2016.03 _b5u04 assignment brief_anthony chow

Upload: terwabe-wapagovski

Post on 06-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    1/11

     

    ***Assignment Soft Copy Email to “[email protected]” 

    All students are advised to keep a duplicate copy of all work submitted for reference.

    Please keep this cover and any marked pages!

    學生姓名 

    Student Name :

    聯絡電話 

    Contact Number :電郵地址 

    Email Address :

    課程名稱 

    Program Name :

      Please 

    HND in BSE HND in Cons HND in Civil

    科目名稱及編號 

    Module Code & Name :

    Unit 4 Management Principles and Application for Construction and the

    Built Environment

    講師姓名 

    Lecturer :

    Anthony Chow/ Dr. Peter Kwan 

    第一次上課日期 

    1st lesson Date:01/04/2016

    派發日期 

    Issue Date:08/04/2016

    遞交限期 

    Submission Deadline :1st submission : 03/06/2016 ; deadline : 07/07/2016

    遞交日期 

    Submission Date :

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    2/11

     課 收紀錄  Assignment Submission Records 

     Attention

      All assignments need to be submitted within 90days after distribution.

      If needed, students can apply for a 30-day extension to the college’s staffs. (ONLY 1 extension per module)

      Deferral application form should be handed in 10 days before deadline.

      To be efficient, please keep this cover and the marked pages after amendment.

      Late submission is not allowed. Any late submission will be charged HK$500 administration fee and students need to redo

    the new term’s assignment in the next intake.

      All assignments must be submitted in both hard and soft copies (USB or Email to “[email protected]).

      No plagiarism is allowed. If there is any plagiarism found, we will follow the procedures stated in the admission pack. If

    you have any enquiries, please feel free to contact our staffs.

    Submission Requirement 

    Font Times New Roman

    Font Size 12

    Spacing Single Line Spacing

    Margin 2 Centimetres (Left-side of page only)

    Printing Single Sided with Page No.

     Number of Words (Approx.) 7,500 words

    學生  / 導師交回功課 

    Submission or Take Away

    日期 

    Date

    負責職員簽處 

    Staff Signature

    1. Student– 1st Submission

    2. Lecturer– 1st Take Away

    3. Lecturer– 1st Marking Completed

    4. Student– 1st Take Away (Amendment)

    5. Student– 1st Amendment Completed

    6. Lecturer– 2n

     Take Away

    7. Lecturer– 2n

     Marking Completed

    8. Student– 2n

     Take Away (Amendment)

    9. Student– 2n

     Amendment Complete

    10. Lecturer– 3r 

     Take Away

    11. Lecturer– 3r 

     Marking Completed

    12. Student– 3r 

     Take Away ( Amendment)

    13. Student– 3r 

     Amendment Completed

    14. Lecturer– 4t Take Away

    15. Lecturer– 4t Marking Completed

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    3/11

    Assessor's comments

    Qualification

    HND in CBE

    HND in CBE (BSE)

    HND in CBE (Civil

    Engineering)

    Assessor name

    Mr. AnthonyChow/ Dr.Peter Kwan

    Second Assessor

    Unit number Unit 4  Learner name

    Assignment

    title

    Unit 4 Management Principles and Application for Construction and the Built

    Environment 

    Marking *FOR REFERENCE ONLY

    Task Subtask

    1

    1.1 1.2 1.3 1.4 1.5

    Comment:

    2

    2.1 2.2 2.3 2.4 2.5

    Comment:

    3

    3.1 3.2 3.3 3.4 3.5

    Comment:

    4

    4.1 4.2 4.3 4.4 4.5

    Comment:

    5

    5.1 5.2 5.3 5.4 5.5

    Comment:

    6

    6.1 6.2 6.3 6.4 6.5

    Comment:

    7

    7.1 7.2 7.3 7.4 7.5

    Comment:

    *Please  below if achieved.

    M1 M2 M3 D1 D2 D3

    Overall Grade

    Marker Signature

    * Grading will not be accepted if there is no signature by the Marker.

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    4/11

     

    Grading criteria Achieved?

    Learner feedback

    Assessor feedback

    Action plan

    Assessor signature Date

    Learner signature Date

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    5/11

    (For College Internal Only) 

    INTERNAL VERIFICATION –  ASSESSMENT DECISIONS

    Award

    HND in CBE

    HND in CBE (BSE)

    HND in CBE (Civil Engineering)

    Assessor Mr. Anthony Chow / Dr. Peter Kwan

    Unit(s)

    Unit 4 Management Principles and Application for Construction and the Built Environment 

    Assignment title:Management Principles and Application for Construction and the Built

    Environment 

    Learner’s name: 

    Which criteria has the assessor

    awarded?

    Pass Merit Distinction

    Do the criteria awarded match

    those targeted by the assignment brief?

    Y/N*

    Details

    Has the work been assessed

    accurately?

    Y/N*

    Details

    Is the feedback to the learner:

      Constructive  Linked to relevant grading

    criteria

      Identifying opportunities forimproved performance

    Y/N*

    Details

    Does the grading decision need

    amending?

    Y/N*

    Details

    Remedial action taken:

    Internal Verifier name

    Internal Verifier signature Date

    Confirm Action completed

    Assessor signature

    Internal verifier signature

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    6/11

    Assignment front sheet

    Learner name Assessor name

    Anthony Chow 

    Date issued Completion date Submitted on

    08/04/2016First Submission: 03/06/2016 ;

    Final Submission: 07/07/2016 Qualification Unit number and title

    HND in Construction and the Built Environment

    HND in Construction and the BuiltEnvironment (Building Services Engineering)

    HND in Construction and the Built Environment

    (Civil Engineering) 

    Unit 4 Management Principles and Application

    for Construction and the Built Environment 

    Assignmenttitle Management Principles and Application for Construction and the Built Environment 

    In this assessment you will have opportunities to provide evidence against the following criteria.Indicate the page numbers where the evidence can be found.

    Criteria

    reference

    To achieve the criteria the evidence must show that

    the student is able to:Task no. Evidence

    P1.1Explain the principles of management used in the construction

    and built environment sector.1.1

    P1.2 Explain the influence of human resources management on the performance of individuals and teams.

    1.2

    P2.1Discuss the structure and activities of the construction and built

    environment sector.2.1

    P2.2Evaluate the organisational structures and approaches used in the

    construction and built environment sector.2.2

    P2.3 Discuss how the scale and size of contracts influence business practices within the construction and built environment sector. 2.3

    P3.1Explain the use of planning in the management of construction

     projects.3.1

    P3.2 Explain how procurement scheduling and control are managed. 3.2

    P3.3 Explain how quality control and risk management are managed. 3.3

    P4.1Evaluate the procurement methods used in the construction and

     built environment sector.4.1

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    7/11

    P4.2 Explain the use of contracts to manage construction projects. 4.2

    P4.3

    Evaluate the impact of procurement techniques on the

    organisation and operation of construction firms and construction

     projects.

    4.3

    M1 Identify and apply strategies to find appropriate solutions. 1.1

    M2 Select/design and apply appropriate methods/techniques. 3.3

    M3 Present and communicate appropriate findings. 4.3

    D1Use critical reflection to evaluate own work and justify valid

    conclusions.3.1

    D2 Take responsibility for managing and organizing activities. 2.1

    D3 Demonstrate convent/lateral/creative thinking. 2.2

    Learner declaration

    I certify that the work submitted for this assignment is my own and research sources are fully

    acknowledged.

    Learner signature: Date:

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    8/11

    Assignment briefQualification HND in Construction and the Built Environment

    HND in Construction and the Built Environment(Building Services

    Engineering)

    HND in Construction and the Built Environment(Civil Engineering)

    Unit number and title Unit 4 Management Principles and Application for Construction andthe Built Environment

    Start date 08/04/2016Deadline 1st submission : 03/06/2016 ; deadline : 07/07/2016 

    Assessor name Anthony Chow

    Assignment title Management Principles and Application for Construction and the BuiltEnvironment

    The purpose of this assignment is to:1.  Understand the evolution of management principles and their application to the construction and

     built environment sector.

    2.  Understand the construction and built environment sector in terms of structures and activities.3.  Understand management techniques used in the construction and built environment sector.4.  Understand the methods of procurement and contracting used in the construction and built

    environment sector. Task 1

    Scenario:

    Management principles are important to all industries including construction and building

    industry. You are requested to study the different management principles and apply them to your

     job or project management. Assume that you are the Management trainee of a construction

    company & was asked to study the management principles and make suggestions.

    Task 1.1 (P1.1)

    Explain the principles of management used in the construction and built environment sector. You can

    also requested to study minimum five processes related to forecasting, planning, organizing, motivating,

    controlling, coordinating, communicating or other functions and elaborate how you can apply them to

    your daily work or to the building service or construction industry.

    Task 1.2 (P1.2)

    Explain the influence of human resources management on the performance of individuals and teams.

    You are requested to study the motivation theories, leadership styles, individual and team behavior, etc.

    and elaborate how they affect your or your company.

    Task 2

    Scenario:

    There are different organizational structures, activities and approaches used for different

    construction and building companies. They varies depends on size and nature of the companies.

    Task 2.1 (P2.1)

    Discuss the structure and activities of the construction and built environment sector. You are requested

    to study the Structures and activities in minimum one building service or building or construction

    company.

    Task 2.2 (P2.2)

    Evaluate the organisational structures and approaches used in the construction and built environment

    sector. Different types of organisational structures (functional, divisional, matrix, etc.) should be studied

    and one practical example of an organisational structure should be given.

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    9/11

    Task 2.3 (P2.3)

    Discuss how the scale and size of contracts influence business practices within the construction and built environment sector.

    Task 3

    Scenario:

    Project managers and engineers are the key persons involved in the management of project

    planning, resource allocation, cost management analysis and quality control.

    Task 3.1 (P3.1)

    Explain the use of planning in the management of construction or building service projects. Minimum

    three typical planning practices which you found useful in your field or your company should be should

     be elaborated.

    Task 3.2 (P3.2)

    Explain how procurement scheduling and control are managed in industry.

    Task 3.3 (P3.3)

    Explain how quality control and risk management are managed. Typical examples of how quality

    control and risk management measures can be applied in industry should be given.

    Task 4

    Scenario:

    Selection of procurement methods are one of the important activities in management of the

    projects. Every project has its characteristics and will need a particular type of procurement

    method, which can ensure the quality requirement in terms of budget, time and performance.

    Project engineers and managers are required to understand the characteristics of each different

    procurement methods in the above selection process to complete the project with success.

    Task 4.1 (P4.1)

    Evaluate the procurement methods used in the construction and built environment sector. Describe

    minimum three typical procurement methods.

    Task 4.2 (P4.2)

    Explain the use of contracts to manage construction projects in terms of time, cost, quality, insurance,

    warranty arrangements.

    Task 4.3 (P4.3)

    Evaluate the impact of procurement techniques on the organisation and operation of construction firms

    and construction projects. You should also include minimum two government initiatives.

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    10/11

    Assignment Guideline

    Qualification HND in Construction and the Built Environment

    HND in Construction and the Built Environment(Building Services

    Engineering)

    HND in Construction and the Built Environment (Civil Engineering)

    Unit number and title Unit 4 Management Principles and Application for Construction and the

    Built Environment

    Assessor name Anthony Chow

    To achieve the diffident criteria that the student should fulfil the related requirement as shown

    as follow:

    Pass Criteria and Related requirement  –   A pass grade is achieved by meeting all the

    requirements in the assessment criteria for pass for each task.

    Merit Criteria  and Related requirement  – A merit grade is achieved by meeting  all the

    criteria for M1, M2 and M3 plus all pass criteria.

    Distinction Criteria and Related requirement – 

    A distinction grade is achieved by meeting allthe criteria for D1, D2 and D3 plus all pass criteria and all merit criteria. 

    Outcome(Pass outcome - extract from Outcome from

    course document)

    Possible Evidence(Given by Lecturer to guide students how to meet the

    criteria of outcome & this evidence will be used for

    assessment of the assignment)

    Pass Criteria

    P1.1

    Explain the principles of management used in

    the construction and built environment sector.

      Demonstrate knowledge of the definitions and able todiscuss how this can be used in industry or in your

    company.

    P1.2

    Explain the influence of human resources

    management on the performance of

    individuals and teams.

      Elaborate in details the motivation theories, leadershipstyles, individual and team behaviour, etc.

    P2.1

    Discuss the structure and activities of the

    construction and built environment sector.

      Describe in details and with illustrations structuresand activities of different sectors of the construction

    industry (clients, consultants and contractors).

    P2.2

    Evaluate the organisational structures andapproaches used in the construction and built

    environment sector.

      State, with illustrations, characteristics of different

    organisational structures (functional, divisional,matrix, etc.) and give examples of organisational

    structures adopted by different firm sizes.

    P2.3

    Discuss how the scale and size of contracts

    influence business practices within the

    construction and built environment sector.

      Consider influence of scale and size of contracts oncontractor’s cash flow. 

    P3.1

    Explain the use of planning in the

    management of construction projects.

      Elaborate typical planning practice using bar charts,line of balance, and network, etc.

    P3.2Explain how procurement scheduling and

    control are managed.

      Explain how construction programme schedule andcontrol are managed e.g. time, project progress using

     bar chart, line of balance or network.

    P3.3

    Explain how quality control and riskmanagement are managed.

      State in details common quality control and riskmanagement measures.

  • 8/17/2019 2016.03 _B5U04 Assignment Brief_Anthony Chow

    11/11

    P4.1

    Evaluate the procurement methods used in the

    construction and built environment sector.

      Should cover minimum three of following generalcontracting, design-and-build, construction

    management, etc. Comparison of different

     procurement methods should also be given.

    P4.2

    Explain the use of contracts to manage

    construction projects.

      Describe the use of contract to manage time, cost andquality.

    P4.3

    Evaluate the impact of procurement

    techniques on the organisation and operation

    of construction firms and construction

     projects.

      State the impact of procurement techniques onorganisation and operation of construction firms and

    construction projects.

    Merit Criteria

    M1

    Identify and apply strategies to find

    appropriate solutions: an effective approach to

    study and research has been applied.

      You have undertaken study and research on the areasrequested with an effective approach in discussing the

    different organization structure or management issue

    or procurement management within task 1.1.

    M2

    Select/design and apply appropriatemethods/techniques: relevant theories and

    techniques have been applied.

      You have studied different techniques of management

    approach or procurement s management and thenselected and applied the relevant theories in an

    effective way within task 3.3.

    M3

    Present and communicate appropriate

    findings: appropriate structure and approach

    has been used.

      Your have presented the assignments in a well presented approach with good details in management

    approach or procurement management issue within

    task 4.3.

    Distinction Criteria 

    D1

    Use critical reflection to evaluate own work

    and justify valid conclusions: realisticimprovements have been proposed against

    defined characteristics for success

      Self-criticism of approach has taken place in assessingthe answer for management structure or procurement

    management within task 3.1.

    D2

    Take responsibility for managing and

    organising activities: autonomy and

    independence has been demonstrated

      Your work is original and shows practical experienceof your own with good details in management

    approaches or activities within task 2.1.

    D3

    Demonstrate convergent/lateral/creative

    thinking: self-evaluation has taken place

      You have applied lateral thinking to your answer in procurement/contract management within task 2.2.