2,300LA0G744 Total 300 2,000 2,300 300 2,000 2,300

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G745 Los Angeles SCAB LA0G745 CAX76 L NON-EXEMPT 0

Description: PTC 920 Agency SANTA CLARITA

CONSTRUCT INTERSECTION IMPROVEMENTS, WIDEN AND RESTRIPE BOUQUET CANYON ROAD FROM SECO CANYON ROAD TO PLUM CANYON ROAD TO ACCOMODATE A CHANGE FROM 4 TO 6 LANES; APPROXIMATELY 2.2 MILESFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 120 800 920 120 800 920LA0G745 Total 120 800 920 120 800 920

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G746 Los Angeles SCAB LA0G746 CAX76 L NON-EXEMPT 0

Description: PTC 575 Agency SANTA CLARITA

CONSTRUCT INTERSECTION IMPROVEMENTS, WIDEN AND RESTRIPE PLUM CANYON ROAD FROM BOUQUET CANYON ROAD TO CITY LIMIT TO ACCOMODATE A CHANGE FROM 4 TO 6 LANES; APPROXIMATELY 0.5 MILESFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 75 500 575 75 500 575LA0G746 Total 75 500 575 75 500 575

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G747 Los Angeles SCAB LA0G747 CAX76 L NON-EXEMPT 0

Description: PTC 920 Agency SANTA CLARITA

CONSTRUCT INTERSECTION IMPROVEMENTS, WIDEN AND RESTRIPE WHITES CANYON ROAD FROM SOLEDAD CANYON ROAD TO CITY LIMIT TO ACCOMODATE A CHANGE FROM 4 TO 6 LANES; APPROXIMATELY 2 MILESFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 120 800 920 120 800 920LA0G747 Total 120 800 920 120 800 920

Print Date: 3/23/2017 9:50:45 AM Page: 106 of 123

Page 107: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G748 Los Angeles SCAB LA0G748 CAX76 L NON-EXEMPT 0

Description: PTC 7,708 Agency SANTA CLARITA

WIDEN AND RESTRIPE GOLDEN VALLEY ROAD FROM SOLEDAD CANYON ROAD TO SIERRA HIGHWAY FROM 4 TO 6 LANES; APPROXIMATELY 2.5 MILES, AND INSTALL TRAFFIC SIGNAL.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 250 7,458 7,708 7,208 500 7,708LA0G748 Total 250 7,458 7,708 7,208 500 7,708

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G751 Los Angeles SCAB LA0G751 CAX76 L NON-EXEMPT 0

Description: PTC 3,700 Agency SANTA CLARITA

CONSTRUCT INTERSECTION IMPORVEMENTS, WIDEN AND RESTRIPE SIERRA HIGHWAY FROM VIA PRINCESSA TO CITY LIMIT TO ACCOMODATE A CHANGE FROM 4 TO 6 LANES; APPROXIMATELY 5.5 MILESFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 500 3,200 3,700 500 3,200 3,700LA0G751 Total 500 3,200 3,700 500 3,200 3,700

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G754 Los Angeles SCAB LA0G754 CANT4 L NON-REPORTABLE TCM

COMMITTED0

Description: PTC 10,850 Agency SANTA CLARITA

Vista Canyon Road Bridge over the Santa Clara River and roadway from Vista Canyon Community (Jakes Way/Lost Canyon) to Soledad Canyon Road. Includes 750-foot long bridge, 1 lane in each direction, Class I bike lane. (bike lane less than 1 mile)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,000 9,850 10,850 1,000 9,850 10,850LA0G754 Total 1,000 9,850 10,850 1,000 9,850 10,850

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G755 Los Angeles SCAB LA0G755 CAR60 L NON-EXEMPT 2

Description: PTC 15,691 Agency SANTA CLARITA

Newhall Ranch Road Bridge widening over the San Francisquito Creek 6 to 8 lanes. From McBean Pkwy to Avenue Tibbitts. Bridge No. 53C2164

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 234 1,565 1,799 1,512 287 1,799LOCAL ADVANCE CONSTRUCTION

9,864 -9,864

BRIDGE - LOCAL 1,810 12,082 13,892 1,810 12,082 13,892LA0G755 Total 2,044 13,647 15,691 13,186 2,505 15,691

Print Date: 3/23/2017 9:50:45 AM Page: 107 of 123

Page 108: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA960170 Los Angeles SCAB LA960170 CAX66 L NON-EXEMPT 0

Description: PTC 19,478 Agency SANTA CLARITA

MAGIC MOUNTAIN PARKWAY EXTENSION FROM THE INTERSECTION OF BOUQUET CANYON/RAILROAD AVENUE TO VIA PRINCESSA (3 OF 3): CONSTRUCT A NEW ROAD AND BRIDGE WITH 3 LANES IN EACH DIRECTIONFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 1,478 18,000 19,478 1,478 18,000 19,478LA960170 Total 1,478 18,000 19,478 1,478 18,000 19,478

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA9708004 Los Angeles SCAB LA9708004 CAX66 L NON-EXEMPT 0

Description: PTC 17,550 Agency SANTA CLARITA

SANTA CLARITA PARKWAY (1 OF 3) FROM BOUQUET CYN RD/SOLEDAD CYN INSTALL NEW ROADWAY (0 TO 4 LANES) (2.5 MILE)

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 1,700 15,850 17,550 1,700 15,850 17,550LA9708004 Total 1,700 15,850 17,550 1,700 15,850 17,550

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA9910013 Los Angeles SCAB LA9910013 CAX66 L NON-EXEMPT 0

Description: PTC 46,075 Agency SANTA CLARITA

VIA PRINCESSA (1 OF 3) EXTENSION FROM GOLDEN VALLEY ROAD TO APPROXIMATELY 350M WEST OF RAINBOW GLEN DRIVE, EAST OF ISABELLA PKWY

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 4,000 30,498 34,498 34,498 34,498PROP "C25" FUNDS 11,577 11,577 11,577 11,577LA9910013 Total 4,000 42,075 46,075 34,498 11,577 46,075

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA9910014 Los Angeles SCAB LA9910014 CAX66 L NON-EXEMPT 0

Description: PTC 11,650 Agency SANTA CLARITA

VIA PRINCESSA (2 OF 3) FROM OAKRIDGE DRIVE TO MAGIC MTN PRKWAY. FROM 0 - 6 LANES; LESS THAN ONE MILE.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 1,650 10,000 11,650 1,650 10,000 11,650LA9910014 Total 1,650 10,000 11,650 1,650 10,000 11,650

Print Date: 3/23/2017 9:50:45 AM Page: 108 of 123

Page 109: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA9910016 Los Angeles SCAB LA9910016 CAX66 L NON-EXEMPT 0

Description: PTC 2,500 Agency SANTA CLARITA

SANTA CLARITA PKWY (2 OF 3) FROM SOLEDAD CYN RD TO VIA PRINCESSA (1.6 MILES); FROM 0 TO 6 LANES.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 500 2,000 2,500 500 2,000 2,500LA9910016 Total 500 2,000 2,500 500 2,000 2,500

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA9910017 Los Angeles SCAB LA9910017 CAX66 L NON-EXEMPT 0

Description: PTC 2,750 Agency SANTA CLARITA

SANTA CLARITA PKWY (3 OF 3) FROM VIA PRINCESSA TO STATE HWY 14 (1 MILE) FROM 0 TO 6 LANES.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalLOCAL TRANS FUNDS 750 2,000 2,750 750 2,000 2,750LA9910017 Total 750 2,000 2,750 750 2,000 2,750

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3300 Los Angeles SCAB 1AL04 ITS02 L TCM Committed 0

Description: PTC 3,902 Agency SANTA CLARITA

ITS Phase IV Interconnect Gap Closure and Signal Synch. This project involves re-synchronizing traffic signals on arterials, deploying an adaptive signal system, and a redundant fiber-optic interconnect system. (aprox. 40+ signals)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 107 763 870 107 763 870PROP "C25" FUNDS 371 2,661 3,032 371 2,661 3,032LAF3300 Total 478 3,424 3,902 478 3,424 3,902

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3535 Los Angeles SCAB 1NL04 NCR25 L TCM Committed 4

Description: PTC 271 Agency SANTA CLARITA

Citywide Wayfinding Program for Pedestrians and Bicyclists. Direct users to Metrolink stations and other regional trip generators, design and install wayfinding signs along the city's existing network of multi-use paths, on-street bikeways, paseos in the Valencia and Saugus neighborhoods, and sidewalks along most major roadways.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 84 133 217 217 217CITY FUNDS 21 33 54 21 33 54LAF3535 Total 105 166 271 238 33 271

Print Date: 3/23/2017 9:50:45 AM Page: 109 of 123

Page 110: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7105 Los Angeles SCAB 1AL04 CAX66 L NON-EXEMPT 0

Description: PTC 9,332 Agency SANTA CLARITA

LYONS AV/DOCKWEILER DR EXTENSION (1 of 2): Extends the two lanes in each direction on Lyons Av from Railroad Av, east for a distance of approx 500 ft to connect with a future extension planned for Dockweiler Dr. Constructs 8-ft sidewalks and Class II bike lanes on both sides. Includes ped/bike facilities and landscaping.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 3,433 3,433 38 3,395 3,433PROP "C25" FUNDS 5,899 5,899 104 5,795 5,899LAF7105 Total 9,332 9,332 142 9,190 9,332

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7301 Los Angeles SCAB 1ITS04 ITS14 L TCM 0

Description: PTC 2,916 Agency SANTA CLARITA

INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PHASE VI : (1) Coordinates signal timing along 19 corridors to enhance the adaptive systems performance. (2) Installs additional system detection at strategic locations. (3) Completes the citys fiber optic interconnection system along Avenue Scott, Avenue Stanford, and Copperhill Dr to communicate with Citys emergency operations centerFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 212 761 973 973 973PROP "C25" FUNDS 848 1,095 1,943 1,943 1,943LAF7301 Total 1,060 1,856 2,916 2,916 2,916

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9306 Los Angeles SCAB 1ITS04 ITS08 L EXEMPT - 93.126 2

Description: PTC 2,687 Agency SANTA CLARITA

ITS Phase VII will enhance safety and mobility by deploying bicycle detection, fiber optic gap closure and Connected Corridor field devices. The original scope of this project was reduced by eliminating bicycle detection at 16 intersections reducing the count from 28 to 12 intersections and $700,000.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 86 478 564 86 478 564PROP "C25" FUNDS 316 1,807 2,123 510 1,613 2,123LAF9306 Total 402 2,285 2,687 596 2,091 2,687

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9513 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 2

Description: PTC 10,180 Agency SANTA CLARITA

Railroad Avenue Class I Bike Path: Project will add 1.45 miles of Class I bike path on Railroad Avenue and enhance connectivity to the Jan Heidt newhall Metrolink Station to the City's bicycle trail networkFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 1,030 652 6,233 7,915 1,030 652 6,233 7,915PROP "C10" FUNDS 798 1,467 2,265 138 2,127 2,265LAF9513 Total 1,030 1,450 7,700 10,180 1,030 790 8,360 10,180

Print Date: 3/23/2017 9:50:46 AM Page: 110 of 123

Page 111: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0F062 Los Angeles SCAB LA0F062 ITS12 L EXEMPT - 93.126 0

Description: PTC 700 Agency SANTA MONICA

DESIGN AND CONST. OF REAL-TIME PARKING INF./GUIDANCE SYSTEM. PHASE II COVERS DOWNTOWN SANTA MONICA AREA, BOUNDED BY PICO BLVD., OCEAN AVE., WILSHIRE BLVD. AND LINCOLN BLVD.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalINTELLIGENT TRANS SYS 350 350 350 350CITY FUNDS 350 350 350 350LA0F062 Total 700 700 700 700

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1296 Los Angeles SCAB 1AL04 CAX65 L NON-EXEMPT 2

Description: PTC 17,081 Agency SANTA MONICA

BRIDGE NO. 53C1900, COLORADO AVE OVER APPIAN WAY/PROMENDAE, 0.6 MI W/O LINCOLN BLVD. Replace existing 2 lane bridge with new 2 lane bridge. 3/14/2011: Toll Credits utilized. (Lump Sum bridge project 53C1900 (5107-(033)).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalBRIDGE - LOCAL 2,512 500 14,069 17,081 1,250 1,262 500 14,069 17,081LA0G1296 Total 2,512 500 14,069 17,081 1,250 1,262 500 14,069 17,081

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA990352 Los Angeles SCAB 1OM0702 NCR30 L EXEMPT - 93.126 0

Description: PTC 7,776 Agency SANTA MONICA

PALISADES BLUFF STABILIZATION CALIFORNIA INCLINE ADJACENT (TEA21-#453)... Toll Credits - Local and State Hwy of $160 will be used to match FY18 federal funds for the CON phase.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO - TEA 21 5,629 5,629 4,827 802 5,629CITY FUNDS 1,513 634 2,147 2,147 2,147LA990352 Total 1,513 6,263 7,776 6,974 802 7,776

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3505 Los Angeles SCAB 1NL04 NCR25 L TCM Committed 2

Description: PTC 3,429 Agency SANTA MONICA

Bike Network Linkages to Exposition Light Rail Project. Bike network enhancements to support Exposition Line. Increased safety and convenience with signal detection, highly visible lane markings and new bike racks. The project area is located throughout the City of Santa Monica and no more than two miles from the proposed Exposition Light Rail line stations.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 2,057 2,057 2,057 2,057CITY FUNDS 1,372 1,372 1,372 1,372LAF3505 Total 3,429 3,429 3,429 3,429

Print Date: 3/23/2017 9:50:46 AM Page: 111 of 123

Page 112: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7320 Los Angeles SCAB 1ITS04 ITS13 L TCM 0

Description: PTC 676 Agency SANTA MONICA

SANTA MONICA - SANTA MONICA SIGNAL SYNC IMPROVEMENTS : (1) Enhances existing Traffic Management System with installation of up to sixty (60) video detection cameras (2~4 cameras at intersection) at twenty one (21) critical intersections along Wilshire Bl, Pico Bl, Ocean Av, Santa Monica Bl, Main St, Ocean Park Bl, Montana Av, and 14th St. (2) The project will also include signage and striping to minimize turn movement conflicts between mixed flow and bicycle lanes.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 135 135 135 135PROP "C25" FUNDS 541 541 541 541LAF7320 Total 676 676 676 676

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7514 Los Angeles SCAB 1O1007 NCN26 L NON-REPORTABLE TCM 2

Description: PTC 2,409 Agency SANTA MONICA

EXPO BICYCLE PATH EXTENSION: The scope includes construction of a 0.6 mile grade-separated cycle track or side path for the 17th St between Colorado Ave and Pico Blvd and the construction of 0.8 mile bike Blvd along Michigan Ave between Lincoln Blvd and 19th St including traffic bike crossing and traffic calming at 6 intersections.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 1,927 1,927 1,927 1,927CITY FUNDS 482 482 482 482LAF7514 Total 2,409 2,409 2,409 2,409

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7704 Los Angeles SCAB 1TR1023 TDM24 L EXEMPT - 93.126 0

Description: PTC 1,612 Agency SANTA MONICA

MULTI-MODAL WAYFINDING: CONGESTION REDUCTION/STATION ACCESS : Improves vehicle, pedestrian, and bicycle circulation by providing 306 wayfinding signs, 6 transit map cases, and 12 electronic parking guidance signs. It will serve the surrounding area of the Metro Expo Line stations, Downtown, and Civic Center.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 323 323 91 143 89 323LOCAL TRANS FUNDS 1,289 1,289 364 571 354 1,289LAF7704 Total 1,612 1,612 455 714 443 1,612

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7807 Los Angeles SCAB 1AL04 NCR25 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 2,016 Agency SANTA MONICA

Expo Station 4th Street Linkages to Downtown and Civic Center. Improves pedestrian and bicyclist linkages on a 0.2-mile segment of 4th Street to support safer first- and last-mile access and connectivity to the future Expo terminus station, central business district, Civic Center and other local destinations.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 60 10 333 403 30 40 333 403

Print Date: 3/23/2017 9:50:46 AM Page: 112 of 123

Page 113: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ACTIVE TRANSPORTATION PROGRAM

240 40 1,333 1,613 120 160 1,333 1,613

LAF7807 Total 300 50 1,666 2,016 150 200 1,666 2,016

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9533 Los Angeles SCAB 1O1007 NCN25 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 1,312 Agency SANTA MONICA

New bicycle connector ramp from the Regional Beach Bike Path to the Santa Monica Pier linking the City's bicycle network as well as the Santa Monica Downtown/4th Street Expo Station.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 138 912 1,050 138 912 1,050CITY FUNDS 34 228 262 34 228 262LAF9533 Total 172 1,140 1,312 172 1,140 1,312

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9625 Los Angeles SCAB 1O1008 NCR30 L EXEMPT - 93.126 2

Description: PTC 1,869 Agency SANTA MONICA

Pedestrian lighting on 17th St. (5,700 LF) & curb bulb-outs (18) for safe ped/bike connections to 17th St/SMC Expo stop & regional path by students & commuters, especially at night.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 157 1,338 1,495 157 1,338 1,495CITY FUNDS 39 335 374 39 335 374LAF9625 Total 196 1,673 1,869 196 1,673 1,869

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9807 Los Angeles SCAB 1TR1023 TDM24 L EXEMPT - 93.126 2

Description: PTC 470 Agency SANTA MONICA

Targeted multi-modal travel planning assistance & incentives coupled with promotion of shared parking options at Expo stations creating travel behavior change to/from Santa Monica

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 94 94 32 31 31 94LOCAL TRANS FUNDS 376 376 127 123 126 376LAF9807 Total 470 470 159 154 157 470

Print Date: 3/23/2017 9:50:46 AM Page: 113 of 123

Page 114: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S010 Los Angeles SCAB 7120004 NCN25 L NON-REPORTABLE TCM

COMMITTED2

Description: PTC 1,234 Agency SANTA MONICA

Michigan Ave Greenway: Completing Bike/Ped Expo Connection Over the I-10. Bike path improvements, dedicated 2-way bike lane and new bike/ped path to close gap in bike network and enhance ped access by connecting discontinuous segments of Michigan Ave. across I-10 Freeway at the 20th St. overcrossing and linking to Expo LRTFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 177 177 177 177TDA ARTICLE #3 27 8 35 70 13 22 35 70ACTIVE TRANSPORTATION PROGRAM

147 42 798 987 72 117 798 987

LATP16S010 Total 174 50 1,010 1,234 85 139 1,010 1,234

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5516 Los Angeles SCAB 7120004 NCN26 L TCM Committed 2

Description: PTC 485 Agency SOUTH EL MONTE

Installation of Class II bike lanes on Santa Anita Ave from Klingerman St to end of City Limits south of Merced Ave (1.5 mi) and on Merced Ave from Fern Ave to Santa Anita Ave (1.3 mi) while Class III bike routes with shared-lane markings will be installed on Lerma Ave from Merced Ave to SW City Limits (0.3 mi) and on Thienes Ave from Tyler Ave to SE City Limits (1 mi). The scope of work also includes installation of bike parking at the Civic Center and wayfinding/signage.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 388 388 388 388MEASURE R 97 97 97 97LAF5516 Total 485 485 485 485

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA996347 Los Angeles SCAB LA996347 CAX60 L NON-EXEMPT 2

Description: PTC 21,396 Agency SOUTH GATE

BRIDGE NO. 53C1972, FIRESTONE BLVD, OVER LOS ANGELES RIVER, 152 m W/O LONG BEACH FREEWAY. Rehabilitate 5-lane bridge & widen to 6-lane bridge, add shoulders, and upgrade bridge railings. Fed Proj: HP21L-5257(016)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO - TEA 21 1,517 800 8,029 10,346 517 7,800 2,029 10,346CITY FUNDS 558 200 1,055 1,813 158 655 1,000 1,813PROP "C25" FUNDS 350 200 1,233 1,783 1,484 173 126 1,783BRIDGE - LOCAL 1,222 6,232 7,454 6,889 565 7,454LA996347 Total 3,647 1,200 16,549 21,396 9,048 9,193 3,155 21,396

Print Date: 3/23/2017 9:50:46 AM Page: 114 of 123

Page 115: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF3124 Los Angeles SCAB LAF3124 CAX63 L NON-EXEMPT 2

Description: PTC 16,668 Agency SOUTH GATE

Firestone Boulevard Capacity Improvements. Increase the number of lanes from 4 to 6 on Firestone Blvd within the ROW, raised LS medians, sidewalks, bus shelters & pullouts, c&g, street lighting, & utility relocation..Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 557 662 1,219 857 362 1,219MEASURE R 20H - HIGHWAY CAPITAL

6,000 6,000 6,000 6,000

PROP "C25" FUNDS 969 8,480 9,449 3,014 6,435 9,449LAF3124 Total 1,526 15,142 16,668 3,871 12,797 16,668

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7309 Los Angeles SCAB 1ITS04 ITS02 L TCM 0

Description: PTC 1,646 Agency SOUTH GATE

TWEEDY BOULEVARD SIGNAL SYNCHRONIZATION PROJECT : (1) Interconnects 18 traffic signals using fiber optic cable and wireless communications (2) synchronizes signal timing to improve traffic flow, and reduces delays along the 2.7-mile arterial. (3) Install a Closed Circuit Television Camera (CCTV) at the intersection of Long Beach Bl to support the Advance Transportation Management Systems (ATMS).Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 329 329 329 329PROP "C25" FUNDS 1,317 1,317 1,317 1,317LAF7309 Total 1,646 1,646 1,646 1,646

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7612 Los Angeles SCAB 1O1008 NCR27 L NON-REPORTABLE TCM 2

Description: PTC 2,586 Agency SOUTH GATE

Long Beach Boulevard Pedestrian Improvements. Improve Long Beach Boulevard streetscape with upgraded pedestrian lighting, enhanced crosswalks, flashing beacons, sidewalk repairs, curb ramps, and bicycle racks.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 49 287 336 10 39 287 336ACTIVE TRANSPORTATION PROGRAM

327 1,923 2,250 65 262 1,923 2,250

LAF7612 Total 376 2,210 2,586 75 301 2,210 2,586

Print Date: 3/23/2017 9:50:46 AM Page: 115 of 123

Page 116: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1101 Los Angeles SCAB 7120004 NCR27 L EXEMPT - 93.126 0

Description: PTC 175 Agency SOUTH PASADENA

Pedestrian enhancements on Mission St including replacement sidewalks and repair, signage, street furniture, lighting, irrigation, trees and more.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSECTION 129 - SURFACE TRANSPORTATION PRIORITIES

145 145 145 145

GENERAL FUNDS 30 30 30 30LA0G1101 Total 175 175 175 175

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF5308 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 580 Agency SOUTH PASADENA

South Pasadena's ATMS, Central TCS and FOIC for Fair Oaks Av. This project is located in South Pasadena on Fair Oaks Av between Columbia St and Huntington Dr. It will establish a fiber-optic backbone communication system connection between 12 signals on Fair Oaks Av and City Hall and install the ATMS/central management/control system at its City Hall Building. Funds are for design and construction costs.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 14 102 116 116 116PROP "C25" FUNDS 464 464 464 464LAF5308 Total 14 566 580 580 580

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAOB422 Los Angeles SCAB LAOB422 CAX63 L NON-EXEMPT 2

Description: PTC 9,418 Agency SOUTH PASADENA

FAIR OAKS AV & SR-110 IMPROVEMENT PROJECT (ROGAN FUNDS, HR5394)Expand Exit off-ramp of 110 NB, add a hook ramp for existing on-ramp 110 SB.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalROGAN HR5394 601 2,628 5,109 8,338 601 7,737 8,338CITY FUNDS 10 43 85 138 10 128 138PROP "C25" FUNDS 68 297 577 942 68 874 942LAOB422 Total 679 2,968 5,771 9,418 679 8,739 9,418

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1269 Los Angeles SCAB 1O1009 NCR25 L TCM Committed 0

Description: PTC 17,749 Agency TEMPLE CITY

Las Tunas Corridor Complete Streets (Bike and Ped) Improvements Project. Installation of Class II bike lanes and end-of-trip facilities for 1.4 mi within the City limits from North Muscatel Ave. to eastern City limit between Rowland Ave. and South Baldwin Ave. Modify on-street parking, update pedestrian lighting and signal heads and ADA improvements. *LA0G1269 combines LAF7526, LAF7618, and LAF7812.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 350 6,557 6,907 350 6,557 6,907

Print Date: 3/23/2017 9:50:46 AM Page: 116 of 123

Page 117: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

STP LOCAL 215 215 215 215CITY FUNDS 350 10,277 10,627 350 10,277 10,627LA0G1269 Total 700 17,049 17,749 700 17,049 17,749

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G1002 Los Angeles SCAB 1ITS04 ITS02 L TCM Committed 0

Description: PTC 1,364 Agency TORRANCE

Implementation of various ITS components at locations not covered by previous 1995 Metro CFP under South Bay Signal Synchronization. This project will upgrades signals and ITS components along major arterials within the City; CCTV module and CCTV cameras, Video detection and controller upgrades at various locationsFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 465 899 1,364 465 899 1,364LA0G1002 Total 465 899 1,364 465 899 1,364

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0G994 Los Angeles SCAB 1AL04 NCRH1 L EXEMPT - 93.127 0

Description: PTC 3,479 Agency TORRANCE

Hathorne Blvd. Corridor Improvement Project:This project will install NB right turn lanes on Hawthorne blvd at the intersections of Lomita BLvd., and 182nd street. In addition it will add WB right turn lane on Hawthorne Blvd at the intersection of Emerald St. and Spencer St.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 879 2,600 3,479 479 400 2,600 3,479LA0G994 Total 879 2,600 3,479 479 400 2,600 3,479

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16M013 Los Angeles SCAB 1AL04 NCR25 L TCM Committed 2

Description: PTC 2,533 Agency TORRANCE

Downtown Torrance Active Transportation Improvement Project. The City of Torrance will enhance pedestrian and bike use in historic downtown by comprehensively overhauling 100,000 square feet of the sidewalk system in the project area, traffic striping, signs, pedestrian signals, and bicycle parking amenities.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 85 421 506 85 421 506ACTIVE TRANSPORTATION PROGRAM - MPO

340 1,687 2,027 340 1,687 2,027

LATP16M013 Total 425 2,108 2,533 425 2,108 2,533

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA000800 Los Angeles SCAB LA000800 LUM02 L EXEMPT - 93.126 2

Description: PTC 420,563 Agency VARIOUS AGENCIES

Grouped Projects for Bridge Rehabilitation and Reconstruction – HBP Program Projects are consistent with 40 CFP Part 93.126 Exempt Tables 2 categories – Widening narrow pavements or reconstruction bridges (no additional travel lanes)Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 45,663 45,663 11,984 286 4,038 679 2,249 26,427 45,663

Print Date: 3/23/2017 9:50:46 AM Page: 117 of 123

Page 118: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

LOCAL ADVANCE CONSTRUCTION

8,368 -8,368

BRIDGE - LOCAL 373,586 373,586 74,582 16,850 33,532 7,620 17,975 223,027 373,586LOCAL BRIDGE SEISMIC RETROFIT ACCOUNT

1,314 1,314 848 177 289 1,314

LA000800 Total 420,563 420,563 94,934 9,616 37,747 8,299 20,224 249,743 420,563

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA11G1 Los Angeles SCAB 1AL04 NCR31 L EXEMPT - 93.126 6

Description: PTC 368,372 Agency VARIOUS AGENCIES

Group projects for pavement resurfacing and or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93.126,127,128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no lane additions. There are projects in the grouped project listing that contain projects with toll credits.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 609 130 44 783 783 783DEMO-SAFETEA-LU 1,100 1,100 500 600 1,100DEMO - TEA 21 1,491 1,491 1,491 1,4912016 EARMARK REPURPOSING 279 279 279 279SECTION 129 - SURFACE TRANSPORTATION PRIORITIES

250 250 250 250

STP LOCAL 6,885 5,996 183,060 195,941 63,005 34,152 33,876 31,541 27,563 5,804 195,941AGENCY 1,270 1,270 70 100 1,100 1,270CITY FUNDS 8,116 9,628 43,063 60,807 18,204 19,613 16,635 3,600 2,755 60,807COUNTY 10 10 10 10GENERAL FUNDS 44 6,450 6,494 2,194 1,300 1,500 1,500 6,494LOCAL TRANS FUNDS 100 100 100 100MEASURE R 180 1,988 2,168 12 956 1,200 2,168MEASURE R 15 - LOCAL RETURN 7,000 4,500 6,646 18,146 5,146 5,000 5,000 3,000 18,146MEASURE R 20H - HIGHWAY CAPITAL

45 940 985 985 985

PROP "C20" FUNDS 8,615 10,000 19,346 37,961 24,109 4,722 3,000 3,130 3,000 37,961PROP "C25" FUNDS 345 345 90 255 345PROP C"40" FUNDS 4,500 5,000 10,742 20,242 7,242 3,000 4,000 3,000 3,000 20,242PROP "A" LOCAL RETURN 7,000 7,000 6,000 20,000 5,000 5,000 5,000 5,000 20,000LA11G1 Total 42,994 42,254 283,124 368,372 115,606 75,493 72,351 53,300 45,818 5,804 368,372

Print Date: 3/23/2017 9:50:46 AM Page: 118 of 123

Page 119: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA11G2 Los Angeles SCAB 1AL04 NCR25 L EXEMPT - 93.126 4

Description: PTC 148,968 Agency VARIOUS AGENCIES

Group projects for bicylce and pedestrian facilites. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Projects to upgrade, create, maintain, enhance, or eliminate hazards for pedestrians and cyclist facilities throughout County.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 4,381 4,000 15,595 23,976 1,155 5,821 5,000 6,000 6,000 23,976CITY FUNDS 4,029 4,000 12,597 20,626 290 5,336 5,000 5,000 5,000 20,626LOCAL TRANS FUNDS 862 862 862 862MEASURE R 4,976 4,976 4,976 4,976MEASURE R 15 - LOCAL RETURN 9,800 6,250 3,950 20,000 5,000 5,000 5,000 5,000 20,000PROP "C20" FUNDS 5,800 8,500 18,728 33,028 9,823 6,205 5,000 6,000 6,000 33,028PROP C"40" FUNDS 5,750 8,500 11,250 25,500 5,500 5,000 5,000 5,000 5,000 25,500PROP "A" FUNDS 6,250 8,000 5,750 20,000 5,000 5,000 5,000 5,000 20,000LA11G2 Total 40,986 39,250 68,732 148,968 22,606 32,362 30,000 32,000 32,000 148,968

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA11G2N Los Angeles SCAB 1AL04 NCR31 L NON-REPORTABLE TCM

COMMITTED4

Description: PTC 24,129 Agency VARIOUS AGENCIES

Group projects for bicylce and pedestrian facilites. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Projects to upgrade, create, maintain, enhance, or eliminate hazards for pedestrians and cyclist facilities throughout County, non reportable TCMs, project split from LA11G2, bicyle type projects do not exceed 1 mile and ped projects do not exceed 1/4 mile.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 755 375 6,968 8,098 3,098 3,500 500 500 500 8,098CITY FUNDS 776 266 3,313 4,355 3,225 500 500 65 65 4,355LOCAL TRANS FUNDS 2,676 2,676 2,676 2,676MEASURE R 1,000 1,000 1,000 1,000MEASURE R 15 - LOCAL RETURN 625 505 870 2,000 500 500 500 500 2,000PROP "C20" FUNDS 770 300 930 2,000 250 500 500 250 500 2,000PROP C"40" FUNDS 750 450 800 2,000 500 500 500 500 2,000PROP "A" FUNDS 675 275 1,050 2,000 500 500 500 500 2,000LA11G2N Total 4,351 2,171 17,607 24,129 9,249 7,000 3,000 2,315 2,565 24,129

Print Date: 3/23/2017 9:50:46 AM Page: 119 of 123

Page 120: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA11G3 Los Angeles SCAB 1AL04 NCR30 L EXEMPT - 93.126 4

Description: PTC 173,778 Agency VARIOUS AGENCIES

Group projects for safety and operating improvements on the local highway system throughout the County. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Railroad/highway crossing, safer Federal-aid system roads, shoulder improvements, projects that correct, improve, or eliminate a hazardous location or feature, traffic control devices and operating assistance, signalization projects (individual intersections), pavement marking demonstration projects, truck climbing laFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 200 200 200 200STP LOCAL 3,049 3,000 33,025 39,074 6,623 12,533 7,289 5,414 7,215 39,074CITY FUNDS 5,110 4,500 31,668 41,278 19,203 4,900 4,000 9,100 4,075 41,278FEE 100 210 310 310 310GENERAL FUNDS 274 200 340 814 814 814LOCAL TRANS FUNDS 70 3,354 3,424 3,424 3,424MEASURE R 5,000 10,000 15,000 15,000 15,000MEASURE R 15 - LOCAL RETURN 3,550 5,450 5,000 14,000 3,500 3,500 3,500 3,500 14,000PROP "C20" FUNDS 4,000 4,000 8,000 16,000 4,000 4,000 4,000 4,000 16,000PROP "C25" FUNDS 5,868 5,868 5,868 5,868PROP C"40" FUNDS 7,000 6,000 10,000 23,000 5,000 4,000 4,000 5,000 5,000 23,000PROP "A" FUNDS 3,720 4,280 6,000 14,000 3,500 3,500 3,500 3,500 14,000ACTIVE TRANSPORTATION PROGRAM

70 714 784 70 714 784

TRAFFIC CONGESTION RELIEF 26 26 26 26LA11G3 Total 26,969 32,430 114,379 173,778 38,044 35,927 27,003 45,514 27,290 173,778

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA11G4 Los Angeles SCAB 1AL04 NCR46 L EXEMPT - 93.126 4

Description: PTC 82,701 Agency VARIOUS AGENCIES

Group Projects for planting, landscaping, transportation system betterments, beautification and scenic easements thoughout the County (no lane additions). Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalRECREATIONAL TRAILS 35 140 175 175 175DEMO-SAFETEA-LU 960 960 960 960STP LOCAL 4,180 3,020 13,350 20,550 8,300 2,000 2,000 2,250 2,000 2,000 2,000 20,550CITY FUNDS 3,391 1,730 4,013 9,134 314 2,000 2,000 560 260 2,000 2,000 9,134COUNTY 10 10 10 10LOCAL TRANS FUNDS 89 783 872 872 872MEASURE R 1,000 1,000 8,000 10,000 5,000 5,000 10,000MEASURE R 15 - LOCAL RETURN 2,600 3,000 2,400 8,000 2,000 2,000 2,000 2,000 8,000PROP "C20" FUNDS 2,700 2,700 6,600 12,000 2,000 2,000 2,000 2,000 4,000 12,000PROP C"40" FUNDS 4,150 3,500 5,350 13,000 2,000 2,000 2,000 2,000 5,000 13,000

Print Date: 3/23/2017 9:50:46 AM Page: 120 of 123

Page 121: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

PROP "A" FUNDS 3,370 2,320 2,310 8,000 2,000 2,000 2,000 2,000 8,000LA11G4 Total 21,515 17,270 43,916 82,701 10,621 12,010 12,000 15,810 15,260 13,000 4,000 82,701

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA11G5 Los Angeles SCAB 1AL04 NCN47 L EXEMPT - 93.126 2

Description: PTC 134,066 Agency VARIOUS AGENCIES

Group projects for directional and informational signage on local roads throughout the County. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Directional and informarmational signs, sign removals, and/or systems to improve or upgrade signage mechanisms.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 2,800 2,800 2,800 2,800STP LOCAL 6,025 9,500 8,295 23,820 1,500 3,000 3,000 3,000 3,320 5,000 5,000 23,820CITY FUNDS 7,025 8,350 13,114 28,489 5,250 4,239 4,000 4,000 4,000 7,000 28,489LOCAL TRANS FUNDS 957 957 957 957MEASURE R 500 500 9,000 10,000 5,000 5,000 10,000MEASURE R 15 - LOCAL RETURN 2,650 6,200 5,150 14,000 3,500 3,500 3,500 3,500 14,000PROP "C20" FUNDS 3,430 4,420 8,150 16,000 3,500 3,500 3,500 3,500 2,000 16,000PROP C"40" FUNDS 8,700 4,300 11,000 24,000 3,500 3,500 3,500 3,500 5,000 5,000 24,000PROP "A" FUNDS 3,020 5,280 5,700 14,000 3,500 3,500 3,500 3,500 14,000LA11G5 Total 31,350 38,550 64,166 134,066 9,550 22,196 21,000 26,000 26,320 19,000 10,000 134,066

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA11G5N Los Angeles SCAB 1AL04 NCR31 L NON-REPORTABLE TCM

COMMITTED4

Description: PTC 11,108 Agency VARIOUS AGENCIES

Group projects for directional and informational signage on local roads throughout the County. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Directional and informarmational signs, sign removals, and/or systems to improve or upgrade signage mechanisms, Non reportable TCMs, project split from LA11G5.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 530 430 1,040 2,000 500 500 500 500 2,000CITY FUNDS 380 670 1,393 2,443 443 500 500 500 500 2,443LOCAL TRANS FUNDS 665 665 665 665MEASURE R 15 - LOCAL RETURN 570 610 820 2,000 500 500 500 500 2,000PROP C"40" FUNDS 800 600 600 2,000 500 500 500 500 2,000PROP "A" FUNDS 750 350 900 2,000 500 500 1,000 2,000LA11G5N Total 3,030 2,660 5,418 11,108 1,108 2,500 2,500 2,000 3,000 11,108

Print Date: 3/23/2017 9:50:46 AM Page: 121 of 123

Page 122: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLASRTS Los Angeles SCAB 7120004 LUM03 L EXEMPT - 93.126 2

Description: PTC 47,092 Agency VARIOUS AGENCIES

Grouped Projects for Safety Improvement - Safe Route to School Program (ATP Program). Projects are consistent with 40 CFR Part 93.126.

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalSTP LOCAL 95 95 95 95CITY FUNDS 217 501 3,118 3,836 1,425 2,167 217 27 3,836COUNTY 60 92 152 152 152ACTIVE TRANSPORTATION PROGRAM

5,143 2,500 28,742 36,385 29,950 2,369 2,745 1,321 36,385

ACTIVE TRANSPORTATION PROGRAM - MPO

243 5,110 5,353 2,209 1,610 333 1,201 5,353

STATE CASH 98 1,173 1,271 1,271 1,271LASRTS Total 5,761 3,001 38,330 47,092 35,007 6,146 3,295 2,644 47,092

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLA0D279 Los Angeles SCAB LA0D279 NCR36 L EXEMPT - 93.126 1

Description: PTC 24,426 Agency VERNON

ATLANTIC BLVD. BRIDGE OVER THE L.A RIVER 5/8 MILE N SLAUSON AVE, WIDEN 6 LANE BRIDGE TO ADD RIGHT TURN LANE (BRIDGE #53C0252)

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 1,164 214 1,378 1,378 1,378CITY FUNDS 302 343 234 879 379 500 879LOCAL ADVANCE CONSTRUCTION

16,707 -16,707

MEASURE R 139 1,931 2,070 139 1,931 2,070BRIDGE - LOCAL 89 3,303 16,707 20,099 1,341 2,051 16,707 20,099LA0D279 Total 1,555 3,999 18,872 24,426 3,237 21,189 24,426

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF9601 Los Angeles SCAB 1O1008 NCR27 L EXEMPT - 93.126 2

Description: PTC 3,927 Agency WEST HOLLYWOOD

Complete Street improvements including pedestrian safety/access, transit, biycle and placemaking features within the West Hollywood Design District along Melrose Ave from San Vicente Blvd to the East City Limit at Croft AvenueFund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 785 785 168 305 312 785PROP "C25" FUNDS 3,142 3,142 671 1,222 1,249 3,142LAF9601 Total 3,927 3,927 839 1,527 1,561 3,927

Print Date: 3/23/2017 9:50:46 AM Page: 122 of 123

Page 123: 2017 Federal Transportation Improvement Program …ftip.scag.ca.gov/Documents/17FTIP_Local_Amend17_01020406LA.pdf2017 Federal Transportation Improvement Program Los Angeles County

2017 Federal Transportation Improvement Program

Los Angeles CountyLocal Highway

Including Amendment 1-2 and 4-6(In $000`s)

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAE1610 Los Angeles SCAB LAE1610 NCR34 L EXEMPT - 93.126 0

Description: PTC 1,530 Agency WHITTIER

RECONSTRUCT WHITTIER BLVD AND IMPROVE PARKWAY DRAINAGE FROM PHILADELPHIA STREET TO FIVE POINTS (WASHINGTON BOULEVARD) IN WHITTIER

Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalDEMO-SAFETEA-LU 233 991 1,224 1,224 1,224CITY FUNDS 58 248 306 58 248 306LAE1610 Total 291 1,239 1,530 1,282 248 1,530

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLAF7519 Los Angeles SCAB 1O1007 NCN26 L TCM Committed 2

Description: PTC 3,089 Agency WHITTIER

WHITTIER GREENWAY TRAIL EAST EXTENSION : This project is located in the City of Whittier. It will implement a two-mile Class I bike/pedestrian path on a City-controlled easement along the Union Pacific Railroad corridor from Mills Av to Leffingwell Rd, and it will also provide a trailhead east of Mills Av. The project promotes a regional bikeway corridor by extending the 4.5-mile Whittier Greenway Trail east at the City and LA County limits. Funds are requested for design and construction.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCMAQ 307 2,151 2,458 2,458 2,458CITY FUNDS 79 552 631 631 631LAF7519 Total 386 2,703 3,089 3,089 3,089

ProjectID County Air Basin Model RTP ID Program Route Begin End System Conformity Category AmendmentLATP16S011 Los Angeles SCAB 1O1007 NCN25 L TCM Committed 2

Description: PTC 5,332 Agency WHITTIER

Whittier Greenway Trail East Extension Gap Closure. Acquisition of final 0.5 mile and construction/completion of final 2.8 miles of the 7.3-mile Whittier Greenway Trail, a Class I bicycle and pedestrian trail along southern boundary of Whittier, connecting LA & Orange County.Fund ENG R/W CON Total Prior 2016/2017 2017/2018 2018/2019 2019/2020 2020/2021 2021/2022 TotalCITY FUNDS 27 220 569 816 816 816ACTIVE TRANSPORTATION PROGRAM

150 1,216 3,150 4,516 1,366 3,150 4,516

LATP16S011 Total 177 1,436 3,719 5,332 2,182 3,150 5,332Grand Total 696,047 874,962 4,841,332 6,412,341 2,950,953 1,259,814 677,617 603,271 280,164 535,156 105,366 6,412,341

Print Date: 3/23/2017 9:50:47 AM Page: 123 of 123